Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: P.S. 332 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K332
Project School Name
P.S. 332 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/4/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
75200
Total Phase Actual Spending Amount
19911
Dsf Number S
DSF0000782921
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / ROOF TOP UNIT / PAVED AREAS- CONCRETE
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/5/2024
Project Phase Planned End Date
8/4/2026
Project Budget Amount
1007361
Final Estimate Of Actual Costs Through End Of Phase Amount
618372
Total Phase Actual Spending Amount
601692
Dsf Number S
DSF0000895932, DSF0000895933, DSF0000895934, DSF0000960659, DSF0001065478
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
12/12/2024
Project Phase Planned End Date
11/6/2025
Project Phase Actual End Date
3/5/2026
Project Budget Amount
143843
Final Estimate Of Actual Costs Through End Of Phase Amount
136465
Total Phase Actual Spending Amount
124866
Dsf Number S
DSF0001087452
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / ROOF TOP UNIT / PAVED AREAS- CONCRETE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/5/2024
Project Phase Planned End Date
8/4/2026
Project Budget Amount
15030267
Final Estimate Of Actual Costs Through End Of Phase Amount
14224839
Total Phase Actual Spending Amount
6811811
Dsf Number S
DSF0000895932, DSF0000895933, DSF0000895934, DSF0000960659, DSF0001065478
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/12/2024
Project Phase Planned End Date
11/6/2025
Project Phase Actual End Date
3/5/2026
Project Budget Amount
209612
Final Estimate Of Actual Costs Through End Of Phase Amount
200162
Total Phase Actual Spending Amount
167680
Dsf Number S
DSF0001087452
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / ROOF TOP UNIT / PAVED AREAS- CONCRETE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/3/2019
Project Phase Planned End Date
6/15/2020
Project Phase Actual End Date
5/1/2020
Project Budget Amount
686840
Final Estimate Of Actual Costs Through End Of Phase Amount
561066
Total Phase Actual Spending Amount
561066
Dsf Number S
DSF0000895932, DSF0000895933, DSF0000895934, DSF0000960659, DSF0001065478
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/7/2024
Project Phase Planned End Date
11/1/2024
Project Phase Actual End Date
8/7/2024
Project Budget Amount
16263
Final Estimate Of Actual Costs Through End Of Phase Amount
4861
Total Phase Actual Spending Amount
4861
Dsf Number S
DSF0001087452
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / EXTERIOR MASONRY / ROOF TOP UNIT / PAVED AREAS- CONCRETE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/28/2019
Project Phase Planned End Date
12/27/2019
Project Phase Actual End Date
11/19/2019
Project Budget Amount
138348
Final Estimate Of Actual Costs Through End Of Phase Amount
192633
Total Phase Actual Spending Amount
186597
Dsf Number S
DSF0000895932, DSF0000895933, DSF0000895934, DSF0000960659, DSF0001065478
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/3/2024
Project Phase Planned End Date
9/4/2024
Project Phase Actual End Date
5/7/2024
Project Budget Amount
3614
Final Estimate Of Actual Costs Through End Of Phase Amount
1215
Total Phase Actual Spending Amount
1215
Dsf Number S
DSF0001087452
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087027
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
28315
Final Estimate Of Actual Costs Through End Of Phase Amount
30000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086090
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
415280
Final Estimate Of Actual Costs Through End Of Phase Amount
440000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086090
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087027
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
28315
Final Estimate Of Actual Costs Through End Of Phase Amount
28315
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086090
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087027
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086090
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001087027
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/2/2018
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
57369
Total Phase Actual Spending Amount
57369
Dsf Number S
SCA0000051111
23
Project Geographic District : 23 • Project Building Identifier: K332 • Project School Name: CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Geographic District
23
Project Building Identifier
K332
Project School Name
CHRISTOPHER AVENUE COMMUNITY SCHOOL
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION- COPING STONES SPALLING BRICK
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/26/2022
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
41743
Total Phase Actual Spending Amount
25170
Dsf Number S
SCA0000071535
16
Project Geographic District : 16 • Project Building Identifier: K335 • Project School Name: P.S. 335 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K335
Project School Name
P.S. 335 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
500000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001008231
16
Project Geographic District : 16 • Project Building Identifier: K335 • Project School Name: P.S. 335 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K335
Project School Name
P.S. 335 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY22 RESO A ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/13/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
87298
Dsf Number S
DSF0001033066
16
Project Geographic District : 16 • Project Building Identifier: K335 • Project School Name: P.S. 335 - BROOKLYN
Project Geographic District
16
Project Building Identifier
K335
Project School Name
P.S. 335 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-REMOVAL OF 9X9 (POSSIBLE ACM) TILES NEEDED; TO BE REPLACED WITH 12X12 TILES IN THE FOLLOWING RM
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/24/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
136784
Total Phase Actual Spending Amount
2314
Dsf Number S
SCA0000075232
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
CM,Art,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
13002705
Final Estimate Of Actual Costs Through End Of Phase Amount
13002705
Total Phase Actual Spending Amount
763198
Dsf Number S
DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
99089583
Final Estimate Of Actual Costs Through End Of Phase Amount
99089583
Total Phase Actual Spending Amount
1295040
Dsf Number S
DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
5/5/2025
Project Phase Planned End Date
11/14/2025
Project Phase Actual End Date
4/10/2026
Project Budget Amount
7173906
Final Estimate Of Actual Costs Through End Of Phase Amount
1960743
Total Phase Actual Spending Amount
1912469
Dsf Number S
DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
11/7/2024
Project Phase Planned End Date
5/2/2025
Project Phase Actual End Date
5/2/2025
Project Budget Amount
1793477
Final Estimate Of Actual Costs Through End Of Phase Amount
1321933
Total Phase Actual Spending Amount
1320341
Dsf Number S
DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1350392
Final Estimate Of Actual Costs Through End Of Phase Amount
1350392
Total Phase Actual Spending Amount
387780
Dsf Number S
DSF0000911837, DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
19694789
Final Estimate Of Actual Costs Through End Of Phase Amount
19694789
Total Phase Actual Spending Amount
1630773
Dsf Number S
DSF0000911837, DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/11/2025
Project Phase Planned End Date
2/27/2026
Project Phase Actual End Date
3/12/2026
Project Budget Amount
938403
Final Estimate Of Actual Costs Through End Of Phase Amount
344835
Total Phase Actual Spending Amount
221980
Dsf Number S
DSF0000911837, DSF0000911837
20
Project Geographic District : 20 • Project Building Identifier: K337 • Project School Name: P.S. @ 8802 5 AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K337
Project School Name
P.S. @ 8802 5 AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/6/2023
Project Phase Planned End Date
7/10/2025
Project Phase Actual End Date
7/10/2025
Project Budget Amount
190733
Final Estimate Of Actual Costs Through End Of Phase Amount
181702
Total Phase Actual Spending Amount
156562
Dsf Number S
DSF0000911837, DSF0000911837
15
Project Geographic District : 15 • Project Building Identifier: K338 • Project School Name: P.S. 338 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K338
Project School Name
P.S. 338 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
125000
Total Phase Actual Spending Amount
125000
Dsf Number S
DSF0001163188
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
CM,Art,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
12618723
Final Estimate Of Actual Costs Through End Of Phase Amount
12618723
Total Phase Actual Spending Amount
223784
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
96163369
Final Estimate Of Actual Costs Through End Of Phase Amount
96163369
Total Phase Actual Spending Amount
692936
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
6962054
Final Estimate Of Actual Costs Through End Of Phase Amount
6962054
Total Phase Actual Spending Amount
726566
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA Capacity
Project Description
NEW SCHOOL
Project Phase Name
Scope
Project Status Name
In-Progress
Project Phase Actual Start Date
2/12/2026
Project Phase Planned End Date
7/10/2026
Project Budget Amount
1740513
Final Estimate Of Actual Costs Through End Of Phase Amount
1740513
Total Phase Actual Spending Amount
195401
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
350000
Final Estimate Of Actual Costs Through End Of Phase Amount
350000
Total Phase Actual Spending Amount
51363
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
3531818
Final Estimate Of Actual Costs Through End Of Phase Amount
3531818
Total Phase Actual Spending Amount
3143
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
3/5/2026
Project Phase Planned End Date
7/8/2026
Project Budget Amount
222727
Final Estimate Of Actual Costs Through End Of Phase Amount
222727
Total Phase Actual Spending Amount
62350
Dsf Number S
DSF0001087184
20
Project Geographic District : 20 • Project Building Identifier: K343 • Project School Name: P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Geographic District
20
Project Building Identifier
K343
Project School Name
P.S. @ 7120 NEW UTRECHT AVENUE - BROOKLYN
Project Type
SCA CIP
Project Description
DEMOLITION
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/4/2026
Project Phase Planned End Date
3/4/2026
Project Phase Actual End Date
3/4/2026
Project Budget Amount
47727
Final Estimate Of Actual Costs Through End Of Phase Amount
15588
Total Phase Actual Spending Amount
15588
Dsf Number S
DSF0001087184
19
Project Geographic District : 19 • Project Building Identifier: K345 • Project School Name: P.S. 345 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K345
Project School Name
P.S. 345 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
12/8/2026
Project Budget Amount
200136
Final Estimate Of Actual Costs Through End Of Phase Amount
179587
Total Phase Actual Spending Amount
49701
Dsf Number S
DSF0001087453
19
Project Geographic District : 19 • Project Building Identifier: K345 • Project School Name: P.S. 345 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K345
Project School Name
P.S. 345 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
12/8/2026
Project Budget Amount
182275
Final Estimate Of Actual Costs Through End Of Phase Amount
175416
Total Phase Actual Spending Amount
100845
Dsf Number S
DSF0001087453
19
Project Geographic District : 19 • Project Building Identifier: K345 • Project School Name: P.S. 345 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K345
Project School Name
P.S. 345 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/14/2025
Project Phase Planned End Date
10/8/2025
Project Phase Actual End Date
8/19/2025
Project Budget Amount
12680
Final Estimate Of Actual Costs Through End Of Phase Amount
9396
Total Phase Actual Spending Amount
9396
Dsf Number S
DSF0001087453
19
Project Geographic District : 19 • Project Building Identifier: K345 • Project School Name: P.S. 345 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K345
Project School Name
P.S. 345 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/2/2025
Project Phase Planned End Date
8/1/2025
Project Phase Actual End Date
4/14/2025
Project Budget Amount
3170
Final Estimate Of Actual Costs Through End Of Phase Amount
2349
Total Phase Actual Spending Amount
2349
Dsf Number S
DSF0001087453
19
Project Geographic District : 19 • Project Building Identifier: K345 • Project School Name: P.S. 345 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K345
Project School Name
P.S. 345 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ASSUME AND ABATE WALLS AND PIPE INSULATION WITHIN THE WALL ON MARKED WALL AT LOCATION: VESTOBUL
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/9/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/15/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
18691
Total Phase Actual Spending Amount
12667
Dsf Number S
SCA0000075413
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: P.S. 346 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K346
Project School Name
P.S. 346 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
RESO A- FY20 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
105000
Total Phase Actual Spending Amount
105000
Dsf Number S
DSF0000960939
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: P.S. 346 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K346
Project School Name
P.S. 346 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
145000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086095
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: I.S. 452
Project Geographic District
19
Project Building Identifier
K346
Project School Name
I.S. 452
Project Type
DOE - RESOA
Project Description
FY22 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
350000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033091
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: P.S. 346 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K346
Project School Name
P.S. 346 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1627285
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086163
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: P.S. 346 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K346
Project School Name
P.S. 346 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/3/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
75200
Total Phase Actual Spending Amount
19316
Dsf Number S
DSF0000782973
19
Project Geographic District : 19 • Project Building Identifier: K346 • Project School Name: P.S. 346 - BROOKLYN
Project Geographic District
19
Project Building Identifier
K346
Project School Name
P.S. 346 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
PARTIAL ACCESSIBILITY - ELEVATORS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/1/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
483511
Total Phase Actual Spending Amount
483511
Dsf Number S
DSF0000845615