Active Projects

List of currently active projects. Project IDs are another way of referring to FMS IDs for an active project.  This project identifier provides a critical way of checking funding and procurement details of City projects.

Please refer to The Mayor’s Office of Operations Capital Project Dashboard to see further project and budget details.

Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 45 real records
SEN002178
Project Id: SEN002178 • Description: COMBINED SEWER & GUNITING IN WEST BROADWAY • Client Agency: Environmental Protection
Project Id
SEN002178
Description
COMBINED SEWER & GUNITING IN WEST BROADWAY
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-05-01T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT AND GUNITING IN WEST BROADWAY BETWEEN THOMAS STREET AND LEONARD ST, BOROUGH OF MANHATTAN. THIS WORK IS REPLACEMENT IN KIND OF DAMAGED COMBINED SEWERS AS RECOMMENDED BY DEP CMOM AND EMERGENCY CONSTRUCTION IN REPORT DATED 2/26/16.
Status
Active
SEQ002715
Project Id: SEQ002715 • Description: COMBINED SEWER OUTFALL N. 81ST & 19TH AVE, LAG • Client Agency: Environmental Protection
Project Id
SEQ002715
Description
COMBINED SEWER OUTFALL N. 81ST & 19TH AVE, LAG
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-02-17T00:00:00.000
Scope
The proposed project involves the reconstruction and replacement of a short length of an existing sewer and an outfall that discharges into Bowery Bay (see Figures C-4a and C-4b); this sewer and outfall reconstruction is proposed to address what is currently a partially collapsed outfall. Replacement would restore the outfall’s necessary functions and avoid a potential full collapse and failure. Specifically, the proposed project includes the following: Installation of a new a 14-foot 7-inch-wide by 8-foot-high combined sewer outfall (referenced as the Bowery Bay [BB]-005 outfall) which discharges into Bowery Bay, thereby replacing the currently collapsed outfall. The proposed outfall would be reconstructed at the same location as the existing outfall and within an existing sewer easement across land that is owned by the City of New York and under the jurisdiction of the Department of Small Business Services. The proposed sewer and outfall design calls for a reinforced concrete structure supported on a concrete cradle with a flap gate at the outlet to control any inflow of tidal water from the bay. Additionally, boulders are proposed to be installed to stabilize the bottom of the bay to minimize the potential for scour and resuspension of sediments into the water column that may otherwise occur when there is flow from the outfall. Reconstruction of a 60-foot-long by 14-foot-7-inch wide and 8-foot-high combined sewer that flows into and connects with the proposed outfall.
Status
Active
SEQ200558
Project Id: SEQ200558 • Description: SEQ - Install of storm SE & replacement of sanitar • Client Agency: Environmental Protection
Project Id
SEQ200558
Description
SEQ - Install of storm SE & replacement of sanitar
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-08-31T00:00:00.000
Scope
Installation of storm sewers and replacement of sanitary sewers and distribution water mains at Eton St. between Barrington St. and Wexford Terrace.
Status
Active
SEQ200563
Project Id: SEQ200563 • Description: STRM SEWERS IN HARTLAND AVE, QNS • Client Agency: Environmental Protection
Project Id
SEQ200563
Description
STRM SEWERS IN HARTLAND AVE, QNS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-11-28T00:00:00.000
Scope
The Storm Sewer in Hartland Avenue between Union Turnpike and 86th Avenue, borough of Queens.

New Storm Sewer Extension in:
Hartland Avenue between Union Turnpike and 86th Avenue
Status
Active
SEQ200596
Project Id: SEQ200596 • Description: STORM SEWER & WM IN 183 ST BTWN 90TH AV,JAMAICA AV • Client Agency: Environmental Protection
Project Id
SEQ200596
Description
STORM SEWER & WM IN 183 ST BTWN 90TH AV,JAMAICA AV
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-07-22T00:00:00.000
Scope
STORM SEWER AND WATER MAIN REPLACEMENT IN 183RD STREET BETWEEN 90TH AVE AND JAMAICA AVE.
Status
Active
SEQ200604
Project Id: SEQ200604 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
SEQ200604
Description
Storm sewer and outfall extension in College Place between 5th Avenue (Poppenhusen Avenue) to U.S. Bulkhead line.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-08-17T00:00:00.000
Scope
This is a storm sewer and outfall extension project in College Place between 5th Avenue (Poppenhusen Avenue) to U.S. Bulkhead line. This project will connect to project SEQ200463.
Status
Active
SEQNS003
Project Id: SEQNS003 • Description: SEWER WHEN & WHERE CONTRACT IN S.E. QUEENS • Client Agency: Environmental Protection
Project Id
SEQNS003
Description
SEWER WHEN & WHERE CONTRACT IN S.E. QUEENS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-04-14T00:00:00.000
Scope
SEWER WHEN & WHERE CONTRACT IN S.E. QNS. NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN & WHERE PROJECTS.
Status
Active
SEQNS004
Project Id: SEQNS004 • Description: SEWER WHEN & WHERE SEQ • Client Agency: Environmental Protection
Project Id
SEQNS004
Description
SEWER WHEN & WHERE SEQ
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-10-09T00:00:00.000
Scope
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH WHEN AND WHERE PROJECTS
Status
Active
SEQNS005
Project Id: SEQNS005 • Description: SEWER WHEN & WHERE SEQ • Client Agency: Environmental Protection
Project Id
SEQNS005
Description
SEWER WHEN & WHERE SEQ
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-04T00:00:00.000
Scope
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS
Status
Active
SEQPGRD1
Project Id: SEQPGRD1 • Description: SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1 • Client Agency: Transportation
Project Id
SEQPGRD1
Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-18T00:00:00.000
Scope
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1
Status
Active
SEQPGRD2
Project Id: SEQPGRD2 • Description: SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2 • Client Agency: Transportation
Project Id
SEQPGRD2
Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-21T00:00:00.000
Scope
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Status
Active
SEQ-SACBA
Project Id: SEQ-SACBA • Description: Green infrastructure for St. Albans Cloudburst Demonstration Project • Client Agency: Environmental Protection
Project Id
SEQ-SACBA
Description
Green infrastructure for St. Albans Cloudburst Demonstration Project
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-02-08T00:00:00.000
Scope
Green infrastructure will be constructed along one block of 112th Avenue, between 177th Street and 178th Street, and along 177th Street, between Sayres Avenue and Murdock Avenue. The section on 112th will include a large, connected stormwater Greenstreet combined with underground storage via infiltration basins. The section on 177th street will include a combination of bioswales and infiltration basins. This project will include DOT-funded roadway grading and street geometry changes.
Status
Active
SER00201W
Project Id: SER00201W • Description: VIT CLAY PIPE SEWERS - STATEN ISLAND • Client Agency: Environmental Protection
Project Id
SER00201W
Description
VIT CLAY PIPE SEWERS - STATEN ISLAND
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Scope
VIT CLAY PIPE SEWERS - STATEN ISLAND
Status
Active
SER00201X
Project Id: SER00201X • Description: RECONSTRUCTION OF VIT CLAY PIPE SEWERS, SI • Client Agency: Environmental Protection
Project Id
SER00201X
Description
RECONSTRUCTION OF VIT CLAY PIPE SEWERS, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Scope
RECONSTRUCTION OF VIT CLAY PIPE SEWERS - STATEN ISLAND
Status
Active
SER00201Z
Project Id: SER00201Z • Description: VIT CLAY PIPE SEWERS - STATEN ISLAND • Client Agency: Environmental Protection
Project Id
SER00201Z
Description
VIT CLAY PIPE SEWERS - STATEN ISLAND
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Scope
VIT CLAY PIPE SEWERS - STATEN ISLAND
Status
Active
SER002306
Project Id: SER002306 • Description: SANITARY AND STORM SEWERS IN WOODROW ROAD • Client Agency: Environmental Protection
Project Id
SER002306
Description
SANITARY AND STORM SEWERS IN WOODROW ROAD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2014-06-09T00:00:00.000
Scope
Construction of sanitary sewers, storm sewers, water mains and appurtenances in:
Woodrow Road between Alexander Avenue and Arthur Kill Road;
Together with all work incidental thereto, Borough of Staten Island.
In addition, Best Management Practice Structure (BMP AH-1) will be built under this project, which will serve as Storm Sewer Outlet.
Status
Active
SER002316
Project Id: SER002316 • Description: SANITARY & STORM SEWERS IN ROSSVILLE AV+WOODROW RD • Client Agency: Environmental Protection
Project Id
SER002316
Description
SANITARY & STORM SEWERS IN ROSSVILLE AV+WOODROW RD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-06-08T00:00:00.000
Scope
OVERLAPS WITH WOODROW ROAD PROJECT – HWR890
Construction of sanitary and storm sewers, water mains and appurtenances in:
(1) Gilroy Street between Woodrow Road and West Castor Place;
(2) Woodrow Road between Rossville Avenue and Powell Street;
(3) Rossville Avenue between Woodrow Road and a point approximately 550 feet north;
(4) Wieland Avenue between Lenevar Avenue and Woodrow Road;
(5) Foster Road between Woodrow Road and Ramapo Avenue;
Together with all work incidental thereto, Borough of Staten Island, City of New York.
Status
Active
SER002317
Project Id: SER002317 • Description: SANITARY & STORM SEWERS IN HALPIN AVE, STATEN IS. • Client Agency: Environmental Protection
Project Id
SER002317
Description
SANITARY & STORM SEWERS IN HALPIN AVE, STATEN IS.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-06-29T00:00:00.000
Scope
OVERLAPS WITH WOODROW ROAD PROJECT – HWR890

Construction of sanitary and storm sewers, water mains and appurtenances in:
(1) Woodrow Road between Jefferson Boulevard and Alexander Avenue;
(2) Vespa Avenue between Jefferson Boulevard and Arden Avenue;
(3) Legate Avenue between Carlton Boulevard and Halpin Avenue;
(4) Halpin Avenue between Arden Avenue and Legate Avenue;
(5) Jefferson Boulevard between Woodrow Road and Vespa Avenue;
(6) Ruxton Street between Woodrow Road and Vespa Avenue;
(7) Almond Street between Woodrow Road and Vespa Avenue;
(8) Arden Avenue between Woodrow Road and Correll Avenue;
(9) Carlton Boulevard between Woodrow Road and Legate Avenue;
(10) Easement (40 feet wide) between Woodrow Road and Legate Avenue;
Together with all work incidental thereto, Borough of Staten Island.

In addition, four (4) Best Management Practice Structures (BMP AH-1, BMP AH-2, BMP AH-3 and BMP AH-4) will be built under this project, which will serve as Storm Sewer Outlets.
Status
Active
SER002323
Project Id: SER002323 • Description: SANITARY AND STORM SEWERS IN MORNINGSTAR ROAD • Client Agency: Environmental Protection
Project Id
SER002323
Description
SANITARY AND STORM SEWERS IN MORNINGSTAR ROAD
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-06-13T00:00:00.000
Scope
SAN & STRM SEWERS IN WALKER STREET, SI
Status
Active
SER002329
Project Id: SER002329 • Description: REPLACEMENT SAN SWRS & DIST WMS IN FOREST HILL RD • Division: Infrastructure
Project Id
SER002329
Description
REPLACEMENT SAN SWRS & DIST WMS IN FOREST HILL RD
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2026-02-13T00:00:00.000
Scope
REPLACEMENT OF SANITARY SEWERS AND DISTRIBUTION WATER MAINS IN FOREST HILL ROAD BETWEEN NORWICH STREET AND WILLOWBROOK ROAD AND DISTRIBUTION WATER MAIN REPLACEMENT IN HAROLD STREET BETWEEN FOREST HILL ROAD AND FIELDS AVENUE IN STATEN ISLAND
Status
Active
SER0201ZA
Project Id: SER0201ZA • Description: RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND • Client Agency: Environmental Protection
Project Id
SER0201ZA
Description
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Scope
VIT CLAY PIPE SEWERS - STATEN ISLAND
Status
Active
SER0201ZB
Project Id: SER0201ZB • Description: RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND • Client Agency: Environmental Protection
Project Id
SER0201ZB
Description
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-21T00:00:00.000
Scope
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Status
Active
SER200202
Project Id: SER200202 • Description: NEW STORM SEWER EXTENSION IN EAGAN AVENUE, SI • Client Agency: Environmental Protection
Project Id
SER200202
Description
NEW STORM SEWER EXTENSION IN EAGAN AVENUE, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-30T00:00:00.000
Scope
NEW STORM AND SANITARY SEWERS IN EAGAN AVENUE, KEEGANS LANE, CRADFORD STREET AND GREENCROFT AVENUE, STATEN ISLAND
Status
Active
SER200208
Project Id: SER200208 • Description: STORM & SANITARY SEWERS IN WARDS POINT AVENUE • Client Agency: Environmental Protection
Project Id
SER200208
Description
STORM & SANITARY SEWERS IN WARDS POINT AVENUE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-10-12T00:00:00.000
Scope
Construction of storm sewers, sanitary sewers, water mains and appurtenances in:
(1) Wards Point Avenue between Amboy Road and Dead End;
(2) Amboy Road between Satterlee Street and U.S. Bulkhead Line;
(3) Satterlee Street between Amboy Road and Shore Road;
(4) Tottenville Place between Wards Point Avenue and Satterlee Street;
(5) Perth Amboy Place between Wards Point Avenue and Satterlee Street;
Together with all work incidental thereto, Borough of Staten Island
Status
Active
SER200209
Project Id: SER200209 • Description: STORM & SANITARY SEWERS IN CANTON AVENUE • Client Agency: Environmental Protection
Project Id
SER200209
Description
STORM & SANITARY SEWERS IN CANTON AVENUE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2015-06-17T00:00:00.000
Scope
Storm Sewer in:
1. Canton Avenue between Vespa Avenue and Crown Avenue
2. Vespa Avenue between Canton Avenue and Holcomb Avenue
3. Holcomb Avenue between Woodrow Road and Crown Avenue
4. Belfield Avenue between Woodrow Road and Crown Avenue
5. Crown Avenue between Carlton Boulevard and Row Place
6. Row Place between Crown Avenue and Woodrow Road

Sanitary Sewers in:
1. Canton Avenue between Vespa Avenue and Crown Avenue
2. Vespa Avenue between Canton Avenue and Holcomb Avenue
3. Holcomb Avenue between Woodrow Road and Crown Avenue
4. Belfield Avenue between Woodrow Road and Crown Avenue
5. Woodrow Road between Jefferson Boulevard and Belfield Avenue

Water mains in:
1 Woodrow Road between Belfield Avenue and Canton Avenue
2. Canton Avenue going east from Woodrow Road and Dead End
3. Holcomb Avenue between Woodrow Road and Crown Avenue

together with all work incidental thereto, Borough of Staten Island
Status
Active
SER200226
Project Id: SER200226 • Description: STORM & SANITARY SEWERS IN TRAVIS AREA, PHASE 1 • Client Agency: Environmental Protection
Project Id
SER200226
Description
STORM & SANITARY SEWERS IN TRAVIS AREA, PHASE 1
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-06-06T00:00:00.000
Scope
Installation of Storm and Sanitary Sewers and BMP in Travis Area.

STORM SEWER (EXTENSION) IN:
1. Victory Blvd. b/t Roswell and Richmond Court
2. Melvin Avenue b/t Glen Street and Wild Avenue
3. Wild Avenue between Glen Street and Pearson Street
4. Parish Avenue b/t Victory Blvd. and Cannon Avenue
5. Shelly Avenue b/t Victory Blvd. and Mildred Avenue
6. Burke Avenue b/t Victory Blvd. and Dead End of Price Lane.
7. Prices Lane b/t Cannon Avenue and Dead End of Burke Avenue
8. Leroy Street b/t Victory Blvd. and Cannon Avenue
9. Glen Street b/t Victory Blvd. and Parish Avenue
10. Cannon Avenue b/t Parish Avenue and Victory Blvd.
11. Meredith Avenue b/t Cannon Avenue and West Shore Expressway

SANITARY SEWER (EXTENSION) IN:
1. Victory Blvd. b/t Richmond Court and Baron Blvd.

SANITARY SEWER (REPLACEMENT) IN:
1. Simmons Lane b/t Victory Blvd. and Mildred Avenue
2. Victory Blvd. b/t Simmons Lane and Ridgeway Avenue
3. Cannon Avenue b/t Victory Blvd. and Meredith Avenue

WATERMAIN (REPLACEMENT) IN:
1. Victory Blvd. b/t Roswell and Richmond Court
2. Melvin Avenue b/t Glen Street and Wild Avenue
3. Wild Avenue between Glen Street and Melvin Avenue
4. Parish Avenue b/t Victory Blvd. and Cannon Avenue
5. Burke Avenue b/t Victory Blvd. and Dead End of Price Lane.
6. Leroy Street b/t Victory Blvd. and Cannon Avenue
7. Glen Street b/t Melvin Avenue and Parish Avenue
8. Cannon Avenue b/t Parish Avenue and Victory Blvd.
9. Meredith Avenue b/t Cannon Avenue and Bates Avenue

WATER MAIN (EXTENSION) IN:
Parish Avenue b/t victory Blvd. and Cannon Avenue
Status
Active
SER200232
Project Id: SER200232 • Description: STORM & SANITARY SEWERS IN XENIA STREET • Client Agency: Environmental Protection
Project Id
SER200232
Description
STORM & SANITARY SEWERS IN XENIA STREET
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-06-23T00:00:00.000
Scope
Installation of Sanitary & Storm sewers in the following streets together with all work incidental thereto in Staten Island:

Storm Sewer in:

1 - Xenia Street b/t Hulbert Street and Mason Avenue.
2 - Hulbert Street b/t Evergreen Avenue and Benton Avenue.
3 - Hulbert Street b/t Quintard Street and Reid Avenue.

Sanitary Sewer in:

1 - Xenia Street b/t Hulbert Street and Mason Avenue.
Status
Active
SER200235
Project Id: SER200235 • Description: STM SEWER IN RICHMOND AVE & AMBOY RD, SI • Client Agency: Environmental Protection
Project Id
SER200235
Description
STM SEWER IN RICHMOND AVE & AMBOY RD, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-06-04T00:00:00.000
Scope
STORM SEWER EXTENSIONS IN RICHMOND AVE & AMBOY ROAD, SI
Status
Active
SER200236
Project Id: SER200236 • Description: STORM SEWER EXTENSION AND WM WORK IN NORTH AVE, SI • Client Agency: Environmental Protection
Project Id
SER200236
Description
STORM SEWER EXTENSION AND WM WORK IN NORTH AVE, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-12-15T00:00:00.000
Scope
STORM SEWER EXTENSION AND WM WORK IN NORTH AVE, SI
Status
Active
SER200239
Project Id: SER200239 • Description: STM & SAN SEWERS IN HARVEST AVENUE, SI • Client Agency: Environmental Protection
Project Id
SER200239
Description
STM & SAN SEWERS IN HARVEST AVENUE, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-06-08T00:00:00.000
Scope
Installation of Storm, Sanitary sewers and water mains together with all work incidental thereto, Borough of Staten Island

STORM SEWER IN:
1. Harvest Avenue b/t N. Burgher Avenue and Broadway
2. Broadway b/t Harvest Avenue and West Raleigh Avenue
3. West Raleigh Avenue b/t Broadway and Clove Road

SANITARY SEWER IN:
1. Harvest Avenue b/t N. Burgher Avenue and Broadway
2. Broadway b/t Harvest Avenue and West Raleigh Avenue
3. West Raleigh Avenue b/t Broadway and Berwin Lane
4. Cary Avenue b/t N. Burgher Avenue and Bement Avenue

WATER MAIN IN:
1. Harvest Avenue b/t N. Burgher Avenue and Broadway
2. Broadway b/t Harvest Avenue and West Raleigh Avenue
3. West Raleigh Avenue b/t Broadway and Berwin Lane
4. Cary Avenue b/t N. Burgher Avenue and Bement Avenue
Status
Active
SER200245
Project Id: SER200245 • Description: NEW STRM SWR & WM REPLACEMENT IN ACACIA AVE, ETC. • Client Agency: Environmental Protection
Project Id
SER200245
Description
NEW STRM SWR & WM REPLACEMENT IN ACACIA AVE, ETC.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-05-31T00:00:00.000
Scope
NEW STORM SEWERS (BMP WDP-1, 2, 3 & 4), SAN & WM REPLACEMENT IN ACACIA AVENUE (Wood Duck Pond) and Vicinity
Status
Active
SER200247
Project Id: SER200247 • Description: STORM SEWER IN KING STREET, SI • Client Agency: Environmental Protection
Project Id
SER200247
Description
STORM SEWER IN KING STREET, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-06-30T00:00:00.000
Scope
CONSTRUCTION OF STORM SEWER IN KING STREET
Status
Active
SER200249
Project Id: SER200249 • Description: STORM SEWER IN MASON STREET, SI • Client Agency: Environmental Protection
Project Id
SER200249
Description
STORM SEWER IN MASON STREET, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-12-31T00:00:00.000
Scope
RECONSTRUCTION OF STORM SEWER IN MASON STREET, STATEN ISLAND
Status
Active
SER200251
Project Id: SER200251 • Description: EXTENSION OF STORM SEWER & WM WORK IN 3RD STREET • Client Agency: Environmental Protection
Project Id
SER200251
Description
EXTENSION OF STORM SEWER & WM WORK IN 3RD STREET
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2026-08-15T00:00:00.000
Scope
EXTENSION OF STORM SEWER & WM WORK IN 3RD STREET, STATEN ISLAND
Status
Active
SER200252
Project Id: SER200252 • Description: STORM SEWER IN SCARBORO AVENUE • Client Agency: Environmental Protection
Project Id
SER200252
Description
STORM SEWER IN SCARBORO AVENUE
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2014-06-02T00:00:00.000
Scope
Construction of storm sewers, water mains and appurtenances in:
Scarboro Avenue between Bay Street and Abbott Street;
Together with all work incidental thereto, Borough of Staten Island, City of New York.
Status
Active
SER200255
Project Id: SER200255 • Description: Storm Sewer Ext. in W Cedarview Ave. Staten Island • Client Agency: Environmental Protection
Project Id
SER200255
Description
Storm Sewer Ext. in W Cedarview Ave. Staten Island
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-18T00:00:00.000
Scope
Storm Sewer Extension in W. Cedarview Ave. between Wolverine Street & Gilbert Street in Staten Island
Status
Active
SER200258
Project Id: SER200258 • Description: STORM & SANITARY SEWERS IN ALVERSON AVENUE, SI • Client Agency: Environmental Protection
Project Id
SER200258
Description
STORM & SANITARY SEWERS IN ALVERSON AVENUE, SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-07-16T00:00:00.000
Scope
Construction of storm and sanitary sewers and appurtenances in:(1) West Castor Place between Alverson Avenue and Powell Street;(2) Alverson Avenue between Mason Boulevard and Woodrow Road;(3) Gilroy Street between West Castor Place and Woodrow Road including Water Main, Street Lighting, and Traffic Signal Work Together with all work incidental thereto, Borough of Staten Island. In addition, one (1) Best Management Practice Structure (BMP LC-1) will be built under this project, which will serve as a Storm Sewer Outlet.
Status
Active
SER20079
Project Id: SER20079 • Description: NEW STRM/SAN SWRS IN WILLOW AVE., SI • Client Agency: Environmental Protection
Project Id
SER20079
Description
NEW STRM/SAN SWRS IN WILLOW AVE., SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-08-12T00:00:00.000
Scope
INSTALLATION OF NEW STORM SEWERS AND REPLACEMENT OF SANITARY SEWERS AND WATER MAINS IN WILLOW AVENUE BETWEEN TOMPKINS AVENUE AND BAY STREET, SI
Status
Active
SETVDDC15
Project Id: SETVDDC15 • Description: CLEANING AND TELEVISING OF SEWERS BY DDC • Client Agency: Environmental Protection
Project Id
SETVDDC15
Description
CLEANING AND TELEVISING OF SEWERS BY DDC
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-04-25T00:00:00.000
Scope
CLEANING AND TELEVISING OF SEWERS BY DDC. DDC TO ADD SONAR INSPECTION TO CONTRACT TO ALLOW INSPECTION OF SEWERS FLOWING FULL. DDC SHALL CLEAN AND INSPECT SEWERS AS DIRECTED BY DEP.
Status
Active
SETVDDC16
Project Id: SETVDDC16 • Description: CLEANING AND TELEVISING OF SEWERS BY DDC • Client Agency: Environmental Protection
Project Id
SETVDDC16
Description
CLEANING AND TELEVISING OF SEWERS BY DDC
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-04-22T00:00:00.000
Scope
DDC to add sonar inspection to contract to allow inspection of sewers flowing full. DDC shall clean and inspect sewers as directed by DEP.
Status
Active
SETVDDC17
Project Id: SETVDDC17 • Description: CLEANING AND TELEVISING OF SEWERS BY DDC • Client Agency: Environmental Protection
Project Id
SETVDDC17
Description
CLEANING AND TELEVISING OF SEWERS BY DDC
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-11-09T00:00:00.000
Scope
Citywide
Status
Active
SEX200400
Project Id: SEX200400 • Description: STM AND SAN SEWERS IN MINNIEFORD AVENUE AREA • Client Agency: Environmental Protection
Project Id
SEX200400
Description
STM AND SAN SEWERS IN MINNIEFORD AVENUE AREA
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2026-09-02T00:00:00.000
Scope
Storm and Sanitary Sewers in:

Terrace St. between Minnieford Ave. and King Ave.

Minnieford Ave. between Terrace St. and Sutherland St.

Easement between Minnieford Ave. and Eastchecter Bay

Bridge St. between Minnieford Ave. and City Island Ave.

City Island Ave. between Bridge St. and Kilroe St.

Kilroe St. between City island Ave. and Eastchester Bay
Status
Active
TLCWOOD
Project Id: TLCWOOD • Description: TLC - NEW OFFICE FACILITY - 24-55 BQE WEST • Client Agency: DCAS
Project Id
TLCWOOD
Description
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2026-05-01T00:00:00.000
Scope
Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.
Status
Active
WM-LC-17
Project Id: WM-LC-17 • Description: Water Main Lining Contract, Citywide • Client Agency: Environmental Protection
Project Id
WM-LC-17
Description
Water Main Lining Contract, Citywide
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-03-15T00:00:00.000
Scope
Water Main Lining Contract, Citywide
Status
Active
WTM4SPRW
Project Id: WTM4SPRW • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
WTM4SPRW
Description
Perform Wetland Mitigation work in Four Sparrow Marsh in the Mill Basin area of Brooklyn.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2025-01-25T00:00:00.000
Scope
The project will perform Wetland Mitigation work in Four Sparrow Marsh in the Mill Basin area of Brooklyn to improve natural wetland conditions and functions through restoration/rehabilitation and prevent further declination of wetland.
Status
Active