Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2
Project Geographic District : 2 • Project Building Identifier: M070 • Project School Name: NYC LAB HS - MANHATTAN
Project Geographic District
2
Project Building Identifier
M070
Project School Name
NYC LAB HS - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ACM FLOOR ABATEMENT IN CLASSROOM 406 (SPACE ID #5406), APPROXIMATELY 924 SF
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/1/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1156
Total Phase Actual Spending Amount
406
Dsf Number S
SCA0000076068
2
Project Geographic District : 2 • Project Building Identifier: M070 • Project School Name: NYC LAB HS - MANHATTAN
Project Geographic District
2
Project Building Identifier
M070
Project School Name
NYC LAB HS - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-FLOOR CORE DRILLING AT STAIRCASE B 1ST, 2ND AND 3RD FLOOR NEED 3 CORE DRILLS (3 AND 1/2-INCH DI
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/29/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000076064
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY19 RESO A TECHNOLOGY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
100000
Dsf Number S
DSF0000890161
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY19 RESO A TECHNOLOGY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
100000
Dsf Number S
DSF0000889840
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY22 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
372863
Total Phase Actual Spending Amount
194593
Dsf Number S
DSF0001033636
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY17 RESO A SCIENCE LAB UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000844208
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/22/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
447131
Total Phase Actual Spending Amount
447131
Dsf Number S
DSF0000992462
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
Fast Track Projects
Project Description
ELECTRICAL WORK FOR A/C INITIATIVE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/13/2021
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
119228
Total Phase Actual Spending Amount
111965
Dsf Number S
DSF0000912082
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
4/17/2023
Project Phase Planned End Date
3/11/2024
Project Budget Amount
155435
Final Estimate Of Actual Costs Through End Of Phase Amount
142370
Total Phase Actual Spending Amount
134112
Dsf Number S
DSF0001034582
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOF REPLACEMENT / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
237720
Final Estimate Of Actual Costs Through End Of Phase Amount
237720
Total Phase Actual Spending Amount
57088
Dsf Number S
DSF0001085177, DSF0001111826
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/17/2023
Project Phase Planned End Date
3/11/2024
Project Budget Amount
271948
Final Estimate Of Actual Costs Through End Of Phase Amount
247047
Total Phase Actual Spending Amount
222351
Dsf Number S
DSF0001034582
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOF REPLACEMENT / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
3820500
Final Estimate Of Actual Costs Through End Of Phase Amount
3820500
Total Phase Actual Spending Amount
91414
Dsf Number S
DSF0001085177, DSF0001111826
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
6/28/2022
Project Phase Planned End Date
12/23/2022
Project Phase Actual End Date
10/25/2022
Project Budget Amount
21099
Final Estimate Of Actual Costs Through End Of Phase Amount
16109
Total Phase Actual Spending Amount
16109
Dsf Number S
DSF0001034582
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOF REPLACEMENT / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/17/2023
Project Phase Planned End Date
4/22/2024
Project Phase Actual End Date
4/24/2024
Project Budget Amount
169800
Final Estimate Of Actual Costs Through End Of Phase Amount
129205
Total Phase Actual Spending Amount
124281
Dsf Number S
DSF0001085177, DSF0001111826
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/14/2022
Project Phase Planned End Date
10/13/2022
Project Phase Actual End Date
6/28/2022
Project Budget Amount
4689
Final Estimate Of Actual Costs Through End Of Phase Amount
4028
Total Phase Actual Spending Amount
4028
Dsf Number S
DSF0001034582
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOF REPLACEMENT / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/13/2023
Project Phase Planned End Date
11/29/2023
Project Phase Actual End Date
11/7/2023
Project Budget Amount
33960
Final Estimate Of Actual Costs Through End Of Phase Amount
56213
Total Phase Actual Spending Amount
55016
Dsf Number S
DSF0001085177, DSF0001111826
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION- SIDEWALK BRIDGE @ PS72M
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/2/2023
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
518228
Total Phase Actual Spending Amount
412807
Dsf Number S
SCA0000072367
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ABATE /REPLACE FLOOR TILES ROOM 207 (SPACE ID# 3207- PRINCIPAL OFFICE) SOFT CONCRETE FILLER FLO
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/30/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/13/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
26110
Total Phase Actual Spending Amount
1847
Dsf Number S
SCA0000075682
4
Project Geographic District : 4 • Project Building Identifier: M072 • Project School Name: P.S. 72 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M072
Project School Name
P.S. 72 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ABATE/REPLACE FLOOR TILES IN THE 1ST FLOOR WEST SIDE HALLWAY APPROX 1092 SF; AS PER DSF LEADERS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/15/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/17/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
50168
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075984
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY24 RESO A CAFETERIA UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086200
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY19 RESO A PLAYGROUND
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
12/23/2019
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
462752
Total Phase Actual Spending Amount
353281
Dsf Number S
DSF0000890811
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
96409
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035650
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / STAIRWELL WINDOWS / PARAPETS / FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2024
Project Phase Planned End Date
4/11/2027
Project Budget Amount
1035457
Final Estimate Of Actual Costs Through End Of Phase Amount
530689
Total Phase Actual Spending Amount
505892
Dsf Number S
DSF0001068672, DSF0001085313, DSF0001111904, DSF0001096372, DSF0001096375
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/16/2021
Project Phase Planned End Date
11/8/2022
Project Budget Amount
151959
Final Estimate Of Actual Costs Through End Of Phase Amount
469817
Total Phase Actual Spending Amount
461080
Dsf Number S
DSF0000890583
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/16/2021
Project Phase Planned End Date
11/8/2022
Project Budget Amount
819872
Final Estimate Of Actual Costs Through End Of Phase Amount
952708
Total Phase Actual Spending Amount
866679
Dsf Number S
DSF0000890583
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / STAIRWELL WINDOWS / PARAPETS / FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
10/14/2024
Project Phase Planned End Date
4/11/2027
Project Budget Amount
14242786
Final Estimate Of Actual Costs Through End Of Phase Amount
12976934
Total Phase Actual Spending Amount
5242867
Dsf Number S
DSF0001068672, DSF0001085313, DSF0001111904, DSF0001096372, DSF0001096375
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
2/25/2020
Project Phase Planned End Date
8/18/2020
Project Phase Actual End Date
4/8/2020
Project Budget Amount
63611
Final Estimate Of Actual Costs Through End Of Phase Amount
132777
Total Phase Actual Spending Amount
131455
Dsf Number S
DSF0000890583
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / STAIRWELL WINDOWS / PARAPETS / FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/12/2024
Project Phase Planned End Date
6/13/2024
Project Phase Actual End Date
5/14/2024
Project Budget Amount
672871
Final Estimate Of Actual Costs Through End Of Phase Amount
706989
Total Phase Actual Spending Amount
706989
Dsf Number S
DSF0001068672, DSF0001085313, DSF0001111904, DSF0001096372, DSF0001096375
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
10/30/2019
Project Phase Planned End Date
4/29/2020
Project Phase Actual End Date
2/13/2020
Project Budget Amount
14136
Final Estimate Of Actual Costs Through End Of Phase Amount
31006
Total Phase Actual Spending Amount
31006
Dsf Number S
DSF0000890583
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / STAIRWELL WINDOWS / PARAPETS / FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
8/3/2023
Project Phase Planned End Date
12/20/2023
Project Phase Actual End Date
12/29/2023
Project Budget Amount
136647
Final Estimate Of Actual Costs Through End Of Phase Amount
272772
Total Phase Actual Spending Amount
264793
Dsf Number S
DSF0001068672, DSF0001085313, DSF0001111904, DSF0001096372, DSF0001096375
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A BATHROOM UPGRADES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
30000
Final Estimate Of Actual Costs Through End Of Phase Amount
30000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112781
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
440000
Final Estimate Of Actual Costs Through End Of Phase Amount
440000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112781
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A BATHROOM UPGRADES
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
30000
Final Estimate Of Actual Costs Through End Of Phase Amount
30000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112781
3
Project Geographic District : 3 • Project Building Identifier: M075 • Project School Name: P.S. 75 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M075
Project School Name
P.S. 75 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A BATHROOM UPGRADES
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112781
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: P.S. 76 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
P.S. 76 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
7/25/2023
Project Phase Planned End Date
1/19/2026
Project Phase Actual End Date
1/19/2026
Project Budget Amount
994770
Final Estimate Of Actual Costs Through End Of Phase Amount
2129049
Total Phase Actual Spending Amount
2082969
Dsf Number S
DSF0001017957, DSF0001017958, DSF0001083744
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: P.S. 76 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
P.S. 76 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
7/25/2023
Project Phase Planned End Date
1/19/2026
Project Phase Actual End Date
1/19/2026
Project Budget Amount
15987375
Final Estimate Of Actual Costs Through End Of Phase Amount
14980481
Total Phase Actual Spending Amount
13525791
Dsf Number S
DSF0001017957, DSF0001017958, DSF0001083744
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: P.S. 76 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
P.S. 76 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/24/2023
Project Phase Planned End Date
6/26/2023
Project Phase Actual End Date
5/4/2023
Project Budget Amount
710551
Final Estimate Of Actual Costs Through End Of Phase Amount
623920
Total Phase Actual Spending Amount
623920
Dsf Number S
DSF0001017957, DSF0001017958, DSF0001083744
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: P.S. 76 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
P.S. 76 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / WINDOWS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/30/2022
Project Phase Planned End Date
2/21/2023
Project Phase Actual End Date
1/11/2023
Project Budget Amount
142110
Final Estimate Of Actual Costs Through End Of Phase Amount
203003
Total Phase Actual Spending Amount
176993
Dsf Number S
DSF0001017957, DSF0001017958, DSF0001083744
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: I.S. 862 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
I.S. 862 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18--ABATE CERAMIC WALL TILE MASTIC IN RM 105A (SPACE ID# 2105A ) 142 SQUARE FEET -CERMAIC WALL TIL
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/29/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
4/21/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
15972
Total Phase Actual Spending Amount
203
Dsf Number S
SCA0000075347
3
Project Geographic District : 3 • Project Building Identifier: M076 • Project School Name: I.S. 862 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M076
Project School Name
I.S. 862 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-P.S. RESPONSE ACTION ABATE AND REPAIR TAR IN RADIATOR COVERS IN ROOM 105(LOCKER ROOM) AND MEDIC
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/13/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075779
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
170000
Total Phase Actual Spending Amount
170000
Dsf Number S
DSF0001163545
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
ELEVATOR MODERNIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/11/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
2283
Total Phase Actual Spending Amount
1408
Dsf Number S
DSF0001096407
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
Fast Track Projects
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/15/2022
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
528160
Total Phase Actual Spending Amount
528159
Dsf Number S
DSF0001034613
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
7679
Final Estimate Of Actual Costs Through End Of Phase Amount
7679
Total Phase Actual Spending Amount
7679
Dsf Number S
DSF0001114723
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
22987
Final Estimate Of Actual Costs Through End Of Phase Amount
22987
Total Phase Actual Spending Amount
21671
Dsf Number S
DSF0001008870
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
216036
Final Estimate Of Actual Costs Through End Of Phase Amount
216036
Total Phase Actual Spending Amount
18856
Dsf Number S
DSF0001008870
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
4505
Final Estimate Of Actual Costs Through End Of Phase Amount
4505
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001114723
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
4/28/2026
Project Phase Planned End Date
8/31/2026
Project Budget Amount
2995
Final Estimate Of Actual Costs Through End Of Phase Amount
2995
Total Phase Actual Spending Amount
2995
Dsf Number S
DSF0001114723
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/14/2022
Project Phase Planned End Date
6/1/2022
Project Phase Actual End Date
3/10/2025
Project Budget Amount
48131
Final Estimate Of Actual Costs Through End Of Phase Amount
48131
Total Phase Actual Spending Amount
36592
Dsf Number S
DSF0001008870
5
Project Geographic District : 5 • Project Building Identifier: M079 • Project School Name: M079 SPED - MANHATTAN
Project Geographic District
5
Project Building Identifier
M079
Project School Name
M079 SPED - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/27/2026
Project Phase Planned End Date
5/28/2026
Project Phase Actual End Date
4/24/2026
Project Budget Amount
749
Final Estimate Of Actual Costs Through End Of Phase Amount
749
Total Phase Actual Spending Amount
749
Dsf Number S
DSF0001114723