15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
47429
Final Estimate Of Actual Costs Through End Of Phase Amount
47429
Total Phase Actual Spending Amount
3554
Dsf Number S
DSF0001087406
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
184891
Final Estimate Of Actual Costs Through End Of Phase Amount
184891
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087406
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/18/2025
Project Phase Planned End Date
1/8/2027
Project Budget Amount
1509600
Final Estimate Of Actual Costs Through End Of Phase Amount
1388954
Total Phase Actual Spending Amount
476488
Dsf Number S
DSF0001062393
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/1/2024
Project Phase Planned End Date
12/3/2024
Project Phase Actual End Date
1/2/2025
Project Budget Amount
95200
Final Estimate Of Actual Costs Through End Of Phase Amount
139226
Total Phase Actual Spending Amount
81079
Dsf Number S
DSF0001062393
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/26/2025
Project Phase Planned End Date
6/24/2026
Project Phase Actual End Date
4/10/2026
Project Budget Amount
12862
Final Estimate Of Actual Costs Through End Of Phase Amount
14354
Total Phase Actual Spending Amount
14354
Dsf Number S
DSF0001087406
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/19/2023
Project Phase Planned End Date
5/6/2024
Project Phase Actual End Date
6/25/2024
Project Budget Amount
20400
Final Estimate Of Actual Costs Through End Of Phase Amount
41670
Total Phase Actual Spending Amount
40240
Dsf Number S
DSF0001062393
15
Project Geographic District : 15 • Project Building Identifier: K154 • Project School Name: P.S. 154 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K154
Project School Name
P.S. 154 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/8/2025
Project Phase Planned End Date
4/9/2026
Project Phase Actual End Date
12/26/2025
Project Budget Amount
3216
Final Estimate Of Actual Costs Through End Of Phase Amount
3589
Total Phase Actual Spending Amount
3589
Dsf Number S
DSF0001087406
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY24 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
62000
Total Phase Actual Spending Amount
62000
Dsf Number S
DSF0001086002
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A PA SYSTEM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112588
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
184414
Total Phase Actual Spending Amount
184414
Dsf Number S
DSF0001008671
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
176000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163113
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION / CRACKED MASONRY / ROOF LEAKS / HEATING PLANT UPGRADE / ELECTRICAL SYSTEMS / DOMESTIC PIPING / WINDOWS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
5/9/2022
Project Phase Planned End Date
5/7/2024
Project Budget Amount
1531334
Final Estimate Of Actual Costs Through End Of Phase Amount
1396525
Total Phase Actual Spending Amount
1370136
Dsf Number S
DSF0000847745, DSF0000893206, DSF0000870432, DSF0000912205, DSF0000893207, DSF0000912206, DSF0000893205
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION / CRACKED MASONRY / ROOF LEAKS / HEATING PLANT UPGRADE / ELECTRICAL SYSTEMS / DOMESTIC PIPING / WINDOWS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/9/2022
Project Phase Planned End Date
5/7/2024
Project Budget Amount
23048198
Final Estimate Of Actual Costs Through End Of Phase Amount
29198631
Total Phase Actual Spending Amount
26012355
Dsf Number S
DSF0000847745, DSF0000893206, DSF0000870432, DSF0000912205, DSF0000893207, DSF0000912206, DSF0000893205
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION / CRACKED MASONRY / ROOF LEAKS / HEATING PLANT UPGRADE / ELECTRICAL SYSTEMS / DOMESTIC PIPING / WINDOWS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/23/2019
Project Phase Planned End Date
6/24/2019
Project Phase Actual End Date
5/17/2019
Project Budget Amount
1252506
Final Estimate Of Actual Costs Through End Of Phase Amount
1190604
Total Phase Actual Spending Amount
1173136
Dsf Number S
DSF0000847745, DSF0000893206, DSF0000870432, DSF0000912205, DSF0000893207, DSF0000912206, DSF0000893205
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
SCA CIP
Project Description
WATER INFILTRATION / CRACKED MASONRY / ROOF LEAKS / HEATING PLANT UPGRADE / ELECTRICAL SYSTEMS / DOMESTIC PIPING / WINDOWS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/3/2017
Project Phase Planned End Date
10/4/2018
Project Phase Actual End Date
11/26/2018
Project Budget Amount
314342
Final Estimate Of Actual Costs Through End Of Phase Amount
143157
Total Phase Actual Spending Amount
143157
Dsf Number S
DSF0000847745, DSF0000893206, DSF0000870432, DSF0000912205, DSF0000893207, DSF0000912206, DSF0000893205
23
Project Geographic District : 23 • Project Building Identifier: K155 • Project School Name: P.S. 155 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K155
Project School Name
P.S. 155 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT 0002 - FAN ROOM - SOFT CONCRETE FILLER FLOORING MATERIAL LV
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/19/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/31/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
2201
Total Phase Actual Spending Amount
1451
Dsf Number S
SCA0000075625
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
350000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113810
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2024
Project Phase Planned End Date
10/22/2025
Project Budget Amount
113762
Final Estimate Of Actual Costs Through End Of Phase Amount
107802
Total Phase Actual Spending Amount
67414
Dsf Number S
DSF0001083802
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS / FLOOD ELIMINATION / ROOFS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
972505
Final Estimate Of Actual Costs Through End Of Phase Amount
972505
Total Phase Actual Spending Amount
136081
Dsf Number S
DSF0000986968, DSF0000938508, DSF0000938505, DSF0000938507
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2024
Project Phase Planned End Date
10/22/2025
Project Budget Amount
613786
Final Estimate Of Actual Costs Through End Of Phase Amount
612973
Total Phase Actual Spending Amount
153550
Dsf Number S
DSF0001083802
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS / FLOOD ELIMINATION / ROOFS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
15629537
Final Estimate Of Actual Costs Through End Of Phase Amount
15629537
Total Phase Actual Spending Amount
455290
Dsf Number S
DSF0000986968, DSF0000938508, DSF0000938505, DSF0000938507
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS / FLOOD ELIMINATION / ROOFS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/14/2020
Project Phase Planned End Date
6/15/2020
Project Phase Actual End Date
3/30/2021
Project Budget Amount
694646
Final Estimate Of Actual Costs Through End Of Phase Amount
447948
Total Phase Actual Spending Amount
430896
Dsf Number S
DSF0000986968, DSF0000938508, DSF0000938505, DSF0000938507
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/12/2023
Project Phase Planned End Date
3/12/2024
Project Phase Actual End Date
4/29/2024
Project Budget Amount
47621
Final Estimate Of Actual Costs Through End Of Phase Amount
125678
Total Phase Actual Spending Amount
125105
Dsf Number S
DSF0001083802
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/15/2023
Project Phase Planned End Date
10/16/2023
Project Phase Actual End Date
10/10/2023
Project Budget Amount
10583
Final Estimate Of Actual Costs Through End Of Phase Amount
21966
Total Phase Actual Spending Amount
21966
Dsf Number S
DSF0001083802
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS / FLOOD ELIMINATION / ROOFS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/4/2019
Project Phase Planned End Date
10/3/2019
Project Phase Actual End Date
12/18/2019
Project Budget Amount
138929
Final Estimate Of Actual Costs Through End Of Phase Amount
157177
Total Phase Actual Spending Amount
157161
Dsf Number S
DSF0000986968, DSF0000938508, DSF0000938505, DSF0000938507
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-RESPONSE ACTION DUE TO OBSERVED DAMAGE FROM PS 4302, 302 CLASSROOM GYPSUM BOARD 6008, 5TH FL ST
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/23/2025
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
98780
Total Phase Actual Spending Amount
3516
Dsf Number S
SCA0000074299
14
Project Geographic District : 14 • Project Building Identifier: K157 • Project School Name: P.S. 157 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K157
Project School Name
P.S. 157 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT FLOORING IN ROOMS: 418 AND 503
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/6/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
3389
Total Phase Actual Spending Amount
639
Dsf Number S
SCA0000075545
19
Project Geographic District : 19 • Project Building Identifier: K158 • Project School Name: P.S. 158 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K158
Project School Name
P.S. 158 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
88000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163723
19
Project Geographic District : 19 • Project Building Identifier: K158 • Project School Name: P.S. 158 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K158
Project School Name
P.S. 158 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
1/24/2025
Project Phase Planned End Date
12/19/2025
Project Phase Actual End Date
4/30/2026
Project Budget Amount
113691
Final Estimate Of Actual Costs Through End Of Phase Amount
112952
Total Phase Actual Spending Amount
108680
Dsf Number S
DSF0001087407
19
Project Geographic District : 19 • Project Building Identifier: K158 • Project School Name: P.S. 158 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K158
Project School Name
P.S. 158 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/24/2025
Project Phase Planned End Date
12/19/2025
Project Phase Actual End Date
4/30/2026
Project Budget Amount
175740
Final Estimate Of Actual Costs Through End Of Phase Amount
164755
Total Phase Actual Spending Amount
145018
Dsf Number S
DSF0001087407
19
Project Geographic District : 19 • Project Building Identifier: K158 • Project School Name: P.S. 158 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K158
Project School Name
P.S. 158 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/21/2024
Project Phase Planned End Date
9/16/2024
Project Phase Actual End Date
8/13/2024
Project Budget Amount
13635
Final Estimate Of Actual Costs Through End Of Phase Amount
7765
Total Phase Actual Spending Amount
7765
Dsf Number S
DSF0001087407
19
Project Geographic District : 19 • Project Building Identifier: K158 • Project School Name: P.S. 158 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K158
Project School Name
P.S. 158 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/11/2024
Project Phase Planned End Date
5/10/2024
Project Phase Actual End Date
1/11/2024
Project Budget Amount
3030
Final Estimate Of Actual Costs Through End Of Phase Amount
1941
Total Phase Actual Spending Amount
1941
Dsf Number S
DSF0001087407
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
Fast Track Projects
Project Description
ELECTRICAL WORK FOR A/C INITIATIVE / LL26 CODE COMPLIANCE/EXIT SIGN REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/18/2019
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
359763
Total Phase Actual Spending Amount
355958
Dsf Number S
DSF0000912055, DSF0000912529
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
12/15/2025
Project Phase Planned End Date
11/9/2026
Project Budget Amount
214715
Final Estimate Of Actual Costs Through End Of Phase Amount
182838
Total Phase Actual Spending Amount
62105
Dsf Number S
DSF0001087408
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/15/2025
Project Phase Planned End Date
11/9/2026
Project Budget Amount
236072
Final Estimate Of Actual Costs Through End Of Phase Amount
224032
Total Phase Actual Spending Amount
161326
Dsf Number S
DSF0001087408
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/6/2025
Project Phase Planned End Date
8/29/2025
Project Phase Actual End Date
8/19/2025
Project Budget Amount
16422
Final Estimate Of Actual Costs Through End Of Phase Amount
8320
Total Phase Actual Spending Amount
8320
Dsf Number S
DSF0001087408
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/28/2025
Project Phase Planned End Date
6/30/2025
Project Phase Actual End Date
3/6/2025
Project Budget Amount
4106
Final Estimate Of Actual Costs Through End Of Phase Amount
2080
Total Phase Actual Spending Amount
2080
Dsf Number S
DSF0001087408
19
Project Geographic District : 19 • Project Building Identifier: K159 • Project School Name: P.S. 159 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K159
Project School Name
P.S. 159 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR 12X12 FLOOR TILES LVL 3 RED/WHITE
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/9/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
93942
Total Phase Actual Spending Amount
5547
Dsf Number S
SCA0000075542
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112589
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY20 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
55000
Total Phase Actual Spending Amount
55000
Dsf Number S
DSF0000913768
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
133921
Final Estimate Of Actual Costs Through End Of Phase Amount
133921
Total Phase Actual Spending Amount
91637
Dsf Number S
DSF0001117827
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1351383
Final Estimate Of Actual Costs Through End Of Phase Amount
1351383
Total Phase Actual Spending Amount
24899
Dsf Number S
DSF0001117827
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
3/6/2026
Project Phase Planned End Date
8/6/2026
Project Budget Amount
85222
Final Estimate Of Actual Costs Through End Of Phase Amount
233872
Total Phase Actual Spending Amount
233872
Dsf Number S
DSF0001117827
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/6/2025
Project Phase Planned End Date
10/23/2025
Project Phase Actual End Date
1/16/2026
Project Budget Amount
18262
Final Estimate Of Actual Costs Through End Of Phase Amount
94018
Total Phase Actual Spending Amount
86130
Dsf Number S
DSF0001117827
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REPAIR ACM CEILING PLASTER APPROX 100SFT WALL PLASTER APPROX 500 SFT LOCATION IN 1003 A
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/2/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
20866
Total Phase Actual Spending Amount
14366
Dsf Number S
SCA0000075711
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED FLOOR TILES ROOM 201 SPACE ID 3201 ROOM 207 SPACE ID 3207
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
11/24/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/24/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
90454
Total Phase Actual Spending Amount
1316
Dsf Number S
SCA0000075159
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PERFORM ABATEMENT ROOM 101 - SPACE ID 2101 TEST BROWN AIRCELL PIPE INSULATION
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/4/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/29/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
10735
Total Phase Actual Spending Amount
2273
Dsf Number S
SCA0000075179
20
Project Geographic District : 20 • Project Building Identifier: K160 • Project School Name: P.S. 160 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K160
Project School Name
P.S. 160 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPAIR PIPE INSULATION IN ROOM 205 SPACE ID 3205 STEAM LEAK
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/19/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/7/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
19823
Total Phase Actual Spending Amount
1656
Dsf Number S
SCA0000075455
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
307000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115032
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: SUCCESS ACADEMY CROWN HEIGHTS (BROOKLYN 7)
Project Geographic District
17
Project Building Identifier
K161
Project School Name
SUCCESS ACADEMY CROWN HEIGHTS (BROOKLYN 7)
Project Type
DOE - RESOA
Project Description
FY17 RESO A PLAYGROUND REDEVELOPMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/2/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1008060
Total Phase Actual Spending Amount
997878
Dsf Number S
DSF0000844991