Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/27/2025
Project Phase Planned End Date
1/22/2026
Project Budget Amount
792000
Final Estimate Of Actual Costs Through End Of Phase Amount
717559
Total Phase Actual Spending Amount
476999
Dsf Number S
DSF0001086073
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A GYMNASIUM UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/8/2024
Project Phase Planned End Date
9/24/2024
Project Phase Actual End Date
9/13/2024
Project Budget Amount
54000
Final Estimate Of Actual Costs Through End Of Phase Amount
93138
Total Phase Actual Spending Amount
90128
Dsf Number S
DSF0001086073
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A GYMNASIUM UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/13/2023
Project Phase Planned End Date
4/16/2024
Project Phase Actual End Date
5/7/2024
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
22385
Total Phase Actual Spending Amount
22385
Dsf Number S
DSF0001086073
14
Project Geographic District : 14 • Project Building Identifier: K297 • Project School Name: P.S. 297 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K297
Project School Name
P.S. 297 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REMOVE AIRCELL PIPE INSULATION IN ROOMS B4, B6, & THE CORRIDOR WASTE LINE IS SPRAYED IN
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/16/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/20/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
14140
Total Phase Actual Spending Amount
1614
Dsf Number S
SCA0000075814
23
Project Geographic District : 23 • Project Building Identifier: K298 • Project School Name: I.S. 363 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K298
Project School Name
I.S. 363 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/11/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
162769
Total Phase Actual Spending Amount
159484
Dsf Number S
DSF0001008242
23
Project Geographic District : 23 • Project Building Identifier: K298 • Project School Name: P.S. 298 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K298
Project School Name
P.S. 298 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
DEP/DOE WATER CONSERVATION FIXTURE RETROFIT PROGRAM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/25/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
103495
Total Phase Actual Spending Amount
103495
Dsf Number S
DSF0001009053
23
Project Geographic District : 23 • Project Building Identifier: K298 • Project School Name: I.S. 363 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K298
Project School Name
I.S. 363 - BROOKLYN
Project Type
SCA Furniture & Equipment
Project Description
FY26 RESO A MOBILE SCIENCE LABS
Project Phase Name
F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/2/2026
Project Budget Amount
454000
Final Estimate Of Actual Costs Through End Of Phase Amount
454000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163172
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
200000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008424
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163134
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2024
Project Phase Planned End Date
8/8/2026
Project Budget Amount
1086528
Final Estimate Of Actual Costs Through End Of Phase Amount
1254748
Total Phase Actual Spending Amount
1065487
Dsf Number S
DSF0001008566, DSF0001034349
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/19/2026
Project Phase Planned End Date
5/14/2027
Project Budget Amount
60173
Final Estimate Of Actual Costs Through End Of Phase Amount
23725
Total Phase Actual Spending Amount
1593
Dsf Number S
DSF0001087446
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/19/2026
Project Phase Planned End Date
5/14/2027
Project Budget Amount
234571
Final Estimate Of Actual Costs Through End Of Phase Amount
220717
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087446
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/21/2024
Project Phase Planned End Date
8/8/2026
Project Budget Amount
14394248
Final Estimate Of Actual Costs Through End Of Phase Amount
13254021
Total Phase Actual Spending Amount
9094264
Dsf Number S
DSF0001008566, DSF0001034349
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/3/2026
Project Phase Planned End Date
7/30/2026
Project Phase Actual End Date
4/8/2026
Project Budget Amount
16318
Final Estimate Of Actual Costs Through End Of Phase Amount
6878
Total Phase Actual Spending Amount
6878
Dsf Number S
DSF0001087446
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
9/15/2021
Project Phase Planned End Date
3/8/2022
Project Phase Actual End Date
9/8/2022
Project Budget Amount
661849
Final Estimate Of Actual Costs Through End Of Phase Amount
568423
Total Phase Actual Spending Amount
537331
Dsf Number S
DSF0001008566, DSF0001034349
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/8/2026
Project Phase Planned End Date
5/8/2026
Project Phase Actual End Date
2/3/2026
Project Budget Amount
4080
Final Estimate Of Actual Costs Through End Of Phase Amount
1720
Total Phase Actual Spending Amount
1720
Dsf Number S
DSF0001087446
32
Project Geographic District : 32 • Project Building Identifier: K299 • Project School Name: P.S. 299 - BROOKLYN
Project Geographic District
32
Project Building Identifier
K299
Project School Name
P.S. 299 - BROOKLYN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / PA SYSTEM REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/5/2021
Project Phase Planned End Date
8/18/2021
Project Phase Actual End Date
8/13/2021
Project Budget Amount
133519
Final Estimate Of Actual Costs Through End Of Phase Amount
134384
Total Phase Actual Spending Amount
134384
Dsf Number S
DSF0001008566, DSF0001034349
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
DIIT - RESOA
Project Description
FY21 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
52000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001034297
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: VISTA ACADEMY - BROOKLYN
Project Geographic District
19
Project Building Identifier
K302
Project School Name
VISTA ACADEMY - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
16125
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163135
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
8/22/2024
Project Phase Planned End Date
9/25/2025
Project Phase Actual End Date
3/3/2026
Project Budget Amount
125775
Final Estimate Of Actual Costs Through End Of Phase Amount
107927
Total Phase Actual Spending Amount
106750
Dsf Number S
DSF0001083809
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
8/1/2028
Project Budget Amount
610675
Final Estimate Of Actual Costs Through End Of Phase Amount
244007
Total Phase Actual Spending Amount
235768
Dsf Number S
DSF0001083707, DSF0001111837
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/22/2024
Project Phase Planned End Date
9/25/2025
Project Phase Actual End Date
3/3/2026
Project Budget Amount
678600
Final Estimate Of Actual Costs Through End Of Phase Amount
607409
Total Phase Actual Spending Amount
504416
Dsf Number S
DSF0001083809
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
8/1/2028
Project Budget Amount
9814409
Final Estimate Of Actual Costs Through End Of Phase Amount
9180805
Total Phase Actual Spending Amount
859539
Dsf Number S
DSF0001083707, DSF0001111837
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
6/21/2023
Project Phase Planned End Date
12/8/2023
Project Phase Actual End Date
8/29/2024
Project Budget Amount
436196
Final Estimate Of Actual Costs Through End Of Phase Amount
323557
Total Phase Actual Spending Amount
243213
Dsf Number S
DSF0001083707, DSF0001111837
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/2/2023
Project Phase Planned End Date
4/2/2024
Project Phase Actual End Date
4/30/2024
Project Budget Amount
52650
Final Estimate Of Actual Costs Through End Of Phase Amount
110406
Total Phase Actual Spending Amount
110406
Dsf Number S
DSF0001083809
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/30/2023
Project Phase Planned End Date
10/30/2023
Project Phase Actual End Date
11/1/2023
Project Budget Amount
11700
Final Estimate Of Actual Costs Through End Of Phase Amount
22597
Total Phase Actual Spending Amount
22597
Dsf Number S
DSF0001083809
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY / FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/10/2023
Project Phase Planned End Date
5/25/2023
Project Phase Actual End Date
6/5/2023
Project Budget Amount
87240
Final Estimate Of Actual Costs Through End Of Phase Amount
94765
Total Phase Actual Spending Amount
94735
Dsf Number S
DSF0001083707, DSF0001111837
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE DAMAGED 9X9 FLOOR TILES P.S. RESPONSE ACTION - PRIORITY 04
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/21/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
576630
Total Phase Actual Spending Amount
8225
Dsf Number S
SCA0000074816
19
Project Geographic District : 19 • Project Building Identifier: K302 • Project School Name: LIBERTY AVENUE MIDDLE SCHOOL
Project Geographic District
19
Project Building Identifier
K302
Project School Name
LIBERTY AVENUE MIDDLE SCHOOL
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR DAMAGED 9X9 FLOOR TILES 145B, 260F
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
3/27/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
60156
Total Phase Actual Spending Amount
406
Dsf Number S
SCA0000075674
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
Complete
Project Phase Actual Start Date
1/26/2026
Project Phase Planned End Date
DIIR
Project Phase Actual End Date
1/28/2026
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001114084
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
DOE - RESOA
Project Description
RESO A PHONE SYSTEM & WIRING UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
532185
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112068
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/16/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
195062
Dsf Number S
DSF0001086075
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
124015
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033538
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
DOE - RESOA
Project Description
FY22 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/16/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
249881
Total Phase Actual Spending Amount
274869
Dsf Number S
DSF0001033068
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY17 RESO A ROOM CONVERSIONS/PARTITIONING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/12/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
383887
Total Phase Actual Spending Amount
352147
Dsf Number S
DSF0000844937
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
DOE - RESOA
Project Description
RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
310396
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112069
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
Fast Track Projects
Project Description
RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
15750
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112066
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / FLOOD ELIMINATION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2023
Project Phase Planned End Date
2/3/2026
Project Budget Amount
916197
Final Estimate Of Actual Costs Through End Of Phase Amount
905997
Total Phase Actual Spending Amount
896985
Dsf Number S
DSF0001014342, DSF0001014343, DSF0001014344, DSF0001065097
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / FLOOD ELIMINATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/18/2023
Project Phase Planned End Date
2/3/2026
Project Budget Amount
12409921
Final Estimate Of Actual Costs Through End Of Phase Amount
11294510
Total Phase Actual Spending Amount
9012265
Dsf Number S
DSF0001014342, DSF0001014343, DSF0001014344, DSF0001065097
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / FLOOD ELIMINATION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/18/2023
Project Phase Planned End Date
6/20/2023
Project Phase Actual End Date
5/9/2023
Project Budget Amount
589908
Final Estimate Of Actual Costs Through End Of Phase Amount
490065
Total Phase Actual Spending Amount
489841
Dsf Number S
DSF0001014342, DSF0001014343, DSF0001014344, DSF0001065097
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: I.S. 303 - BROOKLYN
Project Geographic District
21
Project Building Identifier
K303
Project School Name
I.S. 303 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / FLOOD ELIMINATION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/22/2022
Project Phase Planned End Date
11/7/2022
Project Phase Actual End Date
1/5/2023
Project Budget Amount
119977
Final Estimate Of Actual Costs Through End Of Phase Amount
249718
Total Phase Actual Spending Amount
242320
Dsf Number S
DSF0001014342, DSF0001014343, DSF0001014344, DSF0001065097
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSIONS/PARTITIONING / PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/10/2025
Project Phase Planned End Date
1/5/2026
Project Budget Amount
110271
Final Estimate Of Actual Costs Through End Of Phase Amount
236513
Total Phase Actual Spending Amount
222613
Dsf Number S
DSF0001083692, DSF0001085815
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
11/3/2025
Project Phase Planned End Date
11/2/2026
Project Budget Amount
121727
Final Estimate Of Actual Costs Through End Of Phase Amount
137666
Total Phase Actual Spending Amount
134205
Dsf Number S
DSF0001112072, DSF0001113765
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A IPDVS CAMERA INSTALLATION
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2024
Project Phase Planned End Date
8/27/2025
Project Budget Amount
292014
Final Estimate Of Actual Costs Through End Of Phase Amount
296092
Total Phase Actual Spending Amount
293647
Dsf Number S
DSF0001086076
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSIONS/PARTITIONING / PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/10/2025
Project Phase Planned End Date
1/5/2026
Project Budget Amount
1540309
Final Estimate Of Actual Costs Through End Of Phase Amount
1462273
Total Phase Actual Spending Amount
1326948
Dsf Number S
DSF0001083692, DSF0001085815
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/3/2025
Project Phase Planned End Date
11/2/2026
Project Budget Amount
1785330
Final Estimate Of Actual Costs Through End Of Phase Amount
1697078
Total Phase Actual Spending Amount
533686
Dsf Number S
DSF0001112072, DSF0001113765
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A IPDVS CAMERA INSTALLATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2024
Project Phase Planned End Date
8/27/2025
Project Budget Amount
440000
Final Estimate Of Actual Costs Through End Of Phase Amount
217017
Total Phase Actual Spending Amount
178672
Dsf Number S
DSF0001086076
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSIONS/PARTITIONING / PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/19/2023
Project Phase Planned End Date
2/26/2024
Project Phase Actual End Date
9/20/2024
Project Budget Amount
105021
Final Estimate Of Actual Costs Through End Of Phase Amount
194749
Total Phase Actual Spending Amount
181819
Dsf Number S
DSF0001083692, DSF0001085815
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A IPDVS CAMERA INSTALLATION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/15/2023
Project Phase Planned End Date
5/13/2024
Project Phase Actual End Date
3/20/2024
Project Budget Amount
30000
Final Estimate Of Actual Costs Through End Of Phase Amount
11420
Total Phase Actual Spending Amount
11420
Dsf Number S
DSF0001086076
21
Project Geographic District : 21 • Project Building Identifier: K303 • Project School Name: R. CARSON SCL OF COASTAL ST-K
Project Geographic District
21
Project Building Identifier
K303
Project School Name
R. CARSON SCL OF COASTAL ST-K
Project Type
SCA CIP RESOA
Project Description
RESO A ROOM CONVERSION / PATH OF TRAVEL RESO A ROOM CONVERSION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/20/2024
Project Phase Planned End Date
4/21/2025
Project Phase Actual End Date
4/25/2025
Project Budget Amount
121727
Final Estimate Of Actual Costs Through End Of Phase Amount
137371
Total Phase Actual Spending Amount
112471
Dsf Number S
DSF0001112072, DSF0001113765