Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
17
Project Geographic District : 17 • Project Building Identifier: K210 • Project School Name: I.S. 394 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K210
Project School Name
I.S. 394 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED ACM FLOORING IN ROOM 414. APPROX 60 SQFT
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/15/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/23/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
67989
Total Phase Actual Spending Amount
3135
Dsf Number S
SCA0000075989
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
170000
Total Phase Actual Spending Amount
170000
Dsf Number S
DSF0001163848
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913243
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY24 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
166345
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086026
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / WINDOWS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1138332
Final Estimate Of Actual Costs Through End Of Phase Amount
1138332
Total Phase Actual Spending Amount
22196
Dsf Number S
DSF0001091171, DSF0001091175
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/16/2023
Project Phase Planned End Date
3/3/2026
Project Budget Amount
841658
Final Estimate Of Actual Costs Through End Of Phase Amount
842085
Total Phase Actual Spending Amount
835502
Dsf Number S
DSF0001034984
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/16/2023
Project Phase Planned End Date
3/3/2026
Project Budget Amount
12199500
Final Estimate Of Actual Costs Through End Of Phase Amount
11647586
Total Phase Actual Spending Amount
10091788
Dsf Number S
DSF0001034984
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / WINDOWS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
11486809
Final Estimate Of Actual Costs Through End Of Phase Amount
11486809
Total Phase Actual Spending Amount
2010
Dsf Number S
DSF0001091171, DSF0001091175
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / WINDOWS
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
6/9/2026
Project Phase Planned End Date
11/10/2026
Project Budget Amount
724394
Final Estimate Of Actual Costs Through End Of Phase Amount
724394
Total Phase Actual Spending Amount
280269
Dsf Number S
DSF0001091171, DSF0001091175
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/2/2023
Project Phase Planned End Date
8/17/2023
Project Phase Actual End Date
5/12/2023
Project Budget Amount
542200
Final Estimate Of Actual Costs Through End Of Phase Amount
471978
Total Phase Actual Spending Amount
468462
Dsf Number S
DSF0001034984
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / WINDOWS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/17/2025
Project Phase Planned End Date
2/5/2026
Project Phase Actual End Date
2/12/2026
Project Budget Amount
155227
Final Estimate Of Actual Costs Through End Of Phase Amount
258063
Total Phase Actual Spending Amount
159153
Dsf Number S
DSF0001091171, DSF0001091175
18
Project Geographic District : 18 • Project Building Identifier: K211 • Project School Name: I.S. 211 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K211
Project School Name
I.S. 211 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/29/2022
Project Phase Planned End Date
11/15/2022
Project Phase Actual End Date
3/1/2023
Project Budget Amount
108440
Final Estimate Of Actual Costs Through End Of Phase Amount
131117
Total Phase Actual Spending Amount
120719
Dsf Number S
DSF0001034984
21
Project Geographic District : 21 • Project Building Identifier: K212 • Project School Name: P.S. 212 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K212
Project School Name
P.S. 212 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/3/2020
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
351763
Total Phase Actual Spending Amount
351763
Dsf Number S
DSF0000912964
21
Project Geographic District : 21 • Project Building Identifier: K212 • Project School Name: P.S. 212 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K212
Project School Name
P.S. 212 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
50722
Final Estimate Of Actual Costs Through End Of Phase Amount
6851
Total Phase Actual Spending Amount
6749
Dsf Number S
DSF0001087425
21
Project Geographic District : 21 • Project Building Identifier: K212 • Project School Name: P.S. 212 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K212
Project School Name
P.S. 212 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
197730
Final Estimate Of Actual Costs Through End Of Phase Amount
175172
Total Phase Actual Spending Amount
3233
Dsf Number S
DSF0001087425
21
Project Geographic District : 21 • Project Building Identifier: K212 • Project School Name: P.S. 212 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K212
Project School Name
P.S. 212 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
7/10/2026
Project Phase Actual End Date
4/9/2026
Project Budget Amount
13755
Final Estimate Of Actual Costs Through End Of Phase Amount
5994
Total Phase Actual Spending Amount
5994
Dsf Number S
DSF0001087425
21
Project Geographic District : 21 • Project Building Identifier: K212 • Project School Name: P.S. 212 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K212
Project School Name
P.S. 212 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/8/2026
Project Phase Planned End Date
5/8/2026
Project Phase Actual End Date
1/13/2026
Project Budget Amount
3439
Final Estimate Of Actual Costs Through End Of Phase Amount
1499
Total Phase Actual Spending Amount
1499
Dsf Number S
DSF0001087425
19
Project Geographic District : 19 • Project Building Identifier: K213 • Project School Name: P.S. 213 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K213
Project School Name
P.S. 213 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
RESO A TECHNOLOGY
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001114194
19
Project Geographic District : 19 • Project Building Identifier: K213 • Project School Name: P.S. 213 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K213
Project School Name
P.S. 213 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112620
19
Project Geographic District : 19 • Project Building Identifier: K213 • Project School Name: K036 SPED - BROOKLYN
Project Geographic District
19
Project Building Identifier
K213
Project School Name
K036 SPED - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163849
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
200000
Dsf Number S
DSF0001163850
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
69820
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035474
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
179000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035078
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
ACE BOILER CONTROLS UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/12/2021
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
60651
Total Phase Actual Spending Amount
59835
Dsf Number S
DSF0000866110
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
12/15/2025
Project Phase Planned End Date
11/9/2026
Project Budget Amount
225693
Final Estimate Of Actual Costs Through End Of Phase Amount
188228
Total Phase Actual Spending Amount
69012
Dsf Number S
DSF0001087426
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/15/2025
Project Phase Planned End Date
11/9/2026
Project Budget Amount
281651
Final Estimate Of Actual Costs Through End Of Phase Amount
271944
Total Phase Actual Spending Amount
199062
Dsf Number S
DSF0001087426
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/6/2025
Project Phase Planned End Date
8/29/2025
Project Phase Actual End Date
8/19/2025
Project Budget Amount
19593
Final Estimate Of Actual Costs Through End Of Phase Amount
9375
Total Phase Actual Spending Amount
9375
Dsf Number S
DSF0001087426
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/24/2025
Project Phase Planned End Date
6/24/2025
Project Phase Actual End Date
3/6/2025
Project Budget Amount
4898
Final Estimate Of Actual Costs Through End Of Phase Amount
2344
Total Phase Actual Spending Amount
2344
Dsf Number S
DSF0001087426
19
Project Geographic District : 19 • Project Building Identifier: K214 • Project School Name: P.S. 214 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K214
Project School Name
P.S. 214 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT 2011 - KITCHEN - MORTAR LVL 2 CERAMIC FLOOR TILES
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
22011
Total Phase Actual Spending Amount
14461
Dsf Number S
SCA0000075544
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001033508
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
DOE - Lead Paint
Project Description
LEAD PAINT ABATEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/1/2025
Project Phase Planned End Date
DOEL
Project Budget Amount
DOEL
Final Estimate Of Actual Costs Through End Of Phase Amount
58831
Total Phase Actual Spending Amount
8831
Dsf Number S
NULL
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/2/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
328159
Dsf Number S
DSF0001035475
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/16/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
447218
Dsf Number S
SCA0000071041
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
ACE STEAM SYSTEM OPTIMIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
57392
Total Phase Actual Spending Amount
2574
Dsf Number S
DSF0001034409
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: K231 SPED - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
K231 SPED - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163851
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
46819
Final Estimate Of Actual Costs Through End Of Phase Amount
9450
Total Phase Actual Spending Amount
8645
Dsf Number S
DSF0001087427
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
182515
Final Estimate Of Actual Costs Through End Of Phase Amount
171544
Total Phase Actual Spending Amount
4757
Dsf Number S
DSF0001087427
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2026
Project Phase Planned End Date
8/4/2026
Project Phase Actual End Date
4/9/2026
Project Budget Amount
12697
Final Estimate Of Actual Costs Through End Of Phase Amount
5686
Total Phase Actual Spending Amount
5686
Dsf Number S
DSF0001087427
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/15/2026
Project Phase Planned End Date
5/15/2026
Project Phase Actual End Date
2/6/2026
Project Budget Amount
3174
Final Estimate Of Actual Costs Through End Of Phase Amount
1422
Total Phase Actual Spending Amount
1422
Dsf Number S
DSF0001087427
21
Project Geographic District : 21 • Project Building Identifier: K215 • Project School Name: P.S. 215 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K215
Project School Name
P.S. 215 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE FLOOR TILES IN RM #452 AND SOFT CONCRETE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1491
Total Phase Actual Spending Amount
741
Dsf Number S
SCA0000075905
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A KITCHEN UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
316118
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035476
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A ROOM RENOVATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/28/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
160657
Total Phase Actual Spending Amount
3420
Dsf Number S
DSF0001008440
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A WATER FOUNTAIN UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/30/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
47411
Total Phase Actual Spending Amount
2921
Dsf Number S
DSF0001033509
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
47007
Final Estimate Of Actual Costs Through End Of Phase Amount
6512
Total Phase Actual Spending Amount
6409
Dsf Number S
DSF0001087428
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID CLIMATE CONTROL / COVID FIRE ALARM SYSTEM
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/2/2024
Project Phase Planned End Date
8/1/2026
Project Budget Amount
384579
Final Estimate Of Actual Costs Through End Of Phase Amount
536554
Total Phase Actual Spending Amount
514936
Dsf Number S
DSF0000961073, DSF0001008767, DSF0001008768
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID CLIMATE CONTROL / COVID FIRE ALARM SYSTEM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/2/2024
Project Phase Planned End Date
8/1/2026
Project Budget Amount
6180750
Final Estimate Of Actual Costs Through End Of Phase Amount
5881057
Total Phase Actual Spending Amount
4124896
Dsf Number S
DSF0000961073, DSF0001008767, DSF0001008768
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2026
Project Phase Planned End Date
5/17/2027
Project Budget Amount
183249
Final Estimate Of Actual Costs Through End Of Phase Amount
162399
Total Phase Actual Spending Amount
3052
Dsf Number S
DSF0001087428
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID CLIMATE CONTROL / COVID FIRE ALARM SYSTEM
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/2/2021
Project Phase Planned End Date
7/9/2021
Project Phase Actual End Date
7/9/2021
Project Budget Amount
274700
Final Estimate Of Actual Costs Through End Of Phase Amount
399945
Total Phase Actual Spending Amount
354675
Dsf Number S
DSF0000961073, DSF0001008767, DSF0001008768
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2026
Project Phase Planned End Date
8/4/2026
Project Phase Actual End Date
4/9/2026
Project Budget Amount
12748
Final Estimate Of Actual Costs Through End Of Phase Amount
3696
Total Phase Actual Spending Amount
3696
Dsf Number S
DSF0001087428
21
Project Geographic District : 21 • Project Building Identifier: K216 • Project School Name: P.S. 216 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K216
Project School Name
P.S. 216 - BROOKLYN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID CLIMATE CONTROL / COVID FIRE ALARM SYSTEM
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
8/4/2020
Project Phase Planned End Date
12/4/2020
Project Phase Actual End Date
1/29/2021
Project Budget Amount
54940
Final Estimate Of Actual Costs Through End Of Phase Amount
87388
Total Phase Actual Spending Amount
83780
Dsf Number S
DSF0000961073, DSF0001008767, DSF0001008768