Active Projects

List of currently active projects. Project IDs are another way of referring to FMS IDs for an active project.  This project identifier provides a critical way of checking funding and procurement details of City projects.

Please refer to The Mayor’s Office of Operations Capital Project Dashboard to see further project and budget details.

Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
SANDELEC4
Project Id: SANDELEC4 • Description: electrical system replacement at 60th Precinct • Client Agency: Police
Project Id
SANDELEC4
Description
electrical system replacement at 60th Precinct
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-10-10T00:00:00.000
Scope
Replacement of electrical system and generator at Coney Island Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Status
Active
SANDELEC5
Project Id: SANDELEC5 • Description: electrical system replacement at the 100th Precict • Client Agency: Police
Project Id
SANDELEC5
Description
electrical system replacement at the 100th Precict
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-10-13T00:00:00.000
Scope
Replacement of electrical system and generator at Rockaway Queens Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Status
Active
SANDELEC8
Project Id: SANDELEC8 • Description: ERIE BASIN TOW POUND ELECTRICAL (SANDY) • Client Agency: Police
Project Id
SANDELEC8
Description
ERIE BASIN TOW POUND ELECTRICAL (SANDY)
Client Agency
Police
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-11-30T00:00:00.000
Scope
Restoration and installation of the new electrical power at NYPD's tow pound facility in Red Hook due to flooding during Sandy.
Status
Active
SANDHW06
Project Id: SANDHW06 • Description: RECONSTRUCTION OF VESTRY STREET, MANHATTAN • Client Agency: Transportation
Project Id
SANDHW06
Description
RECONSTRUCTION OF VESTRY STREET, MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-30T00:00:00.000
Scope
RECONSTRUCTION OF VESTRY STREET, MANHATTAN
Status
Active
SANDHW08
Project Id: SANDHW08 • Description: RECONSTRUCTION OF FRONT STREET, MANHATTAN • Client Agency: Transportation
Project Id
SANDHW08
Description
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-10-13T00:00:00.000
Scope
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Status
Active
SANDHW12
Project Id: SANDHW12 • Description: RECONSTRUCTION OF EDGMERE, QUEENS • Client Agency: Transportation
Project Id
SANDHW12
Description
RECONSTRUCTION OF EDGMERE, QUEENS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-10-05T00:00:00.000
Scope
RECONSTRUCTION OF EDGMERE, QUEENS
Status
Active
SANDRDHK
Project Id: SANDRDHK • Description: RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM • Client Agency: Transportation
Project Id
SANDRDHK
Description
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-04-30T00:00:00.000
Scope
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Status
Active
SANDRESM1
Project Id: SANDRESM1 • Description: Coastal Resiliency Area 1 - East 23rd St. to Montg • Client Agency: Parks & Recreation
Project Id
SANDRESM1
Description
Coastal Resiliency Area 1 - East 23rd St. to Montg
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2026-08-12T00:00:00.000
Scope
Coastal Resiliency Area 1 - East 23rd St. to Montgomery St., Manhattan
Status
Active
SANDRESM-1
Project Id: SANDRESM-1 • Description: Coastal Resiliency Area 1 - East 23rd St. to Montg • Client Agency: Parks & Recreation
Project Id
SANDRESM-1
Description
Coastal Resiliency Area 1 - East 23rd St. to Montg
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2026-08-15T00:00:00.000
Scope
Coastal Resiliency Area 1 - East 23rd St. to Montgomery St., Manhattan
Status
Active
SANDRESM2
Project Id: SANDRESM2 • Description: Coastal Resiliency – Project Area 2 • Client Agency: Parks & Recreation
Project Id
SANDRESM2
Description
Coastal Resiliency – Project Area 2
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-10-13T00:00:00.000
Scope
Coastal Resiliency – Project Area 2
Status
Active
SANDRESPC
Project Id: SANDRESPC • Description: Coastal Resiliency -- Parallel Conveyances • Client Agency: Parks & Recreation
Project Id
SANDRESPC
Description
Coastal Resiliency -- Parallel Conveyances
Client Agency
Parks & Recreation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2026-09-11T00:00:00.000
Scope
Coastal Resiliency -- Parallel Conveyances
Status
Active
SANDTWOBR
Project Id: SANDTWOBR • Description: CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges • Client Agency: Mayors Office of Resiliency (MOR)
Project Id
SANDTWOBR
Description
CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges
Client Agency
Mayors Office of Resiliency (MOR)
Division
Infrastructure
Phase
4. Construction
Projected Construction
2026-10-22T00:00:00.000
Scope
This project is an integrated coastal protection initiative aimed at reducing flood risk due to coastal storms and sea-level rise in Lower Manhattan. BMCR will explore a variety of infrastructure typologies in order to develop a comprehensive flood barrier system throughout the project study area. The total project spans approximately 3.5 miles along the Lower Manhattan coast from Montgomery Street on the east, around the Manhattan tip, to the northern end of Battery Park City. BMCR intends to build the physical, social, and economic resiliency of the area by integrating flood protection into the community fabric while improving access to the waterfront and enhancing public spaces.



The Two Bridges portion of the project spans approximately 0.82 (4,330FT) miles from Montgomery Street to the Brooklyn Bridge. The BMCR project will improve Two Bridges resiliency through built infrastructure while also capitalizing on opportunities to create a better public environment for the neighborhood. Community enhancement is a fundamental element/goal of this project, and the design will prioritize project concepts and infrastructure typologies that are implementable, while identifying opportunities for public amenities and view shed preservation. This goal will be realized by using a combination of flood walls, roller and swing gates, and deployable flood (Flip-Up) barriers, including tie-ins to the existing flood plain boundary. A concentration of Flip-Up Barriers along the East River Esplanade will preserve the existing character, view corridor, and pedestrian and vehicular navigability of an important and heavily utilized waterfront public space.
Status
Active
SANDY4-50
Project Id: SANDY4-50 • Description: Rockaway Operational Headquarters • Client Agency: Parks & Recreation
Project Id
SANDY4-50
Description
Rockaway Operational Headquarters
Client Agency
Parks & Recreation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-08-11T00:00:00.000
Scope
The new facility will consist of tempered space including new elevated shop space for maintenance activities, and elevated and ground level storage. There will also be elevated office space, locker rooms and bathrooms. A vehicular ramp, freight elevator, and possible loading dock are required.
The yard will also be reconstructed.
The existing fuel station will be upgraded.
Status
Active
SE798
Project Id: SE798 • Description: STORM & SANITARY SEWERS IN ROBINSON AVENUE • Client Agency: Environmental Protection
Project Id
SE798
Description
STORM & SANITARY SEWERS IN ROBINSON AVENUE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-10-15T00:00:00.000
Scope
Construction of storm sewers and water main in:
1. Wiman Avenue between Hyland Blvd and Tennyson Drive
2. Goodail Street between Hyland Blvd and Tennyson Drive
3. Glover Street between Hyland Blvd and Tennyson Drive
4. Heinz Avenue between Hyland Blvd and Highland Lane
5. Highland Lane between Heinz Avenue and Point Street
6. Point Street between Highland Lane and Tennyson Drive
7. Walnut Avenue between Hyland Blvd and Highland Lane
8. Hyland Blvd between Wiman Avenue and Robinson Avenue
9. Robinson Avenue between Hyland Blvd U.S. Bulkhead Lane
10. Tennynson Drive between Wiman Avenue and Amstrong Avenue
11. Tennynson Drive between Seacrest Avenue and Robinson Avenue
12. Littlefield Avenue between Hylan Blvd and Tennynson Drive

Sanitary sewer (Extension) in:
1. Robinson Avenue between Hyland Blvd and Tennyson Drive
2. Hylan Blvd Heinz Avenue and Walnut Avenue
3. Walnut Avenue between Hyland Blvd and Highland Lane

Sanitary Sewer (Replacement) in:
1. Hyland Blvd between Wiman Avenue and Heinz Avenue
2. Wiman Avenue Sweetwater Road and Tennynson Drive
3. Goodail Street between Hyland Blvd and Tennyson Drive
4. Glover Street between Hyland Blvd and Tennyson Drive
Status
Active
SE803
Project Id: SE803 • Description: SANITARY & STRM SEWER IN RAMBLE ROAD • Client Agency: Environmental Protection
Project Id
SE803
Description
SANITARY & STRM SEWER IN RAMBLE ROAD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-18T00:00:00.000
Scope
Installation of Sanitary & Storm sewers in the following streets:
STORM SEWER

1 - Ramble Road b/t Amboy Road and Dent Road.
2 - Hillside Ave b/t Amboy Road and Rustic Place.
3 - Cleveland Avenue b/t Locust Place and Grandview Terrace.
4 - Brown Avenue b/t Amboy Road and Locust Place.
5 - Nelson Avenue b/t Amboy Road and Rustic Place.
6 - Amboy Road b/t Hillside Terrace and Acacia Avenue.
7 - Adrienne Place b/t Ramble Road and Hillside Terrace.
8 - Locust Place b/t Hillside Terrace and Nelson Avenue.
9 - Rustic Place b/t Hillside Terrace and Nelson Avenue.
10 - Grandview Terrace b/t Hillside Terrace and Nelson Avenue.
11 - Clovis Road b/t Adrienne Place and Dead End.
12 - Acacia Avenue b/t Amboy Road and Dead End.
13 - Easement (exist) b/t Brown Avenue and Hillside Terrace near Amboy Road.
14 - Monticello Terrace b/t Nelson Avenue and Cleveland Avenue.
Status
Active
SE807
Project Id: SE807 • Description: STM & SAN SEWERS IN 20 AVE B/T126 ST & US BULKHEAD • Client Agency: Environmental Protection
Project Id
SE807
Description
STM & SAN SEWERS IN 20 AVE B/T126 ST & US BULKHEAD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-19T00:00:00.000
Scope
The Scope is to provide residents of this area with drainage plan storm sewer. And to disconnect catch basins connected to the existing sanitary sewer going into the regulator R-5 and provide storm sewers to catch the storm flow going in to the existing sewers.
Project Limits for Storm Sewer Extension:
STORM SEWER (EXTENSION) IN:

1. 12th Avenue between Beach Street and 119th Street;
2. 12th Avenue between 117th Street and 118th Street;
3. 1th Avenue betwee120th Street and 119th Street;
4. 14th Road between 1215t Street and 120th Street;
5. 14th Road between 1151h Street an117th Street;
6. 15th Avenue betwee114th Street and 120th Street;
7. 14th Avenue between Beach Street and College Point Blvd;
8. 14th Avenue between I 24th Street and College Point Blvd;
9. 15th Avenue between 125th Street and 123rd Street;
10. 18th Avenue between 127th Street and 120th Street;
11. 20th Avenue between 1 26th Street and U.S. Bulkhead Line;
12. 117th Street between 11th Avenue and 15th Avenue;
13. 118th Street between 12th Avenue and 15th Avenue;
14. 1191h Street between 12'h Avenue and 14'h Road;
15. 120th Street between 14th Avenue and 15th Avenue;
16. 121" Streetbetween14th Avenueandl4th Road;
17. 120th Street between 18th Avenue and 22nd Avenue;
18. College Point Blvd between 12th Avenue and 20th Avenue;
19. 123rd Street between 14th Avenue and 20th Avenue;
20. 127th Street between 15th Avenue and 20th Avenue;
21. I 26th Street between n2"d Avenue and 20m Avenue;
22.125th Street between 22nd Avenue and 20th Avenue;
23. 1241h Street between 21st Avenue and 20th Avenue;
24. 12r'd Street between 131h Avenue and 14th Avenue;
25. 13r'd Street between 151h Avenue and 20th Avenue;
26. College Point Blvd between 21st Avenue and 20th Avenue;
27. 14th Road between 118th Street and !19th street;
28. !16th Street between 14th Avenue and 14th Rod;
29. 119th Street between 15th Avenue and 22"d Avenue;
30. !21st Street between 18th Avenue and 22"d Avenue;
31. 124th Street between 15th Avenue and 20th Avenue;
32. !25th Street between 15th Avenue and 20th Avenue;
33. 1261h Street betwee 15thAvenue and 20th Avenue;
34. 123'd Street between 20th Avenue and 21st Avenue;
35. 123rd Street between 13th Avenue and 14th Avenue;

INTENT:

To provide residents of this area with drainage plan storm sewer.
To disconnect catch basins connected to the existing sanitary sewer going
in to the regulator R-5 and provide storm sewers to catch the storm flow going in to the existing sewers.



Sanitary Sewer(Replacement) Project Limit:
Scope: To provide residents of this area with drainage plan saintary sewer

1. 12th Avenue between 119th Street and 117th Street;
2. 114th Road between 118th Street and 115th Street;
3. 114th Road between ll5th Street and 120th Street;
4. 15th Avenue between 114th Street and I 19th Street;
5. 18th Avenue between 127th Street and 119thStreet;
6. 20th Avenue between College Point Blvd and 119th Street;
7. 115th Street between 14th Avenue and 14th Road;
8. 117tb Street between 1Oth Avenue and 15th Avenue;
9. 118th Street between 14th Road and 151Avenue;
10. I 20th Street between Boker Ct. and 14th Avenue;
11. 121st Street between 14th Avenue and 14th Road;
12. 119th Street between 22"d Avenue and 15th Avenue;
13. 1201h Street between 22"d Avenue and 18th Avenue;
14. 121st Street between 22"d Avenue and 18th Avenue;
15.123'd Street between 14th Avenue and 18th Avenue;
16.124th Street between 20th Avenue and 18th Avenue;
17. 126th Street between 22"d Avenue and 20th Avenue;
18.18th Avenue between 128th Street and 1291 Street;
19. College Point Boulevard between 12th Avenue and 13th Avenue;
20. College Point Boulevard between 13th Avenue and 14th Avenue;
21. 1191h Street between 911> Avenue and 12th Avenue;
22. 120'h Street between !12th Avenue and 9'h Road;
23. 120'h Street between Bo
Status
Active
SECBRKR03
Project Id: SECBRKR03 • Description: INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI • Client Agency: Environmental Protection
Project Id
SECBRKR03
Description
INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-11-09T00:00:00.000
Scope
INSTALLING NEW CATCH BASINS AND RECONSTRUCTION OF EXISTING COLLAPSED CATCH BASINS IN BROOKLYN AND STATEN ISLAND
Status
Active
SE810
Project Id: SE810 • Description: STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2 • Client Agency: Environmental Protection
Project Id
SE810
Description
STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-05-31T00:00:00.000
Scope
The intent is to install Storm sewers, Sanitary sewers, & Water mains in Whitestone Area.
Project Limits (Storm):
1. Willet Point Boulevard between 149 street & 146 St
2. 23rd Ave bet 147 St & Lee St
3. 22nd Ave bet Ryan Court & 146 St
4. 21st Ave bet 147 St & 146th St
5. 20th Rd bet 147 ST & 146th St
6. 20th Ave bet 147 ST & 146th St
7. 22nd Ave bet Lee St & Parsons Blvd
8. 25th Rd bet 144th Place and 147th St
9. 25th Dr bet 148th St & Parsons Blvd
10. 26th Ave bet Union St & Parsons Blvd
11. 26th Ave bet Parsons Blvd and 147 St
12. 27th Ave bet 149 St & 147 ST
13. 27 Ave bet Parsons Blvd & 147 St
14. 26 Ave bet 149 St & 147 St
15. 28 Ave bet Parsons Blvd & 147 St
15. 28 Ave bet 149 St & 147 St
16. 29 Ave bet 146 St & Parsons Blvd
17. 29 Ave bet 147 St & 146 St
18. 29 Ave bet 149 St & 147 St
19. 147 St bet 20 Rd & 23 Ave
20. Ryan Court bet 22 Ave & 23 Ave
21. 146 St bet 20 Ave & Willets Point Blvd
22. 24 Ave bet 147 Ave & 146 St
23. Lee St bet 23 Ave and 22 Ave
24. Parsons Blvd bet 22 Ave & Willets Pt Blvd (25th Ave)
25. Parsons Blvd bet 29 Ave & Willets Pt Blvd (25 Ave)
26. 146 St bet 29 Ave & 25 Rd
27. 147 St bet 29 Ave 25 Dr
28. 147 St bet 24 Ave & Willets Point Blvd (25 Ave)
29. 148 St bet 25 Dr & Willets Point Blvd (25 Ave)
30. 149 St bet 25 Dr & Willets Pt Blvd (25 Ave)
31. 25 Ave bet 146 St & Parsons Blvd
************************************************
Project Limits (Sanitary):
1. Willets Pt Blvd (25 Ave) bet 146 St & Parsons Blvd
2. 25 Dr bet 146 st & Parsons Blvd
3. Parsons Blvd bet 25 Dr & Willets Pt Blvd (25 Ave)
4. 26 Ave bet Union St & Parsons Blvd
************************************************
Project Limits (Water main):
1. 28 Ave bet Willets Blvd & 21 Ave
2. Lee Ct bet 23 Ave & 22 Ave
3. 146 St bet Willets Blvd & 21 Ave
4. Ryan Ct bet 23 Ave & 22 Ave
5. 147 St bet Willets Blvd & 20 Ave
6. Willets Blvd bet Parsons & 149 St
7. 24 Ave bet Parsons & 147 St
8. 23 Ave bet 146 St & 147 St
9. 22 Ave bet Parsons Blvd & Lee Ct
10. 22 Ave bet 146 St & 147 St
11. 21 Ave bet Parsons Blvd & 147 St
12. 20 Ave bet 146 St & 147 St
Status
Active
SE811
Project Id: SE811 • Description: STM & SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3 • Client Agency: Environmental Protection
Project Id
SE811
Description
STM & SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-21T00:00:00.000
Scope
The intent is to install Storm sewers, Sanitary sewers, & Water mains in Whitestone Area
Project Limits (Storm):
1. N.B. Whitestone Expy Ser. Rd bet 15 Ave & 25 Ave
2. 144 Pl bet 13 Ave & 15 Ave
3. 144 St bet 15 Ave & 20 Ave
4. Parsons Blvd bet 17 Ave & 22 Ave
5. 13 Ave bet 147 St & 144 Pl
6. 147 St bet 14 Ave & 13 Ave
7. 146 Pl bet 14 Ave & 13 Ave
8. 146 St bet 14 Ave & 13 Ave
9. 145 Pl bet 13 Rd & 13 Ave
10. Parsons Blvd bet 13 Rd & 144 Pl
11. 14 Ave bet 145 Pl & 144 Pl
12. 15 Ave bet 146 St & 144 Pl
13. 146 St bet 14 Ave & 15 Ave
14. Parsons Blvd bet 14 Ave & 17 Ave
15. 17 Ave bet 145 Pl & Parsons Blvd
16. 19 Ave bet 147 St & Parsons Blvd
17. 20 Ave bet Parsons Blvd & N.B. Whitestone Expy ser Rd
18. 20th Ave bet Parsons Blvd & 146 St
20. 21 Ave bet N.B. Whitestone Expy ser Rd & 146 St
21. 22 Rd bet 144 St & N.B. Whitestone Expy Ser Rd
22. 143 Rd bet 25 Ave & 22 Rd
23. 21 Rd bet 144 st & N.B. Whitestone Expy Service Rd
24. 22 Av bet 144 St & N.B. Whitestone Expy Service Rd
***********************************************
Project limits (Sanitary):
1. 20 Ave bet 146 St & Parsons Blvd
************************************************
Project Limits (Water main):
1. 143 St intersection of 22 Rd
2. 144 St int. of 22 Rd
3. 22 Rd bet Whitestone Expy & Parsons Blvd
4. 22 Ave bet Whitestone Expy & Parsons Blvd
5. 20 Ave bet 144 St & Parsons Blvd
6. 19 Ave bet Parsons Blvd & 147 St
7. Parsons Blvd bet 21 Ave & 18 Ave
8. 15 Ave bet 144 Pl & Parsons Blvd
9. 15 Ave int. of 146 St
10. 144 Pl bet 14 Ave & 15 Ave
11. E Ser Rd bet 13 Ave & 14 Ave
12. 145 Pl bet 13 Ave & 13 Rd
13. 145 Pl bet 14 Ave & 17 Ave
14. 13 Rd bet Parsons Blvd & 145 Pl
15. 146 St bet 15 Ave & 13 Ave
16. 146 Pl bet 13 Ave & 15 Ave
17. 147 St bet 13 Ave & 15 Ave
18. 13 Ave bet 145 Pl & 147 St
Status
Active
SE812
Project Id: SE812 • Description: SAN & STM SEWERS IN PAGE AVENUE (HWR00509) • Client Agency: Environmental Protection
Project Id
SE812
Description
SAN & STM SEWERS IN PAGE AVENUE (HWR00509)
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-15T00:00:00.000
Scope
Sanitary and storm sewer in Page Avenue bet. Amboy Road and Estella Place, etc..
Status
Active
SE818
Project Id: SE818 • Description: SANITARY AND STORM SEWER IN SHELDON AVENUE • Client Agency: Environmental Protection
Project Id
SE818
Description
SANITARY AND STORM SEWER IN SHELDON AVENUE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-06-06T00:00:00.000
Scope
OVERLAPS WITH WOODROW ROAD PROJECT – HWR890
Construction of sanitary and storm sewers, water mains and appurtenances in:
(1) Woodrow Road between Powell Street and Belfield Avenue;
(2) Powell Street between Woodrow Road and Sinclair Avenue;
(3) Walker Place between Woodrow Road and Sinclair Avenue;
(4) Huguenot Avenue between Rensselaer Avenue and Shift Place;
(5) Boulder Street between Woodrow Road and Castor Place;
(6) Castor Place between Huguenot Avenue and Anaconda Street;
(7) Anaconda Street between Delmar Avenue and Sperry Place;
(8) Sperry Place between Anaconda Street and Ballard Avenue;
(9) Ballard Avenue between Woodrow Road and Sperry Place;
(10) Delmar Avenue between Woodrow Road and Sperry Place;
(11) Delmar Avenue between Rensselaer Avenue and Woodrow Road;
(12) Everton Avenue between Woodrow Road and Rosedale Avenue;
(13) Nippon Avenue between Rensselaer Avenue and Woodrow Road;
(14) Crown Avenue between Nippon Avenue and Belfield Avenue;
(15) Crown Place between Crown Avenue and Cul-de-Sac Dead End (North);
(16) Vineland Avenue between Huguenot Avenue and Heenan Avenue;
(17) Stafford Avenue between Huguenot Avenue and Heenan Avenue;
(18) Heenan Avenue between Stafford Avenue and D/E (South);
(19) Sinclair Avenue between Ellsworth Avenue and D/E (East of Delmar Avenue);
(20) Sheldon Avenue between Powell Street and D/E (East of Delmar Avenue);
(21) Along the Sewer Easement East of Delmar Avenue to Rensselaer Avenue;
Together with all work incidental thereto, Borough of Staten Island.
In addition, Best Management Practice Structure (BMP SB-1) will be built under this project, which will serve as Storm Sewer Outlet.
Status
Active
SE823
Project Id: SE823 • Description: STORM & COMBINED SEWERS IN 229 STREET • Client Agency: Environmental Protection
Project Id
SE823
Description
STORM & COMBINED SEWERS IN 229 STREET
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-04-28T00:00:00.000
Scope
STORM SEWER:

1. 230th Place between 144th Avenue and 148th Avenue.
2. 147th Avenuw between 230th Place and 227th Street.
3. 227th Street between 146th Avenue and 149th Avenue.
4. 149th Avenue between 279th Street and 225th Street.
5. 147th Avenue between 229th Street and 227th Street.
6. 147th Avenue between 229th Street and 228th Street.
7. 230th Street between 148th Avenue and 147th Avenue.
8. 229th Street between 148th Avenue and 147th Avenue.
9. 228th Street between 148th Avenue and 147th Avenue.
10. 227th Sterrt between 147th Avenue and 149th Avenue.
11. 149th Avenue between 225th Street and 226th Avenue.
12. 149th Avenue between 228th Street and 227th Street.
13. 229th Street between 145th Avenue and 147th Avenue.
14. 145th Avenue between 230th Place and 226th Street.
15. 230th Street between 146th Avenue and 145th Avenue.
16. 228th Street between 145th Road and 144th Avenue.
17. 227th Street between 145th Avenue and 144th Avenue.

SANITARY SEWER:
1. 227th Street between 148th Avenue and 147th Avenue.
2. 227th Street between 148th Avenue and 147th Avenue.
3. 147th Avenue between 227th Street and 228th Street.
4. 145th Avenue between 230th Place and 229th Street.
5. 230th Place between 145th Avenue and 144th Avenue.

COMBINED SEWER:
1, 230th Place between 144th Avenue and 145th Avenue.
2. 145th Avenue between 230th Place and 229th Street.
3. 229th Street between 145th Avenue and 147th Avenue.

WATER MAIN:
1. 228th Steeet between 147th Avenue and 148th Avenue.
2. 229th Street between 147th Avenue and 145th Avenue.
3. 230th Place between 147th Avenue and 144th Avenue.
4. 230th Street between 148th Street and 147th Street.
5. Intersection 146th Avenue and 229th Street.
6. Intersection 146th Street and 230th Place.
Status
Active
SE-842A1
Project Id: SE-842A1 • Description: STORM SEWER OUTLET IN 224TH ST • Client Agency: Environmental Protection
Project Id
SE-842A1
Description
STORM SEWER OUTLET IN 224TH ST
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2026-07-31T00:00:00.000
Scope
INSTALLATION OF STORM SEWER BETWEEN THE INTERSECTION OF 224TH ST AND 149TH AVE AND THE EXISTING JUNCTION CHAMBER SOUTH OF ROCKAWAY BLVD. THE PROPOSED STORM SEWER WILL CONNECT TO A CHAMBER WITH AN EXISTING OUTLET INTO THURSTON BASIN.
Status
Active
SEK002376
Project Id: SEK002376 • Description: COMBINED SEWER REPLACEMENT IN PRESIDENT STREET, BK • Client Agency: Environmental Protection
Project Id
SEK002376
Description
COMBINED SEWER REPLACEMENT IN PRESIDENT STREET, BK
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-21T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT IN PRESIDENT STREET, BK
Status
Active
SEK002377
Project Id: SEK002377 • Description: SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE • Client Agency: Environmental Protection
Project Id
SEK002377
Description
SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-31T00:00:00.000
Scope
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE., BOROUGH OF BROOKLYN
Status
Active
SE848
Project Id: SE848 • Description: STRM & SAN SEWERS, WM WORK IN BAISLEY BLVD • Client Agency: Environmental Protection
Project Id
SE848
Description
STRM & SAN SEWERS, WM WORK IN BAISLEY BLVD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-11-15T00:00:00.000
Scope
Storm extensions, catch basins, sanitary replacements and water main work in Baisley Boulevard, Guy R. Brewer Boulevard and N. Conduit Avenue area, together with all work incidental thereto, Borough of Queens.

Storm Sewer in:
1) Cranston St between 133 Ave and 135 Ave
2) 134 Ave between Rockaway Blvd and 151 P1
3)151 Place between 134 Ave and N. Conduit Ave
4) 153 St between Baisley Blvd and 132 Ave
5) 154 St between 129 Ave and 134 Ave
6) 155 St between 132 Ave and 134 Ave
7) 156 St between 132 Ave and 140 Ave
8) 159 St between Dead End and 140 Ave
9) 160 St between 133 Ave and 140 Ave
10) 161 St between 137 Ave and 140 Ave
11) 129 Ave between 154 St and 155 St
12) 132 Ave between 153 St and 154 St
13) 134 Ave between Rockaway Blvd and 160 St
14) 137 Ave between 160 St and Guy R Brewer Blvd 151 P1

Intent:
To alleviate the flooding and ponding problems in the area.


Sanitary Sewer in:
1) Guy R Brewer Blvd between Baisley Blvd and 129 Ave
2) 129 Ave between Guy R Brewer Blvd and 158 St
3) 158 St between 129 Ave and 132 Ave
4) 132 Ave between 156 St and 158 St
5) 156 St between 134 Ave and 140 Ave

Intent:
To correct back-pitched segments of existing pipes and alleviate surcharging in the sanitary sewer trunk line.

WM-1 in:
1) Guy R Brewer Blvd between 122 Ave and 130 Ave
2) Guy R Brewer Blvd between 134 Ave and 137 Ave
3) Baisley Blvd between Guy R Brewer Blvd and Smith Street
4) 160 St between 134 Ave and 140 Ave
5) 159 St between 134 Ave and 140 Ave
6) 156 St between 132 Ave and 134 Ave
7) 153 St between Baisley Blvd and 132 Ave
8) 132 Ave between 156 St and 157 St
9) 134 Ave between 151 P1 and 156 St
10) 134 Ave between 157 St and Guy R Brewer Blvd

Intent:
To replace old, unlined and undersized east iron water main and to connect dead ends which will improve water quality within the project limits.
Status
Active
SE851
Project Id: SE851 • Description: HLSS - FRESH CREEK, PHASE 1A • Client Agency: Environmental Protection
Project Id
SE851
Description
HLSS - FRESH CREEK, PHASE 1A
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-06-15T00:00:00.000
Scope
Installations of H.L.S.S., Storm, Sanitary & Combined Sewers and Water Main work in Fresh Creek Basin Area, E 108th Street between Flatlands Ave and Outfall at Ave K, 26th Wards, Brooklyn.

H.L.S.S. in
1. E 108th, E 107th, E 106th, E106th, E 104th E 103rd, E 102nd, E 101 St, E 99th and
E 98th Streets, between Ave J and Flatlands Ave
2. E 100th St between Ave J and Conklin Ave
3. Ave J between E 98th and E 10Sth St
4. Flatlands Ave between E 98th and E 108th St
5. Conklin Ave between E 98th St and E 100th St

Storm Sewers in
1. E 108th St between Ave J and Ave K
2. E 100th St between Conklin Ave and Glenwood Rd
3. Flatlands 1st Street between E 105th St and E 108th St
4. Flatlands 2nd Street between E 105th St and E 108 St
5. Ave K, along sewer easement from E 108 St to outfall

Sanitary Sewers in E 108th St between Ave K and Ave J

Combined Sewers in E 108th St between Ave J and Flatlands Ave

WM-l in
1. E 98th St between Ave J and Flatlands Ave
2. E 99th St between Ave J and Flatlands Ave
Status
Active
SE853
Project Id: SE853 • Description: HLSS - FRESH CREEK, PHASE 2A • Client Agency: Environmental Protection
Project Id
SE853
Description
HLSS - FRESH CREEK, PHASE 2A
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-06-03T00:00:00.000
Scope
Installation of H.L.S.S, storm, combined and sanitary sewers, and water main work in Fresh Creek Basin area, Louisiana Ave between Stanley Ave and Flatland Ave, etc., 26th Ward, Borough of Brooklyn.

H.L.S.S in:
1. Williams Ave between Flatlands Ave and Outfall at Fresh Creek Basin
2. Flatlands Ave between E. 108 St and Alabama Ave
3. Cozine Ave between Williams Ave and Alabama Ave
4. Stanley Ave between Anna Ct and Louisiana Ave
5. Louisiana Ave between Stanley Ave and Wortman Ave
6. Malta Ave between Wortman Ave and Flatlands Ave
7. Alabama Ave between Cozine Ave and Flatlands Ave

Storm Sewers in:
1. Louisiana Ave between Wortman Ave and Flatlands Ave
2. Stanley Ave between Louisiana and Malta Avenues
3. Malta Ave between Dewitt Ave and Stanley Ave
4. Malta Ave between Wortman Ave and Cozine Ave

Combined Sewers in:
1. Louisiana Ave between Stanley Ave and Wortman Ave
2. Alabama Ave between Cozine Ave and Flatlands Ave

Sanitary Sewers in:
1. Stanley Ave between Williams Ave and Malta Ave

Water Main in:
1. Alabama Ave between Wortman Ave and Cozine Ave
Status
Active
SE855
Project Id: SE855 • Description: HLSS - FRESH CREEK BASIN, PHASE 2B • Client Agency: Environmental Protection
Project Id
SE855
Description
HLSS - FRESH CREEK BASIN, PHASE 2B
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-10-30T00:00:00.000
Scope
Installation of H.L.S.S, storm, combined and sanitary sewers, and water main work in Fresh Creek Basin area, Farragut Rd between E. 102nd Street and E. 108th Street, etc., 26th Ward, Borough of Brooklyn.

H.L.S.S. in:
1. Glenwood Rd between E. 98th Street and Williams Ave
2. Farragut Rd between E. 102nd Street and E. 108th Street
3. E. 102nd Street between Glenwood Rd and Flatlands Ave
4. E. 103 Rd Street between Farragut Rd and Glenwood Ave
5. E. 104th Street between Farragut Rd and Glenwood Avenue
6. E. 105th Street Dead End North of Farragut Rd and Glenwood Rd
7. E. 108th Street between Stanley Ave and Farragut Rd
8. Stanley Ave between E. 108th Street and Hinsdale Street

Storm Sewers in:
1. E. 102nd Street between Farragut Rd and Glenwood Rd
2. E. 105th Street between Glenwood Rd and Flatlands Ave
3. E. E. 108th street between Farragut Rd and Flatlands Ave

Combined Sewers in:
1. Glenwood Rd between E. 98th Street and E. 99th Street
2. E. 102nd Street between Farragut Rd and Flatlands Ave
3. E. 103rd Street between Farragut Rd and Glenwood Rd
4. E. 104th Street between Farragut Rd and Glenwood Rd
5. E. 105th Street between Farragut Rd and Glenwood Rd
6. E. 108th Street between Stanley Ave and Farragut Rd
7. Stanley Ave between E. 108th Street and Williams Ave

Water Main in:
1. Glenwood Rd between Rockaway Parkway and E. 108th Street
2. Intersections along Glenwood Ave from E. 98th Street to E. 105th Street
3. E. 98th between Rd and Conklin Ave
4. Turnbull Ave between E. 107th Street and E. 108th Street
Status
Active
SE859
Project Id: SE859 • Description: COMBINED SEWER IN 70TH STREET, QUEENS • Client Agency: Environmental Protection
Project Id
SE859
Description
COMBINED SEWER IN 70TH STREET, QUEENS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-08-10T00:00:00.000
Scope
COMBINED SEWER IN 70TH STREET, QUEENS
Status
Active
SE860
Project Id: SE860 • Description: COMBINED SEWER AND WM WORK IN 71 STREET, QUEENS • Client Agency: Environmental Protection
Project Id
SE860
Description
COMBINED SEWER AND WM WORK IN 71 STREET, QUEENS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-08-21T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT AND WATER MAIN WORK IN 71 STREET, QUEENS
Status
Active
SE-862
Project Id: SE-862 • Description: STORM SANITARY SEWER REPL SPRINGFIELD GARDENS • Client Agency: Environmental Protection
Project Id
SE-862
Description
STORM SANITARY SEWER REPL SPRINGFIELD GARDENS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-08-21T00:00:00.000
Scope
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Status
Active
SE-885
Project Id: SE-885 • Description: 150TH ST SPINE PHASE 1 STORM SEWER AT BERGEN BASIN • Client Agency: Environmental Protection
Project Id
SE-885
Description
150TH ST SPINE PHASE 1 STORM SEWER AT BERGEN BASIN
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-10-21T00:00:00.000
Scope
SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1. TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER.
Status
Active
SE-885A
Project Id: SE-885A • Description: 150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN • Client Agency: Environmental Protection
Project Id
SE-885A
Description
150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-06-19T00:00:00.000
Scope
Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street
Status
Active
SE885AVWE
Project Id: SE885AVWE • Description: 150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer • Client Agency: Environmental Protection
Project Id
SE885AVWE
Description
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-04-14T00:00:00.000
Scope
This trunk sewer project is part of Phase II of the 150th Street spine sewer series and will be built by New York State Department of
Transportation (NYSDOT) in conjunction with their Van Wyck Expressway (VWE) Phase 3 project.
Status
Active
SE-889
Project Id: SE-889 • Description: NEW STORM SEWER N CONDUIT AV-BAISLEY BLVD • Client Agency: Environmental Protection
Project Id
SE-889
Description
NEW STORM SEWER N CONDUIT AV-BAISLEY BLVD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-11-30T00:00:00.000
Scope
Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens
Status
Active
SEBLQX01
Project Id: SEBLQX01 • Description: RECONSTRUCTION OF EXISTING SEWERS, BRONX • Client Agency: Environmental Protection
Project Id
SEBLQX01
Description
RECONSTRUCTION OF EXISTING SEWERS, BRONX
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2025-06-27T00:00:00.000
Scope
Reconstruction of Existing Sewers from Backlog. Queens and Bronx
Status
Active
SEK002380
Project Id: SEK002380 • Description: COMBINED SEWER AND CHAMBERS IN 7TH STREET, BK • Client Agency: Environmental Protection
Project Id
SEK002380
Description
COMBINED SEWER AND CHAMBERS IN 7TH STREET, BK
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-10T00:00:00.000
Scope
COMBINED SEWER AND CHAMBERS IN 7TH STREET, BK
Status
Active
SEK002383
Project Id: SEK002383 • Description: PACIFIC PARK PROJECT PHASE II • Client Agency: Environmental Protection
Project Id
SEK002383
Description
PACIFIC PARK PROJECT PHASE II
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-09-25T00:00:00.000
Scope
COMBINED SEWER INSTALLATION AND WATER MAIN REPLACEMENT IN DEAN STREET BETWEEN 6TH AVENUE AND VANDERBILT AVENUE, ETC. PROJECT IS PART OF THE SECOND PHASE PACIFIC PARK PROJECT IN ATLANTIC TERMINAL AREA.
Status
Active
SEK002386
Project Id: SEK002386 • Description: REPLACE COMBINED SEWER & WM PARK PL & UNDERHILL AV • Client Agency: Environmental Protection
Project Id
SEK002386
Description
REPLACE COMBINED SEWER & WM PARK PL & UNDERHILL AV
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-12-25T00:00:00.000
Scope
REPLACEMENT OF COMBINED SEWER, BULKHEADING OF EXISTING SEWERS AND WATER MAIN WORK IN PARK PLACE BETWEEN UNDERHILL AVE & FLATBUSH AVE, AND OTHER LOCATIONS.
Status
Active
SEK20065
Project Id: SEK20065 • Description: HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA - PH I • Client Agency: Environmental Protection
Project Id
SEK20065
Description
HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA - PH I
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-11-22T00:00:00.000
Scope
High Level Storm Sewer installation and Water Main replacement in Gowanus Canal Phase I in the Borough of Brooklyn, including 6 sewer chamber and a outfall.

New High Level storm sewer In:
1-3rd Ave. b/t Carroll St. and Douglass st.
2-Carroll St. b/t 4th Ave. and Gowanus Canal
3-Denton Pl. b/t 1st Pl and Carroll St.
4-President St. b/t 4th Ave. and 3rd Ave.
5-Union st. b/t 4th Ave. and 3rd Ave.
6-Sackett St/ b/t 4th Ave. and 3rd Ave.
7-DEGraw St/ b/t 4th Ave. and 3rd Ave.

Water Main (Wm-1) In
1-3rd Ave. b/t Carroll St. and Douglass St.
2-Union St. b/t 4th Ave. and 3rd Ave. including intersection
3-Sackett St. 4th Ave. and 3rd Ave. including intersection
4-Intersection b/t 3rd Ave. and Carroll St.; president St;Degraw St.
Status
Active
SEK20067
Project Id: SEK20067 • Description: HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II • Client Agency: Environmental Protection
Project Id
SEK20067
Description
HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-21T00:00:00.000
Scope
High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2 in the Borough of Brooklyn including 6 sewer chamber.

New High Level Storm Sewer In;

1-3rd Ave. b/t Douglass St. and State St.
2-Douglass St. b/t 4th Ave. and 3rd Ave.
3-Butler St. b/t 4th Ave. and 3rd Ave.
4-Baltic St. b/t 4th Ave. and 3rd Ave.
5-Warren St. b/t 4th Ave. and 3rd Ave.
6-St. Marks Pl. b/t 4th Ave. and 3rd Ave.
7-Bergen St. b/t 4th Ave. and 3rd Ave.
8-Dean St. b/t 4th Ave. and 3rd Ave.
9-Pacific St. b/t 4th Ave. and 3rd Ave.
10-Atlantic Ave. b/t 4th Ave. and 3rd Ave.
11-State St. b/t 4th Ave. and 3rd Ave.

Combined Sewer:

1-Bergen St. b/t 3rd Ave. and 4th Ave.

Water Main (WM-1) In:

1-3rd Ave. b/t Douglass St and State St.
2-Butler St b/t 4th Ave. and 3rd Ave. including intersection:
3-Intersection b/t 3rd Ave. and :
Douglass St.
Butler St.
Baltic St.
Warren St.
St. Mark's Place
Bergen St.
Pacific St.
State St.
4-Dean St. b/t 4th Ave. and 3rd Ave.
5-Pacific St. b/t 4th Ave. and 3rd Ave.
Status
Active
SEK20068
Project Id: SEK20068 • Description: NEW STORM & COMBINED SEWERS IN 9TH STREET • Client Agency: Environmental Protection
Project Id
SEK20068
Description
NEW STORM & COMBINED SEWERS IN 9TH STREET
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-06-07T00:00:00.000
Scope
New storm and combined sewers and water main work in 9th Street between 2nd Ave and Gowanus canal, etc.

STORM SEWER:
1-9th Street b/t 2nd Ave and Gowanus Canal
2-9th Street b/t Smith Street and Gowanus Canal

COMBINED SEWER:
1-2nd Ave b/t 9th Street and 7th Street

WATER MAIN WORK (WM-1):
1-2nd Ave from 9th Street to 7th Street
Status
Active
SEK20070
Project Id: SEK20070 • Description: GUNITING & REPAIR OF 25 AVE SEWER AT GRAVESEND BAY • Client Agency: Environmental Protection
Project Id
SEK20070
Description
GUNITING & REPAIR OF 25 AVE SEWER AT GRAVESEND BAY
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-27T00:00:00.000
Scope
Reconstruction of the existing outfall storm sewer in 25th Avenue between Hunter Avenue and Gravesend Bay, in the Borough of Brooklyn.
Status
Active
SELCDDC08
Project Id: SELCDDC08 • Description: CITYWIDE LINING CONTRACT • Client Agency: Environmental Protection
Project Id
SELCDDC08
Description
CITYWIDE LINING CONTRACT
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-08-02T00:00:00.000
Scope
CITYWIDE LINING CONTRACT
Status
Active
SELCDDC09
Project Id: SELCDDC09 • Description: Sewer Lining Contract, Citywide • Client Agency: Environmental Protection
Project Id
SELCDDC09
Description
Sewer Lining Contract, Citywide
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-07-31T00:00:00.000
Scope
SEWER LINING CONTRACT, CITYWIDE
Status
Active
SELCDDC10
Project Id: SELCDDC10 • Description: Sewer Lining Contract, Citywide • Client Agency: Environmental Protection
Project Id
SELCDDC10
Description
Sewer Lining Contract, Citywide
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-03-15T00:00:00.000
Scope
This project provides funding for DDC to line sewers using approved DEP methods
Status
Active
SELCDDC11
Project Id: SELCDDC11 • Description: This project provides funding for DDC to line sewers using approved • Client Agency: Environmental Protection
Project Id
SELCDDC11
Description
This project provides funding for DDC to line sewers using approved
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-07-23T00:00:00.000
Scope
Citywide
Status
Active
SEN002157
Project Id: SEN002157 • Description: REPLMT OF COMB SEWER IN E. 26 ST B/T 1ST AV & FDR • Client Agency: Environmental Protection
Project Id
SEN002157
Description
REPLMT OF COMB SEWER IN E. 26 ST B/T 1ST AV & FDR
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-29T00:00:00.000
Scope
Replacement of :
1) Combined sewer in E 26th St Between First Ave and F.D.R. (DELETE as per DEP 8/28/15)
2) Sanitary sewer in Park Terrace between West 214th St and West 217th St.

Water main replacement in:
3) Broadway between West 125th St and Tiemann Pl. (DELETE as per DEP 11/4/15)
4) Park Terrace West between 214th St and West 218th St.
5) Installation of new 24" Regulators in Amsterdam Ave and West 119th St. and in West 100th St. & Amsterdam Ave, etc.
Status
Active
SEN002169
Project Id: SEN002169 • Description: RECON OF COMB SWR & WM IN YORK AV • Client Agency: Environmental Protection
Project Id
SEN002169
Description
RECON OF COMB SWR & WM IN YORK AV
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-01-04T00:00:00.000
Scope
Reconstruction of Water Main in:

York Ave. (East Side) between 61st St. and 63rd St.
York Ave. (West Side) between 61st St. and 63rd St.
Intersection of York Ave. and 61st St.
Intersection of York Ave. and 62nd St.
Intersection (West side) of York Ave. and 63rd St.

Reconstruction of Combined Sewer:
York Ave. between 61st St. and 63nd St.
62nd St. between York Ave. and 1st Ave.
Status
Active