Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: BROOKLYN DEMOCRACY ACADEMY - K
Project Geographic District
23
Project Building Identifier
K275
Project School Name
BROOKLYN DEMOCRACY ACADEMY - K
Project Type
DOE - RESOA
Project Description
FY23 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
300000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035517
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: I.S. 518 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K275
Project School Name
I.S. 518 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/2/2016
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
309331
Total Phase Actual Spending Amount
304331
Dsf Number S
DSF0000782173
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: I.S. 518 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K275
Project School Name
I.S. 518 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
8/26/2026
Project Budget Amount
67121
Final Estimate Of Actual Costs Through End Of Phase Amount
93961
Total Phase Actual Spending Amount
25049
Dsf Number S
DSF0001035515
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: I.S. 518 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K275
Project School Name
I.S. 518 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
8/26/2026
Project Budget Amount
984446
Final Estimate Of Actual Costs Through End Of Phase Amount
942719
Total Phase Actual Spending Amount
133653
Dsf Number S
DSF0001035515
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: I.S. 518 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K275
Project School Name
I.S. 518 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/19/2023
Project Phase Planned End Date
12/20/2023
Project Phase Actual End Date
11/21/2023
Project Budget Amount
67121
Final Estimate Of Actual Costs Through End Of Phase Amount
83742
Total Phase Actual Spending Amount
71889
Dsf Number S
DSF0001035515
23
Project Geographic District : 23 • Project Building Identifier: K275 • Project School Name: I.S. 518 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K275
Project School Name
I.S. 518 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/25/2023
Project Phase Planned End Date
5/25/2023
Project Phase Actual End Date
7/14/2023
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
9614
Total Phase Actual Spending Amount
9614
Dsf Number S
DSF0001035515
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
550000
Total Phase Actual Spending Amount
550000
Dsf Number S
DSF0001163120
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/1/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
225594
Total Phase Actual Spending Amount
1864
Dsf Number S
DSF0001086063
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/25/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
249133
Total Phase Actual Spending Amount
62457
Dsf Number S
DSF0000913257
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/10/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
105321
Total Phase Actual Spending Amount
90708
Dsf Number S
DSF0001033530
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY23 RESO A (MA) LSP CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
654969
Total Phase Actual Spending Amount
13726
Dsf Number S
DSF0001035518
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/2/2026
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
412250
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112665
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
SCA CIP
Project Description
PLAYGROUND UPGRADE / PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
254483
Final Estimate Of Actual Costs Through End Of Phase Amount
254483
Total Phase Actual Spending Amount
50275
Dsf Number S
DSF0001120056, DSF0001114048
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
SCA CIP
Project Description
PLAYGROUND UPGRADE / PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
2379526
Final Estimate Of Actual Costs Through End Of Phase Amount
2379526
Total Phase Actual Spending Amount
26063
Dsf Number S
DSF0001120056, DSF0001114048
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
SCA CIP
Project Description
PLAYGROUND UPGRADE / PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
12/22/2025
Project Phase Actual End Date
4/1/2026
Project Budget Amount
150832
Final Estimate Of Actual Costs Through End Of Phase Amount
108175
Total Phase Actual Spending Amount
26929
Dsf Number S
DSF0001120056, DSF0001114048
18
Project Geographic District : 18 • Project Building Identifier: K276 • Project School Name: P.S. 276 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K276
Project School Name
P.S. 276 - BROOKLYN
Project Type
SCA CIP
Project Description
PLAYGROUND UPGRADE / PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/22/2025
Project Phase Planned End Date
8/14/2025
Project Phase Actual End Date
8/7/2025
Project Budget Amount
32616
Final Estimate Of Actual Costs Through End Of Phase Amount
67725
Total Phase Actual Spending Amount
67725
Dsf Number S
DSF0001120056, DSF0001114048
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY16 RESO A CAFETERIA/MULTIPURPOSE ROOM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
49084
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000822807
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/18/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
123904
Total Phase Actual Spending Amount
91948
Dsf Number S
DSF0001033531
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/29/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
142267
Total Phase Actual Spending Amount
48629
Dsf Number S
DSF0000913258
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/13/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
300000
Dsf Number S
DSF0001086064
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
35586
Final Estimate Of Actual Costs Through End Of Phase Amount
35586
Total Phase Actual Spending Amount
6397
Dsf Number S
DSF0001087443
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
138723
Final Estimate Of Actual Costs Through End Of Phase Amount
138723
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087443
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/2/2025
Project Phase Planned End Date
12/30/2025
Project Phase Actual End Date
11/28/2025
Project Budget Amount
9650
Final Estimate Of Actual Costs Through End Of Phase Amount
2862
Total Phase Actual Spending Amount
2862
Dsf Number S
DSF0001087443
22
Project Geographic District : 22 • Project Building Identifier: K277 • Project School Name: P.S. 277 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K277
Project School Name
P.S. 277 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/30/2025
Project Phase Planned End Date
10/29/2025
Project Phase Actual End Date
7/2/2025
Project Budget Amount
2413
Final Estimate Of Actual Costs Through End Of Phase Amount
715
Total Phase Actual Spending Amount
715
Dsf Number S
DSF0001087443
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY15 RESO A IP SURVEILLANCE CAMERA INSTALLATION
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
130728
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000801009
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/4/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
233803
Total Phase Actual Spending Amount
1000
Dsf Number S
DSF0001033052
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY08 RESO A SCIENCE LAB UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
75000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000545194
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY10 RESO A- AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
75000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000710069
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A DIGITAL SIGN
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/1/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
65163
Total Phase Actual Spending Amount
21001
Dsf Number S
DSF0001034987
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/28/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
655918
Total Phase Actual Spending Amount
588268
Dsf Number S
DSF0001085724
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY25 RESO A IPDVS CAMERA INSTALLATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/17/2025
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
421702
Total Phase Actual Spending Amount
239368
Dsf Number S
DSF0001112667
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
12125
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163123
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
Fast Track Projects
Project Description
ELECTRICAL WORK FOR A/C INITIATIVE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/10/2021
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
22484
Total Phase Actual Spending Amount
21836
Dsf Number S
DSF0001008764
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE DAMAGED FLOOR TILES. 792SF APPROX 5SF DISTRIBUTED DAMAGE AT ROOM 240 (SPACE ID: 3240) 9X9
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/29/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/24/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
24784
Total Phase Actual Spending Amount
24034
Dsf Number S
SCA0000075879
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE/ REPAIR OR REPLACE ALL DAMAGED BUILDING MATERIALS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/8/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/21/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
78221
Total Phase Actual Spending Amount
549
Dsf Number S
SCA0000074632
22
Project Geographic District : 22 • Project Building Identifier: K278 • Project School Name: I.S. 278 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K278
Project School Name
I.S. 278 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT WALL PLASTER LVL 1 ROOMS AT SPACES - 1126A & 1128. 9X9 FLOO
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/14/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1409
Total Phase Actual Spending Amount
659
Dsf Number S
SCA0000075967
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
150000
Dsf Number S
DSF0001163124
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/26/2026
Project Phase Planned End Date
5/21/2027
Project Budget Amount
55519
Final Estimate Of Actual Costs Through End Of Phase Amount
22375
Total Phase Actual Spending Amount
1947
Dsf Number S
DSF0001087444
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
754192
Final Estimate Of Actual Costs Through End Of Phase Amount
754192
Total Phase Actual Spending Amount
81645
Dsf Number S
DSF0001064739, DSF0001120102
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
BACKFLOW PREVENTION DEVICES
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2019
Project Phase Planned End Date
7/15/2020
Project Budget Amount
202500
Final Estimate Of Actual Costs Through End Of Phase Amount
124597
Total Phase Actual Spending Amount
122655
Dsf Number S
DSF0000888831
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
7190888
Final Estimate Of Actual Costs Through End Of Phase Amount
7190888
Total Phase Actual Spending Amount
29749
Dsf Number S
DSF0001064739, DSF0001120102
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/26/2026
Project Phase Planned End Date
5/21/2027
Project Budget Amount
216430
Final Estimate Of Actual Costs Through End Of Phase Amount
192875
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087444
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
BACKFLOW PREVENTION DEVICES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2019
Project Phase Planned End Date
7/15/2020
Project Budget Amount
873750
Final Estimate Of Actual Costs Through End Of Phase Amount
806650
Total Phase Actual Spending Amount
616306
Dsf Number S
DSF0000888831
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/15/2025
Project Phase Planned End Date
6/17/2025
Project Phase Actual End Date
7/11/2025
Project Budget Amount
455197
Final Estimate Of Actual Costs Through End Of Phase Amount
283795
Total Phase Actual Spending Amount
269181
Dsf Number S
DSF0001064739, DSF0001120102
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
BACKFLOW PREVENTION DEVICES
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/14/2018
Project Phase Planned End Date
5/13/2019
Project Phase Actual End Date
5/10/2019
Project Budget Amount
82500
Final Estimate Of Actual Costs Through End Of Phase Amount
141828
Total Phase Actual Spending Amount
140208
Dsf Number S
DSF0000888831
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/3/2026
Project Phase Planned End Date
7/30/2026
Project Phase Actual End Date
4/7/2026
Project Budget Amount
15056
Final Estimate Of Actual Costs Through End Of Phase Amount
14253
Total Phase Actual Spending Amount
14253
Dsf Number S
DSF0001087444
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/28/2026
Project Phase Planned End Date
5/28/2026
Project Phase Actual End Date
2/3/2026
Project Budget Amount
3764
Final Estimate Of Actual Costs Through End Of Phase Amount
3563
Total Phase Actual Spending Amount
3563
Dsf Number S
DSF0001087444
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/18/2024
Project Phase Planned End Date
11/4/2024
Project Phase Actual End Date
12/11/2024
Project Budget Amount
98199
Final Estimate Of Actual Costs Through End Of Phase Amount
118338
Total Phase Actual Spending Amount
118338
Dsf Number S
DSF0001064739, DSF0001120102
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA CIP
Project Description
BACKFLOW PREVENTION DEVICES
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/12/2018
Project Phase Planned End Date
7/10/2018
Project Phase Actual End Date
10/16/2018
Project Budget Amount
22500
Final Estimate Of Actual Costs Through End Of Phase Amount
33667
Total Phase Actual Spending Amount
33667
Dsf Number S
DSF0000888831
18
Project Geographic District : 18 • Project Building Identifier: K279 • Project School Name: P.S. 279 - BROOKLYN
Project Geographic District
18
Project Building Identifier
K279
Project School Name
P.S. 279 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REPAIR ACM FLOOR - GYM OFFICE (TEACHERS OFFICE) 9X9 FLOOR TILES LVL 2 LIGHT BROWN
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/21/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/12/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
14288
Total Phase Actual Spending Amount
741
Dsf Number S
SCA0000075840