Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/21/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
525288
Total Phase Actual Spending Amount
459117
Dsf Number S
DSF0001033502
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA Capacity
Project Description
ADDITION
Project Phase Name
CM,Art,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2024
Project Phase Planned End Date
9/3/2026
Project Budget Amount
9536000
Final Estimate Of Actual Costs Through End Of Phase Amount
7822853
Total Phase Actual Spending Amount
4886752
Dsf Number S
DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA Capacity
Project Description
ADDITION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2024
Project Phase Planned End Date
9/3/2026
Project Budget Amount
67646000
Final Estimate Of Actual Costs Through End Of Phase Amount
61946241
Total Phase Actual Spending Amount
37591713
Dsf Number S
DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA Capacity
Project Description
ADDITION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/29/2022
Project Phase Planned End Date
3/3/2023
Project Phase Actual End Date
4/12/2023
Project Budget Amount
5364000
Final Estimate Of Actual Costs Through End Of Phase Amount
3761943
Total Phase Actual Spending Amount
3011638
Dsf Number S
DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA Capacity
Project Description
ADDITION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/10/2022
Project Phase Planned End Date
8/26/2022
Project Phase Actual End Date
8/26/2022
Project Budget Amount
1192000
Final Estimate Of Actual Costs Through End Of Phase Amount
875303
Total Phase Actual Spending Amount
875300
Dsf Number S
DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA CIP
Project Description
EXISTING BUILDING/ELECTRICAL SYSTEMS UPGRADE / EXISTING BUILDING/FIRE ALARM UPGRADE / EXISTING BUILDING-EXISTING BUILDING-INTERIOR RENOVATIONS/PROGRAM ACCESSIBILITY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
662886
Final Estimate Of Actual Costs Through End Of Phase Amount
662886
Total Phase Actual Spending Amount
50442
Dsf Number S
DSF0000911846, DSF0000911846, DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA CIP
Project Description
EXISTING BUILDING/ELECTRICAL SYSTEMS UPGRADE / EXISTING BUILDING/FIRE ALARM UPGRADE / EXISTING BUILDING-EXISTING BUILDING-INTERIOR RENOVATIONS/PROGRAM ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
9987974
Final Estimate Of Actual Costs Through End Of Phase Amount
9987974
Total Phase Actual Spending Amount
17216
Dsf Number S
DSF0000911846, DSF0000911846, DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA CIP
Project Description
EXISTING BUILDING/ELECTRICAL SYSTEMS UPGRADE / EXISTING BUILDING/FIRE ALARM UPGRADE / EXISTING BUILDING-EXISTING BUILDING-INTERIOR RENOVATIONS/PROGRAM ACCESSIBILITY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/15/2023
Project Phase Planned End Date
8/15/2023
Project Phase Actual End Date
10/23/2023
Project Budget Amount
455057
Final Estimate Of Actual Costs Through End Of Phase Amount
240253
Total Phase Actual Spending Amount
228766
Dsf Number S
DSF0000911846, DSF0000911846, DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K206 • Project School Name: P.S. 206 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K206
Project School Name
P.S. 206 - BROOKLYN
Project Type
SCA CIP
Project Description
EXISTING BUILDING/ELECTRICAL SYSTEMS UPGRADE / EXISTING BUILDING/FIRE ALARM UPGRADE / EXISTING BUILDING-EXISTING BUILDING-INTERIOR RENOVATIONS/PROGRAM ACCESSIBILITY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/21/2022
Project Phase Planned End Date
1/26/2023
Project Phase Actual End Date
3/13/2023
Project Budget Amount
91591
Final Estimate Of Actual Costs Through End Of Phase Amount
97679
Total Phase Actual Spending Amount
62772
Dsf Number S
DSF0000911846, DSF0000911846, DSF0000911846
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A SCIENCE LAB UPGRADE / PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/25/2025
Project Phase Planned End Date
8/20/2026
Project Budget Amount
85488
Final Estimate Of Actual Costs Through End Of Phase Amount
132011
Total Phase Actual Spending Amount
48471
Dsf Number S
DSF0001086024, DSF0001087018
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY26 RESO A ELECTRICAL UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
30000
Final Estimate Of Actual Costs Through End Of Phase Amount
30000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163846
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A SCIENCE LAB UPGRADE / PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/25/2025
Project Phase Planned End Date
8/20/2026
Project Budget Amount
938576
Final Estimate Of Actual Costs Through End Of Phase Amount
865905
Total Phase Actual Spending Amount
37606
Dsf Number S
DSF0001086024, DSF0001087018
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY26 RESO A ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
440000
Final Estimate Of Actual Costs Through End Of Phase Amount
440000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163846
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY26 RESO A ELECTRICAL UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
30000
Final Estimate Of Actual Costs Through End Of Phase Amount
30000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163846
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A SCIENCE LAB UPGRADE / PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/30/2024
Project Phase Planned End Date
2/5/2025
Project Phase Actual End Date
4/14/2025
Project Budget Amount
63994
Final Estimate Of Actual Costs Through End Of Phase Amount
72144
Total Phase Actual Spending Amount
51286
Dsf Number S
DSF0001086024, DSF0001087018
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A SCIENCE LAB UPGRADE / PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/21/2024
Project Phase Planned End Date
7/8/2024
Project Phase Actual End Date
8/22/2024
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
20662
Total Phase Actual Spending Amount
20662
Dsf Number S
DSF0001086024, DSF0001087018
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY26 RESO A ELECTRICAL UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163846
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED FLOOR TILES 1ST FLOOR HALLWAY - 1937 WING (SPACE ID: 2000) 9X9 FLOOR
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/29/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/27/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
35536
Total Phase Actual Spending Amount
1119
Dsf Number S
SCA0000075878
22
Project Geographic District : 22 • Project Building Identifier: K207 • Project School Name: P.S. 207 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K207
Project School Name
P.S. 207 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE BULLETIN BOARD AT LOCATION 2ND FL HALLWAY (SPACE ID 2000)
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/3/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1136
Total Phase Actual Spending Amount
386
Dsf Number S
SCA0000076076
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035473
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY26 RESO A CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163847
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY24 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/15/2024
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
24959
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086025
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY / ROOFS / WINDOWS / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1209798
Final Estimate Of Actual Costs Through End Of Phase Amount
1216638
Total Phase Actual Spending Amount
42970
Dsf Number S
DSF0001091109, DSF0001091113, DSF0001118735, DSF0001114412, DSF0001142666
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM SYSTEM / COVID CLIMATE CONTROL
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
5/8/2023
Project Phase Planned End Date
8/4/2024
Project Budget Amount
388220
Final Estimate Of Actual Costs Through End Of Phase Amount
1011097
Total Phase Actual Spending Amount
1003117
Dsf Number S
DSF0000961074, DSF0001008796, DSF0000987912
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
910629
Final Estimate Of Actual Costs Through End Of Phase Amount
910629
Total Phase Actual Spending Amount
109675
Dsf Number S
DSF0001114063
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
4/2/2025
Project Phase Planned End Date
2/25/2026
Project Phase Actual End Date
5/20/2026
Project Budget Amount
158909
Final Estimate Of Actual Costs Through End Of Phase Amount
146141
Total Phase Actual Spending Amount
143882
Dsf Number S
DSF0001087424
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/2/2025
Project Phase Planned End Date
2/25/2026
Project Phase Actual End Date
5/20/2026
Project Budget Amount
232000
Final Estimate Of Actual Costs Through End Of Phase Amount
212984
Total Phase Actual Spending Amount
165192
Dsf Number S
DSF0001087424
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM SYSTEM / COVID CLIMATE CONTROL
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/8/2023
Project Phase Planned End Date
8/4/2024
Project Budget Amount
6239250
Final Estimate Of Actual Costs Through End Of Phase Amount
5960395
Total Phase Actual Spending Amount
5239550
Dsf Number S
DSF0000961074, DSF0001008796, DSF0000987912
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY / ROOFS / WINDOWS / PARAPETS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
10113878
Final Estimate Of Actual Costs Through End Of Phase Amount
10127445
Total Phase Actual Spending Amount
59172
Dsf Number S
DSF0001091109, DSF0001091113, DSF0001118735, DSF0001114412, DSF0001142666
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
9189074
Final Estimate Of Actual Costs Through End Of Phase Amount
9189074
Total Phase Actual Spending Amount
87419
Dsf Number S
DSF0001114063
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
11/14/2025
Project Phase Planned End Date
5/5/2026
Project Budget Amount
579491
Final Estimate Of Actual Costs Through End Of Phase Amount
579491
Total Phase Actual Spending Amount
166056
Dsf Number S
DSF0001114063
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY / ROOFS / WINDOWS / PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/29/2025
Project Phase Planned End Date
4/3/2026
Project Phase Actual End Date
4/3/2026
Project Budget Amount
646383
Final Estimate Of Actual Costs Through End Of Phase Amount
468249
Total Phase Actual Spending Amount
454369
Dsf Number S
DSF0001091109, DSF0001091113, DSF0001118735, DSF0001114412, DSF0001142666
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
6/5/2024
Project Phase Planned End Date
12/3/2024
Project Phase Actual End Date
11/20/2024
Project Budget Amount
18000
Final Estimate Of Actual Costs Through End Of Phase Amount
7616
Total Phase Actual Spending Amount
7616
Dsf Number S
DSF0001087424
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM SYSTEM / COVID CLIMATE CONTROL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/2/2021
Project Phase Planned End Date
7/9/2021
Project Phase Actual End Date
6/29/2021
Project Budget Amount
277301
Final Estimate Of Actual Costs Through End Of Phase Amount
451594
Total Phase Actual Spending Amount
426545
Dsf Number S
DSF0000961074, DSF0001008796, DSF0000987912
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/9/2025
Project Phase Planned End Date
8/25/2025
Project Phase Actual End Date
10/9/2025
Project Budget Amount
124177
Final Estimate Of Actual Costs Through End Of Phase Amount
139287
Total Phase Actual Spending Amount
139287
Dsf Number S
DSF0001114063
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID FIRE ALARM SYSTEM / COVID CLIMATE CONTROL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
8/21/2020
Project Phase Planned End Date
12/21/2020
Project Phase Actual End Date
1/27/2021
Project Budget Amount
55460
Final Estimate Of Actual Costs Through End Of Phase Amount
73551
Total Phase Actual Spending Amount
72991
Dsf Number S
DSF0000961074, DSF0001008796, DSF0000987912
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY / ROOFS / WINDOWS / PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/1/2025
Project Phase Planned End Date
11/17/2025
Project Phase Actual End Date
9/17/2025
Project Budget Amount
141786
Final Estimate Of Actual Costs Through End Of Phase Amount
295057
Total Phase Actual Spending Amount
248460
Dsf Number S
DSF0001091109, DSF0001091113, DSF0001118735, DSF0001114412, DSF0001142666
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/30/2024
Project Phase Planned End Date
9/30/2024
Project Phase Actual End Date
6/5/2024
Project Budget Amount
4000
Final Estimate Of Actual Costs Through End Of Phase Amount
1904
Total Phase Actual Spending Amount
1904
Dsf Number S
DSF0001087424
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND DRILL CORE DRILLING THROUGH THE FLOOR IN ROOM 351 MARKED WITH WHITE TAPE AND SIZE IS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
10/9/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
1/25/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
12503
Total Phase Actual Spending Amount
8253
Dsf Number S
SCA0000075028
18
Project Geographic District : 18 • Project Building Identifier: K208 • Project School Name: P.S. 208 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K208
Project School Name
P.S. 208 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE 3LF OF DAMAGED PIPE JOINT TO MAGNESIA PIPE INSULATION & 1 LF OF DAMAGED MAGNECIA PIPE INS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/16/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
16677
Total Phase Actual Spending Amount
16677
Dsf Number S
SCA0000075605
21
Project Geographic District : 21 • Project Building Identifier: K209 • Project School Name: P.S. 209 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K209
Project School Name
P.S. 209 - BROOKLYN
Project Type
Fast Track Projects
Project Description
PATH OF TRAVEL CTF ROOM CONVERSION / CTF ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/19/2024
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
1447542
Total Phase Actual Spending Amount
1357960
Dsf Number S
DSF0001112199, DSF0001112198
21
Project Geographic District : 21 • Project Building Identifier: K209 • Project School Name: P.S. 209 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K209
Project School Name
P.S. 209 - BROOKLYN
Project Type
SCA CIP
Project Description
TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
11/4/2024
Project Phase Planned End Date
11/3/2025
Project Budget Amount
195580
Final Estimate Of Actual Costs Through End Of Phase Amount
217067
Total Phase Actual Spending Amount
211947
Dsf Number S
DSF0001083687
21
Project Geographic District : 21 • Project Building Identifier: K209 • Project School Name: P.S. 209 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K209
Project School Name
P.S. 209 - BROOKLYN
Project Type
SCA CIP
Project Description
TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/4/2024
Project Phase Planned End Date
11/3/2025
Project Budget Amount
3143250
Final Estimate Of Actual Costs Through End Of Phase Amount
2856812
Total Phase Actual Spending Amount
1883710
Dsf Number S
DSF0001083687
21
Project Geographic District : 21 • Project Building Identifier: K209 • Project School Name: P.S. 209 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K209
Project School Name
P.S. 209 - BROOKLYN
Project Type
SCA CIP
Project Description
TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/25/2023
Project Phase Planned End Date
9/11/2023
Project Phase Actual End Date
10/31/2023
Project Budget Amount
139700
Final Estimate Of Actual Costs Through End Of Phase Amount
166274
Total Phase Actual Spending Amount
163552
Dsf Number S
DSF0001083687
21
Project Geographic District : 21 • Project Building Identifier: K209 • Project School Name: P.S. 209 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K209
Project School Name
P.S. 209 - BROOKLYN
Project Type
SCA CIP
Project Description
TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/17/2023
Project Phase Planned End Date
4/17/2023
Project Phase Actual End Date
4/24/2023
Project Budget Amount
27940
Final Estimate Of Actual Costs Through End Of Phase Amount
58964
Total Phase Actual Spending Amount
58964
Dsf Number S
DSF0001083687
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS / FLOOD ELIMINATION / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2024
Project Phase Planned End Date
1/7/2027
Project Budget Amount
1397612
Final Estimate Of Actual Costs Through End Of Phase Amount
851006
Total Phase Actual Spending Amount
838041
Dsf Number S
DSF0001063444, DSF0001063446, DSF0001087234, DSF0001087233, DSF0001087235
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS / FLOOD ELIMINATION / PARAPETS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2024
Project Phase Planned End Date
1/7/2027
Project Budget Amount
19600625
Final Estimate Of Actual Costs Through End Of Phase Amount
17782835
Total Phase Actual Spending Amount
13747043
Dsf Number S
DSF0001063444, DSF0001063446, DSF0001087234, DSF0001087233, DSF0001087235
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS / FLOOD ELIMINATION / PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/20/2023
Project Phase Planned End Date
6/11/2024
Project Phase Actual End Date
4/19/2024
Project Budget Amount
919057
Final Estimate Of Actual Costs Through End Of Phase Amount
586111
Total Phase Actual Spending Amount
583152
Dsf Number S
DSF0001063444, DSF0001063446, DSF0001087234, DSF0001087233, DSF0001087235
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS / FLOOD ELIMINATION / PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/9/2023
Project Phase Planned End Date
12/8/2023
Project Phase Actual End Date
10/6/2023
Project Budget Amount
186305
Final Estimate Of Actual Costs Through End Of Phase Amount
281880
Total Phase Actual Spending Amount
280364
Dsf Number S
DSF0001063444, DSF0001063446, DSF0001087234, DSF0001087233, DSF0001087235
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPAIR FLOOR IN ROOM 407 28LF ASSIGNED TO SCA ON 4.7.2026 AS PRIORITY 1
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/8/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
49434
Total Phase Actual Spending Amount
49434
Dsf Number S
SCA0000075729