Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20
Project Geographic District : 20 • Project Building Identifier: K062 • Project School Name: I.S. 62 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K062
Project School Name
I.S. 62 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PLEASE SURVEY AND ABATE IF ACM DAMAGED FLOOR IN MENS BATHROOM 120
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/1/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
3444
Total Phase Actual Spending Amount
944
Dsf Number S
SCA0000074548
20
Project Geographic District : 20 • Project Building Identifier: K062 • Project School Name: I.S. 62 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K062
Project School Name
I.S. 62 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-RESPONSE ACTION DUE TO OBSERVED DAMAGE (2120) 120 - MEN'S ROOM - CERAMIC TILE MASTIC FLOOR. 15
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/30/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/19/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
414
Total Phase Actual Spending Amount
414
Dsf Number S
SCA0000075354
22
Project Geographic District : 22 • Project Building Identifier: K063 • Project School Name: THE JOAN SNOW PRE-K CENTER
Project Geographic District
22
Project Building Identifier
K063
Project School Name
THE JOAN SNOW PRE-K CENTER
Project Type
DIIT - RESOA
Project Description
FY23 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
100000
Dsf Number S
DSF0001035399
19
Project Geographic District : 19 • Project Building Identifier: K065 • Project School Name: P.S. 65 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K065
Project School Name
P.S. 65 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035400
19
Project Geographic District : 19 • Project Building Identifier: K065 • Project School Name: ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K
Project Geographic District
19
Project Building Identifier
K065
Project School Name
ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION- SWB @ K065
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/13/2023
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
451437
Total Phase Actual Spending Amount
449563
Dsf Number S
SCA0000071882
18
Project Geographic District : 18 • Project Building Identifier: K066 • Project School Name: K771 SPED - BROOKLYN
Project Geographic District
18
Project Building Identifier
K066
Project School Name
K771 SPED - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163593
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: COY L. COX SCHOOL
Project Geographic District
13
Project Building Identifier
K067
Project School Name
COY L. COX SCHOOL
Project Type
DOE - RESOA
Project Description
FY20 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
446453
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913209
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY18 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
65543
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000867232
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: COY L. COX SCHOOL
Project Geographic District
13
Project Building Identifier
K067
Project School Name
COY L. COX SCHOOL
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
9750
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163594
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
925842
Final Estimate Of Actual Costs Through End Of Phase Amount
925842
Total Phase Actual Spending Amount
135950
Dsf Number S
DSF0001034903, DSF0001061163
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
829270
Final Estimate Of Actual Costs Through End Of Phase Amount
829270
Total Phase Actual Spending Amount
94450
Dsf Number S
DSF0001088909, DSF0001088912, DSF0001116507, DSF0001116509
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
8/16/2023
Project Phase Planned End Date
7/10/2024
Project Phase Actual End Date
1/2/2026
Project Budget Amount
165580
Final Estimate Of Actual Costs Through End Of Phase Amount
153797
Total Phase Actual Spending Amount
115734
Dsf Number S
DSF0001034649
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
14879613
Final Estimate Of Actual Costs Through End Of Phase Amount
14879613
Total Phase Actual Spending Amount
711043
Dsf Number S
DSF0001034903, DSF0001061163
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
7786361
Final Estimate Of Actual Costs Through End Of Phase Amount
7786361
Total Phase Actual Spending Amount
122909
Dsf Number S
DSF0001088909, DSF0001088912, DSF0001116507, DSF0001116509
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/16/2023
Project Phase Planned End Date
7/10/2024
Project Phase Actual End Date
1/2/2026
Project Budget Amount
282634
Final Estimate Of Actual Costs Through End Of Phase Amount
266027
Total Phase Actual Spending Amount
206992
Dsf Number S
DSF0001034649
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/10/2023
Project Phase Planned End Date
8/8/2023
Project Phase Actual End Date
4/26/2023
Project Budget Amount
21929
Final Estimate Of Actual Costs Through End Of Phase Amount
12339
Total Phase Actual Spending Amount
12339
Dsf Number S
DSF0001034649
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2023
Project Phase Planned End Date
7/25/2023
Project Phase Actual End Date
5/15/2024
Project Budget Amount
661316
Final Estimate Of Actual Costs Through End Of Phase Amount
580639
Total Phase Actual Spending Amount
554549
Dsf Number S
DSF0001034903, DSF0001061163
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
6/25/2025
Project Phase Planned End Date
11/26/2025
Project Phase Actual End Date
4/30/2026
Project Budget Amount
493413
Final Estimate Of Actual Costs Through End Of Phase Amount
302878
Total Phase Actual Spending Amount
291013
Dsf Number S
DSF0001088909, DSF0001088912, DSF0001116507, DSF0001116509
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/9/2023
Project Phase Planned End Date
6/9/2023
Project Phase Actual End Date
2/10/2023
Project Budget Amount
4873
Final Estimate Of Actual Costs Through End Of Phase Amount
3085
Total Phase Actual Spending Amount
3085
Dsf Number S
DSF0001034649
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/24/2024
Project Phase Planned End Date
10/10/2024
Project Phase Actual End Date
12/18/2024
Project Budget Amount
106641
Final Estimate Of Actual Costs Through End Of Phase Amount
149511
Total Phase Actual Spending Amount
132557
Dsf Number S
DSF0001088909, DSF0001088912, DSF0001116507, DSF0001116509
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/3/2022
Project Phase Planned End Date
10/19/2022
Project Phase Actual End Date
12/6/2022
Project Budget Amount
132263
Final Estimate Of Actual Costs Through End Of Phase Amount
211626
Total Phase Actual Spending Amount
208563
Dsf Number S
DSF0001034903, DSF0001061163
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE FLOOR AREA APPROX 5'X5' AROUND A STEAM PIPE FEEDING A RADIATOR IN ROOM 413A. AREA MARKED
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/17/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/7/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1662
Total Phase Actual Spending Amount
1662
Dsf Number S
SCA0000075436
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-DRILL 1 1/4'HOLE DIAMETER IN THE KITCHEN OFFICE FLOOR AREA TO BE DRILLED MARKED ON FLOOR
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/15/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
11227
Total Phase Actual Spending Amount
8890
Dsf Number S
SCA0000075546
13
Project Geographic District : 13 • Project Building Identifier: K067 • Project School Name: P.S. 67 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K067
Project School Name
P.S. 67 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPAIR CEILING PLASTER IN THE FOLLOWING LOCATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/7/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/5/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
63400
Total Phase Actual Spending Amount
1076
Dsf Number S
SCA0000075721
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY19 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
172357
Total Phase Actual Spending Amount
171490
Dsf Number S
DSF0000890747
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/15/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
139736
Total Phase Actual Spending Amount
36182
Dsf Number S
DSF0000913210
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/1/2023
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
487922
Total Phase Actual Spending Amount
433222
Dsf Number S
DSF0001035159
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/29/2015
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
323409
Total Phase Actual Spending Amount
320909
Dsf Number S
DSF0000778852
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
12125
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163595
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REMOVE ACM PIPE INSULATION ON SIX LINES, 3 LINES ARE IN ROOM B 28 PIPES ARE LOCATED
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/23/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/19/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
28880
Total Phase Actual Spending Amount
28130
Dsf Number S
SCA0000075464
18
Project Geographic District : 18 • Project Building Identifier: K068 • Project School Name: I.S. 68 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K068
Project School Name
I.S. 68 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT DETAILED SCOPE PROVIDED IN THE EMAIL 1001A B1 PIPE SPACE -
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/13/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/2/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
48366
Total Phase Actual Spending Amount
38841
Dsf Number S
SCA0000075599
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
250000
Dsf Number S
DSF0001163596
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
2/20/2025
Project Phase Planned End Date
1/15/2026
Project Phase Actual End Date
2/26/2026
Project Budget Amount
125017
Final Estimate Of Actual Costs Through End Of Phase Amount
112016
Total Phase Actual Spending Amount
111092
Dsf Number S
DSF0001087382
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/20/2025
Project Phase Planned End Date
1/15/2026
Project Phase Actual End Date
2/26/2026
Project Budget Amount
189080
Final Estimate Of Actual Costs Through End Of Phase Amount
171008
Total Phase Actual Spending Amount
122565
Dsf Number S
DSF0001087382
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/4/2024
Project Phase Planned End Date
9/30/2024
Project Phase Actual End Date
9/25/2024
Project Budget Amount
14670
Final Estimate Of Actual Costs Through End Of Phase Amount
9993
Total Phase Actual Spending Amount
9993
Dsf Number S
DSF0001087382
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/1/2024
Project Phase Planned End Date
7/1/2024
Project Phase Actual End Date
4/4/2024
Project Budget Amount
3260
Final Estimate Of Actual Costs Through End Of Phase Amount
2498
Total Phase Actual Spending Amount
2498
Dsf Number S
DSF0001087382
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
7/9/2025
Project Phase Planned End Date
6/3/2026
Project Phase Actual End Date
5/28/2026
Project Budget Amount
63000
Final Estimate Of Actual Costs Through End Of Phase Amount
56994
Total Phase Actual Spending Amount
52337
Dsf Number S
DSF0001085962
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
7/9/2025
Project Phase Planned End Date
6/3/2026
Project Phase Actual End Date
5/28/2026
Project Budget Amount
924000
Final Estimate Of Actual Costs Through End Of Phase Amount
585000
Total Phase Actual Spending Amount
436093
Dsf Number S
DSF0001085962
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/10/2024
Project Phase Planned End Date
9/11/2024
Project Phase Actual End Date
8/23/2024
Project Budget Amount
63000
Final Estimate Of Actual Costs Through End Of Phase Amount
93740
Total Phase Actual Spending Amount
90345
Dsf Number S
DSF0001085962
20
Project Geographic District : 20 • Project Building Identifier: K069 • Project School Name: P.S. 69 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K069
Project School Name
P.S. 69 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/6/2023
Project Phase Planned End Date
4/9/2024
Project Phase Actual End Date
3/26/2024
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
16749
Total Phase Actual Spending Amount
16749
Dsf Number S
DSF0001085962
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY26 RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
450000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163597
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2023
Project Phase Planned End Date
2/20/2024
Project Budget Amount
104930
Final Estimate Of Actual Costs Through End Of Phase Amount
406901
Total Phase Actual Spending Amount
399766
Dsf Number S
DSF0000869347
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2023
Project Phase Planned End Date
2/20/2024
Project Budget Amount
1686375
Final Estimate Of Actual Costs Through End Of Phase Amount
1530819
Total Phase Actual Spending Amount
1010174
Dsf Number S
DSF0000869347
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/18/2018
Project Phase Planned End Date
5/21/2019
Project Phase Actual End Date
5/14/2021
Project Budget Amount
74950
Final Estimate Of Actual Costs Through End Of Phase Amount
173059
Total Phase Actual Spending Amount
173059
Dsf Number S
DSF0000869347
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/25/2018
Project Phase Planned End Date
11/8/2018
Project Phase Actual End Date
12/18/2018
Project Budget Amount
14990
Final Estimate Of Actual Costs Through End Of Phase Amount
29962
Total Phase Actual Spending Amount
29962
Dsf Number S
DSF0000869347
14
Project Geographic District : 14 • Project Building Identifier: K071 • Project School Name: I.S. 71 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K071
Project School Name
I.S. 71 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE EXPOSED ACM HARD BOARD MASTIC ON WALL TO INSTALL MIRROR REPAIR AS NEEDED LOCATION: RM 311
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/16/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
26853
Total Phase Actual Spending Amount
1857
Dsf Number S
SCA0000075817
19
Project Geographic District : 19 • Project Building Identifier: K072 • Project School Name: EAST NEW YORK MIDDLE SCHOOL OF EXCELLENCE - K
Project Geographic District
19
Project Building Identifier
K072
Project School Name
EAST NEW YORK MIDDLE SCHOOL OF EXCELLENCE - K
Project Type
DOE - RESOA
Project Description
FY20 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/8/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
603731
Total Phase Actual Spending Amount
72230
Dsf Number S
DSF0000913043
19
Project Geographic District : 19 • Project Building Identifier: K072 • Project School Name: K004 SPED - BROOKLYN
Project Geographic District
19
Project Building Identifier
K072
Project School Name
K004 SPED - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163598
19
Project Geographic District : 19 • Project Building Identifier: K072 • Project School Name: EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K
Project Geographic District
19
Project Building Identifier
K072
Project School Name
EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K
Project Type
DOE - Skilled Trades
Project Description
ELEVATOR MODERNIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/1/2021
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
507296
Total Phase Actual Spending Amount
304425
Dsf Number S
DSF0000985802
19
Project Geographic District : 19 • Project Building Identifier: K072 • Project School Name: EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K
Project Geographic District
19
Project Building Identifier
K072
Project School Name
EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K
Project Type
DOE - Skilled Trades
Project Description
DEP GREEN INFRASTRUCTURE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/16/2020
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
1004106
Total Phase Actual Spending Amount
997285
Dsf Number S
DSF0000912644