Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: ALC - MS 258
Project Geographic District
13
Project Building Identifier
K258
Project School Name
ALC - MS 258
Project Type
DIIT - RESOA
Project Description
FY20 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
55000
Total Phase Actual Spending Amount
55000
Dsf Number S
DSF0000913809
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
GREASE TRAP
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
87978
Final Estimate Of Actual Costs Through End Of Phase Amount
87978
Total Phase Actual Spending Amount
14140
Dsf Number S
DSF0001114356
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/18/2024
Project Phase Planned End Date
1/3/2027
Project Budget Amount
671160
Final Estimate Of Actual Costs Through End Of Phase Amount
456228
Total Phase Actual Spending Amount
451056
Dsf Number S
DSF0001064390, DSF0001064392
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
95469
Final Estimate Of Actual Costs Through End Of Phase Amount
95469
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114503
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
GREASE TRAP
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
342966
Final Estimate Of Actual Costs Through End Of Phase Amount
342966
Total Phase Actual Spending Amount
459
Dsf Number S
DSF0001114356
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/18/2024
Project Phase Planned End Date
1/3/2027
Project Budget Amount
10786500
Final Estimate Of Actual Costs Through End Of Phase Amount
10220522
Total Phase Actual Spending Amount
6672712
Dsf Number S
DSF0001064390, DSF0001064392
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
372169
Final Estimate Of Actual Costs Through End Of Phase Amount
372169
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114503
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/14/2023
Project Phase Planned End Date
5/16/2024
Project Phase Actual End Date
4/30/2024
Project Budget Amount
479400
Final Estimate Of Actual Costs Through End Of Phase Amount
684896
Total Phase Actual Spending Amount
371393
Dsf Number S
DSF0001064390, DSF0001064392
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
GREASE TRAP
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
2/4/2026
Project Phase Planned End Date
7/13/2026
Project Budget Amount
23858
Final Estimate Of Actual Costs Through End Of Phase Amount
32179
Total Phase Actual Spending Amount
8886
Dsf Number S
DSF0001114356
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
25890
Final Estimate Of Actual Costs Through End Of Phase Amount
25890
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114503
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Scope
Project Status Name
In-Progress
Project Phase Actual Start Date
6/17/2026
Project Phase Planned End Date
10/19/2026
Project Budget Amount
6473
Final Estimate Of Actual Costs Through End Of Phase Amount
6473
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114503
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
GREASE TRAP
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
2/4/2026
Project Phase Actual End Date
2/3/2026
Project Budget Amount
5965
Final Estimate Of Actual Costs Through End Of Phase Amount
16818
Total Phase Actual Spending Amount
2221
Dsf Number S
DSF0001114356
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/22/2023
Project Phase Planned End Date
11/7/2023
Project Phase Actual End Date
12/5/2023
Project Budget Amount
95880
Final Estimate Of Actual Costs Through End Of Phase Amount
271486
Total Phase Actual Spending Amount
249037
Dsf Number S
DSF0001064390, DSF0001064392
13
Project Geographic District : 13 • Project Building Identifier: K258 • Project School Name: K140 SPED - BROOKLYN
Project Geographic District
13
Project Building Identifier
K258
Project School Name
K140 SPED - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REMOVE ACM PIPE INSULATION AT LOCATIONS LOCATION: ROOM B20A, 8LFT BASEMENT UNDER STAIRC
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/28/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/15/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
15806
Total Phase Actual Spending Amount
730
Dsf Number S
SCA0000075339
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
425000
Total Phase Actual Spending Amount
425000
Dsf Number S
DSF0001163979
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY19 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/9/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1338397
Total Phase Actual Spending Amount
189082
Dsf Number S
DSF0000890771
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
90000
Final Estimate Of Actual Costs Through End Of Phase Amount
90000
Total Phase Actual Spending Amount
27850
Dsf Number S
DSF0001112653
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1320000
Final Estimate Of Actual Costs Through End Of Phase Amount
1320000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112653
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/4/2025
Project Phase Planned End Date
12/19/2025
Project Phase Actual End Date
3/17/2026
Project Budget Amount
90000
Final Estimate Of Actual Costs Through End Of Phase Amount
63596
Total Phase Actual Spending Amount
58247
Dsf Number S
DSF0001112653
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/14/2025
Project Phase Planned End Date
7/16/2025
Project Phase Actual End Date
7/30/2025
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
15478
Total Phase Actual Spending Amount
15478
Dsf Number S
DSF0001112653
20
Project Geographic District : 20 • Project Building Identifier: K259 • Project School Name: I.S. 259 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K259
Project School Name
I.S. 259 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & DRILL HOLES IN WALL PLAY AREA 1ST FLOOR LEFT OF EXIT 5 HOLE SIZE 3/4' HOLE DEPTH THRU
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/6/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1967
Total Phase Actual Spending Amount
1217
Dsf Number S
SCA0000075716
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/2/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
177123
Total Phase Actual Spending Amount
173888
Dsf Number S
DSF0001008681
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163980
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
12/8/2026
Project Budget Amount
180082
Final Estimate Of Actual Costs Through End Of Phase Amount
156058
Total Phase Actual Spending Amount
49861
Dsf Number S
DSF0001087439
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
12/8/2026
Project Budget Amount
202688
Final Estimate Of Actual Costs Through End Of Phase Amount
198983
Total Phase Actual Spending Amount
57286
Dsf Number S
DSF0001087439
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/6/2025
Project Phase Planned End Date
8/29/2025
Project Phase Actual End Date
8/19/2025
Project Budget Amount
14100
Final Estimate Of Actual Costs Through End Of Phase Amount
8871
Total Phase Actual Spending Amount
8871
Dsf Number S
DSF0001087439
19
Project Geographic District : 19 • Project Building Identifier: K260 • Project School Name: THE FRESH CREEK SCHOOL - BROOKLYN
Project Geographic District
19
Project Building Identifier
K260
Project School Name
THE FRESH CREEK SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2025
Project Phase Planned End Date
7/3/2025
Project Phase Actual End Date
3/6/2025
Project Budget Amount
3525
Final Estimate Of Actual Costs Through End Of Phase Amount
2152
Total Phase Actual Spending Amount
2152
Dsf Number S
DSF0001087439
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
150000
Dsf Number S
DSF0001163118
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
556906
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086049
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/17/2026
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
115111
Total Phase Actual Spending Amount
9813
Dsf Number S
DSF0001035506
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: COY L. COX SCHOOL
Project Geographic District
15
Project Building Identifier
K261
Project School Name
COY L. COX SCHOOL
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163981
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / PLAYGROUND REDEVELOPMENT / TCU REMOVAL/PLAYGROUND REDEVELOPMENT / PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2024
Project Phase Planned End Date
4/1/2027
Project Budget Amount
785532
Final Estimate Of Actual Costs Through End Of Phase Amount
413656
Total Phase Actual Spending Amount
387800
Dsf Number S
DSF0000872231, DSF0000895047, DSF0000895046, DSF0000940371, DSF0001035191, DSF0001083690
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOM CONVERSION / PATH OF TRAVEL ROOM CONVERSION
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
1/4/2024
Project Phase Planned End Date
1/2/2025
Project Phase Actual End Date
1/4/2026
Project Budget Amount
261160
Final Estimate Of Actual Costs Through End Of Phase Amount
436087
Total Phase Actual Spending Amount
429605
Dsf Number S
DSF0001085150, DSF0001083699
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOM CONVERSION / PATH OF TRAVEL ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/4/2024
Project Phase Planned End Date
1/2/2025
Project Phase Actual End Date
1/4/2026
Project Budget Amount
2835771
Final Estimate Of Actual Costs Through End Of Phase Amount
2654265
Total Phase Actual Spending Amount
2344855
Dsf Number S
DSF0001085150, DSF0001083699
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / PLAYGROUND REDEVELOPMENT / TCU REMOVAL/PLAYGROUND REDEVELOPMENT / PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2024
Project Phase Planned End Date
4/1/2027
Project Budget Amount
6663650
Final Estimate Of Actual Costs Through End Of Phase Amount
6339593
Total Phase Actual Spending Amount
1961006
Dsf Number S
DSF0000872231, DSF0000895047, DSF0000895046, DSF0000940371, DSF0001035191, DSF0001083690
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / PLAYGROUND REDEVELOPMENT / TCU REMOVAL/PLAYGROUND REDEVELOPMENT / PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/1/2023
Project Phase Planned End Date
9/1/2023
Project Phase Actual End Date
2/7/2024
Project Budget Amount
396001
Final Estimate Of Actual Costs Through End Of Phase Amount
611224
Total Phase Actual Spending Amount
513688
Dsf Number S
DSF0000872231, DSF0000895047, DSF0000895046, DSF0000940371, DSF0001035191, DSF0001083690
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOM CONVERSION / PATH OF TRAVEL ROOM CONVERSION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/5/2023
Project Phase Planned End Date
9/8/2023
Project Phase Actual End Date
5/12/2023
Project Budget Amount
136639
Final Estimate Of Actual Costs Through End Of Phase Amount
124854
Total Phase Actual Spending Amount
124854
Dsf Number S
DSF0001085150, DSF0001083699
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOM CONVERSION / PATH OF TRAVEL ROOM CONVERSION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/17/2022
Project Phase Planned End Date
4/25/2023
Project Phase Actual End Date
4/28/2023
Project Budget Amount
27880
Final Estimate Of Actual Costs Through End Of Phase Amount
40330
Total Phase Actual Spending Amount
40330
Dsf Number S
DSF0001085150, DSF0001083699
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / ROOFS / PLAYGROUND REDEVELOPMENT / TCU REMOVAL/PLAYGROUND REDEVELOPMENT / PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/18/2018
Project Phase Planned End Date
4/25/2023
Project Phase Actual End Date
4/28/2023
Project Budget Amount
84394
Final Estimate Of Actual Costs Through End Of Phase Amount
105823
Total Phase Actual Spending Amount
105723
Dsf Number S
DSF0000872231, DSF0000895047, DSF0000895046, DSF0000940371, DSF0001035191, DSF0001083690
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT 1000A: BASEMENT HALLWAY SOUTH SIDE OF AUDITORIUM?- WALL PLA
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/14/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075965
15
Project Geographic District : 15 • Project Building Identifier: K261 • Project School Name: P.S. 261 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K261
Project School Name
P.S. 261 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE BROKEN MISSING 9X9 TILES IN THE BASEMENT HALLWAY, SOUTH SIDE OF THE AUDITORIU
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1246
Total Phase Actual Spending Amount
496
Dsf Number S
SCA0000075549
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A- RESO A PLAYGROUND
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
223000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001085308
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION / LOW-VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/5/2022
Project Phase Planned End Date
7/3/2024
Project Budget Amount
624960
Final Estimate Of Actual Costs Through End Of Phase Amount
1147984
Total Phase Actual Spending Amount
1132295
Dsf Number S
DSF0000988931, DSF0001008798, DSF0000988932
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/8/2026
Project Phase Planned End Date
5/3/2027
Project Budget Amount
49796
Final Estimate Of Actual Costs Through End Of Phase Amount
23949
Total Phase Actual Spending Amount
5616
Dsf Number S
DSF0001087440
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION / LOW-VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/5/2022
Project Phase Planned End Date
7/3/2024
Project Budget Amount
10044000
Final Estimate Of Actual Costs Through End Of Phase Amount
9691694
Total Phase Actual Spending Amount
8420585
Dsf Number S
DSF0000988931, DSF0001008798, DSF0000988932
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/8/2026
Project Phase Planned End Date
5/3/2027
Project Budget Amount
194120
Final Estimate Of Actual Costs Through End Of Phase Amount
188529
Total Phase Actual Spending Amount
4279
Dsf Number S
DSF0001087440
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION / LOW-VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
6/22/2021
Project Phase Planned End Date
11/23/2021
Project Phase Actual End Date
11/10/2021
Project Budget Amount
446400
Final Estimate Of Actual Costs Through End Of Phase Amount
651304
Total Phase Actual Spending Amount
627219
Dsf Number S
DSF0000988931, DSF0001008798, DSF0000988932
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/19/2025
Project Phase Planned End Date
5/18/2026
Project Phase Actual End Date
3/11/2026
Project Budget Amount
13504
Final Estimate Of Actual Costs Through End Of Phase Amount
905
Total Phase Actual Spending Amount
905
Dsf Number S
DSF0001087440
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/10/2025
Project Phase Planned End Date
3/16/2026
Project Phase Actual End Date
11/19/2025
Project Budget Amount
3376
Final Estimate Of Actual Costs Through End Of Phase Amount
226
Total Phase Actual Spending Amount
226
Dsf Number S
DSF0001087440
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION / LOW-VOLTAGE ELECTRICAL SYSTEM
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/6/2021
Project Phase Planned End Date
9/3/2021
Project Phase Actual End Date
6/21/2021
Project Budget Amount
89280
Final Estimate Of Actual Costs Through End Of Phase Amount
139773
Total Phase Actual Spending Amount
139773
Dsf Number S
DSF0000988931, DSF0001008798, DSF0000988932