Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/5/2026
Project Phase Planned End Date
4/30/2027
Project Budget Amount
234600
Final Estimate Of Actual Costs Through End Of Phase Amount
230824
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087418
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/9/2025
Project Phase Planned End Date
11/5/2025
Project Phase Actual End Date
10/31/2025
Project Budget Amount
16320
Final Estimate Of Actual Costs Through End Of Phase Amount
11185
Total Phase Actual Spending Amount
11185
Dsf Number S
DSF0001087418
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM / PARAPETS / EXTERIOR MASONRY / ROOFS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/21/2023
Project Phase Planned End Date
1/25/2024
Project Phase Actual End Date
4/4/2024
Project Budget Amount
1167416
Final Estimate Of Actual Costs Through End Of Phase Amount
970029
Total Phase Actual Spending Amount
883303
Dsf Number S
DSF0001008653, DSF0000987593, DSF0001012375, DSF0001012376, DSF0001085832
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/1/2025
Project Phase Planned End Date
9/2/2025
Project Phase Actual End Date
5/9/2025
Project Budget Amount
4080
Final Estimate Of Actual Costs Through End Of Phase Amount
2796
Total Phase Actual Spending Amount
2796
Dsf Number S
DSF0001087418
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / LOW VOLTAGE ELECTRICAL SYSTEM / PARAPETS / EXTERIOR MASONRY / ROOFS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/26/2021
Project Phase Planned End Date
11/22/2022
Project Phase Actual End Date
7/19/2023
Project Budget Amount
237237
Final Estimate Of Actual Costs Through End Of Phase Amount
399512
Total Phase Actual Spending Amount
392606
Dsf Number S
DSF0001008653, DSF0000987593, DSF0001012375, DSF0001012376, DSF0001085832
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
120000
Final Estimate Of Actual Costs Through End Of Phase Amount
120000
Total Phase Actual Spending Amount
41293
Dsf Number S
DSF0001112601
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1760000
Final Estimate Of Actual Costs Through End Of Phase Amount
1760000
Total Phase Actual Spending Amount
29719
Dsf Number S
DSF0001112601
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/27/2025
Project Phase Planned End Date
4/1/2026
Project Phase Actual End Date
4/7/2026
Project Budget Amount
120000
Final Estimate Of Actual Costs Through End Of Phase Amount
99353
Total Phase Actual Spending Amount
88711
Dsf Number S
DSF0001112601
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/4/2025
Project Phase Planned End Date
6/5/2025
Project Phase Actual End Date
7/1/2025
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
31864
Total Phase Actual Spending Amount
31864
Dsf Number S
DSF0001112601
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT CEILING PLASTER LVL 3 ROOMS - PRINCIPAL'S OFFICE - 3207
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/30/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
7311
Total Phase Actual Spending Amount
761
Dsf Number S
SCA0000075903
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE FLOOR TILES ROOM 307 - SPACE ID 4307, 9X9 FLOOR TILES CE: EDWARD MCLINDEN
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/16/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
883
Total Phase Actual Spending Amount
133
Dsf Number S
SCA0000075533
22
Project Geographic District : 22 • Project Building Identifier: K193 • Project School Name: P.S. 193 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K193
Project School Name
P.S. 193 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPAIR EXIT 2002V - PIPE INSULATION 14 LFT
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/14/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/21/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
12316
Total Phase Actual Spending Amount
1163
Dsf Number S
SCA0000075294
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
125000
Total Phase Actual Spending Amount
125000
Dsf Number S
DSF0001163791
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/15/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
269352
Total Phase Actual Spending Amount
77206
Dsf Number S
DSF0001033499
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/5/2026
Project Phase Planned End Date
4/30/2027
Project Budget Amount
54575
Final Estimate Of Actual Costs Through End Of Phase Amount
26747
Total Phase Actual Spending Amount
6767
Dsf Number S
DSF0001087419
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2023
Project Phase Planned End Date
11/5/2025
Project Budget Amount
771474
Final Estimate Of Actual Costs Through End Of Phase Amount
1554933
Total Phase Actual Spending Amount
1528812
Dsf Number S
DSF0001008565
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/5/2026
Project Phase Planned End Date
4/30/2027
Project Budget Amount
212750
Final Estimate Of Actual Costs Through End Of Phase Amount
206553
Total Phase Actual Spending Amount
2615
Dsf Number S
DSF0001087419
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2023
Project Phase Planned End Date
11/5/2025
Project Budget Amount
12363750
Final Estimate Of Actual Costs Through End Of Phase Amount
12331836
Total Phase Actual Spending Amount
7626213
Dsf Number S
DSF0001008565
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/29/2021
Project Phase Planned End Date
5/17/2022
Project Phase Actual End Date
2/8/2023
Project Budget Amount
549500
Final Estimate Of Actual Costs Through End Of Phase Amount
388307
Total Phase Actual Spending Amount
297898
Dsf Number S
DSF0001008565
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/9/2025
Project Phase Planned End Date
11/5/2025
Project Phase Actual End Date
10/31/2025
Project Budget Amount
14800
Final Estimate Of Actual Costs Through End Of Phase Amount
11469
Total Phase Actual Spending Amount
11469
Dsf Number S
DSF0001087419
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/26/2021
Project Phase Planned End Date
7/13/2021
Project Phase Actual End Date
11/29/2021
Project Budget Amount
109900
Final Estimate Of Actual Costs Through End Of Phase Amount
97495
Total Phase Actual Spending Amount
97495
Dsf Number S
DSF0001008565
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/5/2025
Project Phase Planned End Date
9/4/2025
Project Phase Actual End Date
5/9/2025
Project Budget Amount
3700
Final Estimate Of Actual Costs Through End Of Phase Amount
2867
Total Phase Actual Spending Amount
2867
Dsf Number S
DSF0001087419
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
4/29/2026
Project Phase Planned End Date
3/24/2027
Project Budget Amount
45000
Final Estimate Of Actual Costs Through End Of Phase Amount
58968
Total Phase Actual Spending Amount
34099
Dsf Number S
DSF0001112602
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A LIBRARY UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113574
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113574
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/29/2026
Project Phase Planned End Date
3/24/2027
Project Budget Amount
660000
Final Estimate Of Actual Costs Through End Of Phase Amount
367457
Total Phase Actual Spending Amount
26510
Dsf Number S
DSF0001112602
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A LIBRARY UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113574
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/1/2025
Project Phase Planned End Date
11/17/2025
Project Phase Actual End Date
10/23/2025
Project Budget Amount
45000
Final Estimate Of Actual Costs Through End Of Phase Amount
98935
Total Phase Actual Spending Amount
81635
Dsf Number S
DSF0001112602
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A LIBRARY UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113574
22
Project Geographic District : 22 • Project Building Identifier: K194 • Project School Name: P.S. 194 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K194
Project School Name
P.S. 194 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/17/2025
Project Phase Planned End Date
7/17/2025
Project Phase Actual End Date
6/25/2025
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
24534
Total Phase Actual Spending Amount
24534
Dsf Number S
DSF0001112602
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
250000
Dsf Number S
DSF0001163792
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY25 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
28628
Total Phase Actual Spending Amount
10227
Dsf Number S
DSF0001112603
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
1/9/2023
Project Phase Planned End Date
4/2/2024
Project Budget Amount
134028
Final Estimate Of Actual Costs Through End Of Phase Amount
534308
Total Phase Actual Spending Amount
525539
Dsf Number S
DSF0000939151
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS / WINDOWS / ROOFS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
906582
Final Estimate Of Actual Costs Through End Of Phase Amount
906582
Total Phase Actual Spending Amount
73334
Dsf Number S
DSF0001090831, DSF0001090832, DSF0001118451
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
3/26/2027
Project Budget Amount
46743
Final Estimate Of Actual Costs Through End Of Phase Amount
23656
Total Phase Actual Spending Amount
6543
Dsf Number S
DSF0001087420
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
3/26/2027
Project Budget Amount
182218
Final Estimate Of Actual Costs Through End Of Phase Amount
173884
Total Phase Actual Spending Amount
5497
Dsf Number S
DSF0001087420
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/9/2023
Project Phase Planned End Date
4/2/2024
Project Budget Amount
2154024
Final Estimate Of Actual Costs Through End Of Phase Amount
2073334
Total Phase Actual Spending Amount
1510438
Dsf Number S
DSF0000939151
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS / WINDOWS / ROOFS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
8484701
Final Estimate Of Actual Costs Through End Of Phase Amount
8499052
Total Phase Actual Spending Amount
92512
Dsf Number S
DSF0001090831, DSF0001090832, DSF0001118451
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS / WINDOWS / ROOFS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/10/2025
Project Phase Planned End Date
8/8/2025
Project Phase Actual End Date
10/27/2025
Project Budget Amount
537787
Final Estimate Of Actual Costs Through End Of Phase Amount
304533
Total Phase Actual Spending Amount
291541
Dsf Number S
DSF0001090831, DSF0001090832, DSF0001118451
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/12/2025
Project Phase Planned End Date
11/6/2025
Project Phase Actual End Date
10/29/2025
Project Budget Amount
12676
Final Estimate Of Actual Costs Through End Of Phase Amount
9341
Total Phase Actual Spending Amount
9341
Dsf Number S
DSF0001087420
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/22/2021
Project Phase Planned End Date
5/25/2022
Project Phase Actual End Date
5/5/2022
Project Budget Amount
95734
Final Estimate Of Actual Costs Through End Of Phase Amount
95842
Total Phase Actual Spending Amount
95842
Dsf Number S
DSF0000939151
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/2/2021
Project Phase Planned End Date
10/18/2021
Project Phase Actual End Date
12/22/2021
Project Budget Amount
19147
Final Estimate Of Actual Costs Through End Of Phase Amount
22438
Total Phase Actual Spending Amount
22053
Dsf Number S
DSF0000939151
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS / WINDOWS / ROOFS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/14/2024
Project Phase Planned End Date
10/31/2024
Project Phase Actual End Date
2/27/2025
Project Budget Amount
116278
Final Estimate Of Actual Costs Through End Of Phase Amount
192169
Total Phase Actual Spending Amount
191719
Dsf Number S
DSF0001090831, DSF0001090832, DSF0001118451
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/12/2025
Project Phase Planned End Date
9/11/2025
Project Phase Actual End Date
5/12/2025
Project Budget Amount
3169
Final Estimate Of Actual Costs Through End Of Phase Amount
2335
Total Phase Actual Spending Amount
2335
Dsf Number S
DSF0001087420
22
Project Geographic District : 22 • Project Building Identifier: K195 • Project School Name: P.S. 195 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K195
Project School Name
P.S. 195 - BROOKLYN
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/23/2021
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
393959
Total Phase Actual Spending Amount
393959
Dsf Number S
SCA0000070421
14
Project Geographic District : 14 • Project Building Identifier: K196 • Project School Name: I.S. 582 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K196
Project School Name
I.S. 582 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
633376
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113972
14
Project Geographic District : 14 • Project Building Identifier: K196 • Project School Name: P.S. 196 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K196
Project School Name
P.S. 196 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086020
14
Project Geographic District : 14 • Project Building Identifier: K196 • Project School Name: P.S. 196 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K196
Project School Name
P.S. 196 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
114107
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035466
14
Project Geographic District : 14 • Project Building Identifier: K196 • Project School Name: P.S. 196 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K196
Project School Name
P.S. 196 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY12 RESO A- LIGHTING UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000732437
14
Project Geographic District : 14 • Project Building Identifier: K196 • Project School Name: I.S. 582 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K196
Project School Name
I.S. 582 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/15/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
513487
Total Phase Actual Spending Amount
52054
Dsf Number S
DSF0001085720