Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
3023283
Final Estimate Of Actual Costs Through End Of Phase Amount
3023283
Total Phase Actual Spending Amount
6047
Dsf Number S
DSF0001092864
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/10/2023
Project Phase Planned End Date
8/8/2025
Project Phase Actual End Date
7/11/2025
Project Budget Amount
7797375
Final Estimate Of Actual Costs Through End Of Phase Amount
7338895
Total Phase Actual Spending Amount
6569305
Dsf Number S
DSF0000941045, DSF0000960645
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/8/2026
Project Phase Planned End Date
5/3/2027
Project Budget Amount
175030
Final Estimate Of Actual Costs Through End Of Phase Amount
174734
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087448
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/8/2020
Project Phase Planned End Date
9/8/2020
Project Phase Actual End Date
8/12/2020
Project Budget Amount
346550
Final Estimate Of Actual Costs Through End Of Phase Amount
442097
Total Phase Actual Spending Amount
415297
Dsf Number S
DSF0000941045, DSF0000960645
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/3/2025
Project Phase Planned End Date
6/1/2026
Project Phase Actual End Date
3/11/2026
Project Budget Amount
12176
Final Estimate Of Actual Costs Through End Of Phase Amount
2788
Total Phase Actual Spending Amount
2788
Dsf Number S
DSF0001087448
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/31/2024
Project Phase Planned End Date
3/21/2025
Project Phase Actual End Date
7/16/2025
Project Budget Amount
190657
Final Estimate Of Actual Costs Through End Of Phase Amount
98296
Total Phase Actual Spending Amount
89018
Dsf Number S
DSF0001092864
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PLANYC CLIMATE CONTROL / PLANYC BOILER CONVERSION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/31/2020
Project Phase Planned End Date
7/1/2020
Project Phase Actual End Date
4/7/2020
Project Budget Amount
69310
Final Estimate Of Actual Costs Through End Of Phase Amount
99634
Total Phase Actual Spending Amount
99634
Dsf Number S
DSF0000941045, DSF0000960645
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/14/2024
Project Phase Planned End Date
9/30/2024
Project Phase Actual End Date
10/22/2024
Project Budget Amount
40855
Final Estimate Of Actual Costs Through End Of Phase Amount
19412
Total Phase Actual Spending Amount
19412
Dsf Number S
DSF0001092864
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/26/2025
Project Phase Planned End Date
3/31/2026
Project Phase Actual End Date
12/3/2025
Project Budget Amount
3044
Final Estimate Of Actual Costs Through End Of Phase Amount
697
Total Phase Actual Spending Amount
697
Dsf Number S
DSF0001087448
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR DAMAGED MATERIALS 4307 - 307 - CLA
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/1/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
41219
Total Phase Actual Spending Amount
117
Dsf Number S
SCA0000075697
16
Project Geographic District : 16 • Project Building Identifier: K309 • Project School Name: P.S. 309 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K309
Project School Name
P.S. 309 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE & REPLACE 9X9 BROWN VFT SET DAMAGED MATERIALS IN 2ND FLR RM#220 & 249
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
9/4/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
1/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
56876
Total Phase Actual Spending Amount
56876
Dsf Number S
SCA0000074878
20
Project Geographic District : 20 • Project Building Identifier: K310 • Project School Name: P.S. 310 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K310
Project School Name
P.S. 310 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
300000
Total Phase Actual Spending Amount
300000
Dsf Number S
DSF0001163173
20
Project Geographic District : 20 • Project Building Identifier: K310 • Project School Name: P.S. 310 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K310
Project School Name
P.S. 310 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035530
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY10 RESO A- AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000709494
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY16 RESO A FENCING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
94000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000865843
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/9/2015
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
295102
Total Phase Actual Spending Amount
292602
Dsf Number S
DSF0000799863
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
80000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163138
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
39428
Final Estimate Of Actual Costs Through End Of Phase Amount
39428
Total Phase Actual Spending Amount
5820
Dsf Number S
DSF0001087449
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
153701
Final Estimate Of Actual Costs Through End Of Phase Amount
153701
Total Phase Actual Spending Amount
2904
Dsf Number S
DSF0001087449
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/7/2025
Project Phase Planned End Date
1/2/2026
Project Phase Actual End Date
11/28/2025
Project Budget Amount
10692
Final Estimate Of Actual Costs Through End Of Phase Amount
3784
Total Phase Actual Spending Amount
3784
Dsf Number S
DSF0001087449
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/30/2025
Project Phase Planned End Date
10/29/2025
Project Phase Actual End Date
7/7/2025
Project Budget Amount
2673
Final Estimate Of Actual Costs Through End Of Phase Amount
946
Total Phase Actual Spending Amount
946
Dsf Number S
DSF0001087449
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A LIBRARY UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/28/2025
Project Phase Planned End Date
9/22/2026
Project Budget Amount
180894
Final Estimate Of Actual Costs Through End Of Phase Amount
162035
Total Phase Actual Spending Amount
67314
Dsf Number S
DSF0001035531
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/28/2025
Project Phase Planned End Date
9/22/2026
Project Budget Amount
1496000
Final Estimate Of Actual Costs Through End Of Phase Amount
734035
Total Phase Actual Spending Amount
244036
Dsf Number S
DSF0001035531
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A LIBRARY UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/18/2023
Project Phase Planned End Date
12/4/2023
Project Phase Actual End Date
1/26/2024
Project Budget Amount
102000
Final Estimate Of Actual Costs Through End Of Phase Amount
124596
Total Phase Actual Spending Amount
72513
Dsf Number S
DSF0001035531
22
Project Geographic District : 22 • Project Building Identifier: K312 • Project School Name: P.S. 312 - BROOKLYN
Project Geographic District
22
Project Building Identifier
K312
Project School Name
P.S. 312 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY23 RESO A LIBRARY UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2023
Project Phase Planned End Date
6/7/2023
Project Phase Actual End Date
7/14/2023
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
18488
Total Phase Actual Spending Amount
18488
Dsf Number S
DSF0001035531
13
Project Geographic District : 13 • Project Building Identifier: K313 • Project School Name: I.S. 527 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K313
Project School Name
I.S. 527 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/17/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
231846
Total Phase Actual Spending Amount
180361
Dsf Number S
DSF0000913056
13
Project Geographic District : 13 • Project Building Identifier: K313 • Project School Name: I.S. 527 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K313
Project School Name
I.S. 527 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / ROOFS / FIRE ALARM
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
2907033
Final Estimate Of Actual Costs Through End Of Phase Amount
437309
Total Phase Actual Spending Amount
321331
Dsf Number S
DSF0001111632, DSF0001113726, DSF0001113725, DSF0001113727
13
Project Geographic District : 13 • Project Building Identifier: K313 • Project School Name: I.S. 527 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K313
Project School Name
I.S. 527 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / ROOFS / FIRE ALARM
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/18/2025
Project Phase Planned End Date
2/3/2028
Project Budget Amount
28287957
Final Estimate Of Actual Costs Through End Of Phase Amount
26556735
Total Phase Actual Spending Amount
3216381
Dsf Number S
DSF0001111632, DSF0001113726, DSF0001113725, DSF0001113727
13
Project Geographic District : 13 • Project Building Identifier: K313 • Project School Name: I.S. 527 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K313
Project School Name
I.S. 527 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / ROOFS / FIRE ALARM
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/15/2024
Project Phase Planned End Date
3/14/2025
Project Phase Actual End Date
2/19/2025
Project Budget Amount
1788209
Final Estimate Of Actual Costs Through End Of Phase Amount
1227504
Total Phase Actual Spending Amount
888649
Dsf Number S
DSF0001111632, DSF0001113726, DSF0001113725, DSF0001113727
13
Project Geographic District : 13 • Project Building Identifier: K313 • Project School Name: I.S. 527 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K313
Project School Name
I.S. 527 - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / ROOFS / FIRE ALARM
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/17/2023
Project Phase Planned End Date
4/17/2024
Project Phase Actual End Date
7/18/2024
Project Budget Amount
384825
Final Estimate Of Actual Costs Through End Of Phase Amount
252542
Total Phase Actual Spending Amount
252466
Dsf Number S
DSF0001111632, DSF0001113726, DSF0001113725, DSF0001113727
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY24 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
228997
Total Phase Actual Spending Amount
4147
Dsf Number S
DSF0001086079
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 506 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 506 - BROOKLYN
Project Type
Fast Track Projects
Project Description
BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/14/2025
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
194183
Total Phase Actual Spending Amount
171399
Dsf Number S
DSF0001092926
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
Fast Track Projects
Project Description
LSP FY16 RESO A EXTERIOR PLAYGROUND LIGHTING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/5/2021
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
259194
Total Phase Actual Spending Amount
237997
Dsf Number S
DSF0000912454
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
SCA CIP
Project Description
CHILLER REPLACEMENT / AHU REPLACEMENT / BMS UPGRADE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
4/3/2024
Project Phase Planned End Date
4/2/2026
Project Budget Amount
782323
Final Estimate Of Actual Costs Through End Of Phase Amount
756264
Total Phase Actual Spending Amount
735197
Dsf Number S
DSF0001065264, DSF0001065265, DSF0001085160
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
SCA CIP
Project Description
CHILLER REPLACEMENT / AHU REPLACEMENT / BMS UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/3/2024
Project Phase Planned End Date
4/2/2026
Project Budget Amount
10579036
Final Estimate Of Actual Costs Through End Of Phase Amount
9634041
Total Phase Actual Spending Amount
7634527
Dsf Number S
DSF0001065264, DSF0001065265, DSF0001085160
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
SCA CIP
Project Description
CHILLER REPLACEMENT / AHU REPLACEMENT / BMS UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/15/2023
Project Phase Planned End Date
10/17/2023
Project Phase Actual End Date
11/7/2023
Project Budget Amount
501798
Final Estimate Of Actual Costs Through End Of Phase Amount
675073
Total Phase Actual Spending Amount
392606
Dsf Number S
DSF0001065264, DSF0001065265, DSF0001085160
20
Project Geographic District : 20 • Project Building Identifier: K314 • Project School Name: P.S. 503 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K314
Project School Name
P.S. 503 - BROOKLYN
Project Type
SCA CIP
Project Description
CHILLER REPLACEMENT / AHU REPLACEMENT / BMS UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/10/2023
Project Phase Planned End Date
6/9/2023
Project Phase Actual End Date
4/25/2023
Project Budget Amount
102004
Final Estimate Of Actual Costs Through End Of Phase Amount
94780
Total Phase Actual Spending Amount
94780
Dsf Number S
DSF0001065264, DSF0001065265, DSF0001085160
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: M.S. 353 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
M.S. 353 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
Complete
Project Phase Actual Start Date
10/29/2025
Project Phase Planned End Date
DIIR
Project Phase Actual End Date
1/27/2026
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
250000
Dsf Number S
DSF0001112680
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A CAFETERIA SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
227000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033543
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
500000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035536
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
DOE - RESOA
Project Description
RESO A FENCING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/23/2017
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
131337
Total Phase Actual Spending Amount
131337
Dsf Number S
DSF0000845591
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/4/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
156587
Total Phase Actual Spending Amount
142993
Dsf Number S
DSF0000913269
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
Fast Track Projects
Project Description
FY25 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112682
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE FLOOR TILES IN ROOMS: #209, 215, 213, 203
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/25/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/18/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
19764
Total Phase Actual Spending Amount
1014
Dsf Number S
SCA0000075660
17
Project Geographic District : 17 • Project Building Identifier: K316 • Project School Name: P.S. 316 - BROOKLYN
Project Geographic District
17
Project Building Identifier
K316
Project School Name
P.S. 316 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-OIL TANK LINE/PIPE INSULATION ABATEMENT FOR ISOLATION VALVE INSTALLS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/16/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
5771
Total Phase Actual Spending Amount
621
Dsf Number S
SCA0000075394
13
Project Geographic District : 13 • Project Building Identifier: K317 • Project School Name: P.S. 133 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K317
Project School Name
P.S. 133 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY21 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001008270
13
Project Geographic District : 13 • Project Building Identifier: K317 • Project School Name: P.S. 133 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K317
Project School Name
P.S. 133 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
250000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112683
14
Project Geographic District : 14 • Project Building Identifier: K318 • Project School Name: I.S. 318 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K318
Project School Name
I.S. 318 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/15/2016
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
152595
Total Phase Actual Spending Amount
25601
Dsf Number S
DSF0000782769
14
Project Geographic District : 14 • Project Building Identifier: K318 • Project School Name: I.S. 318 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K318
Project School Name
I.S. 318 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PLEASE ABATE APPROX 10 LFT OF MARKED PIPE INSULATION IN THE PIPE CHASE IN BOYS LOCKER ROOM (111
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/14/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
8360
Total Phase Actual Spending Amount
1192
Dsf Number S
SCA0000075299
14
Project Geographic District : 14 • Project Building Identifier: K318 • Project School Name: I.S. 318 - BROOKLYN
Project Geographic District
14
Project Building Identifier
K318
Project School Name
I.S. 318 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT TAR - LVL 4 - PIPES AT PIPE CHASE IN BOY'S TOILET - 4307A I
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/26/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000076041