HWS2016R1
Project Id: HWS2016R1 • Description: PRIOR NOTICE SIDEWALKS- STATEN ISLAND • Client Agency: Transportation
Project Id
HWS2016R1
Description
PRIOR NOTICE SIDEWALKS- STATEN ISLAND
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-07-29T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS- STATEN ISLAND
Status
Active
HWS2016R2
Project Id: HWS2016R2 • Description: PRIOR NOTICE SIDEWALKS- STATEN ISLAND • Client Agency: Transportation
Project Id
HWS2016R2
Description
PRIOR NOTICE SIDEWALKS- STATEN ISLAND
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-07-29T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS- STATEN ISLAND
Status
Active
HWS2016XM
Project Id: HWS2016XM • Description: PRIOR NOTICE SIDEWALKS-BRONX & MANHATTAN • Client Agency: Transportation
Project Id
HWS2016XM
Description
PRIOR NOTICE SIDEWALKS-BRONX & MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-02-11T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS - BRONX & MANHATTAN
Status
Active
HWS2017M
Project Id: HWS2017M • Description: PRIOR NOTICE SIDEWALKS FY17 - MANHATTAN • Client Agency: Transportation
Project Id
HWS2017M
Description
PRIOR NOTICE SIDEWALKS FY17 - MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-09-07T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS FY17 - MANHATTAN
Status
Active
HWS2019Q1
Project Id: HWS2019Q1 • Description: PRIOR NOTICE SIDEWALKS - QUEENS • Client Agency: Transportation
Project Id
HWS2019Q1
Description
PRIOR NOTICE SIDEWALKS - QUEENS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-21T00:00:00.000
Scope
REPLACEMENT OF SIDEWALKS THAT HAVE VIOLATIONS WHERE PROPERTY OWNERS RECEIVED PRIOR NOTICE. LOCATIONS FOR PRIOR NOTICE SIDEWALKS WILL BE DETERMINED BY NYC DOT, DIVISION OF SIDEWALKS AND INSPECTIONS MANAGEMENT (SIM). THIS CONTRACT SHALL BE ESTABLISHED FOR ONE YEAR. IT MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS.
Status
Active
HWS2020K1
Project Id: HWS2020K1 • Description: Prior Notice Sidewalks- Brooklyn • Client Agency: Transportation
Project Id
HWS2020K1
Description
Prior Notice Sidewalks- Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-02-03T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $8M.
Status
Active
IFPM01CW
Project Id: IFPM01CW • Description: INSTALLATION OF INTERIM FLOOD PROTECTION MEASURES • Client Agency: Emergency Management
Project Id
IFPM01CW
Description
INSTALLATION OF INTERIM FLOOD PROTECTION MEASURES
Client Agency
Emergency Management
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-09-22T00:00:00.000
Scope
INSTALLATION OF INTERIM FLOOD PROTECTION MEASURES AT VARIOUS LOCATIONS, INCLUDING REPAIR AND DEINSTALLATION, CITYWIDE
Status
Active
HWS2020K2
Project Id: HWS2020K2 • Description: Prior Notice Sidewalks- Brooklyn • Client Agency: Transportation
Project Id
HWS2020K2
Description
Prior Notice Sidewalks- Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-09-16T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established .for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $8M.
Status
Active
HWS2020Q1
Project Id: HWS2020Q1 • Description: Prior Notice Sidewalks- Queens • Client Agency: Transportation
Project Id
HWS2020Q1
Description
Prior Notice Sidewalks- Queens
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-02-18T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $8M.
Status
Active
HWS2020Q2
Project Id: HWS2020Q2 • Description: Prior Notice Sidewalks- Queens • Client Agency: Transportation
Project Id
HWS2020Q2
Description
Prior Notice Sidewalks- Queens
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-02-18T00:00:00.000
Scope
Replacement of sidewalks. that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $7.999M.
Status
Active
HWS2020R
Project Id: HWS2020R • Description: PRIOR NOTICE SIDEWALKS- STATEN ISLAND • Client Agency: Transportation
Project Id
HWS2020R
Description
PRIOR NOTICE SIDEWALKS- STATEN ISLAND
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-02-18T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $3M.
Status
Active
HWS2020X
Project Id: HWS2020X • Description: Prior Notice Sidewalks- Bronx • Client Agency: Transportation
Project Id
HWS2020X
Description
Prior Notice Sidewalks- Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-09-16T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $5M.
Status
Active
HWS2020XM
Project Id: HWS2020XM • Description: Prior Notice Sidewalks- Manhattan & Bronx • Client Agency: Transportation
Project Id
HWS2020XM
Description
Prior Notice Sidewalks- Manhattan & Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-03-05T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM). This contract shall be established for one year. It must comply with applicable Federal ADA requirements. The cost of this contract must not exceed the available funding of $4.759M.
Status
Active
HWS2021K
Project Id: HWS2021K • Description: FY21 Prior Notice Sidewalks -Brooklyn • Client Agency: Transportation
Project Id
HWS2021K
Description
FY21 Prior Notice Sidewalks -Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-11-26T00:00:00.000
Scope
Sidewalk Repairs/Replacements
Status
Active
HWS2021Q
Project Id: HWS2021Q • Description: FY21 Prior Notice Sidewalk contract - Queens • Client Agency: Transportation
Project Id
HWS2021Q
Description
FY21 Prior Notice Sidewalk contract - Queens
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-11-09T00:00:00.000
Scope
Sidewalk repair/replacement Replacement of sidewalks that have violations where property owners received prior notice.
Status
Active
HWS2021R
Project Id: HWS2021R • Description: FY21 Prior Notice Sidewalk contract -Staten Island • Client Agency: Transportation
Project Id
HWS2021R
Description
FY21 Prior Notice Sidewalk contract -Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-12-05T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice.
Status
Active
HWS2021X
Project Id: HWS2021X • Description: FY21 Prior Notice Sidewalk contract -Bronx • Client Agency: Transportation
Project Id
HWS2021X
Description
FY21 Prior Notice Sidewalk contract -Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-02-15T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice.
Status
Active
HWS2021XM
Project Id: HWS2021XM • Description: FY21 Prior Notice Sidewalk contract - Bronx & Manhattan • Client Agency: Transportation
Project Id
HWS2021XM
Description
FY21 Prior Notice Sidewalk contract - Bronx & Manhattan
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-10-26T00:00:00.000
Scope
Replacement of sidewalks that have violations where property owners received prior notice.
Status
Active
HWSRT200E
Project Id: HWSRT200E • Description: SAFE ROUTES TO TRANSIT, 86TH S / BED-828 • Client Agency: Transportation
Project Id
HWSRT200E
Description
SAFE ROUTES TO TRANSIT, 86TH S / BED-828
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-11-15T00:00:00.000
Scope
Safe Routes to Transit - 86th St Brooklyn
The project will also include reconstruction of new bus pads, high-visibility crosswalks, relocation of existing manholes and utilities, ADA-compliant designs, and installation of City benches and pedestrian wayfinding signs. The scope of the project will also include a trench restoration with full street reconstruction on 20th Ave from 86th Street to Bath Ave and new distribution water main work under project ID BED-828.
Status
Active
HWTRK1
Project Id: HWTRK1 • Description: TRENCH RESTORATION BROOKLYN • Client Agency: Transportation
Project Id
HWTRK1
Description
TRENCH RESTORATION BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-08-26T00:00:00.000
Scope
Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction.
Locations:
1. Division Avenue from Berry Street to Bedford Avenue
2. Juliana Place from Clymer Street to Morton Street
3. Maujer Street from Union Avenue to Lorimer Street
4. Warren Street from Bond Street to Nevins Street
5. Hancock Street from Marcy Avenue to Tompkins Avenue
6. Bushwick Avenue from Woodbine Street to Madison Street
7. Hill Street from Crescent Street to Autumn Avenue
8. 7th Avenue from 14th Street to 15th Street
9. Bergen Street from Troy Avenue to Schenectady Avenue
10. Union Street from Troy Avenue to Schenectady Avenue
11. 9th Avenue from 63rd Street to 64th Street
12. 20th Avenue from 86th Street to Benson Avenue
13. Bay Parkway from Cropsey Avenue to Bath Avenue
14. 16th Avenue from 46th Street to 47th Street
15. New York Avenue from Glenwood Road to Avenue
16. East 80th Street from Foster Avenue to Glenwood Road
Status
Active
HWTRQX1
Project Id: HWTRQX1 • Description: TRENCH RESTORATION QUEENS & THE BRONX • Client Agency: Transportation
Project Id
HWTRQX1
Description
TRENCH RESTORATION QUEENS & THE BRONX
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-10-15T00:00:00.000
Scope
TRENCH RESTORATION, QUEENS & THE BRONX. INCLUDES RESTORATION OF TRENCHES, ROADWAY RECONSTRUCTION, REPLACE CURBS AND ADJACENT SIDEWALK FLAGS WHERE CONDITION IS POOR, INSTALL ACCESSIBLE PEDESTRIAN SYSTEMS AT SIGNALIZED INTERSECTIONS, ETC.
Status
Active
HWTRR1
Project Id: HWTRR1 • Description: Trench Restoration - Staten Island • Client Agency: Transportation
Project Id
HWTRR1
Description
Trench Restoration - Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-28T00:00:00.000
Scope
This project has been initiated to bring three identified utility trenches in SI to a state of good repair. These sites, pulled from a master list, were prioritized with attention to ratings data, field observations, and community needs. The sites are split into scoping categories; full street reconstruction, and trench restoration with resurfacing. Projects will upgrade pedestrian facilities to ADA compliancy, and address adjacent capital assets in poor condition (curbs, sidewalks, and others as needed). SER002333 IS A SUB-PROJECT TO HWTRR1.
Status
Active
LNCA14MBG
Project Id: LNCA14MBG • Description: Muhlenberg HVAC & Related Work • Client Agency: Libraries-NYPL
Project Id
LNCA14MBG
Description
Muhlenberg HVAC & Related Work
Client Agency
Libraries-NYPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-11-15T00:00:00.000
Scope
Replacement of current HVAC equipment.
Status
Active
HWX006-01
Project Id: HWX006-01 • Description: RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET • Client Agency: Transportation
Project Id
HWX006-01
Description
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-23T00:00:00.000
Scope
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET. THIS STREET IS CURRENTLY IN STATE OF DISREPAIR AND IS SUBJECT OF FREQUENT COMPLAINTS TO DOT. THE STEPS ON HENWOOD PLACE ARE HIGHLY INEVEN DUE TO SOIL EROSION AND SINKING LANDINGS AND THE STREETS IS BESET BY SIGNIFICANT DRAINAGE ISSUES AND CHRONIC PONDING. THIS PROJECT WILL FULLY RECONSTRUCT THE HENWOOD PLACE STEP STREEET, BRINGING IT UP TO GOOD REPAIR , CREATE SAFER TRAVEL CONDITIONS .
Status
Active
HWX100SBC
Project Id: HWX100SBC • Description: South Bronx East-West Crosstown SBS • Client Agency: Transportation
Project Id
HWX100SBC
Description
South Bronx East-West Crosstown SBS
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-08T00:00:00.000
Scope
The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.
Status
Active
HWX402
Project Id: HWX402 • Description: BRUNER AND ELY • Client Agency: Transportation
Project Id
HWX402
Description
BRUNER AND ELY
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-02-14T00:00:00.000
Scope
BRUNER & ELY IS A CRITICAL STATE OF REPAIR (SOGR) PROJECT IN THE BAYCHESTER NEIGHBORHOOD OF THE EAST BRONX. THE ROADWAYS , CURBS, AND SIDEWALKS WITHIN THE PROJECT LIMITS HAVE SUNKEN DRRAMATICALLY OVER TIME TO HEAVY VEHICLE USAGE, POOR SUBSURFACE CONDITIONS AND DEFERRED MAINTENANCE. THE PROJECT WILL BRING THESE STREETSD TO STATE OF GOOD REPAIR.
Status
Active
HWX404
Project Id: HWX404 • Description: Southern Bronx Multi-Site Safety Improvements • Client Agency: Transportation
Project Id
HWX404
Description
Southern Bronx Multi-Site Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-11-29T00:00:00.000
Scope
This Vision Zero capital project will construct pedestrian safety-focused geometric improvements at three
intersections in the southern Bronx. The project scope includes two bus bulbs on Westchester Avenue below the Prospect Avenue 2/5 subway station, four additional curb extensions, and streetscape improvements. All three locations in this capital project have received successful operational treatments introduced via Street
Improvement Projects (SIPs). Capital construction will permanently improve safety conditions at these
intersections for all street users by shortening crossing distances, calming traffic, increasing pedestrian visibility, and controlling vehicle turning movements.
Status
Active
HWX405
Project Id: HWX405 • Description: Southern Boulevard Pedestrian and Cyclist Safety Improvements • Client Agency: Transportation
Project Id
HWX405
Description
Southern Boulevard Pedestrian and Cyclist Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-09-13T00:00:00.000
Scope
Capital construction will make permanent the operational improvements introduced in this corridor and will enhance traffic calming measures, shorten pedestrian crossing distances, increase pedestrian visibility, and control vehicle turning movements.
Status
Active
HWX406
Project Id: HWX406 • Description: Northwest Bronx School Safety Improvements • Client Agency: Transportation
Project Id
HWX406
Description
Northwest Bronx School Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-05-25T00:00:00.000
Scope
This Vision Zero capital project will improve pedestrian safety and accessibility near two schools in the northwest Bronx. In Riverdale, adjacent to the Salanter Akiba Riverdale (SAR) Academy, the project will construct new sidewalks as a part of the full reconstruction of West 254th Street from Arlington Avenue to Railroad Terrace. In Woodlawn, the project will normalize the intersection of East 238th Street and Van Cortlandt Park East, improving pedestrian safety conditions in the vicinity of the Judith K. Weiss Woodlawn School (P.S. 19).

Location 1: West 254th Street – Salanter Akiba Riverdale (SAR) Academy:
This project will fully reconstruct West 254th Street between Arlington Avenue and Railroad Terrace, including construction of 5-foot grade-separated sidewalk on both sides of the street. Sidewalk construction will correct the safety and accessibility issues identified on this portion of West 254th Street, while full roadway reconstruction will bring this underbuilt street to a state of good repair. The new street configuration permits construction within the existing 35- to 40-foot street envelope between Independence and Palisade Avenues, and is intended to minimize acquisition and costly impacts to the masonry walls lining both sides of West 254th Street.

1A: West 254th Street between Arlington and Independence Avenues
As a part of the full street reconstruction of these limits, the project will construct new 5-foot, grade-separated sidewalks on both sides of the street. On the north side, the project will construct 5-foot ribbon sidewalk, aligned approximately with the existing ribbon sidewalk adjacent to 5403 Arlington Avenue. Ribbon sidewalk is contextually appropriate for the low-density, residential character of this R1-1 and R1-2 zoned neighborhood, and may allow for preservation of some of the existing mature trees within the right-of-way. New street trees may also be feasible at this location if the green strip inside of the ribbon sidewalk is 5 feet or greater in width.

On the south side of the street, the project will construct a standard 5-foot sidewalk adjacent to the existing masonry walls, in the footprint of the current parking lane. Ribbon sidewalk is less desirable
on the south side of this segment because the houses and front lawns are physically separated from the street by high hedges, rows of trees, and taller masonry walls (3- to 6-feet) than on the north side. This side of the street does not include any trees within the built right-of-way that would require the root space provided by ribbon sidewalk, also indicating that conventional sidewalk is a more appropriate treatment on this side.

1B: West 254th Street between Independence and Sycamore Avenues:
Between Independence and Sycamore Avenues, the project will construct 5-foot sidewalk on both sides of West 254th Street as a part of property line to property line reconstruction. The new sidewalk will be sited adjacent to the existing masonry walls, which should be left undisturbed to the greatest extent possible.

1C: West 254th Street between Sycamore Avenue and Railroad Terrace:
Between Sycamore Avenue and Railroad Terrace, the project will reconstruct West 254th Street to a width of 35 feet, including construction of 5-foot grade-separated sidewalk on both sides.

Location 2: Van Cortlandt Park East – Judith K. Weiss Woodlawn School (P.S. 19):
The capital project will construct a large curb extension the southwest corner of Van Cortlandt Park East and East 238th Street, normalizing the slip lane condition and reducing the crossing distance to approximately 35 feet. Opposite the new curb extension, the project will also extend the curbline on Ley Triangle by several feet and construct a new pedestrian ramp. The project will introduce a crosswalk at the new narrower crossing, increasing pedestrian connectivity on the south side of Van Cortlandt Park East and improving access to the triangle.

In addition to the work at East 238th Street, the project will upgrade three pedestrian ramps at Van Cortlandt Park East’s intersection with Oneida Avenue: two at the northeast corner of Ley Triangle, and one receiving ramp across Van Cortlandt Park East. Reconstruction of these three ramps will improve connectivity between the Woodlawn street grid and amenities in Van Cortlandt Park, including the Oneida Run dog park and hiking trail. The project may also introduce a marked crossing between these ramps, pending the outcome of an Intersection Control Unit (ICU) study that DOT will conduct in parallel with design procurement.
Status
Active
HWX710A
Project Id: HWX710A • Description: PELHAM PKWY - Phase 2 • Client Agency: Transportation
Project Id
HWX710A
Description
PELHAM PKWY - Phase 2
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-12-22T00:00:00.000
Scope
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River Pkwy

Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.

Stillwell Ave from westbound mainline to north service road
Status
Active
HWXF2000B
Project Id: HWXF2000B • Description: 1400 Williamsbridge Rd, BX.HVAC Replacement • Client Agency: Transportation
Project Id
HWXF2000B
Description
1400 Williamsbridge Rd, BX.HVAC Replacement
Client Agency
Transportation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-08-18T00:00:00.000
Scope
Replace existing mechanical systems with new systems and a BMS, replacement of the windows (1st & 2nd fl) and upgrade the existing fire alarm system.
Status
Active
HWXJEROME
Project Id: HWXJEROME • Client Agency: Transportation • Division: Infrastructure
Project Id
HWXJEROME
Description
The Jerome Avenue Capital project is a corridor-wide suite of projects aimed at enhancing safety and creating hospitable open spaces for the community.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-05-10T00:00:00.000
Scope
Corridor improvements to include pedestrian experience under the elevated 4 train that runs above Jerome Avenue plus final design for the following three sites: Jerome Ave at Burnside, Jerome Ave at Tremont Ave, and 170th Street/Keltch Park. This project will also take the remaining sites through both preliminary and final design. Streetscape design component of this project includes reconstruction of numerous Bus Stops Under the El which will include installation of a new transit node furnishing called the CityEl. The CityEl is in design and this will be part of the pilot launch. This project will require coordination with MTA.
Status
Active
HWXP136A
Project Id: HWXP136A • Description: GRAND CONCOURSE SERVICE ROADS X770.18 • Client Agency: Transportation
Project Id
HWXP136A
Description
GRAND CONCOURSE SERVICE ROADS X770.18
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-10-02T00:00:00.000
Scope
Reconstruction of Grand Concourse service roads between East 166 Street and East 171 Street including widening of median/malls, installation of bicycle lanes and landscaping and sewer work.
Also, combined sewer work included in the following locations.
- Grand Concourse Blvd. from E.166 Street to E.165 Street
- Grand Concourse Blvd. from E.171 Street to E.172 Street
- E.168 Street from Grand Concourse Blvd. to Grandview Pl.
- Clarke Pl. bet. Grand Concourse Blvd. and Walton Ave.
- Marcy Pl. bet. Grand Concourse Blvd. and Walton Ave.
- Elliot Pl. bet. Grand Concourse Blvd. and Walton Ave.
- E.170 Street from Wythe Pl. to Grand Concourse.
Status
Active
HWXP136C
Project Id: HWXP136C • Description: RECONSTRUCTION OF GRAND CONCOURSE - PHASE 4 • Client Agency: Transportation
Project Id
HWXP136C
Description
RECONSTRUCTION OF GRAND CONCOURSE - PHASE 4
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-13T00:00:00.000
Scope
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Status
Active
HWXP136D
Project Id: HWXP136D • Description: GRAND CONCOURSE, PHASE 5 • Client Agency: Transportation
Project Id
HWXP136D
Description
GRAND CONCOURSE, PHASE 5
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-30T00:00:00.000
Scope
THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.
Status
Active
HWXP2007
Project Id: HWXP2007 • Description: RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE • Client Agency: Transportation
Project Id
HWXP2007
Description
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-15T00:00:00.000
Scope
Road Reconstruction, Water Main and Combined Sewer Work

E 177th Street from Devoe Ave to Bronx Park Ave

East Tremont Ave from Bronx Park Ave to Boston Rd

Devoe Ave from E 177th Street to East Tremont Ave
Status
Active
HWXPRATT
Project Id: HWXPRATT • Description: Pratt Avenue Retaining Wall and Roadway Recon • Client Agency: Transportation
Project Id
HWXPRATT
Description
Pratt Avenue Retaining Wall and Roadway Recon
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-23T00:00:00.000
Scope
The retaining wall along the segment of Pratt Avenue (Needham Ave to Dead End) shows multiple signs of damage. This includes cracking (long cracks run the entire height of the wall) and movement of the individual elements of the wall. The cracks and movement of the wall has allowed the backfill that supports the roadway to escape. The roadway within the project limits has experienced significant damage due to settlement of supporting materials. The proposed scope includes reconstruction of the roadway and retaining wall along this segment.
Status
Active
HWXS711
Project Id: HWXS711 • Description: RECONSTRUCTION OF STEP ST AT DAVIDSON AVE • Client Agency: Transportation
Project Id
HWXS711
Description
RECONSTRUCTION OF STEP ST AT DAVIDSON AVE
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-24T00:00:00.000
Scope
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Status
Active
LB20DUMBO
Project Id: LB20DUMBO • Description: interior fit out of Adams Street @ Dumbo library branch • Client Agency: Libraries-BPL
Project Id
LB20DUMBO
Description
interior fit out of Adams Street @ Dumbo library branch
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2025-03-28T00:00:00.000
Scope
The new Adams Street branch of Brooklyn Public Library will be located within the landmarked DUMBO Historic District, located next to the Manhattan Bridge and facing the northern half of Brooklyn Bridge Park with views of the Brooklyn Bridge. The Library will occupy the northwest corner of the ground floor of a historical Romanesque Revival building which was originally built in 1891 and served many different uses, such as a torpedo factory, a paper recycling factory and now a mixed-use commercial and residential building. This 6,300 SF library space is intended to be a public beacon for all and a public amenity for the neighboring communities of DUMBO, Vinegar Hill and Farragut Houses. This library will be the first new Brooklyn Public Library branch to open in more than 30 years.
Status
Active
LBC10CDHC1
Project Id: LBC10CDHC1 • Description: Clarendon HVAC & BMS Upgrade • Client Agency: Libraries-BPL
Project Id
LBC10CDHC1
Description
Clarendon HVAC & BMS Upgrade
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-01-26T00:00:00.000
Scope
HVAC and BMS Installation.
Status
Active
LBC12STHC
Project Id: LBC12STHC • Description: Saratoga HVAC Replacement • Client Agency: Libraries-BPL
Project Id
LBC12STHC
Description
Saratoga HVAC Replacement
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-12-30T00:00:00.000
Scope
Boiler, HVAC, BMS replacement at the Saratoga Branch Library
Status
Active
LBC13BPRF
Project Id: LBC13BPRF • Description: Borough Park Major Renovation • Client Agency: Libraries-BPL
Project Id
LBC13BPRF
Description
Borough Park Major Renovation
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-05-28T00:00:00.000
Scope
Borough Park Library is a complete interior and exterior renovation including new interior layout program, new HVAC, security, IT/AV, BMS, roofing system and structural repairs.
Status
Active
LBC14LDRF
Project Id: LBC14LDRF • Description: Leonard Roof Replacement • Client Agency: Libraries-BPL
Project Id
LBC14LDRF
Description
Leonard Roof Replacement
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-07-25T00:00:00.000
Scope
Roof Replacement
Status
Active
LBC15BWHC
Project Id: LBC15BWHC • Description: Bushwick HVAC Upgrade • Client Agency: Libraries-BPL
Project Id
LBC15BWHC
Description
Bushwick HVAC Upgrade
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-10-10T00:00:00.000
Scope
HVAC Replacement and new BMS
Status
Active
LBC15MPHC
Project Id: LBC15MPHC • Description: Mapleton Boiler/BMS System Replacement • Client Agency: Libraries-BPL
Project Id
LBC15MPHC
Description
Mapleton Boiler/BMS System Replacement
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2026-06-13T00:00:00.000
Scope
Replacement of boiler and new BMS system.
Status
Active
LBC16MD2F
Project Id: LBC16MD2F • Description: Midwood 2nd Floor Renovation • Client Agency: Libraries-BPL
Project Id
LBC16MD2F
Description
Midwood 2nd Floor Renovation
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2025-06-28T00:00:00.000
Scope
Midwood Library will undergo a 2nd Floor Interior Renovation. The work scope will include the replacement of the HVAC System, Fire Alarm, 2nd Floor Security System and the installation of a new BMS. The work scope will also include the replacement of the roofing system and bulkhead restoration.
Status
Active
LBC16MPHC
Project Id: LBC16MPHC • Description: Mapleton HVAC Upgrade • Client Agency: Libraries-BPL
Project Id
LBC16MPHC
Description
Mapleton HVAC Upgrade
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2026-06-13T00:00:00.000
Scope
Replacement of the existing cooling equipment
Status
Active
LBC17CDOP
Project Id: LBC17CDOP • Description: CLARENDON OUTDOOR PLAZA • Client Agency: Libraries-BPL
Project Id
LBC17CDOP
Description
CLARENDON OUTDOOR PLAZA
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-10-31T00:00:00.000
Scope
Replace building components which have exceeded their useful and and to maximize efficiency of public use area.
Status
Active
LBC17MPGD
Project Id: LBC17MPGD • Description: Mapleton Library Landscape & Exterior Improvements • Client Agency: Libraries-BPL
Project Id
LBC17MPGD
Description
Mapleton Library Landscape & Exterior Improvements
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-11-10T00:00:00.000
Scope
MAPLETON GARDEN RENOVATION
Status
Active
LBC17MRAD
Project Id: LBC17MRAD • Description: Marcy Renovation of Meeting Room • Client Agency: Libraries-BPL
Project Id
LBC17MRAD
Description
Marcy Renovation of Meeting Room
Client Agency
Libraries-BPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-07-04T00:00:00.000
Scope
Renovation of meeting room, providing ADA accessibility to meeting room.
Status
Active