17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
ADA SHELTER COMPLIANCE RAMPS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/28/2021
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
401566
Total Phase Actual Spending Amount
308160
Dsf Number S
DSF0000911929
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/6/2025
Project Phase Planned End Date
7/1/2026
Project Budget Amount
195169
Final Estimate Of Actual Costs Through End Of Phase Amount
173380
Total Phase Actual Spending Amount
116003
Dsf Number S
DSF0001087435
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
8/21/2023
Project Phase Planned End Date
1/6/2026
Project Phase Actual End Date
4/30/2026
Project Budget Amount
683096
Final Estimate Of Actual Costs Through End Of Phase Amount
731175
Total Phase Actual Spending Amount
715809
Dsf Number S
DSF0001013489, DSF0001013490, DSF0001013491, DSF0001083822
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/6/2025
Project Phase Planned End Date
7/1/2026
Project Budget Amount
267909
Final Estimate Of Actual Costs Through End Of Phase Amount
250038
Total Phase Actual Spending Amount
147385
Dsf Number S
DSF0001087435
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/21/2023
Project Phase Planned End Date
1/6/2026
Project Phase Actual End Date
4/30/2026
Project Budget Amount
10071331
Final Estimate Of Actual Costs Through End Of Phase Amount
9198412
Total Phase Actual Spending Amount
8647849
Dsf Number S
DSF0001013489, DSF0001013490, DSF0001013491, DSF0001083822
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/10/2023
Project Phase Planned End Date
6/12/2023
Project Phase Actual End Date
5/10/2023
Project Budget Amount
462806
Final Estimate Of Actual Costs Through End Of Phase Amount
391165
Total Phase Actual Spending Amount
391165
Dsf Number S
DSF0001013489, DSF0001013490, DSF0001013491, DSF0001083822
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/8/2024
Project Phase Planned End Date
2/6/2025
Project Phase Actual End Date
2/7/2025
Project Budget Amount
20786
Final Estimate Of Actual Costs Through End Of Phase Amount
11846
Total Phase Actual Spending Amount
11846
Dsf Number S
DSF0001087435
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/25/2024
Project Phase Planned End Date
10/24/2024
Project Phase Actual End Date
8/8/2024
Project Budget Amount
4619
Final Estimate Of Actual Costs Through End Of Phase Amount
2962
Total Phase Actual Spending Amount
2962
Dsf Number S
DSF0001087435
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/24/2022
Project Phase Planned End Date
11/9/2022
Project Phase Actual End Date
12/16/2022
Project Budget Amount
93351
Final Estimate Of Actual Costs Through End Of Phase Amount
169807
Total Phase Actual Spending Amount
164054
Dsf Number S
DSF0001013489, DSF0001013490, DSF0001013491, DSF0001083822
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PLEASE TEST AND ABATE 50' LINEAR FT OF PIPE INSULATION ON VERTICAL AND HORIZONTAL PIPES. LOCATE
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/10/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
1/25/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
17852
Total Phase Actual Spending Amount
11002
Dsf Number S
SCA0000075199
17
Project Geographic District : 17 • Project Building Identifier: K249 • Project School Name: P.S. 249 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K249
Project School Name
P.S. 249 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR DAMAGED MATERIALS ABATE AND REPLAC
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/27/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
28456
Total Phase Actual Spending Amount
2105
Dsf Number S
SCA0000075670
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001083941
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
588700
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163974
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
DCAS ELECTRIFICATION/HEAT PUMP SYSTEMS / DCAS FIRE ALARM SYSTEM / DCAS ROOFS / DCAS ELECTRICAL UPGRADE / DCAS LIGHTING UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
3911050
Final Estimate Of Actual Costs Through End Of Phase Amount
3911050
Total Phase Actual Spending Amount
182880
Dsf Number S
DSF0001114049, DSF0001143510, DSF0001143514, DSF0001143517, DSF0001143511
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
61503
Final Estimate Of Actual Costs Through End Of Phase Amount
61503
Total Phase Actual Spending Amount
3905
Dsf Number S
DSF0001087436
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
DCAS ELECTRIFICATION/HEAT PUMP SYSTEMS / DCAS FIRE ALARM SYSTEM / DCAS ROOFS / DCAS ELECTRICAL UPGRADE / DCAS LIGHTING UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
39466050
Final Estimate Of Actual Costs Through End Of Phase Amount
39466050
Total Phase Actual Spending Amount
42853
Dsf Number S
DSF0001114049, DSF0001143510, DSF0001143514, DSF0001143517, DSF0001143511
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
239759
Final Estimate Of Actual Costs Through End Of Phase Amount
239759
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087436
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
DCAS ELECTRIFICATION/HEAT PUMP SYSTEMS / DCAS FIRE ALARM SYSTEM / DCAS ROOFS / DCAS ELECTRICAL UPGRADE / DCAS LIGHTING UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/24/2025
Project Phase Planned End Date
6/30/2026
Project Phase Actual End Date
4/17/2026
Project Budget Amount
2488850
Final Estimate Of Actual Costs Through End Of Phase Amount
1197773
Total Phase Actual Spending Amount
1146355
Dsf Number S
DSF0001114049, DSF0001143510, DSF0001143514, DSF0001143517, DSF0001143511
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/30/2025
Project Phase Planned End Date
4/29/2026
Project Phase Actual End Date
3/11/2026
Project Budget Amount
16679
Final Estimate Of Actual Costs Through End Of Phase Amount
7431
Total Phase Actual Spending Amount
7431
Dsf Number S
DSF0001087436
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
10/27/2025
Project Phase Planned End Date
3/2/2026
Project Phase Actual End Date
10/30/2025
Project Budget Amount
4170
Final Estimate Of Actual Costs Through End Of Phase Amount
1858
Total Phase Actual Spending Amount
1858
Dsf Number S
DSF0001087436
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA CIP
Project Description
DCAS ELECTRIFICATION/HEAT PUMP SYSTEMS / DCAS FIRE ALARM SYSTEM / DCAS ROOFS / DCAS ELECTRICAL UPGRADE / DCAS LIGHTING UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/10/2025
Project Phase Planned End Date
9/11/2025
Project Phase Actual End Date
10/16/2025
Project Budget Amount
533326
Final Estimate Of Actual Costs Through End Of Phase Amount
473185
Total Phase Actual Spending Amount
433155
Dsf Number S
DSF0001114049, DSF0001143510, DSF0001143514, DSF0001143517, DSF0001143511
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA Furniture & Equipment
Project Description
FY25 RESO A MOBILE SCIENCE LAB
Project Phase Name
F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
350000
Final Estimate Of Actual Costs Through End Of Phase Amount
350000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112649
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPAIR WALL PLASTER IN ROOMS: 129(WOMEN'S REST RO
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/14/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075966
14
Project Geographic District : 14 • Project Building Identifier: K250 • Project School Name: P.S. 250 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K250
Project School Name
P.S. 250 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & DRILL 2 HOLES IN THE KITCHEN WALL TWO 1/2'' DIAMETER HOLES, 2' DEEP NO THROUGH HOLES NE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/21/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075843
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
350000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112650
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A ROOM RENOVATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
94456
Total Phase Actual Spending Amount
84472
Dsf Number S
DSF0000913250
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A MEDIA STUDIO
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
133202
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033525
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
160000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163975
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
3/26/2027
Project Budget Amount
52967
Final Estimate Of Actual Costs Through End Of Phase Amount
23715
Total Phase Actual Spending Amount
4323
Dsf Number S
DSF0001087437
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2026
Project Phase Planned End Date
3/26/2027
Project Budget Amount
206483
Final Estimate Of Actual Costs Through End Of Phase Amount
190463
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087437
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/9/2025
Project Phase Planned End Date
11/5/2025
Project Phase Actual End Date
10/29/2025
Project Budget Amount
14364
Final Estimate Of Actual Costs Through End Of Phase Amount
7470
Total Phase Actual Spending Amount
7470
Dsf Number S
DSF0001087437
22
Project Geographic District : 22 • Project Building Identifier: K251 • Project School Name: P.S. 251 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K251
Project School Name
P.S. 251 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/21/2025
Project Phase Planned End Date
8/20/2025
Project Phase Actual End Date
5/9/2025
Project Budget Amount
3591
Final Estimate Of Actual Costs Through End Of Phase Amount
1868
Total Phase Actual Spending Amount
1868
Dsf Number S
DSF0001087437
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
DOE - RESOA
Project Description
FY22 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/22/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
316605
Total Phase Actual Spending Amount
9588
Dsf Number S
DSF0001033594
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
DOE - RESOA
Project Description
FY25 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
334495
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112651
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
355816
Final Estimate Of Actual Costs Through End Of Phase Amount
171326
Total Phase Actual Spending Amount
170727
Dsf Number S
DSF0001091948
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATOR AND FREEZERS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
168888
Final Estimate Of Actual Costs Through End Of Phase Amount
168888
Total Phase Actual Spending Amount
20870
Dsf Number S
DSF0001114407
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATOR AND FREEZERS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
658377
Final Estimate Of Actual Costs Through End Of Phase Amount
658377
Total Phase Actual Spending Amount
15976
Dsf Number S
DSF0001114407
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
3590504
Final Estimate Of Actual Costs Through End Of Phase Amount
3321214
Total Phase Actual Spending Amount
256673
Dsf Number S
DSF0001091948
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATOR AND FREEZERS
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
4/2/2026
Project Phase Planned End Date
9/8/2026
Project Budget Amount
45800
Final Estimate Of Actual Costs Through End Of Phase Amount
47215
Total Phase Actual Spending Amount
7772
Dsf Number S
DSF0001114407
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/30/2024
Project Phase Planned End Date
4/4/2025
Project Phase Actual End Date
4/15/2025
Project Budget Amount
226428
Final Estimate Of Actual Costs Through End Of Phase Amount
211639
Total Phase Actual Spending Amount
175438
Dsf Number S
DSF0001091948
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATOR AND FREEZERS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/5/2025
Project Phase Planned End Date
3/11/2026
Project Phase Actual End Date
3/24/2026
Project Budget Amount
11450
Final Estimate Of Actual Costs Through End Of Phase Amount
17505
Total Phase Actual Spending Amount
17505
Dsf Number S
DSF0001114407
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/1/2024
Project Phase Planned End Date
7/17/2024
Project Phase Actual End Date
10/3/2024
Project Budget Amount
48520
Final Estimate Of Actual Costs Through End Of Phase Amount
152221
Total Phase Actual Spending Amount
151984
Dsf Number S
DSF0001091948
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT 1006: FAN ROOM - MAGNESIA PIPE INSULATION 4319A:319A - OFFI
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/14/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
953
Total Phase Actual Spending Amount
203
Dsf Number S
SCA0000075964
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA IEH
Project Description
PO18-ABATE AND REMOVE PIPE INSULATION FAN ROOM SPACE ID 1006, APPROX. 50 SQ FT, RED SPRAY PAINTED CA
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/30/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1492
Total Phase Actual Spending Amount
742
Dsf Number S
SCA0000075356
18
Project Geographic District : 18 • Project Building Identifier: K252 • Project School Name: MIDDLE SCHOOL FOR ART & PHILOS - K
Project Geographic District
18
Project Building Identifier
K252
Project School Name
MIDDLE SCHOOL FOR ART & PHILOS - K
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE ACM FLOOR TILES FOR CABINET REMOVAL ROOM #429 2025-153865
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/9/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/27/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
21754
Total Phase Actual Spending Amount
2488
Dsf Number S
SCA0000075565
21
Project Geographic District : 21 • Project Building Identifier: K253 • Project School Name: P.S. 253 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K253
Project School Name
P.S. 253 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
250000
Dsf Number S
DSF0001163976
21
Project Geographic District : 21 • Project Building Identifier: K253 • Project School Name: P.S. 253 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K253
Project School Name
P.S. 253 - BROOKLYN
Project Type
DOE - Lead Paint
Project Description
LEAD PAINT ABATEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/10/2024
Project Phase Planned End Date
DOEL
Project Budget Amount
DOEL
Final Estimate Of Actual Costs Through End Of Phase Amount
70694
Total Phase Actual Spending Amount
68694
Dsf Number S
NULL
21
Project Geographic District : 21 • Project Building Identifier: K253 • Project School Name: P.S. 253 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K253
Project School Name
P.S. 253 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/28/2020
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
124986
Total Phase Actual Spending Amount
105540
Dsf Number S
DSF0000912966
21
Project Geographic District : 21 • Project Building Identifier: K253 • Project School Name: P.S. 253 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K253
Project School Name
P.S. 253 - BROOKLYN
Project Type
Fast Track Projects
Project Description
ELECTRICAL WORK FOR A/C INITIATIVE / LL26 CODE COMPLIANCE/EXIT SIGN REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/18/2019
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
437149
Total Phase Actual Spending Amount
437092
Dsf Number S
DSF0000912069, DSF0000912474
21
Project Geographic District : 21 • Project Building Identifier: K253 • Project School Name: P.S. 253 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K253
Project School Name
P.S. 253 - BROOKLYN
Project Type
SCA CIP
Project Description
EXISTING BUILDING RENOVATION WORK
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
233929
Final Estimate Of Actual Costs Through End Of Phase Amount
233929
Total Phase Actual Spending Amount
185056
Dsf Number S
DSF0000911840