Scope
Remove and replace existing Boiler system including, but not limited to, all the required modifications and/or replacements of equipment, pipes, valves, chimney/chimney liner, fans, insulation, fire stopping, fire alarm devices, plumbing, electrical, architectural work and related miscellaneous materials and labor necessary & required to provide a code compliant hot water boiler heating system. Renovate/upgrade the Boiler Room per NYC DOB’s code to facilitate replacement of the old boiler & installation of the new as needed. Replace existing hot water piping system in it entirety. Provide new Boiler control system and integrate it into the building's Automatic Control System for its seamless/harmonious operation with the building's HAVC system.