Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
Fast Track Projects
Project Description
CTF- CHARTER MATCH PROMETHEAN BOARDS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/29/2019
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
289087
Total Phase Actual Spending Amount
288587
Dsf Number S
DSF0000888771
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
1440000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163724
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114827
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114827
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114827
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114827
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-RESPONSE ACTION NEEDED DUE TO OBSERVED DAMAGE ABATE, TEST AS NEEDED
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/15/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
242456
Total Phase Actual Spending Amount
1983
Dsf Number S
SCA0000074744
17
Project Geographic District : 17 • Project Building Identifier: K161 • Project School Name: P.S. 161 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K161
Project School Name
P.S. 161 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPAIR WALL AND CEILING PLASTER IN THE FOLLOWING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/21/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
14354
Total Phase Actual Spending Amount
304
Dsf Number S
SCA0000075831
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/10/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1058888
Total Phase Actual Spending Amount
392836
Dsf Number S
DSF0000913228
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/11/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
216296
Total Phase Actual Spending Amount
9480
Dsf Number S
DSF0001033492
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/1/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
423370
Total Phase Actual Spending Amount
14992
Dsf Number S
DSF0001085718
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/30/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
430227
Total Phase Actual Spending Amount
262456
Dsf Number S
DSF0001008672
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / ELECTRIFICATION/HEAT PUMP SYSTEMS / WINDOWS / ELECTRICAL SERVICE UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/5/2024
Project Phase Planned End Date
8/3/2028
Project Budget Amount
2581579
Final Estimate Of Actual Costs Through End Of Phase Amount
1151820
Total Phase Actual Spending Amount
944231
Dsf Number S
DSF0001083706, DSF0001083814, DSF0001111903, DSF0001090256
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS CAMERA INSTALLATION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/15/2022
Project Phase Planned End Date
5/10/2023
Project Budget Amount
174542
Final Estimate Of Actual Costs Through End Of Phase Amount
180282
Total Phase Actual Spending Amount
100331
Dsf Number S
DSF0000960738
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / ELECTRIFICATION/HEAT PUMP SYSTEMS / WINDOWS / ELECTRICAL SERVICE UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/5/2024
Project Phase Planned End Date
8/3/2028
Project Budget Amount
41467501
Final Estimate Of Actual Costs Through End Of Phase Amount
39985301
Total Phase Actual Spending Amount
14858487
Dsf Number S
DSF0001083706, DSF0001083814, DSF0001111903, DSF0001090256
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS CAMERA INSTALLATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/15/2022
Project Phase Planned End Date
5/10/2023
Project Budget Amount
189428
Final Estimate Of Actual Costs Through End Of Phase Amount
176378
Total Phase Actual Spending Amount
146656
Dsf Number S
DSF0000960738
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS CAMERA INSTALLATION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/2/2020
Project Phase Planned End Date
12/30/2020
Project Phase Actual End Date
5/19/2021
Project Budget Amount
14697
Final Estimate Of Actual Costs Through End Of Phase Amount
22927
Total Phase Actual Spending Amount
22927
Dsf Number S
DSF0000960738
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / ELECTRIFICATION/HEAT PUMP SYSTEMS / WINDOWS / ELECTRICAL SERVICE UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/12/2024
Project Phase Planned End Date
10/3/2024
Project Phase Actual End Date
5/14/2024
Project Budget Amount
1843001
Final Estimate Of Actual Costs Through End Of Phase Amount
1964052
Total Phase Actual Spending Amount
1532349
Dsf Number S
DSF0001083706, DSF0001083814, DSF0001111903, DSF0001090256
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / ELECTRIFICATION/HEAT PUMP SYSTEMS / WINDOWS / ELECTRICAL SERVICE UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/24/2023
Project Phase Planned End Date
11/30/2023
Project Phase Actual End Date
12/27/2023
Project Budget Amount
368600
Final Estimate Of Actual Costs Through End Of Phase Amount
442870
Total Phase Actual Spending Amount
438177
Dsf Number S
DSF0001083706, DSF0001083814, DSF0001111903, DSF0001090256
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS CAMERA INSTALLATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/3/2020
Project Phase Planned End Date
10/1/2020
Project Phase Actual End Date
7/2/2020
Project Budget Amount
3266
Final Estimate Of Actual Costs Through End Of Phase Amount
5732
Total Phase Actual Spending Amount
5732
Dsf Number S
DSF0000960738
32
Project Geographic District : 32 • Project Building Identifier: K162 • Project School Name: I.S. 162 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K162
Project School Name
I.S. 162 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PLEASE DRILL THE WALL IN MARKED LOCATIONS PICTURES SHARED IN THE EMAIL- 1ST FLOOR KITCHEN & HAL
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/9/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
6005
Total Phase Actual Spending Amount
929
Dsf Number S
SCA0000075191
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 163 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 163 - BROOKLYN
Project Type
DOE - Lead Paint
Project Description
LEAD PAINT ABATEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/6/2025
Project Phase Planned End Date
DOEL
Project Budget Amount
DOEL
Final Estimate Of Actual Costs Through End Of Phase Amount
131000
Dsf Number S
NULL
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
320978
Final Estimate Of Actual Costs Through End Of Phase Amount
90923
Total Phase Actual Spending Amount
87793
Dsf Number S
DSF0001062546, DSF0001087262
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
62514
Final Estimate Of Actual Costs Through End Of Phase Amount
62514
Total Phase Actual Spending Amount
2248
Dsf Number S
DSF0001087409
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
243698
Final Estimate Of Actual Costs Through End Of Phase Amount
243698
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087409
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
2812195
Final Estimate Of Actual Costs Through End Of Phase Amount
2667993
Total Phase Actual Spending Amount
160899
Dsf Number S
DSF0001062546, DSF0001087262
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/24/2023
Project Phase Planned End Date
3/28/2024
Project Phase Actual End Date
8/13/2024
Project Budget Amount
179092
Final Estimate Of Actual Costs Through End Of Phase Amount
165865
Total Phase Actual Spending Amount
141289
Dsf Number S
DSF0001062546, DSF0001087262
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/23/2026
Project Phase Planned End Date
7/21/2026
Project Phase Actual End Date
4/7/2026
Project Budget Amount
16953
Final Estimate Of Actual Costs Through End Of Phase Amount
5749
Total Phase Actual Spending Amount
5749
Dsf Number S
DSF0001087409
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/5/2023
Project Phase Planned End Date
10/20/2023
Project Phase Actual End Date
10/17/2023
Project Budget Amount
39044
Final Estimate Of Actual Costs Through End Of Phase Amount
65004
Total Phase Actual Spending Amount
64762
Dsf Number S
DSF0001062546, DSF0001087262
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/18/2025
Project Phase Planned End Date
4/21/2026
Project Phase Actual End Date
1/23/2026
Project Budget Amount
4238
Final Estimate Of Actual Costs Through End Of Phase Amount
1437
Total Phase Actual Spending Amount
1437
Dsf Number S
DSF0001087409
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL GYMANSIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033609
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
4680
Final Estimate Of Actual Costs Through End Of Phase Amount
4680
Total Phase Actual Spending Amount
1603
Dsf Number S
DSF0000960542
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL GYMANSIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033609
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
68640
Final Estimate Of Actual Costs Through End Of Phase Amount
68640
Total Phase Actual Spending Amount
2716
Dsf Number S
DSF0000960542
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL GYMANSIUM UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033609
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/3/2021
Project Phase Planned End Date
7/2/2021
Project Phase Actual End Date
5/12/2021
Project Budget Amount
4680
Final Estimate Of Actual Costs Through End Of Phase Amount
154
Total Phase Actual Spending Amount
154
Dsf Number S
DSF0000960542
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/10/2019
Project Phase Planned End Date
3/6/2020
Project Phase Actual End Date
5/3/2021
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
6638
Total Phase Actual Spending Amount
6638
Dsf Number S
DSF0000960542
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL GYMANSIUM UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033609
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/5/2019
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
50890
Total Phase Actual Spending Amount
50890
Dsf Number S
SCA0000062808
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR DAMAGED MATERIALS WALL PLASTER LVL
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/21/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075835
20
Project Geographic District : 20 • Project Building Identifier: K163 • Project School Name: P.S. 748 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K163
Project School Name
P.S. 748 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REPAIR ALL LAYERS OF WALL PLASTER & COLUMN PLASTER, CEILING PLASTER ABATE & REMOVE AIRC
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/4/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
52506
Total Phase Actual Spending Amount
3150
Dsf Number S
SCA0000075912
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: K077 SPED - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
K077 SPED - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
65000
Total Phase Actual Spending Amount
65000
Dsf Number S
DSF0001033460
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
Complete
Project Phase Actual Start Date
1/7/2026
Project Phase Planned End Date
DIIR
Project Phase Actual End Date
4/27/2026
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112590
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY10 RESO A- AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
35000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000688243
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
3/6/2023
Project Phase Planned End Date
6/2/2024
Project Phase Actual End Date
3/16/2026
Project Budget Amount
481273
Final Estimate Of Actual Costs Through End Of Phase Amount
737264
Total Phase Actual Spending Amount
700939
Dsf Number S
DSF0000987100, DSF0001011868
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/22/2025
Project Phase Planned End Date
3/9/2028
Project Budget Amount
1025953
Final Estimate Of Actual Costs Through End Of Phase Amount
95005
Total Phase Actual Spending Amount
90898
Dsf Number S
DSF0001090294, DSF0001117908, DSF0001117909
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS / PARAPETS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/22/2025
Project Phase Planned End Date
3/9/2028
Project Budget Amount
7797099
Final Estimate Of Actual Costs Through End Of Phase Amount
7327125
Total Phase Actual Spending Amount
348835
Dsf Number S
DSF0001090294, DSF0001117908, DSF0001117909
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM REPLACEMENT
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/6/2023
Project Phase Planned End Date
6/2/2024
Project Phase Actual End Date
3/16/2026
Project Budget Amount
7621875
Final Estimate Of Actual Costs Through End Of Phase Amount
8746229
Total Phase Actual Spending Amount
7735577
Dsf Number S
DSF0000987100, DSF0001011868
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY / ROOFS / PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/22/2024
Project Phase Planned End Date
4/28/2025
Project Phase Actual End Date
4/2/2025
Project Budget Amount
502169
Final Estimate Of Actual Costs Through End Of Phase Amount
366794
Total Phase Actual Spending Amount
348102
Dsf Number S
DSF0001090294, DSF0001117908, DSF0001117909
20
Project Geographic District : 20 • Project Building Identifier: K164 • Project School Name: P.S. 164 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K164
Project School Name
P.S. 164 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM REPLACEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/2/2021
Project Phase Planned End Date
5/2/2022
Project Phase Actual End Date
8/31/2022
Project Budget Amount
338750
Final Estimate Of Actual Costs Through End Of Phase Amount
356765
Total Phase Actual Spending Amount
345381
Dsf Number S
DSF0000987100, DSF0001011868