Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP
Project Description
IDA FLOOD ELIMINATION / PATH OF TRAVEL NON-IDA FLOOD ELIMINATION / IDA INTERIOR SPACES
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
10/8/2021
Project Phase Planned End Date
11/10/2022
Project Phase Actual End Date
1/25/2023
Project Budget Amount
72818
Final Estimate Of Actual Costs Through End Of Phase Amount
113955
Total Phase Actual Spending Amount
105923
Dsf Number S
DSF0001014182, DSF0001035059, DSF0001036332
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/18/2024
Project Phase Planned End Date
8/1/2024
Project Phase Actual End Date
3/5/2025
Project Budget Amount
149625
Final Estimate Of Actual Costs Through End Of Phase Amount
168816
Total Phase Actual Spending Amount
167255
Dsf Number S
DSF0001064935, DSF0001120325, DSF0001120327
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
383
Final Estimate Of Actual Costs Through End Of Phase Amount
383
Total Phase Actual Spending Amount
383
Dsf Number S
DSF0001007763
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY21 RESO A ROOM CONVERSION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008243
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
102
Final Estimate Of Actual Costs Through End Of Phase Amount
102
Total Phase Actual Spending Amount
102
Dsf Number S
DSF0001007763
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY21 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008243
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001007763
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY21 RESO A ROOM CONVERSION
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008243
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY21 RESO A ROOM CONVERSION
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008243
32
Project Geographic District : 32 • Project Building Identifier: K291 • Project School Name: I.S. 291 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K291
Project School Name
I.S. 291 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001007763
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: BARD HIGH SCHOOL EARLY COLLEGE BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
BARD HIGH SCHOOL EARLY COLLEGE BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
200000
Dsf Number S
DSF0001163132
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
Complete
Project Phase Actual Start Date
1/15/2025
Project Phase Planned End Date
DIIR
Project Phase Actual End Date
4/15/2025
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
220000
Total Phase Actual Spending Amount
220000
Dsf Number S
DSF0001033057
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: BARD HIGH SCHOOL EARLY COLLEGE BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
BARD HIGH SCHOOL EARLY COLLEGE BROOKLYN
Project Type
DOE - RESOA
Project Description
FY26 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
360000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163171
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/4/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
121400
Total Phase Actual Spending Amount
121400
Dsf Number S
DSF0000782446
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/9/2024
Project Phase Planned End Date
4/1/2026
Project Budget Amount
378000
Final Estimate Of Actual Costs Through End Of Phase Amount
518088
Total Phase Actual Spending Amount
512058
Dsf Number S
DSF0001064959, DSF0001092609
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
SCIENCE LAB UPGRADE / PATH OF TRAVEL SCIENCE LAB UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
238149
Final Estimate Of Actual Costs Through End Of Phase Amount
238149
Total Phase Actual Spending Amount
71152
Dsf Number S
DSF0001120363, DSF0001114344
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
SCIENCE LAB UPGRADE / PATH OF TRAVEL SCIENCE LAB UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1952371
Final Estimate Of Actual Costs Through End Of Phase Amount
1952371
Total Phase Actual Spending Amount
49575
Dsf Number S
DSF0001120363, DSF0001114344
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/9/2024
Project Phase Planned End Date
4/1/2026
Project Budget Amount
6075001
Final Estimate Of Actual Costs Through End Of Phase Amount
5746859
Total Phase Actual Spending Amount
3813392
Dsf Number S
DSF0001064959, DSF0001092609
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/21/2023
Project Phase Planned End Date
4/24/2024
Project Phase Actual End Date
5/6/2024
Project Budget Amount
270000
Final Estimate Of Actual Costs Through End Of Phase Amount
381934
Total Phase Actual Spending Amount
366520
Dsf Number S
DSF0001064959, DSF0001092609
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
SCIENCE LAB UPGRADE / PATH OF TRAVEL SCIENCE LAB UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/24/2025
Project Phase Planned End Date
4/15/2026
Project Phase Actual End Date
3/25/2026
Project Budget Amount
124968
Final Estimate Of Actual Costs Through End Of Phase Amount
90979
Total Phase Actual Spending Amount
15413
Dsf Number S
DSF0001120363, DSF0001114344
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/7/2023
Project Phase Planned End Date
11/22/2023
Project Phase Actual End Date
11/20/2023
Project Budget Amount
54000
Final Estimate Of Actual Costs Through End Of Phase Amount
148815
Total Phase Actual Spending Amount
148815
Dsf Number S
DSF0001064959, DSF0001092609
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA CIP
Project Description
SCIENCE LAB UPGRADE / PATH OF TRAVEL SCIENCE LAB UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/10/2025
Project Phase Planned End Date
12/17/2025
Project Phase Actual End Date
11/21/2025
Project Budget Amount
27484
Final Estimate Of Actual Costs Through End Of Phase Amount
56575
Total Phase Actual Spending Amount
13779
Dsf Number S
DSF0001120363, DSF0001114344
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT MORTAR LVL 2 CERAMIC FLOOR TILES AT 152 - MEN'S TOILET - 21
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/15/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
9866
Total Phase Actual Spending Amount
1116
Dsf Number S
SCA0000075979
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-DRILL 8 HOLES THROUGH THE FLOOR IN ROOM 304 1 1/4 INCH HOLEA TO BRING POWER FROM THE 3RD TO 2ND
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/6/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/2/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
29575
Total Phase Actual Spending Amount
24425
Dsf Number S
SCA0000075715
19
Project Geographic District : 19 • Project Building Identifier: K292 • Project School Name: I.S. 292 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K292
Project School Name
I.S. 292 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-DRILL HOLE THROUGH SLAB IN ROOM 304 5' DIAMETER HOLE
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/7/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
15299
Total Phase Actual Spending Amount
10924
Dsf Number S
SCA0000075543
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: THE BOERUM HILL SCHOOL FOR INTERNATIONAL STUDIES - K
Project Geographic District
15
Project Building Identifier
K293
Project School Name
THE BOERUM HILL SCHOOL FOR INTERNATIONAL STUDIES - K
Project Type
DIIT - RESOA
Project Description
FY21 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
60000
Total Phase Actual Spending Amount
60000
Dsf Number S
DSF0001008211
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: SUCCESS ACADEMY CHARTER SCHOOL - COBBLE HILL
Project Geographic District
15
Project Building Identifier
K293
Project School Name
SUCCESS ACADEMY CHARTER SCHOOL - COBBLE HILL
Project Type
DOE - RESOA
Project Description
FY22 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/26/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
210715
Total Phase Actual Spending Amount
206463
Dsf Number S
DSF0001033480
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: THE BOERUM HILL SCHOOL FOR INTERNATIONAL STUDIES - K
Project Geographic District
15
Project Building Identifier
K293
Project School Name
THE BOERUM HILL SCHOOL FOR INTERNATIONAL STUDIES - K
Project Type
DOE - RESOA
Project Description
FY21 RESO A WATER FOUNTAIN UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/22/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
51442
Total Phase Actual Spending Amount
50750
Dsf Number S
DSF0001008214
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Geographic District
15
Project Building Identifier
K293
Project School Name
DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Type
Fast Track Projects
Project Description
CTF CHARTER MATCH ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/19/2026
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
140524
Total Phase Actual Spending Amount
68580
Dsf Number S
DSF0001114203
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: K368 SPED - BROOKLYN
Project Geographic District
15
Project Building Identifier
K293
Project School Name
K368 SPED - BROOKLYN
Project Type
Fast Track Projects
Project Description
CTF ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/20/2026
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
189777
Total Phase Actual Spending Amount
89545
Dsf Number S
DSF0001114205
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Geographic District
15
Project Building Identifier
K293
Project School Name
DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Type
SCA IEH
Project Description
PO18-ABATE & REPLACE 9X9 FLOOR TILES LOC: ROOM B21A (SPACE ID 1021A)
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/3/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1460
Total Phase Actual Spending Amount
710
Dsf Number S
SCA0000075712
15
Project Geographic District : 15 • Project Building Identifier: K293 • Project School Name: DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Geographic District
15
Project Building Identifier
K293
Project School Name
DIGITAL ARTS AND CINEMA TECHNOLOGY HIGH SCHOOL - K
Project Type
SCA IEH
Project Description
PO18-ABATE FAUCET, SINK, AND CABINET CE WOULD LIKE THE FAUCET DECOMMISSIONED, SINK AND CABINET REMOV
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/14/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/17/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
48851
Total Phase Actual Spending Amount
2433
Dsf Number S
SCA0000075296
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/3/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1765939
Total Phase Actual Spending Amount
1559056
Dsf Number S
DSF0001033585
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
12325
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163133
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
3290678
Final Estimate Of Actual Costs Through End Of Phase Amount
194745
Total Phase Actual Spending Amount
194219
Dsf Number S
DSF0001112306
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRICAL SERVICE UPGRADE / FIRE ALARM UPGRADE / PARAPETS / ROOFS / FLOOD ELIMINATION / PARTIAL ELECTRIFICATION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
4226084
Final Estimate Of Actual Costs Through End Of Phase Amount
4226084
Total Phase Actual Spending Amount
44455
Dsf Number S
DSF0001112313, DSF0001120392, DSF0001120398, DSF0001120397, DSF0001120394, DSF0001115008
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
PATH OF TRAVEL FLOOD ELIMINATION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
50135
Final Estimate Of Actual Costs Through End Of Phase Amount
50135
Total Phase Actual Spending Amount
2214
Dsf Number S
DSF0001114102
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
PATH OF TRAVEL FLOOD ELIMINATION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
195441
Final Estimate Of Actual Costs Through End Of Phase Amount
195441
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114102
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
33205936
Final Estimate Of Actual Costs Through End Of Phase Amount
392545
Total Phase Actual Spending Amount
157672
Dsf Number S
DSF0001112306
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRICAL SERVICE UPGRADE / FIRE ALARM UPGRADE / PARAPETS / ROOFS / FLOOD ELIMINATION / PARTIAL ELECTRIFICATION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
42645026
Final Estimate Of Actual Costs Through End Of Phase Amount
42645026
Total Phase Actual Spending Amount
42830
Dsf Number S
DSF0001112313, DSF0001120392, DSF0001120398, DSF0001120397, DSF0001120394, DSF0001115008
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRICAL SERVICE UPGRADE / FIRE ALARM UPGRADE / PARAPETS / ROOFS / FLOOD ELIMINATION / PARTIAL ELECTRIFICATION
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2025
Project Phase Planned End Date
10/7/2025
Project Budget Amount
2689325
Final Estimate Of Actual Costs Through End Of Phase Amount
2689325
Total Phase Actual Spending Amount
242269
Dsf Number S
DSF0001112313, DSF0001120392, DSF0001120398, DSF0001120397, DSF0001120394, DSF0001115008
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
PATH OF TRAVEL FLOOD ELIMINATION
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
7/23/2025
Project Phase Planned End Date
12/1/2025
Project Budget Amount
13596
Final Estimate Of Actual Costs Through End Of Phase Amount
13596
Total Phase Actual Spending Amount
9824
Dsf Number S
DSF0001114102
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2025
Project Phase Planned End Date
10/7/2025
Project Budget Amount
2094068
Final Estimate Of Actual Costs Through End Of Phase Amount
645001
Total Phase Actual Spending Amount
342485
Dsf Number S
DSF0001112306
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/2/2024
Project Phase Planned End Date
12/4/2024
Project Phase Actual End Date
2/19/2025
Project Budget Amount
448729
Final Estimate Of Actual Costs Through End Of Phase Amount
284668
Total Phase Actual Spending Amount
284668
Dsf Number S
DSF0001112306
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRICAL SERVICE UPGRADE / FIRE ALARM UPGRADE / PARAPETS / ROOFS / FLOOD ELIMINATION / PARTIAL ELECTRIFICATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/2/2024
Project Phase Planned End Date
12/4/2024
Project Phase Actual End Date
2/19/2025
Project Budget Amount
576283
Final Estimate Of Actual Costs Through End Of Phase Amount
237068
Total Phase Actual Spending Amount
236238
Dsf Number S
DSF0001112313, DSF0001120392, DSF0001120398, DSF0001120397, DSF0001120394, DSF0001115008
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA CIP
Project Description
PATH OF TRAVEL FLOOD ELIMINATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/28/2025
Project Phase Planned End Date
7/30/2025
Project Phase Actual End Date
7/23/2025
Project Budget Amount
3399
Final Estimate Of Actual Costs Through End Of Phase Amount
2456
Total Phase Actual Spending Amount
2456
Dsf Number S
DSF0001114102
32
Project Geographic District : 32 • Project Building Identifier: K296 • Project School Name: I.S. 562 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K296
Project School Name
I.S. 562 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT CERAMIC TILE MASTIC - WALL AT 1008 AND WALL PLASTER, 1006A
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/15/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075978
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087226
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY19 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/2/2019
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
227233
Total Phase Actual Spending Amount
190001
Dsf Number S
DSF0000890655
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A GYMNASIUM UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/27/2025
Project Phase Planned End Date
1/22/2026
Project Budget Amount
54000
Final Estimate Of Actual Costs Through End Of Phase Amount
98381
Total Phase Actual Spending Amount
94342
Dsf Number S
DSF0001086073