PV467BHPE
Project Id: PV467BHPE • Description: Brooklyn Historical Society--Interior Renovation • Client Agency: Cultural Affairs
Project Id
PV467BHPE
Description
Brooklyn Historical Society--Interior Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2015-12-21T00:00:00.000
Scope
To make the first floor a Multipurpose Space and create Temporary and Permanent Exhibition Gallery. Also utilize cellar space as Education Facility for Public
Status
Active
PV467BRAC
Project Id: PV467BRAC • Description: Bx River Art Ctr-Building Reconstruction • Client Agency: Cultural Affairs
Project Id
PV467BRAC
Description
Bx River Art Ctr-Building Reconstruction
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2015-08-22T00:00:00.000
Scope
Renovation, upgrade and code compliance of the Bronx River Art Center Bldg.

The project includes the gut renovation of interiors, exterior brick repoingting and stitching, new windows, ADA compliance renovation, reprogramming of the spaces into arts educational rooms, artist studio's and administrative offices. It includes also the full replacement of the exisiting MEP.

4/22/15 New project design & construction CP requested limit is $10,299,364 ($1,044,924 Design + $9,254,440 Construction).
Status
Active
PV467-CRG
Project Id: PV467-CRG • Description: CLG - Manhattan Class Co. - Initial Outfitting • Client Agency: Cultural Affairs
Project Id
PV467-CRG
Description
CLG - Manhattan Class Co. - Initial Outfitting
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2018-12-27T00:00:00.000
Scope
The project comprises initial construction of a tenant fit-out in the Avalon Bay development. The base building construction has been completed. MCC Theater will occupy the ground floor and a portion of the second floor. The ground floor will house two theaters: one with a minimum of 199 seats (more if possible); another flexible theater space with 99 seats or more. The first floor will also house dressing rooms for each theater, lobby and box office and restrooms. Second floor will house MCC’s administrative office with conference room and small office kitchen, rehearsal studio, possibly additional meeting room for literary and education program meetings/readings
Status
Active
PV467CSVB
Project Id: PV467CSVB • Description: clemente soto velez boiler reconstruction • Client Agency: Cultural Affairs
Project Id
PV467CSVB
Description
clemente soto velez boiler reconstruction
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2013-04-01T00:00:00.000
Scope
The program to address the failing heating system at the referenced facility – replacement of the non-compliant boiler, controls and associated heat distribution systems
Status
Active
PV467GUG6
Project Id: PV467GUG6 • Client Agency: Cultural Affairs • Division: Public Buildings
Project Id
PV467GUG6
Description
Guggenheim Museum Roof System Replacement and Fire Safety System Upgrade; copper roofing, roof membrane systems, and fire safety protection system replacement.
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-12-30T00:00:00.000
Scope
1. Copper Standing Seam Roofing and Flashing Replacement (City-Funded), 2. Class E Fire Safety System Equipment Replacement (City-Funded), 3. Roofing Overlay Gravel and Paver Surface Replacement (Non-City Funded), 4. Exterior Building Soffit Rehabilitation (Non-City Funded).
Status
Active
PV467HECK
Project Id: PV467HECK • Description: Heckscher bldg east harlem ctr roof sys replacemen • Client Agency: Cultural Affairs
Project Id
PV467HECK
Description
Heckscher bldg east harlem ctr roof sys replacemen
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2023-02-09T00:00:00.000
Scope
Repair/replacement of sections of the roof of the Heckscher Building. Replacement of roof drains. Associated water damage repair of mezzanine level of 5th floor gymnasium.
Status
Active
PV467IRT1
Project Id: PV467IRT1 • Description: Irish Repertory Theatre - Phase I Renovations • Client Agency: Cultural Affairs
Project Id
PV467IRT1
Description
Irish Repertory Theatre - Phase I Renovations
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2016-06-08T00:00:00.000
Scope
The total scope of work for the Irish Repertory Theatre consists of a comprehensive interior renovation of the cellar, first and second floors, including the addition of a theater balcony and all associated structural, mechanical, and electrical work; ADA and all code compliance, including fire protection; redesign of the second floor rehearsal studio, office spaces, and public bathrooms. This project shall be in compliance with LL86 and shall achieve LEED Silver rating. This renovation will dramatically improve audience experience and allow the theater company to work more efficiently in improved performance, office and rehearsal spaces.
Status
Active
PV467POP2
Project Id: PV467POP2 • Description: Poppenhusen Institute- Elevator & ADA Bathroom • Client Agency: Cultural Affairs
Project Id
PV467POP2
Description
Poppenhusen Institute- Elevator & ADA Bathroom
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2018-05-31T00:00:00.000
Scope
Provide elevator access and access way and handicap accessible toilet facility at historic community center built 1868. Designated NY Exterior Landmark.
Status
Active
PV467POPP
Project Id: PV467POPP • Description: Poppenhusen Institute Window/Façade Restoration • Client Agency: Cultural Affairs
Project Id
PV467POPP
Description
Poppenhusen Institute Window/Façade Restoration
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-06-24T00:00:00.000
Scope
The project involves restoring the exterior façade to preserve the historic nature of the Poppenhusen Institute. The scope of work includes replacement of brownstone sills, wood windows and masonry. Many of the brownstone window sills and trim are exfoliated and deteriorated causing water infiltration into the wall system. Three monumental windows on the second floor have been recently restored and require no additional repair.
Status
Active
PW348-72
Project Id: PW348-72 • Description: FUEL TANK REPLACEMENT • Client Agency: DCAS
Project Id
PW348-72
Description
FUEL TANK REPLACEMENT
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-11-22T00:00:00.000
Scope
Installation, replacement, closure of gasoline and diesel underground/aboveground storage tanks at 10 locations within the Bronx.
Status
Active
PW348-73
Project Id: PW348-73 • Description: FUEL TANK REPLACEMENT • Client Agency: DCAS
Project Id
PW348-73
Description
FUEL TANK REPLACEMENT
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-10-04T00:00:00.000
Scope
FUEL TANK REPLACEMENT
Status
Active
PV467SRA4
Project Id: PV467SRA4 • Description: 7th Regiment Armory-Façade & Shelter Work • Client Agency: Cultural Affairs
Project Id
PV467SRA4
Description
7th Regiment Armory-Façade & Shelter Work
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2014-05-21T00:00:00.000
Scope
Project has two parts:

Façade restoration / roof repair:

The scope of work includes: Rebuilding the masonry parapets and installing through-wall flashing (Level 4); Repairing of roof membrane at parapet work; Brick re-pointing / replacement as required on Park Avenue façade and corner towers; Cleaning the full Park Avenue façade; Removing and replacing the copper mansard roof (Level 4); Installing new gutters and leaders in the head house; Installing a new fourth floor slab to create a level ADA accessible floor for the future homeless shelter; Repairing /removal of iron window guards; Restoring the fence on Park Avenue and Side Streets; Installing exterior landscape and façade lighting; and Installing new hot water heating in the fourth floor and fifth floor.

Relocation of Women's shelter within the Armory and initial fit-out:

This project calls for the removal and protection of existing historic features to be preserved and reused, the demolition of existing construction and removal of existing fixtures and equipment in demised area, the construction of new sleeping quarters, restrooms, showers, staff facilities and resident support facilities for 80 to 100 women, and the incorporation per approval of the New York State Historic Preservation Office of historic elements into the new facility.

The scope of work includes a new HVAC system throughout the facility; new upgraded electrical service sufficient to support the facility, including new electrical distribution panels from building’s electrical risers; new lighting and belly tank to provide emergency power for: emergency lighting, elevator emergency power, fire pumps and other code-required equipment; smoke and fire detection devices to tie into building’s fire alarm system; new restrooms and shower rooms per requirements for facility occupancy to tie into building’s risers; new secondary water service from street per code and new fire pumps to meet the requirements of new sprinkler system, including new riser(s); as well as full sprinklers throughout facility per DOB requirements.

This project is a necessary phase of construction in the sequence of work to accomplish the Park Avenue Armory’s full renovation as envisioned in our Master Plan. Today the homeless shelter occupies a portion of the 3rd floor and the entire 5th floor. It is the joint desire of the NYC Department of Homeless Services (DHS) and the Park Avenue Armory to consolidate the shelter in a newly renovated space on the 4th floor. For DHS and the residents, the current shelter on separate floors is inefficient (requiring additional staff), non-code compliant and non-ADA accessible. For the Armory, the shelter’s relocation stands in the way of completing the Administration Building renovation and its full activation as a arts center.


Project square footage:
PV467SRA4 – Park Avenue Façade and Shelter Fit-out – Shelter Space (approx. 13,500 SF) + Park Avenue façade restoration.

Project Address: 643 Park Avenue New York, NY 10065
BIN: 1042460
Tax Block: 1401
Tax Lot: 1
Status
Active
PV467WFAC
Project Id: PV467WFAC • Description: Heckscher Building West Facade Renovation • Client Agency: Cultural Affairs
Project Id
PV467WFAC
Description
Heckscher Building West Facade Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-04-19T00:00:00.000
Scope
Heckscher Building West Façade Restoration and window replacement.
Status
Active
PV477TEMP
Project Id: PV477TEMP • Description: Staten Island Museum - HVAC Upgrade • Client Agency: Cultural Affairs
Project Id
PV477TEMP
Description
Staten Island Museum - HVAC Upgrade
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-03-10T00:00:00.000
Scope
HVAC upgrade Buildings M & J
Status
Active
PV488-BN
Project Id: PV488-BN • Description: Bronx Net - Renovation of Carman Hall • Client Agency: Cultural Affairs
Project Id
PV488-BN
Description
Bronx Net - Renovation of Carman Hall
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-02-10T00:00:00.000
Scope
upgrade to the facility's public and offices areas.Spatial reconfiguration and interior finishes will be provided.Approx 3,970 sf
Status
Active
PV490-C
Project Id: PV490-C • Description: Snug Harbor Building C Roof Replacement • Client Agency: Cultural Affairs
Project Id
PV490-C
Description
Snug Harbor Building C Roof Replacement
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2023-04-13T00:00:00.000
Scope
Budget information from CPI & FMS
Status
Active
PV490ELEC
Project Id: PV490ELEC • Description: SHCC - Snug Harbor Cult. Ctr. Site - Wide Electric • Client Agency: Cultural Affairs
Project Id
PV490ELEC
Description
SHCC - Snug Harbor Cult. Ctr. Site - Wide Electric
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-09-23T00:00:00.000
Scope
SHCC - Snug Harbor Cult. Ctr. Site - Wide Electric Upgrade.
New 4.16kV medium voltage Con-Edison Service able to accommodate the existing, new and projected loads. New 4.16kV service distribution configuration in Building “G” located in new or enlarged service switchgear room in this building or above the ground immediately adjacent to building “G”. New service distribution switchgear shall include Con-Edison C/T compartments, metering & 4.16kV/ 180-208V step-down transformers. The above mentioned new service shall be able to accommodate the electric loads.
Status
Active
PV490-INF
Project Id: PV490-INF • Description: Snug Harbor Center CTR.1000 Richmond Ter.HVAC/PLU • Client Agency: Cultural Affairs
Project Id
PV490-INF
Description
Snug Harbor Center CTR.1000 Richmond Ter.HVAC/PLU
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-07-15T00:00:00.000
Scope
The project will replace an aging, damaged, and obsolete site wide heating and cooling system

Replace steam pipes to and from Building L to all served buildings
• Replace pumps within served buildings to improve steam and cold circulation
• Replace interior steam pipes within served buildings, including addition of two radiators to each attic in order to protect wet sprinkler systems
• Replace existing chiller with a modular multi-unit system with at least four chillers of 200 ton capacity with a gas-fired absorption system; replace cooling towers
o Two existing chillers: McQuay chillers with evaporator cooling capacity of 285 tons and water flow of 570 gpm (one nonfunctional)
• Connect ground floor of Building C and Building B to central air conditioning plant
Status
Active
PV490JNFC
Project Id: PV490JNFC • Description: NOBLE MARITIME COLLECTION • Client Agency: Cultural Affairs
Project Id
PV490JNFC
Description
NOBLE MARITIME COLLECTION
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-10-10T00:00:00.000
Scope
Snug Harbor Cultural Center - Noble Maritime Collection, Building "D" Façade Reconstruction
Status
Active
PV490-Q3
Project Id: PV490-Q3 • Description: SHC Center Music Hall, Dressing and ADA compliance • Client Agency: Cultural Affairs
Project Id
PV490-Q3
Description
SHC Center Music Hall, Dressing and ADA compliance
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-30T00:00:00.000
Scope
Renovation of SHCC Music Hall (Bldg T) to provide back of house amenities i.e. dressing rooms, green room administrative offices and other support spaces; incl. scope to obtain C of O for PA use.
Status
Active
PV501BOIL
Project Id: PV501BOIL • Description: MOMA PS1-BOILER REPLACEMENT • Client Agency: Cultural Affairs
Project Id
PV501BOIL
Description
MOMA PS1-BOILER REPLACEMENT
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-15T00:00:00.000
Scope
PS-1 Boiler Replacement
Status
Active
PV502-SDW
Project Id: PV502-SDW • Description: JCAL JPAC Outdoor Space • Client Agency: Cultural Affairs
Project Id
PV502-SDW
Description
JCAL JPAC Outdoor Space
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
1. Initiation
Projected Construction
2026-06-26T00:00:00.000
Scope
This project seeks to re-imagine the entire outdoor space at the Jamaica Performing Arts Center (JPAC) to annihilate and minimize further hazardous issues as we respond to the needs of artists and the community.
Status
Active
PV503ELEV
Project Id: PV503ELEV • Description: CH - Carnegie Hall Elevators • Client Agency: Cultural Affairs
Project Id
PV503ELEV
Description
CH - Carnegie Hall Elevators
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2027-01-27T00:00:00.000
Scope
The City-funded work will be to modernize the mechanical components and controls for four traction elevators and five hydraulic elevators throughout the facility in order to meet end of life and new elevator code requirements.
Status
Active
PV520HIST
Project Id: PV520HIST • Description: Weekville Heritage Center: Restoration of Hunterfl • Client Agency: Cultural Affairs
Project Id
PV520HIST
Description
Weekville Heritage Center: Restoration of Hunterfl
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-07-03T00:00:00.000
Scope
The project scope of work includes the necessary reconstruction to stabilize and maintain watertight building envelopes of the existing collection of buildings known as the Hunterfly Houses; work shall include roof and flashing replacement; replacement of drainage components including gutters, leaders and collection boxes; reconstruction and replacement of wood siding and trim; reconstruction of the existing windows and doors, trim, frames, sills and stools; reconstruction of the porches including railing, floor board, fascia and trim replacement; damp proofing of the basements in areas where leaders drain onto to direct the flow of drainage away from the foundations. In addition upgrades to the security and lighting systems will be implemented.
Status
Active
PV525STUD
Project Id: PV525STUD • Description: Studio Museum in Harlem New Building • Client Agency: Cultural Affairs
Project Id
PV525STUD
Description
Studio Museum in Harlem New Building
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-06-30T00:00:00.000
Scope
The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. The Museum will transfer the Lot 9 property to the City before construction begins. Existing structures on both lots will be demolished for the new, six-story 82,000sf City-owned building.
Status
Active
PV574ROD2
Project Id: PV574ROD2 • Description: Rod Rogers Dance Company and DUO Theatre • Client Agency: Cultural Affairs
Project Id
PV574ROD2
Description
Rod Rogers Dance Company and DUO Theatre
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2019-02-18T00:00:00.000
Scope
Rear yard and Emergency Egress improvements ( requires LPC approval )
Status
Active
PV656-EXT
Project Id: PV656-EXT • Description: GRHS ONDERDONK HOUSE EXTERIOR • Client Agency: Cultural Affairs
Project Id
PV656-EXT
Description
GRHS ONDERDONK HOUSE EXTERIOR
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
2. Design
Projected Construction
2026-12-01T00:00:00.000
Scope
Excavation and below grade waterproofing to arrest water infiltration in basement
Restoration of the masonry walls of the stone house
Restoration of the wood clapboard of the frame addition
Restoration of the windows not previously restored during roof restoration
Restoration of the historic water cistern
Restoration of the wooden floors on the first or main floor
Install gutter/downspout at front to match rear system that was installed with the previous roof restoration
Status
Active
PV669-NPC
Project Id: PV669-NPC • Description: Nuyorican Poets Cafe Renovation • Client Agency: Cultural Affairs
Project Id
PV669-NPC
Description
Nuyorican Poets Cafe Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-11-13T00:00:00.000
Scope
The base scope of work includes the General Construction, Plumbing, HVAC, Fire protection and Electrical work to rehabilitate the Nuyorican Poet’s Café facility. The building is a turn-of-the-century tenement building consisting of a cellar and four above-grade stories, plus a mezzanine. NPC is only able to utilize the cellar, 1st and mezzanine spaces. The cellar houses the offices and support spaces for the Café’s performance space, as well as the facilities mechanical equipment, dressing rooms and toilets. The performance space occupies the first floor and a mezzanine level. The second, third, and fourth floors are currently being used for storage. Much of the building lacks code compliance and ADA accessibility, in addition to being in poor condition due to years of wear and tear. The base scope of work includes renovation of all interior spaces, with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces, additional staff office space and an additional publicly-accessible performance space. The cellar, ground floor and mezzanine will also be included in the renovation and be investigated for possible re-configuration. The scope includes a new elevator for ADA accessibility, and life safety system requirements such as the Fire Alarm system and a security system. It also includes an upgrade to all Mechanical, Plumbing and Electrical systems. The exterior work includes new roof, building envelope (masonry) rehabilitation to address water infiltration, a new ADA ramp for public access from the sidewalk level into the facility, fire exit stairs and other necessary work.
Status
Active
PV678-BCA
Project Id: PV678-BCA • Description: Bronx Council on the Arts - Facility Renovation • Client Agency: Cultural Affairs
Project Id
PV678-BCA
Description
Bronx Council on the Arts - Facility Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2019-01-31T00:00:00.000
Scope
The project is a one-storey building that was previously operated by WaMu/Chase as a commercial bank. Although it is one story, it includes a mezzanine and double height ceilings in the main space. It was gifted to the Bronx Council on the Arts. The project includes the gut renovation of interiors, reprogramming of the spaces into BCA’s administrative headquarters, mezzanine level office fit-out, a cultural and community gathering space on the main level, ADA compliance renovation.
Status
Active
PV741CI40
Project Id: PV741CI40 • Description: China Institute Renovation of 40 Rector St • Client Agency: Cultural Affairs
Project Id
PV741CI40
Description
China Institute Renovation of 40 Rector St
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-06-05T00:00:00.000
Scope
China Institute's project is Phase II A of a three-phase renovation of its two-floor, 52,000-square foot 100 Washington Street facility, purchased outright by our organization as raw space in 2012. Phase II A centers on the interior “white box” renovation of 6,500 square-foot space on our ground floor.
Status
Active
PV788-FAC
Project Id: PV788-FAC • Description: 122C -122CC Facade Reconstruction • Client Agency: Cultural Affairs
Project Id
PV788-FAC
Description
122C -122CC Facade Reconstruction
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
2. Design
Projected Construction
2026-09-17T00:00:00.000
Scope
Project includes masonry reconstruction of severe delamination and widespread emergent cracking of white cementitious coating on the window surrounds, and spalling brownstone substrate on the west facing (approx. 45 feet long) and south facing (140 feet long) facades. Also observed are cracked brick masonry, deteriorated joint sealant, dislodged window panning and efflorescence.

Scope consists of:
• Remove and replace all jamb stones with natural limestone or cast stone units following the present toothed pattern on the south and west facades
• Remove and replace all cornices and architectural bands with natural limestone or cast stone units following the existing exterior profiles on the south and west facades
• Address corroded steel lintels
• Replace west portico slate tile roof
• Address joint sealant failures

Attached is a comprehensive investigative report of the façade condition and recommendations by Superstructures Engineers and Architects dated April 26, 2019.
Status
Active
PV791-TNC
Project Id: PV791-TNC • Description: Theatre for the New City:Roof & Phase 1 HVAC • Client Agency: Cultural Affairs
Project Id
PV791-TNC
Description
Theatre for the New City:Roof & Phase 1 HVAC
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-07-31T00:00:00.000
Scope
Theater for the New City - Scope of work includes the replacement of the existing HVAC equipment and controls serving the Cino Theater, Scene shop and the theater lobby including the offices.
Status
Active
PV957DGRW
Project Id: PV957DGRW • Description: DeGraw Firehouse Renovation • Client Agency: Cultural Affairs
Project Id
PV957DGRW
Description
DeGraw Firehouse Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
1. Initiation
Projected Construction
2027-01-08T00:00:00.000
Scope
This project is to renovate the former 6,000 sf firehouse of Engine Company 204 at 299 DeGraw Street in Cobble Hill, Brooklyn into a permanent home and music school for the non-profit cultural organization Noel Pointer Foundation. School to have private lesson rooms, private offices, music library and gallery, work stations, storage rooms, and recording rooms. Install new elevator, MEP systems, FF&E, and IT/security systems.
Status
Active
PV960JSNY
Project Id: PV960JSNY • Description: Japan Society HVAC Upgrade • Client Agency: Cultural Affairs
Project Id
PV960JSNY
Description
Japan Society HVAC Upgrade
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-07-13T00:00:00.000
Scope
PV960JSNY - Japan Society HVAC Upgrade
Status
Active
PVDTA-PH2
Project Id: PVDTA-PH2 • Description: Downtown Art-70 East 4th ST.Renovation • Client Agency: Cultural Affairs
Project Id
PVDTA-PH2
Description
Downtown Art-70 East 4th ST.Renovation
Client Agency
Cultural Affairs
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-09-22T00:00:00.000
Scope
The project is to renovate the 2nd and 3rd floors of Downtown Art's home at 70 East 4th Street and improve
two outdoor spaces. The scope includes: a large rehearsal studio, open office area, new bathroom, new storage, and kitchen, and two outdoor spaces suitable for community gatherings. Renovations include installation of HVAC and sprinklers on the 2nd and 3rd floors, decking for low roof, finishes to walls and ceiling, installation of bathroom, kitchen, and storage areas, installation of a sprung wood floor, and landscaping for adjacent yard.
Status
Active
PW195SW2
Project Id: PW195SW2 • Description: 80 CENTRE ST. - SIDEWALK REHABILITATION • Client Agency: DCAS
Project Id
PW195SW2
Description
80 CENTRE ST. - SIDEWALK REHABILITATION
Client Agency
DCAS
Division
Public Buildings
Phase
2. Design
Projected Construction
2024-12-06T00:00:00.000
Scope
Replace existing concrete sidewalks, landscaping and curbs. Provide new handicap accessibilty to building.
Status
Active
PW29310R
Project Id: PW29310R • Description: 10 RICHMOND TERRACE - FIRE ALARM • Client Agency: DCAS
Project Id
PW29310R
Description
10 RICHMOND TERRACE - FIRE ALARM
Client Agency
DCAS
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-08-05T00:00:00.000
Scope
Architectural
To preserve the distinctive qualities of the monumental spaces, the project design team should include an historic preservation architect who is fully involved in all phases of the project.
Fire Suppression
Provide a complete sprinkler system for the ground floor and all levels of the building above in compliance with all applicable codes. (The basement already has complete sprinkler coverage.)
Concealed piping and heads to be provided at all distinctive ceilings on the ground, first, and second floors.
Concealed piping and heads to be provided at all other ceilings where possible. Exposed piping and heads will be permitted in back-of-house locations.
Electrical
Provide a new, fully addressable, code compliant fire alarm system.
Provide an elevator recall system and connect it to the fire alarm system.
Status
Active
PW29380FC
Project Id: PW29380FC • Description: 80 CENTRE ST.- FIRE ALARMS/SPRINKLERS • Client Agency: DCAS
Project Id
PW29380FC
Description
80 CENTRE ST.- FIRE ALARMS/SPRINKLERS
Client Agency
DCAS
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-09-30T00:00:00.000
Scope
80 CENTRE ST.- FIRE ALARMS/SPRINKLERS
Status
Active
PW348-74
Project Id: PW348-74 • Description: FUEL TANK REPLACEMENT • Client Agency: DCAS
Project Id
PW348-74
Description
FUEL TANK REPLACEMENT
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-04-14T00:00:00.000
Scope
The scope of work consists of providing all necessary construction management, design, and
r.onstruction services required to perform ail phases of the project: Surveying, tank testing,
investigation, design, construction, and construction management for the closure, removal, upgrade,
or replacement of petroieum product storage tanks at various City owned sites. This work must
comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.

The general scope of work for tank replacement includes:

File NYSDEC PBS application; mobilization; securing all required NYC agency approvals & permits;
site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane & rigging;
saw cutting; demo & disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank
bottom sludge removal & disposal; remove/transfer/dispose product; laboratory analysis of soil and
groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and
tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical
wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;
performance of a closeout investigation and the preparation and filing of appropriate reports;
obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.
Status
Active
PW348-75
Project Id: PW348-75 • Description: Replacement/Continuation Contracts for Remediation • Client Agency: DCAS
Project Id
PW348-75
Description
Replacement/Continuation Contracts for Remediation
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-09-21T00:00:00.000
Scope
Replacement/Continuation Contracts for Remediation Of Petroleum Contaminated Sites
Status
Active
PW348-76
Project Id: PW348-76 • Description: Replacement/Continuation Contracts for Remediation • Client Agency: DCAS
Project Id
PW348-76
Description
Replacement/Continuation Contracts for Remediation
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-08-23T00:00:00.000
Scope
Replacement/Continuation Contracts for Remediation Of Petroleum Contaminated Sites
Status
Active
PW348-81
Project Id: PW348-81 • Description: FUEL TANK & SUMP REPLACEMENTS – QUEENS • Client Agency: DCAS
Project Id
PW348-81
Description
FUEL TANK & SUMP REPLACEMENTS – QUEENS
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-01-22T00:00:00.000
Scope
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Status
Active
PW348-82
Project Id: PW348-82 • Description: FUEL TANK & SUMP REPLACEMENTS – BROOKLYN • Client Agency: DCAS
Project Id
PW348-82
Description
FUEL TANK & SUMP REPLACEMENTS – BROOKLYN
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-01-22T00:00:00.000
Scope
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Status
Active
PW348-83
Project Id: PW348-83 • Description: FUEL TANK & SUMP REPLACEMENTS – MANHATTAN/S.I. • Client Agency: DCAS
Project Id
PW348-83
Description
FUEL TANK & SUMP REPLACEMENTS – MANHATTAN/S.I.
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-01-22T00:00:00.000
Scope
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Status
Active
PW348-84
Project Id: PW348-84 • Description: FUEL TANK & SUMP REPLACEMENTS - BRONX • Client Agency: DCAS
Project Id
PW348-84
Description
FUEL TANK & SUMP REPLACEMENTS - BRONX
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-01-22T00:00:00.000
Scope
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Status
Active
PW357ELEV
Project Id: PW357ELEV • Description: 253 BROADWAY- ELEVATOR MODERNIZATION • Client Agency: DCAS
Project Id
PW357ELEV
Description
253 BROADWAY- ELEVATOR MODERNIZATION
Client Agency
DCAS
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-11-30T00:00:00.000
Scope
The scope of work includes replacement of 5 existing elevators with new passenger cars and installation of new main machine and controls. proper efficient operation and to meet the current Federal ADA requirements, ASME A17.7 Safety code of elevators and local building codes. The machine room is to be renovated with new air conditioning system.
Status
Active
PW357EXFR
Project Id: PW357EXFR • Description: FACADE RESTORATION • Client Agency: DCAS
Project Id
PW357EXFR
Description
FACADE RESTORATION
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-08-31T00:00:00.000
Scope
Scope – Façade Restoration - Repair of Coping Stones
Status
Active
PW357FIRE
Project Id: PW357FIRE • Description: 253 Broadway NYC. Fire Alarm Raplacement • Client Agency: DCAS
Project Id
PW357FIRE
Description
253 Broadway NYC. Fire Alarm Raplacement
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2026-12-31T00:00:00.000
Scope
Installation of new building wide fire alarm, sprinkler distribution and BMS system throughout building
Status
Active
PW77102S3
Project Id: PW77102S3 • Description: City Hall Park - Steps Reconstruction • Client Agency: DCAS
Project Id
PW77102S3
Description
City Hall Park - Steps Reconstruction
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-01-17T00:00:00.000
Scope
City Hall Park - Steps Reconstruction: Replace deteriorating steps, and stop leakage into basement.
Status
Active
PW77198CT
Project Id: PW77198CT • Description: 198 E161 ST.- COOLING TOWER REPLACEMENT • Client Agency: DCAS
Project Id
PW77198CT
Description
198 E161 ST.- COOLING TOWER REPLACEMENT
Client Agency
DCAS
Division
Public Buildings
Phase
1. Initiation
Projected Construction
2027-02-21T00:00:00.000
Scope
Replacement of existing cooling tower with (2) cells of 400 ton each.
Selective demolition of existing cooling tower and auxiliaries; crane to hoist the tower, rehabilitation of existing dunnage, installation of new cooling tower and provide new heat trace; performing all associated electrical, controls, plumbing and GC work. The new equipment shall be sized based on present and projected future loads including coordination of new requirements for any ongoing projects or projects at design stage.
Status
Active