Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
17
Project Geographic District : 17 • Project Building Identifier: K091 • Project School Name: P.S. 91 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K091
Project School Name
P.S. 91 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/30/2024
Project Phase Planned End Date
5/29/2024
Project Phase Actual End Date
4/2/2024
Project Budget Amount
3818
Final Estimate Of Actual Costs Through End Of Phase Amount
5925
Total Phase Actual Spending Amount
5925
Dsf Number S
DSF0001087385
17
Project Geographic District : 17 • Project Building Identifier: K091 • Project School Name: P.S. 91 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K091
Project School Name
P.S. 91 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPAIR PIPE INSULATION IN FAN ROOM, BOILER ROOM C
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/7/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/8/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
12163
Total Phase Actual Spending Amount
913
Dsf Number S
SCA0000075727
17
Project Geographic District : 17 • Project Building Identifier: K091 • Project School Name: P.S. 91 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K091
Project School Name
P.S. 91 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-RESPONSE ACTION DUE TO OBSERVED DAMAGE FROM PS CRAWL SPACE SOFT CONCRETE FILLER FLOORING MATERI
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/29/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/29/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
25246
Total Phase Actual Spending Amount
1130
Dsf Number S
SCA0000075348
17
Project Geographic District : 17 • Project Building Identifier: K092 • Project School Name: P.S. 92 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K092
Project School Name
P.S. 92 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A MULTIMEDIA CENTER
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
9394
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035599
17
Project Geographic District : 17 • Project Building Identifier: K092 • Project School Name: P.S. 92 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K092
Project School Name
P.S. 92 - BROOKLYN
Project Type
SCA Furniture & Equipment
Project Description
FY25 RESO A MOBILE SCIENCE CARTS
Project Phase Name
F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
199466
Final Estimate Of Actual Costs Through End Of Phase Amount
199466
Total Phase Actual Spending Amount
199466
Dsf Number S
DSF0001112559
13
Project Geographic District : 13 • Project Building Identifier: K093 • Project School Name: P.S. 93 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K093
Project School Name
P.S. 93 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/4/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
156950
Total Phase Actual Spending Amount
17051
Dsf Number S
DSF0000779133
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
465000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112560
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/20/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
242297
Total Phase Actual Spending Amount
238303
Dsf Number S
DSF0001008248
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/29/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
700288
Total Phase Actual Spending Amount
412852
Dsf Number S
DSF0001008254
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
108758
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035411
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY25 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
20000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112561
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
SCA CIP
Project Description
VENTILATION / FIRE ALARM SYSTEM REPLACEMENT / BMS UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/9/2024
Project Phase Planned End Date
9/8/2026
Project Budget Amount
708094
Final Estimate Of Actual Costs Through End Of Phase Amount
457063
Total Phase Actual Spending Amount
450624
Dsf Number S
DSF0001010809, DSF0001061494, DSF0001061493
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
SCA CIP
Project Description
VENTILATION / FIRE ALARM SYSTEM REPLACEMENT / BMS UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/9/2024
Project Phase Planned End Date
9/8/2026
Project Budget Amount
9967662
Final Estimate Of Actual Costs Through End Of Phase Amount
9278240
Total Phase Actual Spending Amount
5003897
Dsf Number S
DSF0001010809, DSF0001061494, DSF0001061493
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
SCA CIP
Project Description
VENTILATION / FIRE ALARM SYSTEM REPLACEMENT / BMS UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/13/2022
Project Phase Planned End Date
4/13/2023
Project Phase Actual End Date
4/25/2023
Project Budget Amount
466664
Final Estimate Of Actual Costs Through End Of Phase Amount
502275
Total Phase Actual Spending Amount
415430
Dsf Number S
DSF0001010809, DSF0001061494, DSF0001061493
15
Project Geographic District : 15 • Project Building Identifier: K094 • Project School Name: P.S. 94 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K094
Project School Name
P.S. 94 - BROOKLYN
Project Type
SCA CIP
Project Description
VENTILATION / FIRE ALARM SYSTEM REPLACEMENT / BMS UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/23/2021
Project Phase Planned End Date
4/22/2022
Project Phase Actual End Date
9/12/2022
Project Budget Amount
94564
Final Estimate Of Actual Costs Through End Of Phase Amount
87333
Total Phase Actual Spending Amount
87333
Dsf Number S
DSF0001010809, DSF0001061494, DSF0001061493
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
DIIT - Project Connect
Project Description
CLASSROOM CONNECTIVITY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2019
Project Phase Planned End Date
DIIT
Project Budget Amount
DIIT
Final Estimate Of Actual Costs Through End Of Phase Amount
445236066
Total Phase Actual Spending Amount
443306
Dsf Number S
DSF0000959783
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
DEP GREEN INFRASTRUCTURE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/5/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
1145000
Total Phase Actual Spending Amount
907626
Dsf Number S
DSF0001034209
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
4/1/2028
Project Budget Amount
282447
Final Estimate Of Actual Costs Through End Of Phase Amount
55145
Total Phase Actual Spending Amount
54936
Dsf Number S
DSF0001089252, DSF0001112403
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / ELECTRICAL SYSTEMS / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
4/25/2022
Project Phase Planned End Date
7/12/2024
Project Budget Amount
1006895
Final Estimate Of Actual Costs Through End Of Phase Amount
1568962
Total Phase Actual Spending Amount
1542318
Dsf Number S
DSF0000798421, DSF0000892368, DSF0000937647, DSF0000937645
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
4/1/2028
Project Budget Amount
2850147
Final Estimate Of Actual Costs Through End Of Phase Amount
2736449
Total Phase Actual Spending Amount
69699
Dsf Number S
DSF0001089252, DSF0001112403
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / ELECTRICAL SYSTEMS / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/25/2022
Project Phase Planned End Date
7/12/2024
Project Budget Amount
12232723
Final Estimate Of Actual Costs Through End Of Phase Amount
11545841
Total Phase Actual Spending Amount
9550791
Dsf Number S
DSF0000798421, DSF0000892368, DSF0000937647, DSF0000937645
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / ELECTRICAL SYSTEMS / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/20/2020
Project Phase Planned End Date
10/21/2020
Project Phase Actual End Date
8/3/2020
Project Budget Amount
609827
Final Estimate Of Actual Costs Through End Of Phase Amount
559890
Total Phase Actual Spending Amount
556709
Dsf Number S
DSF0000798421, DSF0000892368, DSF0000937647, DSF0000937645
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/24/2024
Project Phase Planned End Date
12/26/2024
Project Phase Actual End Date
2/25/2025
Project Budget Amount
179739
Final Estimate Of Actual Costs Through End Of Phase Amount
132538
Total Phase Actual Spending Amount
110389
Dsf Number S
DSF0001089252, DSF0001112403
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/8/2024
Project Phase Planned End Date
7/24/2024
Project Phase Actual End Date
7/22/2024
Project Budget Amount
38515
Final Estimate Of Actual Costs Through End Of Phase Amount
77043
Total Phase Actual Spending Amount
56275
Dsf Number S
DSF0001089252, DSF0001112403
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / ELECTRICAL SYSTEMS / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/3/2020
Project Phase Planned End Date
7/2/2020
Project Phase Actual End Date
5/19/2020
Project Budget Amount
125407
Final Estimate Of Actual Costs Through End Of Phase Amount
151422
Total Phase Actual Spending Amount
151422
Dsf Number S
DSF0000798421, DSF0000892368, DSF0000937647, DSF0000937645
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL ROOFTOP GARDEN
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033466
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL ROOFTOP GARDEN
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033466
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL ROOFTOP GARDEN
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033466
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL ROOFTOP GARDEN
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033466
21
Project Geographic District : 21 • Project Building Identifier: K095 • Project School Name: P.S. 95 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K095
Project School Name
P.S. 95 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PERFORM ABATEMENT & REPAIR ROOM 411 - ABATE & REPAIR WALL PLASTER (PICTURE ATTACHED IN THE EMAI
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
1/6/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
16067
Total Phase Actual Spending Amount
16067
Dsf Number S
SCA0000075257
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Geographic District
21
Project Building Identifier
K096
Project School Name
SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Type
DIIT - RESOA
Project Description
FY21 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001008522
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Geographic District
21
Project Building Identifier
K096
Project School Name
SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
65000
Total Phase Actual Spending Amount
65000
Dsf Number S
DSF0001033615
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Geographic District
21
Project Building Identifier
K096
Project School Name
SUCCESS ACADEMY CHARTER SCHOOL - BENSONHURST - NEW YORK 3
Project Type
DIIT - RESOA
Project Description
FY23 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001035412
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: I.S. 96 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K096
Project School Name
I.S. 96 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/7/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1161015
Total Phase Actual Spending Amount
26244
Dsf Number S
DSF0001087177
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: I.S. 96 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K096
Project School Name
I.S. 96 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY18 RESO A PLAYGROUNDS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/15/2018
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
8367
Dsf Number S
DSF0000866362
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: I.S. 96 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K096
Project School Name
I.S. 96 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001164030
21
Project Geographic District : 21 • Project Building Identifier: K096 • Project School Name: I.S. 96 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K096
Project School Name
I.S. 96 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPAIR WALL AND CEILING PLASTER IN THE FOLLOWING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/13/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1186
Total Phase Actual Spending Amount
436
Dsf Number S
SCA0000075775
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
855227
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001085969
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/15/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
108641
Dsf Number S
DSF0001085162
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / EXISTING BUILDING WORK
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/15/2024
Project Phase Planned End Date
4/2/2027
Project Budget Amount
806843
Final Estimate Of Actual Costs Through End Of Phase Amount
535681
Total Phase Actual Spending Amount
525909
Dsf Number S
DSF0000799391, DSF0000779204, DSF0000798193
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / EXISTING BUILDING WORK
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/15/2024
Project Phase Planned End Date
4/2/2027
Project Budget Amount
12915001
Final Estimate Of Actual Costs Through End Of Phase Amount
11852215
Total Phase Actual Spending Amount
6428689
Dsf Number S
DSF0000799391, DSF0000779204, DSF0000798193
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / EXISTING BUILDING WORK
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/21/2018
Project Phase Planned End Date
6/18/2018
Project Phase Actual End Date
2/4/2020
Project Budget Amount
602780
Final Estimate Of Actual Costs Through End Of Phase Amount
1249381
Total Phase Actual Spending Amount
1025669
Dsf Number S
DSF0000799391, DSF0000779204, DSF0000798193
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC BOILER CONVERSION / PLANYC CLIMATE CONTROL / EXISTING BUILDING WORK
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/9/2017
Project Phase Planned End Date
3/21/2018
Project Phase Actual End Date
2/21/2018
Project Budget Amount
129190
Final Estimate Of Actual Costs Through End Of Phase Amount
144850
Total Phase Actual Spending Amount
144850
Dsf Number S
DSF0000799391, DSF0000779204, DSF0000798193
21
Project Geographic District : 21 • Project Building Identifier: K097 • Project School Name: P.S. 97 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K097
Project School Name
P.S. 97 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT WALL PLASTER SPACE ID #'S 1004, 4005, 2003, 3007, 2005, 400
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/19/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/6/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
35186
Total Phase Actual Spending Amount
24436
Dsf Number S
SCA0000075621
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
ACE STEAM SYSTEM OPTIMIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/30/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
128824
Total Phase Actual Spending Amount
115538
Dsf Number S
DSF0001034407
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/8/2022
Project Phase Planned End Date
8/6/2024
Project Budget Amount
1125552
Final Estimate Of Actual Costs Through End Of Phase Amount
1176177
Total Phase Actual Spending Amount
1174618
Dsf Number S
DSF0000912354, DSF0000937704
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/8/2022
Project Phase Planned End Date
8/6/2024
Project Budget Amount
14367375
Final Estimate Of Actual Costs Through End Of Phase Amount
15438232
Total Phase Actual Spending Amount
13936827
Dsf Number S
DSF0000912354, DSF0000937704
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/13/2019
Project Phase Planned End Date
5/1/2020
Project Phase Actual End Date
11/19/2021
Project Budget Amount
638550
Final Estimate Of Actual Costs Through End Of Phase Amount
624975
Total Phase Actual Spending Amount
624975
Dsf Number S
DSF0000912354, DSF0000937704
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/7/2019
Project Phase Planned End Date
9/20/2019
Project Phase Actual End Date
11/4/2019
Project Budget Amount
127710
Final Estimate Of Actual Costs Through End Of Phase Amount
133835
Total Phase Actual Spending Amount
133442
Dsf Number S
DSF0000912354, DSF0000937704
21
Project Geographic District : 21 • Project Building Identifier: K099 • Project School Name: P.S. 99 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K099
Project School Name
P.S. 99 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE 9X9 FLOOR TILE FLOOR APPRX 2700SQFT TILES ARE BABDLY BROKEN CAUSES HAZARD 1ST FLR CORRID
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/23/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
711438
Total Phase Actual Spending Amount
3207
Dsf Number S
SCA0000075468