Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
10713
Trackerid: 10713 • Title: Canarsie Park Soccer Field Construction • Summary: This project will construct a soccer field at Canarsie Park.
Trackerid
10713
Title
Canarsie Park Soccer Field Construction
Summary
This project will construct a soccer field at Canarsie Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Seaview Avenue between E. 93rd Street and Paerdegat Ave N.
Parkid
B018
Latitude
40.62916116
Longitude
-73.89380192
Borough
Brooklyn
VIEW LOCATION
9649
Trackerid: 9649 • Fmsid: 846 P-411CDTR • Title: Captain Dermody Triangle Reconstruction
Trackerid
9649
Fmsid
846 P-411CDTR
Title
Captain Dermody Triangle Reconstruction
Summary
This project will reconstruct Captain Dermody Triangle.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-09-01T00:00:00.000
Procurementstart
2021-09-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementadjustedcompletion
2023-01-01T00:00:00.000
Procurementactualcompletion
2023-01-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2023-07-01T00:00:00.000
Totalfunding
$439,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
State
Name
48th Avenue and 216th Street
Parkid
Q316
Latitude
40.755742054276
Longitude
-73.764470292252
Borough
Queens
VIEW LOCATION
11087
Trackerid: 11087 • Title: Captain Jacob Joseph Playground Dog Run Construction • Summary: This project will construct a dog run at Captain Jacob Joseph Playground.
Trackerid
11087
Title
Captain Jacob Joseph Playground Dog Run Construction
Summary
This project will construct a dog run at Captain Jacob Joseph Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Rutgers Street an Henry Street
Parkid
M122
Latitude
40.71358657
Longitude
-73.98982703
Borough
Manhattan
VIEW LOCATION
1250111
Trackerid: 1250111 • Fmsid: 846 P-6UTILCW • Title: Captain John McKenna IV Park Water Line Reconstruction
Trackerid
1250111
Fmsid
846 P-6UTILCW
Title
Captain John McKenna IV Park Water Line Reconstruction
Summary
This project will reconstruct the water line to Captain John McKenna IV Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-01-01T00:00:00.000
Designprojectedcompletion
2021-06-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2020-12-01T00:00:00.000
Constructionstart
2021-03-01T00:00:00.000
Constructionprojectedcom
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$200,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B255L
Latitude
40.652388
Longitude
-73.97751
Borough
Brooklyn
VIEW LOCATION
9105
Trackerid: 9105 • Title: Captain Tilly Park Mother Language Day Site Construction • Currentphase: proposed
Trackerid
9105
Title
Captain Tilly Park Mother Language Day Site Construction
Summary
This project will construct a commemorative site of Mother Language Day at Captain Tilly Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Parkid
Q052
Latitude
40.71260071
Longitude
-73.79866577
Borough
Queens
VIEW LOCATION
6258
Trackerid: 6258 • Fmsid: 846 P-408TIL2 • Title: Captain Tilly Park Plaza Reconstruction
Trackerid
6258
Fmsid
846 P-408TIL2
Title
Captain Tilly Park Plaza Reconstruction
Summary
This project will reconstruct the plaza area in Captain Tilly Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-05-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-03-01T00:00:00.000
Designactualcompletion
2015-11-01T00:00:00.000
Procurementstart
2015-11-01T00:00:00.000
Procurementprojectedcompletion
2016-08-01T00:00:00.000
Procurementadjustedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-11-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionactualcompletion
2017-10-01T00:00:00.000
Totalfunding
$1,073,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Highland Avenue
Parkid
Q052
Latitude
40.711404
Longitude
-73.798285
Borough
Queens
VIEW LOCATION
9376
Trackerid: 9376 • Fmsid: 846 P-4CPTLCS • Title: Captain Tilly Park Public Restroom Building Reconstruction
Trackerid
9376
Fmsid
846 P-4CPTLCS
Title
Captain Tilly Park Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Captain Tilly Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-11-01T00:00:00.000
Designprojectedcompletion
2019-11-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$1,636,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Highland Avenue between 165th Street and 166th Street
Parkid
Q052
Latitude
40.711440432311
Longitude
-73.79824413497
Borough
Queens
VIEW LOCATION
11286
Trackerid: 11286 • Title: Captain Tilly Park Pathways Reconstruction • Summary: This project will reconstruct the pathways in Captain Tilly Park.
Trackerid
11286
Title
Captain Tilly Park Pathways Reconstruction
Summary
This project will reconstruct the pathways in Captain Tilly Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Highland Avenue, 85th Avenue between 165th Street and Chapin Parkway
Parkid
Q052
Latitude
40.71235657
Longitude
-73.79873912
Borough
Queens
VIEW LOCATION
10072
Trackerid: 10072 • Fmsid: 846 P-4CAPTGP • Title: Captain Tilly Park Goose Pond Restoration
Trackerid
10072
Fmsid
846 P-4CAPTGP
Title
Captain Tilly Park Goose Pond Restoration
Summary
This project will restore the Goose Pond at Captain Tilly Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
34.1
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designadjustedcompletion
2024-06-01T00:00:00.000
Designactualcompletion
2024-06-01T00:00:00.000
Procurementstart
2024-06-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2025-11-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$5,394,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Highland Avenue, Gothic Drive, Chapin Parkway, 85th Avenue and 165th Street
Parkid
Q052
Latitude
40.71219984
Longitude
-73.79875323
Borough
Queens
VIEW LOCATION
3056
Trackerid: 3056 • Fmsid: 846 P-408TILL • Title: Captain Tilly Park Landscape and Drainage Reconstruction
Trackerid
3056
Fmsid
846 P-408TILL
Title
Captain Tilly Park Landscape and Drainage Reconstruction
Summary
This project will reconstruct the landscaped areas and drainage structures at Captain Tilly Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designadjustedcompletion
2013-09-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-10-01T00:00:00.000
Constructionstart
2014-11-01T00:00:00.000
Constructionprojectedcom
2015-11-01T00:00:00.000
Constructionactualcompletion
2015-11-01T00:00:00.000
Totalfunding
$921,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Highland Avenue, Upland Parkway, Gothic Parkway, 85th Avenue
Parkid
Q052
Latitude
40.712046
Longitude
-73.798423
Borough
Queens
VIEW LOCATION
8790
Trackerid: 8790 • Fmsid: 846 P-1CPIBR3 • Title: Playground 174 Public Restroom Building Reconstruction
Trackerid
8790
Fmsid
846 P-1CPIBR3
Title
Playground 174 Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Building in Playground 174.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2018-02-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2021-03-01T00:00:00.000
Constructionprojectedcom
2022-03-01T00:00:00.000
Constructionactualcompletion
2022-04-01T00:00:00.000
Totalfunding
$1,889,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 174th Street between Bronx River Avenue and Manor Avenue
Parkid
X159
Latitude
40.83433
Longitude
-73.877924
Borough
Bronx
VIEW LOCATION
8791
Trackerid: 8791 • Fmsid: 846 P-1CPIBR2 • Title: Playground 174 Reconstruction
Trackerid
8791
Fmsid
846 P-1CPIBR2
Title
Playground 174 Reconstruction
Summary
This project will reconstruct play and adult fitness equipment, swings, spray shower, pavements, fencing, lighting, and mini-pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2018-02-01T00:00:00.000
Designadjustedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2018-01-01T00:00:00.000
Procurementstart
2018-01-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementadjustedcompletion
2018-12-01T00:00:00.000
Procurementactualcompletion
2018-11-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionactualcompletion
2020-01-01T00:00:00.000
Totalfunding
$4,466,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 174th Street between Bronx River Avenue and Manor Avenue.
Parkid
X159
Latitude
40.834485
Longitude
-73.877698
Borough
Bronx
VIEW LOCATION
2007111
Trackerid: 2007111 • Title: Carl Schurz Park Pavement Reconstruction • Currentphase: proposed
Trackerid
2007111
Title
Carl Schurz Park Pavement Reconstruction
Summary
This project will reconstruct the basketball and volleyball court paved surfaces and color seal.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
M081
Latitude
40.7739862
Longitude
-73.9443453
Borough
Manhattan
VIEW LOCATION
10894
Trackerid: 10894 • Title: Carl Schurz Park Promenade Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
10894
Title
Carl Schurz Park Promenade Public Restroom Building Reconstruction
Summary
This project will reconstruct the Promenade public restroom building in Carl Schurz Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
East End Avenue & East 87th Street
Parkid
M081
Latitude
40.77571428
Longitude
-73.94390112
Borough
Manhattan
VIEW LOCATION
10505
Trackerid: 10505 • Fmsid: 846 P-308CSPP • Title: Carl Schurz Park Pathway Reconstruction
Trackerid
10505
Fmsid
846 P-308CSPP
Title
Carl Schurz Park Pathway Reconstruction
Summary
This project will reconstruct bluestone paths in Carl Schurz Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-01-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2026-02-01T00:00:00.000
Constructionstart
2026-07-01T00:00:00.000
Constructionprojectedcom
2027-01-01T00:00:00.000
Totalfunding
$450,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East End Avenue and East 86th Street
Parkid
M081
Latitude
40.77536474
Longitude
-73.94334409
Borough
Manhattan
VIEW LOCATION
7404
Trackerid: 7404 • Fmsid: 846 P-308CSPG • Title: Carl Schurz Park Playground Reconstruction
Trackerid
7404
Fmsid
846 P-308CSPG
Title
Carl Schurz Park Playground Reconstruction
Summary
This project will reconstruct the children's playground in Carl Schurz Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-07-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designadjustedcompletion
2018-08-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-05-01T00:00:00.000
Procurementactualcompletion
2019-05-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$3,054,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
East End Avenue from Gracie Square to East 86th Street
Parkid
M081
Latitude
40.773961
Longitude
-73.944227
Borough
Manhattan
VIEW LOCATION
9205
Trackerid: 9205 • Fmsid: 846 P-3CSPBOL • Title: Carl Schurz Park Security Measures Construction
Trackerid
9205
Fmsid
846 P-3CSPBOL
Title
Carl Schurz Park Security Measures Construction
Summary
This project will construct security measures at entrances to Carl Schurz Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-07-01T00:00:00.000
Procurementstart
2020-07-01T00:00:00.000
Procurementprojectedcompletion
2021-03-01T00:00:00.000
Procurementadjustedcompletion
2023-01-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$1,140,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
York Avenue, Gracie Square, FDR Drive
Parkid
M081
Latitude
40.776172
Longitude
-73.942584
Borough
Manhattan
VIEW LOCATION
6270
Trackerid: 6270 • Fmsid: 846 P-309CARM • Title: Carmansville Playground Reconstruction
Trackerid
6270
Fmsid
846 P-309CARM
Title
Carmansville Playground Reconstruction
Summary
This project will reconstruct Carmansville Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2015-07-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-08-01T00:00:00.000
Constructionstart
2016-09-01T00:00:00.000
Constructionprojectedcom
2017-12-01T00:00:00.000
Constructionactualcompletion
2017-12-01T00:00:00.000
Totalfunding
$2,467,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Amsterdam Avenue between West 151st Street and West 152nd Street
Parkid
M018
Latitude
40.82918889
Longitude
-73.94425778
Borough
Manhattan
VIEW LOCATION
10626
Trackerid: 10626 • Fmsid: 846 P-2CPICWC • Title: Carter G. Woodson Children’s Park Reconstruction
Trackerid
10626
Fmsid
846 P-2CPICWC
Title
Carter G. Woodson Children’s Park Reconstruction
Summary
This project will reconstruct the playground, passive recreation, sitting area, and sidewalk in Carter G. Woodson Children's Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2026-01-01T00:00:00.000
Designadjustedcompletion
2026-05-01T00:00:00.000
Designactualcompletion
2026-05-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
Christopher Avenue between Belmont and Sutter Avenues
Parkid
B397
Latitude
40.66824504
Longitude
-73.90577249
Borough
Brooklyn
VIEW LOCATION
1749111
Trackerid: 1749111 • Fmsid: 846 P-203CARV • Title: Carver Playground Multipurpose Play Area Reconstruction
Trackerid
1749111
Fmsid
846 P-203CARV
Title
Carver Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in Carver Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-10-01T00:00:00.000
Constructionprojectedcom
2026-02-01T00:00:00.000
Constructionactualcompletion
2025-12-01T00:00:00.000
Totalfunding
$600,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B347
Latitude
40.6804647
Longitude
-73.9204607
Borough
Brooklyn
VIEW LOCATION
1813111
Trackerid: 1813111 • Fmsid: 846 P-109CHLL • Title: Castle Hill Little League Field Fence Reconstruction
Trackerid
1813111
Fmsid
846 P-109CHLL
Title
Castle Hill Little League Field Fence Reconstruction
Summary
This project will reconstruct the fence at the Castle Hill Little League Field.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-10-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-05-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-09-01T00:00:00.000
Constructionprojectedcom
2027-01-01T00:00:00.000
Totalfunding
$426,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
X239
Latitude
40.8121707
Longitude
-73.8478113
Borough
Bronx
VIEW LOCATION
1986111
Trackerid: 1986111 • Title: Castle Hill Park Fence Reconstruction • Summary: This project will reconstruct the perimeter fence.
Trackerid
1986111
Title
Castle Hill Park Fence Reconstruction
Summary
This project will reconstruct the perimeter fence.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
X007
Latitude
40.8113116
Longitude
-73.8466336
Borough
Bronx
VIEW LOCATION
4611
Trackerid: 4611 • Fmsid: 846 P-1CASHIL • Title: Castle Hill Park Paths Construction
Trackerid
4611
Fmsid
846 P-1CASHIL
Title
Castle Hill Park Paths Construction
Summary
This project will construct paths and landscaping in Castle Hill Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-11-01T00:00:00.000
Designprojectedcompletion
2013-06-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-12-01T00:00:00.000
Procurementactualcompletion
2014-12-01T00:00:00.000
Constructionstart
2015-01-01T00:00:00.000
Constructionprojectedcom
2016-01-01T00:00:00.000
Constructionactualcompletion
2016-01-01T00:00:00.000
Totalfunding
$434,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Castle Hill Avenue and Hart Street
Parkid
X007
Latitude
40.8109525
Longitude
-73.84653278
Borough
Bronx
VIEW LOCATION
11001
Trackerid: 11001 • Title: Castle Hill Playground and Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
11001
Title
Castle Hill Playground and Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building, the playground, basketball, handball courts, new synthetic turf multi-purpose play area including new play equipment, safety surfacing, the spray shower, fencing, landscaping, pavement, park security lighting, water and drainage systems, and sidewalks in Castle Hill Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Castle Hill Avenue, Parker Street
Parkid
X177
Latitude
40.83909335
Longitude
-73.85299707
Borough
Bronx
VIEW LOCATION
9193
Trackerid: 9193 • Fmsid: 846 P-413CAST • Title: Castlewood Playground Multipurpose Play Area Reconstruction
Trackerid
9193
Fmsid
846 P-413CAST
Title
Castlewood Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at Castlewood Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designadjustedcompletion
2020-01-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2023-03-01T00:00:00.000
Constructionactualcompletion
2022-11-01T00:00:00.000
Totalfunding
$2,745,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Little Neck Parkway between 72nd Avenue and 73rd Avenue
Parkid
Q327
Latitude
40.749271066243
Longitude
-73.722364404272
Borough
Queens
VIEW LOCATION
4500
Trackerid: 4500 • Fmsid: 846 P-100CEDR • Title: Cedar Playground Basketball Court and Playground Reconstruction
Trackerid
4500
Fmsid
846 P-100CEDR
Title
Cedar Playground Basketball Court and Playground Reconstruction
Summary
This project will reconstruct the playground, basketball courts and adjacent landscape in Cedar Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-09-01T00:00:00.000
Procurementstart
2014-09-01T00:00:00.000
Procurementprojectedcompletion
2015-06-01T00:00:00.000
Procurementadjustedcompletion
2015-08-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2016-09-01T00:00:00.000
Constructionactualcompletion
2016-08-01T00:00:00.000
Totalfunding
$2,182,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Cedar Avenue between West 179th Street and Sedgwick Avenue
Parkid
X111
Latitude
40.854826
Longitude
-73.917818
Borough
Bronx
VIEW LOCATION
6236
Trackerid: 6236 • Fmsid: 846 P-100CDAR • Title: Cedar Playground Public Restroom Building Reconstruction
Trackerid
6236
Fmsid
846 P-100CDAR
Title
Cedar Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Cedar Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designadjustedcompletion
2016-08-01T00:00:00.000
Designactualcompletion
2016-08-01T00:00:00.000
Procurementstart
2016-08-01T00:00:00.000
Procurementprojectedcompletion
2017-05-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionadjustedcompletion
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$828,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Cedar Avenue between West 179th Street and Sedgwick Avenue
Parkid
X111
Latitude
40.855266
Longitude
-73.917534
Borough
Bronx
VIEW LOCATION
1633111
Trackerid: 1633111 • Fmsid: 846 P-310ARFA • Title: Arsenal Fire Alarm System Reconstruction
Trackerid
1633111
Fmsid
846 P-310ARFA
Title
Arsenal Fire Alarm System Reconstruction
Summary
This project will reconstruct the fire alarm system at the Arsenal.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2023-11-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2024-08-01T00:00:00.000
Constructionprojectedcom
2026-01-01T00:00:00.000
Constructionactualcompletion
2025-04-01T00:00:00.000
Totalfunding
$91,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M010
Latitude
40.767835
Longitude
-73.971368
Borough
Manhattan
VIEW LOCATION
10949
Trackerid: 10949 • Fmsid: 846 P-3CENZPG • Title: Central Park Zoo Garage Parking Lot Reconstruction
Trackerid
10949
Fmsid
846 P-3CENZPG
Title
Central Park Zoo Garage Parking Lot Reconstruction
Summary
This project will reconstruct the parking lot at Zoo Garage in Central Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-05-01T00:00:00.000
Designprojectedcompletion
2027-05-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
5th Avenue, 63rd Street, and East Drive.
Parkid
M010
Latitude
40.78368501
Longitude
-73.96436698
Borough
Manhattan
VIEW LOCATION
8515
Trackerid: 8515 • Fmsid: 846 P-313CPA2 • Title: Arsenal Emergency Elevator Reconstruction
Trackerid
8515
Fmsid
846 P-313CPA2
Title
Arsenal Emergency Elevator Reconstruction
Summary
This project will reconstruct the elevator at the Arsenal in Central Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designactualcompletion
2016-04-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2016-05-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionadjustedcompletion
2017-08-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fifth Avenue and East 64th Street
Parkid
M010
Latitude
40.779845
Longitude
-73.962807
Borough
Manhattan
VIEW LOCATION
6297
Trackerid: 6297 • Fmsid: 846 P-313CPAB • Title: Arsenal Building Facade and Roof Reconstruction
Trackerid
6297
Fmsid
846 P-313CPAB
Title
Arsenal Building Facade and Roof Reconstruction
Summary
This project will reconstruct the facade and roof at the Arsenal building in Central Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-05-01T00:00:00.000
Designprojectedcompletion
2016-05-01T00:00:00.000
Designadjustedcompletion
2017-03-01T00:00:00.000
Designactualcompletion
2017-03-01T00:00:00.000
Procurementstart
2017-03-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementadjustedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2018-01-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-09-01T00:00:00.000
Totalfunding
$2,369,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fifth Avenue and East 64th Street
Parkid
M010
Latitude
40.779218
Longitude
-73.962947
Borough
Manhattan
VIEW LOCATION
8782
Trackerid: 8782 • Fmsid: 846 P-400LNCP • Title: Challenge Playground Reconstruction
Trackerid
8782
Fmsid
846 P-400LNCP
Title
Challenge Playground Reconstruction
Summary
This project will reconstruct the play equipment, fencing, and spray shower area at Challenge Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-05-01T00:00:00.000
Designprojectedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-05-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$2,651,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
251st Street between 61st Avenue and 63rd Avenue
Parkid
Q346
Latitude
40.757041188448
Longitude
-73.728160588919
Borough
Queens
VIEW LOCATION
1651111
Trackerid: 1651111 • Fmsid: 846 P-501CLP2 • Title: Clove Lakes Park Pathway Reconstruction
Trackerid
1651111
Fmsid
846 P-501CLP2
Title
Clove Lakes Park Pathway Reconstruction
Summary
This project will reconstruct paths in Clove Lakes Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-11-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-03-01T00:00:00.000
Procurementprojectedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$6,989,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
R005
Latitude
40.618705
Longitude
-74.111602
Borough
Staten Island
VIEW LOCATION
10606
Trackerid: 10606 • Fmsid: 846 P-408CHLG • Title: Challenge Playground Multipurpose Play Area Reconstruction
Trackerid
10606
Fmsid
846 P-408CHLG
Title
Challenge Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at Challenge Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-01-01T00:00:00.000
Designprojectedcompletion
2026-04-01T00:00:00.000
Designactualcompletion
2026-03-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
This project is located between 61st avenue, 63rd Avenue, Marathon Parkway and 251st Street.
Parkid
Q346
Latitude
40.75660208
Longitude
-73.72789159
Borough
Queens
VIEW LOCATION
9222
Trackerid: 9222 • Fmsid: 846 P-203CHRL • Title: Charlie's Place Reconstruction
Trackerid
9222
Fmsid
846 P-203CHRL
Title
Charlie's Place Reconstruction
Summary
This project will reconstruct the basketball and handball courts, provide fencing, water supply and construct a new entrance along Ellery Street at Charlie's Place.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-04-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionadjustedcompletion
2022-11-01T00:00:00.000
Constructionactualcompletion
2022-11-01T00:00:00.000
Totalfunding
$1,057,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Hopkins Street, Tompkins Avenue, Ellery Street, Throop Avenue
Parkid
B302
Latitude
40.698995867434
Longitude
-73.946112809768
Borough
Brooklyn
VIEW LOCATION
5542
Trackerid: 5542 • Fmsid: 846 P-3FFAGAN • Currentphase: completed
Trackerid
5542
Fmsid
846 P-3FFAGAN
Title
Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation
Summary
This multisite contract will reconstruct the sitting area in Father Fagan Park and install water service at Charlton Plaza.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-03-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$1,401,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Ave. of Americas, King St. and Charlton St.
Parkid
M125E
Latitude
40.727285
Longitude
-74.003519
Borough
Manhattan
VIEW LOCATION
5542
Trackerid: 5542 • Fmsid: 846 P-3FFAGAN • Currentphase: completed
Trackerid
5542
Fmsid
846 P-3FFAGAN
Title
Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation
Summary
This multisite contract will reconstruct the sitting area in Father Fagan Park and install water service at Charlton Plaza.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-03-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$1,401,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Ave. Of Americas between Prince St. & Spring St.
Parkid
M207
Latitude
40.726626
Longitude
-74.003433
Borough
Manhattan
VIEW LOCATION
8467
Trackerid: 8467 • Fmsid: 846 P-30420S2 • Title: Chelsea Green Construction
Trackerid
8467
Fmsid
846 P-30420S2
Title
Chelsea Green Construction
Summary
This project will construct a new park, including play equipment, seating, lighting, plantings, and other site furnishings at Chelsea Green.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-07-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementactualcompletion
2018-03-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$2,601,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
West 20th Street between 6th and 7th Avenues
Parkid
M402
Latitude
40.741577
Longitude
-73.996185
Borough
Manhattan
VIEW LOCATION
1509111
Trackerid: 1509111 • Fmsid: 846 P-304CPTF • Title: Chelsea Park Synthetic Turf and Track Reconstruction
Trackerid
1509111
Fmsid
846 P-304CPTF
Title
Chelsea Park Synthetic Turf and Track Reconstruction
Summary
This project will reconstruct the synthetic turf field and track at Chelsea Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-04-01T00:00:00.000
Designactualcompletion
2023-01-01T00:00:00.000
Procurementstart
2022-09-01T00:00:00.000
Procurementprojectedcompletion
2023-02-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$1,250,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
M011
Latitude
40.750189
Longitude
-74.001224
Borough
Manhattan
VIEW LOCATION
9348
Trackerid: 9348 • Fmsid: 846 P-304CBBC • Title: Chelsea Park Basketball Court Reconstruction
Trackerid
9348
Fmsid
846 P-304CBBC
Title
Chelsea Park Basketball Court Reconstruction
Summary
This project will reconstruct the basketball court and adjacent paths and landscape at Chelsea Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-04-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$877,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Mid block on West 28th Street between 9th Avenue and 10th Avenue
Parkid
M011
Latitude
40.749766
Longitude
-74.000178
Borough
Manhattan
VIEW LOCATION
1335111
Trackerid: 1335111 • Fmsid: 846 P-3TDCREC • Title: Chelsea Recreation Center Fitness Room Reconstruction
Trackerid
1335111
Fmsid
846 P-3TDCREC
Title
Chelsea Recreation Center Fitness Room Reconstruction
Summary
This project will reconstruct the fitness room at Chelsea Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2023-08-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$297,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
M260
Latitude
40.748324
Longitude
-74.0022
Borough
Manhattan
VIEW LOCATION
1473111
Trackerid: 1473111 • Fmsid: 846 P-3CHLENT • Title: Chelsea Recreation Center Storefront Entry System Reconstruction
Trackerid
1473111
Fmsid
846 P-3CHLENT
Title
Chelsea Recreation Center Storefront Entry System Reconstruction
Summary
This project will reconstruct the storefront entry system at the Chelsea Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$300,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M260
Latitude
40.748302
Longitude
-74.002194
Borough
Manhattan
VIEW LOCATION
10562
Trackerid: 10562 • Fmsid: 846 P-3CRHVAC • Title: Chelsea Recreation Center HVAC Systems Reconstruction
Trackerid
10562
Fmsid
846 P-3CRHVAC
Title
Chelsea Recreation Center HVAC Systems Reconstruction
Summary
This project will reconstruct the HVAC systems at Chelsea Recreation Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-08-01T00:00:00.000
Designactualcompletion
2024-01-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementprojectedcompletion
2026-09-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-11-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
$3,191,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
430 West 25th Street
Parkid
M260
Latitude
40.74831349
Longitude
-74.00228146
Borough
Manhattan
VIEW LOCATION
6264
Trackerid: 6264 • Fmsid: 846 P-304CRLB • Title: Chelsea Recreation Center Locker Room Reconstruction
Trackerid
6264
Fmsid
846 P-304CRLB
Title
Chelsea Recreation Center Locker Room Reconstruction
Summary
This project will reconstruct the men's and women's locker rooms at the Chelsea Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-10-01T00:00:00.000
Designprojectedcompletion
2015-10-01T00:00:00.000
Designadjustedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$2,767,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
430 West 25th Street
Parkid
M260
Latitude
40.748398
Longitude
-74.002307
Borough
Manhattan
VIEW LOCATION
10905
Trackerid: 10905 • Title: Chelsea Recreation Center Multimedia Center Reconstruction • Currentphase: proposed
Trackerid
10905
Title
Chelsea Recreation Center Multimedia Center Reconstruction
Summary
This project will construct a multimedia center at the Chelsea Recreation Center.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
430 West 25th Street, Manhattan
Parkid
M260
Latitude
40.74828537
Longitude
-74.00221867
Borough
Manhattan
VIEW LOCATION
8736
Trackerid: 8736 • Fmsid: 846 ACEDPR408 • Title: Citywide HVAC Controls Building Automation Systems Installation
Trackerid
8736
Fmsid
846 ACEDPR408
Title
Citywide HVAC Controls Building Automation Systems Installation
Summary
This project will install automated HVAC system controls at various parks facilities citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2021-04-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$2,334,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Southside West 25 Street, 9 to 10 Avenues
Parkid
M260
Latitude
40.7482685
Longitude
-74.0020647
Borough
ManhattanBronxQueensBrooklyn
VIEW LOCATION
8736
Trackerid: 8736 • Fmsid: 846 ACEDPR408 • Title: Citywide HVAC Controls Building Automation Systems Installation
Trackerid
8736
Fmsid
846 ACEDPR408
Title
Citywide HVAC Controls Building Automation Systems Installation
Summary
This project will install automated HVAC system controls at various parks facilities citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2021-04-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$2,334,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 54th Street between 1st and 2nd Avenues.
Parkid
M130
Latitude
40.7564903
Longitude
-73.965096
Borough
ManhattanBronxQueensBrooklyn
VIEW LOCATION
8736
Trackerid: 8736 • Fmsid: 846 ACEDPR408 • Title: Citywide HVAC Controls Building Automation Systems Installation
Trackerid
8736
Fmsid
846 ACEDPR408
Title
Citywide HVAC Controls Building Automation Systems Installation
Summary
This project will install automated HVAC system controls at various parks facilities citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2021-04-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$2,334,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
85 Bradhurst Avenue
Parkid
M014
Latitude
40.824308
Longitude
-73.942442
Borough
ManhattanBronxQueensBrooklyn
VIEW LOCATION
8736
Trackerid: 8736 • Fmsid: 846 ACEDPR408 • Title: Citywide HVAC Controls Building Automation Systems Installation
Trackerid
8736
Fmsid
846 ACEDPR408
Title
Citywide HVAC Controls Building Automation Systems Installation
Summary
This project will install automated HVAC system controls at various parks facilities citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2021-04-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$2,334,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Manida Street, Barretto Street, Lafayette Avenue
Parkid
X260
Latitude
40.8149605
Longitude
-73.8890915
Borough
ManhattanBronxQueensBrooklyn
VIEW LOCATION
8736
Trackerid: 8736 • Fmsid: 846 ACEDPR408 • Title: Citywide HVAC Controls Building Automation Systems Installation
Trackerid
8736
Fmsid
846 ACEDPR408
Title
Citywide HVAC Controls Building Automation Systems Installation
Summary
This project will install automated HVAC system controls at various parks facilities citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2021-04-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$2,334,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East & Harlem Rivers
Parkid
M104
Latitude
40.7992526
Longitude
-73.9230296
Borough
ManhattanBronxQueensBrooklyn
VIEW LOCATION