Active Projects

List of currently active projects. Project IDs are another way of referring to FMS IDs for an active project.  This project identifier provides a critical way of checking funding and procurement details of City projects.

Please refer to The Mayor’s Office of Operations Capital Project Dashboard to see further project and budget details.

Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
MED625
Project Id: MED625 • Description: DIST WM EXTEN & REPLACMTS, NEW BLGS • Client Agency: Environmental Protection
Project Id
MED625
Description
DIST WM EXTEN & REPLACMTS, NEW BLGS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-10-18T00:00:00.000
Scope
Distribution Water Main Extension and/or Replacement (New Buildings) at the following locations:

1. West 14th Street (N&S) from 9th Avenue to 10th Avenue; West 13th Street. from 9th Avenue to 10th Avenue.; Little West 12th Street from 9th Avenue to West Street & from Greenwich Street to Washington Street; and Washington Street from Bethune Street to W.14th Street (Survey ordered on 06/11/10, forwarded to Design 8/15/11) - No NYCT facility.

2. West 13th Street b/t 7th & 8th Avenue (Survey ordered on 12/02/10, forwarded to Design 8/15/11) - Interference with NYCT facilities.

3. Bowery (East & West Side) b/t East 4th Street & Canal Street (Survey ordered 12/02/10, forwarded to Design 8/15/11) - Interference with NYCT facilities
Above locations (1 to 3) were transferred from MED617.

4. Wadsworth Avenue from W. 190th Street to St. Nicholas Avenue; West 190th Street from Wadsworth Terrace to Wadsworth Avenue (Location added 1/31/12, Survey ordered 2/1/12 - transmitted to Design 10/05/12) - Interference with NYCT facilities

5. East 1st Street between 1st Avenue and Bowery; East 2nd Street between 1st Avenue and Bowery; 1st Avenue between East 1st Street and East 2nd Street; 2nd Avenue (east and west side) between Houston Street and East 2nd Street; Extra Place between East 1st Street and Dead End. A total of 3,400LF of new 12" wm, added 03/02/12 (Survey ordered 03/09/12; Interference with NYCT facilities).
Status
Active
MED630
Project Id: MED630 • Description: WATER MAIN REPLACEMENT AT W 170 STREET, MN • Client Agency: Environmental Protection
Project Id
MED630
Description
WATER MAIN REPLACEMENT AT W 170 STREET, MN
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-05-27T00:00:00.000
Scope
Distribution water main replacement at various locations from W. 170th St. to W. 190th St. between Broadway and Amsterdam Ave. - Borough of Manhattan
Status
Active
MED-645
Project Id: MED-645 • Description: DISTRIBUTION WATER MAIN INSTALLATION, MANHATTAN • Client Agency: Environmental Protection
Project Id
MED-645
Description
DISTRIBUTION WATER MAIN INSTALLATION, MANHATTAN
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-21T00:00:00.000
Scope
INSTALL DISTRIBUTION WATER MAINS THROUGHOUT MANHATTAN AS DIRECTED BY THE BOROUGH DISTRIBUTION ENGINEER.
Status
Active
MED669
Project Id: MED669 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
MED669
Description
New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-02-23T00:00:00.000
Scope
Distribution water main area contract, water main replacement along 7th avenue between 14th street and 34th street, as directed by Distribution Engineer, This project contains 35,950 L.F. of Distribution Water Mains.
Status
Active
MED682
Project Id: MED682 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
MED682
Description
Water Main work in Central Park West between West 81st Street and West 85th Street and other locations
Client Agency
Environmental Protection
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2028-01-20T00:00:00.000
Scope
Project MED682 will replace 2700 L.F. of existing 12" cast iron water mains with new DIP water mains
Status
Active
MEDA002
Project Id: MEDA002 • Description: ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT • Client Agency: Environmental Protection
Project Id
MEDA002
Description
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-11-19T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, MANHATTAN
Status
Active
MEDA003
Project Id: MEDA003 • Description: ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT • Client Agency: Environmental Protection
Project Id
MEDA003
Description
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-10-25T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, MANHATTAN
Status
Active
MIBBNC002
Project Id: MIBBNC002 • Description: STM & SAN SEWER, BMP AND WM WORK IN HUSSON ST • Client Agency: Environmental Protection
Project Id
MIBBNC002
Description
STM & SAN SEWER, BMP AND WM WORK IN HUSSON ST
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-05-08T00:00:00.000
Scope
STORM AND SANITARY SEWER CONSTRUCTION, BMP AND WATER MAINREPLACEMENT IN HUSSON STREET, STATEN ISLAND
Status
Active
MIBBNC003
Project Id: MIBBNC003 • Description: CONSTRUCTION OF SANITARY SEWERS, STORM SEWERS (BM • Client Agency: Environmental Protection
Project Id
MIBBNC003
Description
CONSTRUCTION OF SANITARY SEWERS, STORM SEWERS (BM
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-11-30T00:00:00.000
Scope
BMP NC-16 STORM & SANITARY SEWERS IN MASON AVE, SI
Status
Active
MIBBNC04A
Project Id: MIBBNC04A • Description: CONSTRUCTION OF BMP’s NC 6 AND 15, SI • Client Agency: Environmental Protection
Project Id
MIBBNC04A
Description
CONSTRUCTION OF BMP’s NC 6 AND 15, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-06-09T00:00:00.000
Scope
CONSTRUCTION OF BMP’s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI
Status
Active
MIBBNC04B
Project Id: MIBBNC04B • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
MIBBNC04B
Description
Storm sewer installation and water main replacement in Hunter Avenue between Haven Avenue and Nugent Avenue, as well as other locations.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2030-06-29T00:00:00.000
Scope
This project is part of the Mid-Island Bluebelt series of projects that was initiated to alleviate severe and widespread flooding issues in the New Creek Area. The storm sewers proposed under this project will outlet into BMP NC-7, constructed under MIBBNC001.

Additionally, this project will replace old cast iron and lined cast iron distribution water mains with new restrained joint ductile iron pipe within the project area. DEP Distribution Engineering approval of all water main design drawings is required before procurement.

DDC to TV all existing sewers within the project limits to determine repair needs.

As per memos received from DOT, there is an existing culvert in Hunter Avenue between Idlease Place and Moreland Street that is in poor condition. As stated in these memos, it is the responsibility of DEP to repair this culvert. These repairs will be included in this project.

This project has been identified as an Extreme Weather Project that will address the “The New Normal: Combating Storm-Related Extreme Weather in New York City”.
Status
Active
NDF-CRLYN
Project Id: NDF-CRLYN • Description: Mary Cali Dalton Recreation Center • Client Agency: Parks & Recreation
Project Id
NDF-CRLYN
Description
Mary Cali Dalton Recreation Center
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-10-15T00:00:00.000
Scope
A new recreation center will be constructed within the Lyons Pool complex. It's anticipated that the recreation center will include a variety of amenities including sports courts, exercise equipment, multipurpose areas for fitness, yoga, and dance, and flexible programming spaces that complement recreation amenities already at Lyons.
Status
Active
NDF-DAVID
Project Id: NDF-DAVID • Description: DAVIDSON AVE COMMUNITY CENTER • Client Agency: DCAS
Project Id
NDF-DAVID
Description
DAVIDSON AVE COMMUNITY CENTER
Client Agency
DCAS
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-04-23T00:00:00.000
Scope
Construction of small building addition to house a new 3 stop elevator serving the cellar, first and second floors; proposed to be built at rear of fire egress stair on south side of building. Modification of spaces to create egress route to cellar floor connecting new elev. and existing egress stairs. Lighting, fire alarm devices, HVAC work , and structural work associated with the new elevator, as well as fire rated partitions and fire rated doors to existing rooms.
Status
Active
NDFIBZ
Project Id: NDFIBZ • Description: Van Sinderen Avenue Streetscape Improvements • Client Agency: Transportation
Project Id
NDFIBZ
Description
Van Sinderen Avenue Streetscape Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-10-06T00:00:00.000
Scope
Van Sinderen Avenue is a narrow corridor, adjacent to both the MTA L-train elevated subway line and LIRR freight rail right-of-way to its west. The focus area of this project will address the substandard pedestrian conditions near the entrance to the L-Train station at the intersection of Van Sinderen and Sutter Avenues. Additional capital improvements on Van Sinderen Avenue, between Sutter to East New York Avenues, will seek to enhance the streetscape and may include repeating elements such as decorative fencing, lighting, and pedestrian amenities.
Status
Active
P-102DELV
Project Id: P-102DELV • Description: Reconstruction of Del Valle Square, Bronx • Client Agency: Transportation
Project Id
P-102DELV
Description
Reconstruction of Del Valle Square, Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-11-12T00:00:00.000
Scope
RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE & EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE
Status
Active
P109STARA
Project Id: P109STARA • Description: Starlight Park Comfort Station • Client Agency: Parks & Recreation
Project Id
P109STARA
Description
Starlight Park Comfort Station
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-15T00:00:00.000
Scope
Construction of a new 1800 sf comfort station and maintenance garage in Starlight Park, Bronx.
Status
Active
P-1HARTIS
Project Id: P-1HARTIS • Description: Hart Island Demolition and Safety Improvements • Client Agency: Parks & Recreation
Project Id
P-1HARTIS
Description
Hart Island Demolition and Safety Improvements
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-05-31T00:00:00.000
Scope
The Emergency declaration calls for safe demolition of eighteen (18) unsafe buildings that have been vacant open and unguarded for decades. They are an immediate danger to the public, and the island staff. The purpose of the safe demolition is to better support the burial operation at the Bronx Hart Island the largest New York City potter’s field / burial site.
Status
Active
P-1ORCHMO
Project Id: P-1ORCHMO • Description: Orchard Beach Maintenance and Operations Building Site Work & New Construction • Client Agency: Parks & Recreation
Project Id
P-1ORCHMO
Description
Orchard Beach Maintenance and Operations Building Site Work & New Construction
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-06-02T00:00:00.000
Scope
The project consists of a new 2-story 9,000 sf M&O building that will house material and equipment storage, DPR offices, locker rooms, a staff lunch room, muster/meeting room and other support spaces to meet operational needs and accommodate seasonal staff, along with an ~33,000 sf brick-walled enclosure for vehicle maintenance and storage, as well as a new access road, a relocated fuel pumping facility, and remediation of the existing fuel station. The current location is susceptible to inundation as it is below the flood plain and was flooded during Hurricane Sandy. The new location has been carefully selected to mitigate existing conflict between service vehicles and beachgoers who arrive by bus. Separate access is proposed for the new maintenance yard. The access road was originally envisioned as 3,370 lf of all new construction, however, it's now planned to shorten the road by sharing the existing MTA bus loop road. Coordination with MTA will be needed.
Status
Active
P-1TREREC
Project Id: P-1TREREC • Description: Construction of a New Recreation Center at Tremont Park • Client Agency: Parks & Recreation
Project Id
P-1TREREC
Description
Construction of a New Recreation Center at Tremont Park
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
2. Design
Projected Construction
2028-08-28T00:00:00.000
Scope
The Department of Parks and Recreation, in consultation with local elected officials and community stakeholders, has identified the need for a new Recreation Center to be located at Walter Gladwin Park in the Tremont neighborhood.
The purpose of the project is to provide a Parks run Recreation Center to serve the community in an area identified by the Agency as under-served.
Status
Active
P1YANK15A
Project Id: P1YANK15A • Description: Kids Powerhouse Discovery Center • Client Agency: Parks & Recreation
Project Id
P1YANK15A
Description
Kids Powerhouse Discovery Center
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-09-30T00:00:00.000
Scope
The Bronx Childrens Museum and the New York City Department of Parks and Recreation (NYCDRP) will renovate and fit-out the 11,000 Sq Ft second floor of Building J at the Bronx Terminal Market as the new home of Bronx Childrens Museum (BXCM). The intent is to create exhibit space, interactive program spaces, creative workshops, and a community room to involve parents and children in learning activities. All required amenities, structural, and MEP work shall be included in the proposed designs. The scope also includes exterior and interior signage and lighting. Any requirement for acoustic separation within the museum space and from the first floor office space shall be considered. This project shall achieve minimum LEED Silver rating.
Status
Active
P-217SCRC
Project Id: P-217SCRC • Description: Shirley Chisholm Recreation Center • Client Agency: Parks & Recreation
Project Id
P-217SCRC
Description
Shirley Chisholm Recreation Center
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-06-28T00:00:00.000
Scope
New Recreation Center
Status
Active
P-2CIB1HQ
Project Id: P-2CIB1HQ • Description: Coney Island Beach Operations HQ at West 25th Street • Client Agency: Parks & Recreation
Project Id
P-2CIB1HQ
Description
Coney Island Beach Operations HQ at West 25th Street
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-06-12T00:00:00.000
Scope
The existing Coney Island Headquarters is composed of 2 separate structures and the surrounding maintenance yard. The project is to provide a modern and fully functional beach operations headquarters. This project will reconstruct the Main Building while leaving the Administration Building and Vehicle Shops operational during and after the project. Parks would prefer to work with the existing structure as opposed to demolishing and starting new. However, the structures are aging and need to be evaluated.
Please see attached document prepared by the Parks operations team outlining their programmatic requirements and understanding of required scope.
Please note that these buildings were impacted by Hurricane Sandy. The basement of the main building is filled with sand and debris including an oil tank that requires remediation.
Parks will relocate operations during construction, but will need seasonal access to the trash compactor and full access to the vehicle shops and maintenance yard during construction.
Status
Active
P-303ERPK
Project Id: P-303ERPK • Description: East River Park • Client Agency: DCAS
Project Id
P-303ERPK
Description
East River Park
Client Agency
DCAS
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-09-28T00:00:00.000
Scope
Reconstruction of the East River Park bulkheads and platforms in order to bring the structures up to a state of good repair, using the attached inspection reports as guidance for their scope. Final Design would be coordinated with East Side Coastal Resiliency to facilitate that project’s objectives. Parks requests that this work include priority work identified in the 2015/2016 reports, as well as all routine work identified in the 2015/2016 reports necessary to keep the structure in a state of good repair.
Status
Active
P-3RANDAL
Project Id: P-3RANDAL • Description: RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND • Client Agency: Parks & Recreation
Project Id
P-3RANDAL
Description
RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-01-22T00:00:00.000
Scope
RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND
Status
Active
P-413QCF1
Project Id: P-413QCF1 • Description: Queens County Farm Museum Phase 2 Restoration • Client Agency: Parks & Recreation
Project Id
P-413QCF1
Description
Queens County Farm Museum Phase 2 Restoration
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-09-17T00:00:00.000
Scope
The project consists of restoring the reconstructed barn and garage buildings at the Queens County Farm Museum currently used for administrative and public gathering purposes. The scope includes installing new HVAC systems, improving the building envelope, structural changes and stabilization, exterior replacement of faux garage doors and ADA access ramp.
Status
Active
P-502WIL2
Project Id: P-502WIL2 • Description: WILLOWBROOK PARK FLOOD CONTROL - PHASE II • Client Agency: Parks & Recreation
Project Id
P-502WIL2
Description
WILLOWBROOK PARK FLOOD CONTROL - PHASE II
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-08-29T00:00:00.000
Scope
WILLOWBROOK PARK FLOOD CONTROL - PHASE II
Status
Active
P-5PNYC06
Project Id: P-5PNYC06 • Description: Ocean Breeze Athletic Center - Staten Island • Client Agency: Parks & Recreation
Project Id
P-5PNYC06
Description
Ocean Breeze Athletic Center - Staten Island
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2015-10-28T00:00:00.000
Scope
Construction of a 135,000 sq. ft. Athletic Center in Staten Island featuring an 8 lane, 200m track and seating for 2,500 spectators.
The project is being constructed via 3 contracts including Contract 1 for the foundation and landscaping scope, Contract 2 for the Pre-fabricated metal building and Contract 3 for the interior fit -out
Status
Active
PDWTC2013
Project Id: PDWTC2013 • Description: WTC CAMPUS SECURITY PLAN • Client Agency: Police
Project Id
PDWTC2013
Description
WTC CAMPUS SECURITY PLAN
Client Agency
Police
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-12-22T00:00:00.000
Scope
To provide security measures surrounding the WTC Campus. Security measures will include fencing, barriers, bollards, kiosks, and establishments of check zones. Additional Infrastructure work will include installation of new pre-cast concrete roadway (subject to NYCDOT's approval), replacement of curb and sidewalk (as applicable), pavement markings, street lighting, signals together with all work incidental thereto.
Status
Active
PO002-116
Project Id: PO002-116 • Description: NEW 116TH PCT • Client Agency: Police
Project Id
PO002-116
Description
NEW 116TH PCT
Client Agency
Police
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-04-01T00:00:00.000
Scope
Construction of a new precinct station house facility and associated site work for the new 116th Precinct.
Status
Active
PO205-PA
Project Id: PO205-PA • Description: New Police Academy • Client Agency: Police
Project Id
PO205-PA
Description
New Police Academy
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2014-10-31T00:00:00.000
Scope
The New Police Academy is a 2.5 million square foot comprehensive training facility to be constructed on a 30 acre campus in College Point, Queens. The facility will include conventional and demonstration classrooms and laboratories, fixed, tactical and virtual firing ranges, tactical training facilities, fitness training facilities, an emergency vehicle operations course and a state of the art tactical village. The New Academy will be designed to provide annual training for 4,000 recruits and 40,000 in service NYPD personnel. The construction is currently budgeted at $1,000,000,000 and is expected to last three years; funding for construction begins in FY10.
Status
Active
PO79-77AX
Project Id: PO79-77AX • Description: 77th Pct. Annex Renovation • Client Agency: Police
Project Id
PO79-77AX
Description
77th Pct. Annex Renovation
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2018-07-02T00:00:00.000
Scope
Renovation of annex building including general construction, electrical, hvac, plumbing, communications
Status
Active
PO79-77FA
Project Id: PO79-77FA • Description: 77th Precinct Annex Fire Alarm Installation • Client Agency: Police
Project Id
PO79-77FA
Description
77th Precinct Annex Fire Alarm Installation
Client Agency
Police
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-09-05T00:00:00.000
Scope
Provide new non-proprietary open Architecture Code compliant fire alarm
system
Provide for integration or the capacity for future integration into a building
BMS/ Life Safety (DDC) System
Status
Active
PO79BMAHQ
Project Id: PO79BMAHQ • Description: One Police Plaza Paving and Landscaping • Client Agency: Police
Project Id
PO79BMAHQ
Description
One Police Plaza Paving and Landscaping
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-01-14T00:00:00.000
Scope
Restoration of Plaza at One Police Plaza. Plaza has heaving. Check for leaks in concrete slab. Replace expansion joints. Install waterproofing membrane. Reinstall pavers,
Status
Active
PO79BMAHW
Project Id: PO79BMAHW • Description: 114TH PCT PLUMBING SYSTEM REPLACEMENT • Client Agency: Police
Project Id
PO79BMAHW
Description
114TH PCT PLUMBING SYSTEM REPLACEMENT
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-10-28T00:00:00.000
Scope
Project scope is remediation of sewer back-up contamination;separation of storm and sanitary outflow within upper floors of building leading to basement trap/outflow. In addition, ponding condition in parking lot will be corrected.
Status
Active
PO79BMAJU
Project Id: PO79BMAJU • Description: 26TH PRECINCT ROOF, WINDOWS & FACADE • Client Agency: Police
Project Id
PO79BMAJU
Description
26TH PRECINCT ROOF, WINDOWS & FACADE
Client Agency
Police
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-05-15T00:00:00.000
Scope
Removal and replacement of roofing, façade and windows, masonry and plumbing. Disconnect and reconnect any electric power conduits or appurtenances that may interfere with aforementioned job, data and telephone lines attached or associated to the existing roof.
Status
Active
PO79FDBNX
Project Id: PO79FDBNX • Description: NYPD: REPLACEMENT OF FRONT DESKS/ BRONX PRECINCTS • Client Agency: Police
Project Id
PO79FDBNX
Description
NYPD: REPLACEMENT OF FRONT DESKS/ BRONX PRECINCTS
Client Agency
Police
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-30T00:00:00.000
Scope
TO PROVIDE FOR THE FRONT DESK REPLACEMENT AT THE 42ND, 44TH, 52ND AND 108TH PCT IN THE BRONX
Status
Active
PO79FDCW1
Project Id: PO79FDCW1 • Description: Front Desk Renovations for 45th,75th,105th,123rd • Client Agency: Police
Project Id
PO79FDCW1
Description
Front Desk Renovations for 45th,75th,105th,123rd
Client Agency
Police
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-09-25T00:00:00.000
Scope
DDC shall furnish Contract documents, (drawings and specifications) labor, materials, equipment and appliances necessary and required to build and install a new front desk, and other miscellaneous work.
DDC should verify all existing conditions, existing utilities to be located and/or replaced.
Demolition and removal of existing front desk.
Removal/relocation of existing outlets, data and telephone lines.
e) New wood platform and clean/polish existing aluminum railing and gate.
Status
Active
PO79ROD
Project Id: PO79ROD • Description: NYPD Firearms and Tactics Facility • Client Agency: Police
Project Id
PO79ROD
Description
NYPD Firearms and Tactics Facility
Client Agency
Police
Division
Public Buildings
Phase
2. Design
Projected Construction
2028-12-05T00:00:00.000
Scope
Provide design and construction administration services for a consolidated state of the art secure training facility and compound. The facility shall consist of new partially baffled outdoor ranges, a tactical training village, a training/administration building and associated security and infrastructure improvements.

To consolidate and provide a Firearms Training facility that meets modern Firearms and Tactical Training standards. To provide sheltered firearm ranges that will mitigate noise pollution for adjacent neighborhoods, reduce hazardous waste removals and provide appropriate infrastructure in a secure compound.
Status
Active
PO79SHOPR
Project Id: PO79SHOPR • Description: Service Shop #6/72 PCT151 30th Street. Brooklyn NY • Client Agency: Police
Project Id
PO79SHOPR
Description
Service Shop #6/72 PCT151 30th Street. Brooklyn NY
Client Agency
Police
Division
Public Buildings
Phase
2. Design
Projected Construction
2026-03-15T00:00:00.000
Scope
TO PROVIDE LABOR AND MATERIALS FOR THE SERVICE SHOP #6 ROOF RENOVATION AND FACADE REHABILITATION, LOCATED 151 30TH STREET BROOKLYN NY
Status
Active
PO79WNDWS
Project Id: PO79WNDWS • Description: Window Replacement at 26th, 67th, 76th and 111th P • Client Agency: Police
Project Id
PO79WNDWS
Description
Window Replacement at 26th, 67th, 76th and 111th P
Client Agency
Police
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-11-08T00:00:00.000
Scope
Remove existing windows/replace with new at 4 precincts (67,76,111,Hwy 3.)
Status
Active
PROCONTRL
Project Id: PROCONTRL • Description: Consulting Services for Project Controls Support • Client Agency: Unknown
Project Id
PROCONTRL
Description
Consulting Services for Project Controls Support
Client Agency
Unknown
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-30T00:00:00.000
Scope
This is a project controls pilot program that engages consultants in support of project controls. The objective of the pilot program is to analyze project data to positively influence cost and schedule of the projects supported.
Status
Active
PS-312CW
Project Id: PS-312CW • Description: REPAIRS & REHAB. OF INTERCEPTING SEWERS, CW • Client Agency: Environmental Protection
Project Id
PS-312CW
Description
REPAIRS & REHAB. OF INTERCEPTING SEWERS, CW
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2014-10-07T00:00:00.000
Scope
REPAIRS & REHAB. OF INTERCEPTING SEWERS, CW
Status
Active
PS-312MX
Project Id: PS-312MX • Description: REPAIRS & REHAB OF INTERCEPTING SEWERS, MN & BX • Client Agency: Environmental Protection
Project Id
PS-312MX
Description
REPAIRS & REHAB OF INTERCEPTING SEWERS, MN & BX
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-12-10T00:00:00.000
Scope
Repair and Rehabilitation of Interceptor Sewers at Various Locations in the Boroughs of Manhattan and Bronx.
Status
Active
PS-349
Project Id: PS-349 • Description: Lining Interceptor Assets in Rockaway • Client Agency: Environmental Protection
Project Id
PS-349
Description
Lining Interceptor Assets in Rockaway
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-05-15T00:00:00.000
Scope
There are 7 Assets in the Rockaway system that are in bad shape and need to be repaired. They have surface defects and the rebar can be seen. They need to be assessed and repaired, most likely through some type of lining method. Inspection reports, videos, and available as-builts are shared via OneDrive.
Status
Active
PV001SELM
Project Id: PV001SELM • Description: LAH - Louis Armstrong House - Administration Facil • Client Agency: Cultural Affairs
Project Id
PV001SELM
Description
LAH - Louis Armstrong House - Administration Facil
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-11-10T00:00:00.000
Scope
Complete rehabilitation/restoration of the house at: 34-52 107th Street, (Admin. Facility)
from basement to roof (interior & exterior)
Non City owned
Status
Active
PV002CULT
Project Id: PV002CULT • Description: Construction of a new cultural facility at Hudson • Client Agency: Cultural Affairs
Project Id
PV002CULT
Description
Construction of a new cultural facility at Hudson
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-02-11T00:00:00.000
Scope
Tower D BIN: 1089411. CS Fixed Building will be an Alt 1 to Tower D, so should have the same BIN.

Site block/lot: Block 702, parts of Lots 4 and 10
Site address: 545 West 30th Street, NY NY 10001
Anticipated construction completion date for the fixed building, phase 1, is Oct 16, 2019.

The Culture Shed is a brand new cultural facility (“the Culture Shed facility”) of approximately 199,000 square feet that will be located on West 30th Street in the Eastern Rail Yards at the Hudson Yards. The facility will be a multi-purpose venue. Culture Shed will produce and present a full calendar of events in its architecturally dynamic spaces that include galleries as well as flexible spaces to accommodate a range of performance disciplines.

The Culture Shed facility includes a non-moving, fixed building (the “Culture Shed Building”) and a moving, retractable shed (the “Shed”) that may be deployed over the Culture Shed Plaza (“the Plaza”) to the east of the Culture Shed Building to provide additional indoor or covered outdoor space for exhibitions and other programming.

Phase 1, “The Project” (the Culture Shed Building) is the subject of this CCG application. Phases 2 and 3 are not the subject of this CCG application, but are described below to provide a full description of the entire Culture Shed facility and the context for Phase 1.

The overall Culture Shed facility will consist of the following phases:

• Phase 1: The Culture Shed Building: This portion of the facility is referred to as the “fixed building”. It is an 84,733 square foot, 107 foot tall, seven story structure containing museum-quality exhibition and performance galleries, a café, a roof gallery, circulation, and support spaces. It features expansive column-free floor plates that are suitable for the presentation of exhibitions and a wide range of performance productions and will include all the essential operating infrastructure to produce visual art exhibits, performances, and events. The Culture Shed will only initiate Phase 1 in concert with the building of the Tower D core and shell where the mechanical, electrical, plumbing, and life safety systems that serve the fixed building reside. These systems are included in the Phase 1 scope. Phase 1 is “The Project” that is the subject of this CCG application. Anticipated construction completion date is Oct 16, 2019

• Phase 2: The Shed and the Plaza: The Shed is a 125 foot tall movable structure comprised of 3 sides (north, east,south) and a roof. Its western side is open and is filled by the eastern face of the Culture Shed Building to which it is connected. In the nested position, the Shed covers the Culture Shed Building (north, east, south, overhead). In the deployed position, the Shed no longer covers the Culture Shed Building, but is still connected to it at the fixed building’s easternmost façade. The Plaza is an 18,000 square foot open space directly east of the Culture Shed Building. When deployed, the Shed covers the Plaza creating a large, tall, and flexible space for a multitude of programming. When the Shed is not deployed (ie it is nested over the Culture Shed Building), the Plaza will be completely open-air and used for a variety of cultural activities that will be open to the public. Phase 2 is part of the overall Culture Shed facility, but is not included in “The Project” that is the subject of this CCG application.

• Phase 3: Portions of Culture Shed in Tower D and the Podium: Portions of the Culture Shed facility, primarily back office, service facilities, and mechanical rooms will be located in the residential building currently known as Tower D to be developed by the Eastern Rail Yard (ERY) Developer, Related Properties. Tower D is located on the east side of Eleventh Avenue between West 30th and West 31st Streets, immediately west of and adjacent to the Culture Shed Building. The portions of the Culture Shed facility within Tower D are easily accessible from the Culture Shed Building as they are co-level, adjacent, and separated only by a structural construction joint.

Portions of the Culture Shed facility, primarily lobbies, restrooms, coffee bar, bookstore, back offices, catering kitchen, loading and service facilities, and mechanical rooms will also be located in the Podium. The Podium is defined as the area below plaza level, below the Culture Shed Building and the Plaza,that is to be developed by Related Properties. The portions of the Culture Shed facility within the Podium are easily accessible from the Culture Shed Building above via stairs and elevators.

Culture Shed Inc. is responsible for reimbursing Related Properties for the core and shell construction of the portions of Tower D and the Podium occupied by the Culture Shed facility (foundations, floor and roof structure, slabs,roofing, waterproofing, and curtainwall). Culture Shed Inc. is responsible for construction and payment for the fit-out of these spaces (interior partitions, finishes, vertical transporation, glazing, etc.) by its own construction manager. Phase 3 is part of the overall Culture Shed facility, but is not included in “The Project” that is the subject of this CCG application.
Status
Active
PV022-SKY
Project Id: PV022-SKY • Description: MMA - Metropolitan Museum Skylight Replacement for Museum Building Wings A, B, C • Client Agency: Cultural Affairs
Project Id
PV022-SKY
Description
MMA - Metropolitan Museum Skylight Replacement for Museum Building Wings A, B, C
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2027-06-30T00:00:00.000
Scope
The core of the ABC Skylights and HVAC Infrastructure project is replacing 30,000 square feet of 70+ year old, corrugated wire glass skylights over the oldest three wings A, B, C of the museum containing our world-famous European Paintings collection. Maintenance of our building envelope and infrastructure is of paramount importance to the preservation of our collection and this project was overdue. We are replacing this antiquated skylight system with high performing insulated skylights and thermally broken aluminum framing. Specific work includes the following:
• Replacing 30,000 SF of tempered glass ceiling panels with safety laminated glass in the second-floor galleries

• Replacing 30,000 SF of new operable louvers to temper the sun as needed to maintain the museums strict 70 degree / 50% humidity conditions required for the art

• Replacing and upgrading all exiting HVAC systems in the affected galleries. Including seven (7) large air handling units that are all well past their serviceable lifespans.

• Replacing and reinsulating thousands of feet of ductwork and enlarging two HVAC machine room enclosures for two (2) additional air handlers

• Replacing and moving 58 reheat coils previously directly over the art to a location not above a gallery eliminating the threat of water damage to the gallery below

• Electrical components include:

o Furnish dozens of new panels and switchgear including new feeder raceways, cabling and feeder terminations
o Pull new feeder cables from the basement up to the attic
o Install new telecom cabling, back boxes and raceways
o Install new fire alarm system and devices and a new VESDA smoke detection system in the attics
o Tie in all new equipment including nine new air handlers
Status
Active
PV028-ISS
Project Id: PV028-ISS • Description: Issue Project Room - interior fitout • Client Agency: Cultural Affairs
Project Id
PV028-ISS
Description
Issue Project Room - interior fitout
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-12-31T00:00:00.000
Scope
A 4,600 sq. ft. theater renovation for multi disciplinary and new media arts performances.



Estimated Construction Cost: $2.5M

Approved Design CP Amount $596,668

Design CP Breakdown:
WORK AC $555,620
Commissioning allowance $40,000

Construction CP's:
PH1 JOCS - Acoustic wall $171,898.51
sibmitted on 5/15/14 to CBA
Status
Active
PV034NWCH
Project Id: PV034NWCH • Description: AMNH - Northwest Coast Hall Renovation • Client Agency: Cultural Affairs
Project Id
PV034NWCH
Description
AMNH - Northwest Coast Hall Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-01T00:00:00.000
Scope
The work associated with the total proposed project includes the removal of HVAC in 1997 under City-funded Pass-Through PVC034-S. The project will not disturb or demolish any other City-funded improvements; the existing lighting that was previously funded by the PV034CPWR will remain intact. PV034-S is beyond the useful life of the registered Pass-Through and the bonds are expired.
Status
Active
PV040ELEV
Project Id: PV040ELEV • Description: Flushing Town Hall Elevator Replacement • Client Agency: Cultural Affairs
Project Id
PV040ELEV
Description
Flushing Town Hall Elevator Replacement
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2024-11-01T00:00:00.000
Scope
Replacement of elevator hydraulics and related electrical work, carpentry work, and flooring replacement
Status
Active