Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20
Project Geographic District : 20 • Project Building Identifier: K971 • Project School Name: P.S. 971 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K971
Project School Name
P.S. 971 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A KITCHEN UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035602
20
Project Geographic District : 20 • Project Building Identifier: K971 • Project School Name: P.S. 971 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K971
Project School Name
P.S. 971 - BROOKLYN
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION- FALLING MASONRY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/28/2022
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
386475
Total Phase Actual Spending Amount
358801
Dsf Number S
SCA0000071579
16
Project Geographic District : 16 • Project Building Identifier: K987 • Project School Name: BROOKLYN HIGH SCHOOL FOR LAW AND TECHNOLOGY - K
Project Geographic District
16
Project Building Identifier
K987
Project School Name
BROOKLYN HIGH SCHOOL FOR LAW AND TECHNOLOGY - K
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
110000
Total Phase Actual Spending Amount
110000
Dsf Number S
DSF0001033097
16
Project Geographic District : 16 • Project Building Identifier: K987 • Project School Name: BROOKLYN HIGH SCHOOL FOR LAW AND TECHNOLOGY - K
Project Geographic District
16
Project Building Identifier
K987
Project School Name
BROOKLYN HIGH SCHOOL FOR LAW AND TECHNOLOGY - K
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/7/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
254093
Total Phase Actual Spending Amount
250675
Dsf Number S
DSF0001034236
20
Project Geographic District : 20 • Project Building Identifier: K989 • Project School Name: P.S. 104 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K989
Project School Name
P.S. 104 - BROOKLYN
Project Type
SCA CIP
Project Description
HEATING PLANT UPGRADE (BOILER REPLACEMENT) @ K989 / CHILLER REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
684625
Final Estimate Of Actual Costs Through End Of Phase Amount
684625
Total Phase Actual Spending Amount
77335
Dsf Number S
SCA0000074162, DSF0001147263
20
Project Geographic District : 20 • Project Building Identifier: K989 • Project School Name: P.S. 104 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K989
Project School Name
P.S. 104 - BROOKLYN
Project Type
SCA CIP
Project Description
HEATING PLANT UPGRADE (BOILER REPLACEMENT) @ K989 / CHILLER REPLACEMENT
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
6908487
Final Estimate Of Actual Costs Through End Of Phase Amount
6908487
Total Phase Actual Spending Amount
31323
Dsf Number S
SCA0000074162, DSF0001147263
20
Project Geographic District : 20 • Project Building Identifier: K989 • Project School Name: P.S. 104 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K989
Project School Name
P.S. 104 - BROOKLYN
Project Type
SCA CIP
Project Description
HEATING PLANT UPGRADE (BOILER REPLACEMENT) @ K989 / CHILLER REPLACEMENT
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
2/4/2026
Project Phase Planned End Date
7/8/2026
Project Budget Amount
435670
Final Estimate Of Actual Costs Through End Of Phase Amount
435670
Total Phase Actual Spending Amount
15380
Dsf Number S
SCA0000074162, DSF0001147263
20
Project Geographic District : 20 • Project Building Identifier: K989 • Project School Name: P.S. 104 - BROOKLYN
Project Geographic District
20
Project Building Identifier
K989
Project School Name
P.S. 104 - BROOKLYN
Project Type
SCA CIP
Project Description
HEATING PLANT UPGRADE (BOILER REPLACEMENT) @ K989 / CHILLER REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/23/2025
Project Phase Planned End Date
12/24/2025
Project Phase Actual End Date
12/16/2025
Project Budget Amount
93358
Final Estimate Of Actual Costs Through End Of Phase Amount
91871
Total Phase Actual Spending Amount
82950
Dsf Number S
SCA0000074162, DSF0001147263
13
Project Geographic District : 13 • Project Building Identifier: K994 • Project School Name: BEDFORD ACADEMY HS - K
Project Geographic District
13
Project Building Identifier
K994
Project School Name
BEDFORD ACADEMY HS - K
Project Type
DOE - RESOA
Project Description
FY21 RESO A MEDIA CENTER UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/11/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
159262
Total Phase Actual Spending Amount
105724
Dsf Number S
DSF0001008228
15
Project Geographic District : 15 • Project Building Identifier: KAGI • Project School Name: BROOKLYN PROSPECT CHARTER SCHOOL - K
Project Geographic District
15
Project Building Identifier
KAGI
Project School Name
BROOKLYN PROSPECT CHARTER SCHOOL - K
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112746
15
Project Geographic District : 15 • Project Building Identifier: KAGI • Project School Name: BROOKLYN PROSPECT CHARTER SCHOOL - K
Project Geographic District
15
Project Building Identifier
KAGI
Project School Name
BROOKLYN PROSPECT CHARTER SCHOOL - K
Project Type
DIIT - RESOA
Project Description
FY21 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001008259
19
Project Geographic District : 19 • Project Building Identifier: KAKM • Project School Name: IMAGINE ME LEADERSHIP CHARTER SCHOOL
Project Geographic District
19
Project Building Identifier
KAKM
Project School Name
IMAGINE ME LEADERSHIP CHARTER SCHOOL
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
633000
Total Phase Actual Spending Amount
633000
Dsf Number S
DSF0001112747
17
Project Geographic District : 17 • Project Building Identifier: KASV • Project School Name: MOSDOTH DAY CARE CENTER, INC.
Project Geographic District
17
Project Building Identifier
KASV
Project School Name
MOSDOTH DAY CARE CENTER, INC.
Project Type
SCA CIP
Project Description
ACS EARLY LEARN RENEWAL
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
54449
Final Estimate Of Actual Costs Through End Of Phase Amount
54449
Total Phase Actual Spending Amount
28903
Dsf Number S
DSF0001035073
17
Project Geographic District : 17 • Project Building Identifier: KASV • Project School Name: MOSDOTH DAY CARE CENTER, INC.
Project Geographic District
17
Project Building Identifier
KASV
Project School Name
MOSDOTH DAY CARE CENTER, INC.
Project Type
SCA CIP
Project Description
ACS EARLY LEARN RENEWAL
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
293771
Final Estimate Of Actual Costs Through End Of Phase Amount
293771
Total Phase Actual Spending Amount
25692
Dsf Number S
DSF0001035073
17
Project Geographic District : 17 • Project Building Identifier: KASV • Project School Name: MOSDOTH DAY CARE CENTER, INC.
Project Geographic District
17
Project Building Identifier
KASV
Project School Name
MOSDOTH DAY CARE CENTER, INC.
Project Type
SCA CIP
Project Description
ACS EARLY LEARN RENEWAL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
8/23/2023
Project Phase Planned End Date
2/29/2024
Project Phase Actual End Date
5/9/2024
Project Budget Amount
22793
Final Estimate Of Actual Costs Through End Of Phase Amount
63147
Total Phase Actual Spending Amount
57638
Dsf Number S
DSF0001035073
17
Project Geographic District : 17 • Project Building Identifier: KASV • Project School Name: MOSDOTH DAY CARE CENTER, INC.
Project Geographic District
17
Project Building Identifier
KASV
Project School Name
MOSDOTH DAY CARE CENTER, INC.
Project Type
SCA CIP
Project Description
ACS EARLY LEARN RENEWAL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/19/2023
Project Phase Planned End Date
4/20/2023
Project Phase Actual End Date
8/15/2023
Project Budget Amount
5065
Final Estimate Of Actual Costs Through End Of Phase Amount
59875
Total Phase Actual Spending Amount
52273
Dsf Number S
DSF0001035073
23
Project Geographic District : 23 • Project Building Identifier: KAYT • Project School Name: HOPE FAITH AND CHARITY
Project Geographic District
23
Project Building Identifier
KAYT
Project School Name
HOPE FAITH AND CHARITY
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/10/2025
Project Phase Planned End Date
6/4/2026
Project Budget Amount
208550
Final Estimate Of Actual Costs Through End Of Phase Amount
185794
Total Phase Actual Spending Amount
58836
Dsf Number S
DSF0001008770
23
Project Geographic District : 23 • Project Building Identifier: KAYT • Project School Name: HOPE FAITH AND CHARITY
Project Geographic District
23
Project Building Identifier
KAYT
Project School Name
HOPE FAITH AND CHARITY
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/10/2025
Project Phase Planned End Date
6/4/2026
Project Budget Amount
1125200
Final Estimate Of Actual Costs Through End Of Phase Amount
1149050
Total Phase Actual Spending Amount
229233
Dsf Number S
DSF0001008770
23
Project Geographic District : 23 • Project Building Identifier: KAYT • Project School Name: HOPE FAITH AND CHARITY
Project Geographic District
23
Project Building Identifier
KAYT
Project School Name
HOPE FAITH AND CHARITY
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/4/2022
Project Phase Planned End Date
5/4/2022
Project Phase Actual End Date
5/12/2023
Project Budget Amount
87300
Final Estimate Of Actual Costs Through End Of Phase Amount
180219
Total Phase Actual Spending Amount
38679
Dsf Number S
DSF0001008770
23
Project Geographic District : 23 • Project Building Identifier: KAYT • Project School Name: HOPE FAITH AND CHARITY
Project Geographic District
23
Project Building Identifier
KAYT
Project School Name
HOPE FAITH AND CHARITY
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/5/2021
Project Phase Planned End Date
5/28/2021
Project Phase Actual End Date
8/3/2021
Project Budget Amount
19400
Final Estimate Of Actual Costs Through End Of Phase Amount
16544
Total Phase Actual Spending Amount
16544
Dsf Number S
DSF0001008770
19
Project Geographic District : 19 • Project Building Identifier: KBDA • Project School Name: URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Geographic District
19
Project Building Identifier
KBDA
Project School Name
URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT / PATH OF TRAVEL
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
100653
Final Estimate Of Actual Costs Through End Of Phase Amount
100653
Total Phase Actual Spending Amount
37669
Dsf Number S
DSF0001008772, DSF0001008772
19
Project Geographic District : 19 • Project Building Identifier: KBDA • Project School Name: URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Geographic District
19
Project Building Identifier
KBDA
Project School Name
URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT / PATH OF TRAVEL
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1404336
Final Estimate Of Actual Costs Through End Of Phase Amount
1404336
Total Phase Actual Spending Amount
29787
Dsf Number S
DSF0001008772, DSF0001008772
19
Project Geographic District : 19 • Project Building Identifier: KBDA • Project School Name: URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Geographic District
19
Project Building Identifier
KBDA
Project School Name
URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT / PATH OF TRAVEL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
9/5/2023
Project Phase Planned End Date
1/10/2024
Project Phase Actual End Date
11/4/2025
Project Budget Amount
65561
Final Estimate Of Actual Costs Through End Of Phase Amount
281596
Total Phase Actual Spending Amount
260463
Dsf Number S
DSF0001008772, DSF0001008772
19
Project Geographic District : 19 • Project Building Identifier: KBDA • Project School Name: URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Geographic District
19
Project Building Identifier
KBDA
Project School Name
URBAN STRATEGIES DAY CARE CENTER SITE 1
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT / PATH OF TRAVEL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/9/2021
Project Phase Planned End Date
9/25/2023
Project Phase Actual End Date
9/1/2023
Project Budget Amount
13276
Final Estimate Of Actual Costs Through End Of Phase Amount
45022
Total Phase Actual Spending Amount
37488
Dsf Number S
DSF0001008772, DSF0001008772
23
Project Geographic District : 23 • Project Building Identifier: KBDD • Project School Name: SALVATION ARMY SUTTER DAY CARE
Project Geographic District
23
Project Building Identifier
KBDD
Project School Name
SALVATION ARMY SUTTER DAY CARE
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
1/8/2024
Project Phase Planned End Date
12/2/2024
Project Budget Amount
145555
Final Estimate Of Actual Costs Through End Of Phase Amount
136202
Total Phase Actual Spending Amount
96195
Dsf Number S
DSF0001008773
23
Project Geographic District : 23 • Project Building Identifier: KBDD • Project School Name: SALVATION ARMY SUTTER DAY CARE
Project Geographic District
23
Project Building Identifier
KBDD
Project School Name
SALVATION ARMY SUTTER DAY CARE
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/8/2024
Project Phase Planned End Date
12/2/2024
Project Budget Amount
785320
Final Estimate Of Actual Costs Through End Of Phase Amount
770018
Total Phase Actual Spending Amount
550516
Dsf Number S
DSF0001008773
23
Project Geographic District : 23 • Project Building Identifier: KBDD • Project School Name: SALVATION ARMY SUTTER DAY CARE
Project Geographic District
23
Project Building Identifier
KBDD
Project School Name
SALVATION ARMY SUTTER DAY CARE
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/26/2022
Project Phase Planned End Date
3/29/2023
Project Phase Actual End Date
5/12/2023
Project Budget Amount
60930
Final Estimate Of Actual Costs Through End Of Phase Amount
105124
Total Phase Actual Spending Amount
3995
Dsf Number S
DSF0001008773
23
Project Geographic District : 23 • Project Building Identifier: KBDD • Project School Name: SALVATION ARMY SUTTER DAY CARE
Project Geographic District
23
Project Building Identifier
KBDD
Project School Name
SALVATION ARMY SUTTER DAY CARE
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/9/2021
Project Phase Planned End Date
7/9/2021
Project Phase Actual End Date
8/3/2021
Project Budget Amount
13540
Final Estimate Of Actual Costs Through End Of Phase Amount
17412
Total Phase Actual Spending Amount
17412
Dsf Number S
DSF0001008773
14
Project Geographic District : 14 • Project Building Identifier: KBME • Project School Name: BUSHWICK UNITED DEVELOPMENT FUND
Project Geographic District
14
Project Building Identifier
KBME
Project School Name
BUSHWICK UNITED DEVELOPMENT FUND
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT SOFT CONCRETE FILLER FLOORING MATERIAL LVL 1 AT CELLAR HALL
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/15/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075980
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
PATH OF TRAVEL EARLY LEARN ROOF REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
52641
Final Estimate Of Actual Costs Through End Of Phase Amount
52641
Total Phase Actual Spending Amount
1538
Dsf Number S
DSF0001114475
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
EARLY LEARN ROOF REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
498329
Final Estimate Of Actual Costs Through End Of Phase Amount
498329
Total Phase Actual Spending Amount
51897
Dsf Number S
DSF0001114240
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
PATH OF TRAVEL EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
205211
Final Estimate Of Actual Costs Through End Of Phase Amount
205211
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114475
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
5028590
Final Estimate Of Actual Costs Through End Of Phase Amount
5028590
Total Phase Actual Spending Amount
78424
Dsf Number S
DSF0001114240
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
PATH OF TRAVEL EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
2/13/2026
Project Phase Planned End Date
6/23/2026
Project Budget Amount
14276
Final Estimate Of Actual Costs Through End Of Phase Amount
14276
Total Phase Actual Spending Amount
1169
Dsf Number S
DSF0001114475
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
12/24/2025
Project Phase Planned End Date
6/11/2026
Project Budget Amount
317118
Final Estimate Of Actual Costs Through End Of Phase Amount
317118
Total Phase Actual Spending Amount
7930
Dsf Number S
DSF0001114240
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
8/26/2025
Project Phase Planned End Date
1/7/2026
Project Phase Actual End Date
11/17/2025
Project Budget Amount
67954
Final Estimate Of Actual Costs Through End Of Phase Amount
83488
Total Phase Actual Spending Amount
76319
Dsf Number S
DSF0001114240
15
Project Geographic District : 15 • Project Building Identifier: KBND • Project School Name: PAL MICCIO EARLY LEARNING CENTER
Project Geographic District
15
Project Building Identifier
KBND
Project School Name
PAL MICCIO EARLY LEARNING CENTER
Project Type
SCA CIP
Project Description
PATH OF TRAVEL EARLY LEARN ROOF REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
1/13/2026
Project Phase Planned End Date
4/15/2026
Project Phase Actual End Date
2/12/2026
Project Budget Amount
3569
Final Estimate Of Actual Costs Through End Of Phase Amount
19147
Total Phase Actual Spending Amount
19147
Dsf Number S
DSF0001114475
15
Project Geographic District : 15 • Project Building Identifier: KBNU • Project School Name: BROOKLYN URBAN CHARTER SCHOOL
Project Geographic District
15
Project Building Identifier
KBNU
Project School Name
BROOKLYN URBAN CHARTER SCHOOL
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
51100
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112748
17
Project Geographic District : 17 • Project Building Identifier: KBOR • Project School Name: SAINT JOHN'S DAY CARE CENTER
Project Geographic District
17
Project Building Identifier
KBOR
Project School Name
SAINT JOHN'S DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/9/2024
Project Phase Planned End Date
8/1/2025
Project Budget Amount
177281
Final Estimate Of Actual Costs Through End Of Phase Amount
556266
Total Phase Actual Spending Amount
406255
Dsf Number S
DSF0001008760
17
Project Geographic District : 17 • Project Building Identifier: KBOR • Project School Name: SAINT JOHN'S DAY CARE CENTER
Project Geographic District
17
Project Building Identifier
KBOR
Project School Name
SAINT JOHN'S DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/9/2024
Project Phase Planned End Date
8/1/2025
Project Budget Amount
2849162
Final Estimate Of Actual Costs Through End Of Phase Amount
2798540
Total Phase Actual Spending Amount
2365355
Dsf Number S
DSF0001008760
17
Project Geographic District : 17 • Project Building Identifier: KBOR • Project School Name: SAINT JOHN'S DAY CARE CENTER
Project Geographic District
17
Project Building Identifier
KBOR
Project School Name
SAINT JOHN'S DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/1/2021
Project Phase Planned End Date
3/28/2022
Project Phase Actual End Date
8/9/2022
Project Budget Amount
126629
Final Estimate Of Actual Costs Through End Of Phase Amount
127756
Total Phase Actual Spending Amount
121054
Dsf Number S
DSF0001008760
17
Project Geographic District : 17 • Project Building Identifier: KBOR • Project School Name: SAINT JOHN'S DAY CARE CENTER
Project Geographic District
17
Project Building Identifier
KBOR
Project School Name
SAINT JOHN'S DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/2/2021
Project Phase Planned End Date
6/30/2021
Project Phase Actual End Date
7/2/2021
Project Budget Amount
25326
Final Estimate Of Actual Costs Through End Of Phase Amount
48160
Total Phase Actual Spending Amount
48160
Dsf Number S
DSF0001008760
32
Project Geographic District : 32 • Project Building Identifier: KBRV • Project School Name: BETHESDA DAY CARE CENTER OF BROOKLYN
Project Geographic District
32
Project Building Identifier
KBRV
Project School Name
BETHESDA DAY CARE CENTER OF BROOKLYN
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
27111
Final Estimate Of Actual Costs Through End Of Phase Amount
27111
Total Phase Actual Spending Amount
21789
Dsf Number S
DSF0001008776
32
Project Geographic District : 32 • Project Building Identifier: KBRV • Project School Name: BETHESDA DAY CARE CENTER OF BROOKLYN
Project Geographic District
32
Project Building Identifier
KBRV
Project School Name
BETHESDA DAY CARE CENTER OF BROOKLYN
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
146275
Final Estimate Of Actual Costs Through End Of Phase Amount
146275
Total Phase Actual Spending Amount
29783
Dsf Number S
DSF0001008776
32
Project Geographic District : 32 • Project Building Identifier: KBRV • Project School Name: BETHESDA DAY CARE CENTER OF BROOKLYN
Project Geographic District
32
Project Building Identifier
KBRV
Project School Name
BETHESDA DAY CARE CENTER OF BROOKLYN
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
5/3/2022
Project Phase Planned End Date
10/3/2022
Project Budget Amount
11349
Final Estimate Of Actual Costs Through End Of Phase Amount
19225
Total Phase Actual Spending Amount
1108
Dsf Number S
DSF0001008776
32
Project Geographic District : 32 • Project Building Identifier: KBRV • Project School Name: BETHESDA DAY CARE CENTER OF BROOKLYN
Project Geographic District
32
Project Building Identifier
KBRV
Project School Name
BETHESDA DAY CARE CENTER OF BROOKLYN
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE IMPROVEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/8/2021
Project Phase Planned End Date
8/9/2021
Project Phase Actual End Date
7/19/2021
Project Budget Amount
2522
Final Estimate Of Actual Costs Through End Of Phase Amount
13929
Total Phase Actual Spending Amount
13929
Dsf Number S
DSF0001008776
32
Project Geographic District : 32 • Project Building Identifier: KBSG • Project School Name: 200 CENTRAL AVENUE DAY CARE CENTER
Project Geographic District
32
Project Building Identifier
KBSG
Project School Name
200 CENTRAL AVENUE DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
53216
Final Estimate Of Actual Costs Through End Of Phase Amount
53216
Total Phase Actual Spending Amount
9814
Dsf Number S
DSF0001008778
32
Project Geographic District : 32 • Project Building Identifier: KBSG • Project School Name: 200 CENTRAL AVENUE DAY CARE CENTER
Project Geographic District
32
Project Building Identifier
KBSG
Project School Name
200 CENTRAL AVENUE DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
287121
Final Estimate Of Actual Costs Through End Of Phase Amount
287121
Total Phase Actual Spending Amount
26649
Dsf Number S
DSF0001008778
32
Project Geographic District : 32 • Project Building Identifier: KBSG • Project School Name: 200 CENTRAL AVENUE DAY CARE CENTER
Project Geographic District
32
Project Building Identifier
KBSG
Project School Name
200 CENTRAL AVENUE DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/3/2022
Project Phase Planned End Date
5/3/2022
Project Phase Actual End Date
1/6/2023
Project Budget Amount
22277
Final Estimate Of Actual Costs Through End Of Phase Amount
67740
Total Phase Actual Spending Amount
38168
Dsf Number S
DSF0001008778
32
Project Geographic District : 32 • Project Building Identifier: KBSG • Project School Name: 200 CENTRAL AVENUE DAY CARE CENTER
Project Geographic District
32
Project Building Identifier
KBSG
Project School Name
200 CENTRAL AVENUE DAY CARE CENTER
Project Type
SCA CIP
Project Description
ACS EARLY LEARN LEASE RENEWAL
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/12/2021
Project Phase Planned End Date
8/11/2021
Project Phase Actual End Date
7/19/2021
Project Budget Amount
4950
Final Estimate Of Actual Costs Through End Of Phase Amount
35837
Total Phase Actual Spending Amount
35837
Dsf Number S
DSF0001008778