Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A PLAYGROUND UPGRADE / PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/2/2025
Project Phase Planned End Date
2/1/2027
Project Budget Amount
111450
Final Estimate Of Actual Costs Through End Of Phase Amount
141595
Total Phase Actual Spending Amount
134526
Dsf Number S
DSF0001035507, DSF0001035508
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A PLAYGROUND UPGRADE / PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/2/2025
Project Phase Planned End Date
2/1/2027
Project Budget Amount
1634601
Final Estimate Of Actual Costs Through End Of Phase Amount
1419048
Total Phase Actual Spending Amount
59493
Dsf Number S
DSF0001035507, DSF0001035508
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A PLAYGROUND UPGRADE / PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/28/2023
Project Phase Planned End Date
5/1/2024
Project Phase Actual End Date
5/21/2024
Project Budget Amount
111450
Final Estimate Of Actual Costs Through End Of Phase Amount
161076
Total Phase Actual Spending Amount
149507
Dsf Number S
DSF0001035507, DSF0001035508
16
Project Geographic District : 16 • Project Building Identifier: K262 • Project School Name: P.S. 262 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K262
Project School Name
P.S. 262 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A PLAYGROUND UPGRADE / PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/30/2023
Project Phase Planned End Date
5/1/2023
Project Phase Actual End Date
12/15/2023
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
72492
Total Phase Actual Spending Amount
72492
Dsf Number S
DSF0001035507, DSF0001035508
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
171000
Total Phase Actual Spending Amount
171000
Dsf Number S
DSF0001163982
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112657
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
400000
Dsf Number S
DSF0001163983
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
15465
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086055
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086052
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A WATER FOUNTAIN UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/24/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
58788
Total Phase Actual Spending Amount
57998
Dsf Number S
DSF0000913055
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
500000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112658
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086057
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/11/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
315029
Total Phase Actual Spending Amount
315029
Dsf Number S
DSF0001008295
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
DEP GREEN INFRASTRUCTURE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/28/2023
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
873843
Total Phase Actual Spending Amount
400220
Dsf Number S
DSF0000865736
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY24 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
29250
Total Phase Actual Spending Amount
9418
Dsf Number S
DSF0001086053
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / WINDOWS / EXTERIOR MASONRY / PAVED AREA- CONCRETE / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/16/2024
Project Phase Planned End Date
3/4/2027
Project Budget Amount
2002002
Final Estimate Of Actual Costs Through End Of Phase Amount
762007
Total Phase Actual Spending Amount
749973
Dsf Number S
DSF0001064483, DSF0001111780, DSF0001111777, DSF0001111778, DSF0001111779
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / WINDOWS / EXTERIOR MASONRY / PAVED AREA- CONCRETE / PARAPETS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/16/2024
Project Phase Planned End Date
3/4/2027
Project Budget Amount
32175001
Final Estimate Of Actual Costs Through End Of Phase Amount
29323223
Total Phase Actual Spending Amount
15160804
Dsf Number S
DSF0001064483, DSF0001111780, DSF0001111777, DSF0001111778, DSF0001111779
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / WINDOWS / EXTERIOR MASONRY / PAVED AREA- CONCRETE / PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/27/2023
Project Phase Planned End Date
5/29/2024
Project Phase Actual End Date
4/23/2024
Project Budget Amount
1430000
Final Estimate Of Actual Costs Through End Of Phase Amount
531033
Total Phase Actual Spending Amount
531033
Dsf Number S
DSF0001064483, DSF0001111780, DSF0001111777, DSF0001111778, DSF0001111779
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: P.S./I.S. 323 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
P.S./I.S. 323 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / WINDOWS / EXTERIOR MASONRY / PAVED AREA- CONCRETE / PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/21/2023
Project Phase Planned End Date
12/19/2023
Project Phase Actual End Date
11/2/2023
Project Budget Amount
286001
Final Estimate Of Actual Costs Through End Of Phase Amount
215133
Total Phase Actual Spending Amount
210614
Dsf Number S
DSF0001064483, DSF0001111780, DSF0001111777, DSF0001111778, DSF0001111779
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
56676
Final Estimate Of Actual Costs Through End Of Phase Amount
56676
Total Phase Actual Spending Amount
31174
Dsf Number S
DSF0001086056, DSF0001087022
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
521114
Final Estimate Of Actual Costs Through End Of Phase Amount
521114
Total Phase Actual Spending Amount
7605
Dsf Number S
DSF0001086056, DSF0001087022
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/3/2025
Project Phase Planned End Date
2/13/2026
Project Phase Actual End Date
1/5/2026
Project Budget Amount
51995
Final Estimate Of Actual Costs Through End Of Phase Amount
51995
Total Phase Actual Spending Amount
27900
Dsf Number S
DSF0001086056, DSF0001087022
23
Project Geographic District : 23 • Project Building Identifier: K263 • Project School Name: M.S. 671 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K263
Project School Name
M.S. 671 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/10/2025
Project Phase Planned End Date
11/7/2025
Project Phase Actual End Date
10/3/2025
Project Budget Amount
19915
Final Estimate Of Actual Costs Through End Of Phase Amount
19915
Total Phase Actual Spending Amount
19915
Dsf Number S
DSF0001086056, DSF0001087022
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/29/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
195341
Dsf Number S
DSF0001033527
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: K231 SPED - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
K231 SPED - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
20000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163984
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY20 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913254
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/26/2024
Project Phase Planned End Date
5/21/2025
Project Budget Amount
39268
Final Estimate Of Actual Costs Through End Of Phase Amount
60723
Total Phase Actual Spending Amount
30248
Dsf Number S
DSF0001035509
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY20 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913254
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/26/2024
Project Phase Planned End Date
5/21/2025
Project Budget Amount
575927
Final Estimate Of Actual Costs Through End Of Phase Amount
410750
Total Phase Actual Spending Amount
120500
Dsf Number S
DSF0001035509
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY20 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913254
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/17/2023
Project Phase Planned End Date
12/18/2023
Project Phase Actual End Date
2/16/2024
Project Budget Amount
39268
Final Estimate Of Actual Costs Through End Of Phase Amount
36052
Total Phase Actual Spending Amount
29546
Dsf Number S
DSF0001035509
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY20 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913254
20
Project Geographic District : 20 • Project Building Identifier: K264 • Project School Name: P.S. 264 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K264
Project School Name
P.S. 264 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/13/2023
Project Phase Planned End Date
6/14/2023
Project Phase Actual End Date
7/6/2023
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
8716
Total Phase Actual Spending Amount
8716
Dsf Number S
DSF0001035509
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/25/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
546915
Total Phase Actual Spending Amount
42183
Dsf Number S
DSF0001035185
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
90696
Final Estimate Of Actual Costs Through End Of Phase Amount
90696
Total Phase Actual Spending Amount
234
Dsf Number S
DSF0001114505
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
353559
Final Estimate Of Actual Costs Through End Of Phase Amount
353559
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114505
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
24595
Final Estimate Of Actual Costs Through End Of Phase Amount
24595
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114505
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS UPGRADES
Project Phase Name
Scope
Project Status Name
In-Progress
Project Phase Actual Start Date
6/24/2026
Project Phase Planned End Date
10/23/2026
Project Budget Amount
6149
Final Estimate Of Actual Costs Through End Of Phase Amount
6149
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114505
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-TEST AND ABATE LOOSE PIPE INSULATION, PAINTED RED APPROX 15 LINEAR FT. PIPE INSULATION DEBRIS O
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/1/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/8/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
26498
Total Phase Actual Spending Amount
26498
Dsf Number S
SCA0000075162
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE APPROX. 15 LFT PIPE INSULATION LOCATION BASEMENT B7, ABOVE DROP CEILING
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/22/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/22/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
19262
Total Phase Actual Spending Amount
12437
Dsf Number S
SCA0000075325
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE PIPE AND PLASTER 1) CLASSROOM B7, SPACE ID 1107 CEILING ACCOUSTICAL PLASTER (RED) 2' X 7'
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/17/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075440
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED CEILING IN STUDENT CAFETERIA CEILING TILES ARE FALLING.
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/23/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/26/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
73227
Total Phase Actual Spending Amount
1349
Dsf Number S
SCA0000075853
13
Project Geographic District : 13 • Project Building Identifier: K265 • Project School Name: I.S. 265 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K265
Project School Name
I.S. 265 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REPAIR BASEMENT CORRIDOR CEILING BY B47 FOR ACM
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
1/25/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
51097
Total Phase Actual Spending Amount
51097
Dsf Number S
SCA0000074960
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY09 RESO A IP SURVEILLANCE CAMERA
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
193893
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000623076
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
375000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112659
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED FLOORS 3RD FLOOR EXIT 'E' GYM LANDING -SPACE 4005 CE: FRANK LOSSMANN
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/26/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
801
Total Phase Actual Spending Amount
51
Dsf Number S
SCA0000076057
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PERFORM ACM ABATE/REPLACE DAMAGED FLOOR TILES AT LOCATIONS CLASSROOM FLOORS 315,321,208, 204 FL
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/3/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
902
Total Phase Actual Spending Amount
152
Dsf Number S
SCA0000076073
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-REMOVE APPROX 10' OF ACM PIPE COVER FROM A 5' STORM PIPE ( 3-SPOTS ) LOCATED IN BASEMENT STORA
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/12/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
20868
Total Phase Actual Spending Amount
1262
Dsf Number S
SCA0000075212
18
Project Geographic District : 18 • Project Building Identifier: K268 • Project School Name: P.S. 268 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K268
Project School Name
P.S. 268 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REMOVE WIRING IN ELECTRICAL BOX IN ELECTRICAL ROOM B11, SPACE ID 1011 SCOPE IS TO REPLA
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/7/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/23/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
15663
Total Phase Actual Spending Amount
913
Dsf Number S
SCA0000075934
22
Project Geographic District : 22 • Project Building Identifier: K269 • Project School Name: P.S. 361 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K269
Project School Name
P.S. 361 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
270000
Total Phase Actual Spending Amount
270000
Dsf Number S
DSF0001163985