1910111
Trackerid: 1910111 • Fmsid: 846 P-6RETW23 • Title: Crotona Park Retaining Walls Reconstruction
Trackerid
1910111
Fmsid
846 P-6RETW23
Title
Crotona Park Retaining Walls Reconstruction
Summary
This project will reconstruct retaining walls between East 172nd and East 173rd Streets east of Fulton Avenue in Crotona Park.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-11-01T00:00:00.000
Designprojectedcompletion
2026-10-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.840151
Longitude
-73.89844
Borough
Bronx
VIEW LOCATION
1949111
Trackerid: 1949111 • Fmsid: 846 P-103PATH • Title: Crotona Park Path Pavement Reconstruction
Trackerid
1949111
Fmsid
846 P-103PATH
Title
Crotona Park Path Pavement Reconstruction
Summary
This project will reconstruct paved pathways in Crotona Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Procurementstart
2026-05-01T00:00:00.000
Procurementprojectedcompletion
2026-10-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$500,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
State
Parkid
X010
Latitude
40.8386987
Longitude
-73.8961943
Borough
Bronx
VIEW LOCATION
1997111
Trackerid: 1997111 • Title: Crotona Park Tennis House Roof Reconstruction • Summary: This project will reconstruct the tennis house roof.
Trackerid
1997111
Title
Crotona Park Tennis House Roof Reconstruction
Summary
This project will reconstruct the tennis house roof.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.8391279
Longitude
-73.8955813
Borough
Bronx
VIEW LOCATION
1050111
Trackerid: 1050111 • Fmsid: 846 P-1PL12A2 • Title: Crotona Park Tennis Building Electrical Upgrade
Trackerid
1050111
Fmsid
846 P-1PL12A2
Title
Crotona Park Tennis Building Electrical Upgrade
Summary
This project will upgrade the electrical system to new and existing tennis buildings in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-08-01T00:00:00.000
Designprojectedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2016-03-01T00:00:00.000
Procurementprojectedcompletion
2016-08-01T00:00:00.000
Procurementactualcompletion
2014-10-01T00:00:00.000
Constructionstart
2014-10-01T00:00:00.000
Constructionprojectedcom
2014-11-01T00:00:00.000
Constructionactualcompletion
2014-12-01T00:00:00.000
Totalfunding
$182,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.83738
Longitude
-73.896022
Borough
Bronx
VIEW LOCATION
1505111
Trackerid: 1505111 • Fmsid: 846 P-1FACDCR • Title: Crotona Park Pool Community Center FaÇade Reconstruction
Trackerid
1505111
Fmsid
846 P-1FACDCR
Title
Crotona Park Pool Community Center FaÇade Reconstruction
Summary
This project will reconstruct the faÇade of the Community Center at Crotona Park Pool.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2022-08-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementprojectedcompletion
2025-11-01T00:00:00.000
Procurementactualcompletion
2025-11-01T00:00:00.000
Constructionstart
2026-01-01T00:00:00.000
Constructionprojectedcom
2027-09-01T00:00:00.000
Totalfunding
$875,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.839794
Longitude
-73.898053
Borough
Bronx
VIEW LOCATION
1551111
Trackerid: 1551111 • Fmsid: 846 P-6ROOF22 • Title: Crotona Park Nature Center Roof Reconstruction
Trackerid
1551111
Fmsid
846 P-6ROOF22
Title
Crotona Park Nature Center Roof Reconstruction
Summary
This project will reconstruct the roof at the Crotona Park Nature Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-09-01T00:00:00.000
Designprojectedcompletion
2024-08-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2023-12-01T00:00:00.000
Procurementprojectedcompletion
2024-05-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-05-01T00:00:00.000
Constructionactualcompletion
2025-04-01T00:00:00.000
Totalfunding
$700,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.839284
Longitude
-73.89461
Borough
Bronx
VIEW LOCATION
1615111
Trackerid: 1615111 • Fmsid: 846 P-1PAVBRX • Title: Crotona Park Path Partial Reconstruction
Trackerid
1615111
Fmsid
846 P-1PAVBRX
Title
Crotona Park Path Partial Reconstruction
Summary
This project will partially reconstruct the paths at Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-05-01T00:00:00.000
Designactualcompletion
2024-04-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2025-07-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$2,530,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X010
Latitude
40.839889
Longitude
-73.894327
Borough
Bronx
VIEW LOCATION
9951
Trackerid: 9951 • Fmsid: 846 P-1CRTORF • Title: Crotona Park Bathhouse Roof Reconstruction
Trackerid
9951
Fmsid
846 P-1CRTORF
Title
Crotona Park Bathhouse Roof Reconstruction
Summary
This project will reconstruct a portion of the roof at Crotona Park Bathhouse.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2023-10-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2024-02-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-03-01T00:00:00.000
Totalfunding
$3,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
1700 Fulton Avenue
Parkid
X010
Latitude
40.83973
Longitude
-73.894839
Borough
Bronx
VIEW LOCATION
11204
Trackerid: 11204 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
11204
Title
Crotona Park Pool House Mechanical and Electrical Equipment Reconstruction (Hurricane Ida)
Summary
This project will reconstruct mechanical and electrical equipment at the pool house in Crotona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalState
Name
173rd Street and Fulton Avenue
Parkid
X010
Latitude
40.83815759
Longitude
-73.8934473
Borough
Bronx
VIEW LOCATION
4625
Trackerid: 4625 • Fmsid: 846 P-1CRNAPK • Title: Crotona Park Nature Center Reconstruction
Trackerid
4625
Fmsid
846 P-1CRNAPK
Title
Crotona Park Nature Center Reconstruction
Summary
This project will reconstruct the nature center in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-09-01T00:00:00.000
Designprojectedcompletion
2015-02-01T00:00:00.000
Designadjustedcompletion
2017-02-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-11-01T00:00:00.000
Procurementactualcompletion
2017-11-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionadjustedcompletion
2021-08-01T00:00:00.000
Constructionactualcompletion
2021-08-01T00:00:00.000
Totalfunding
$3,279,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Crotona Avenue and Crotona Park East
Parkid
X010
Latitude
40.838124
Longitude
-73.893432
Borough
Bronx
VIEW LOCATION
9604
Trackerid: 9604 • Fmsid: 846 P-1CROALG • Title: Crotona Park Indian Lake Shoreline Restoration
Trackerid
9604
Fmsid
846 P-1CROALG
Title
Crotona Park Indian Lake Shoreline Restoration
Summary
This project will remove invasive species and plant new and replacement trees to restore the shoreline of Indian Lake in Crotona Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designadjustedcompletion
2021-03-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2023-01-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2025-08-01T00:00:00.000
Totalfunding
$575,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Crotona Avenue, Crotona Park North, Crotona Park East, Claremont Parkway
Parkid
X010
Latitude
40.83825794
Longitude
-73.89408199
Borough
Bronx
VIEW LOCATION
11399
Trackerid: 11399 • Title: Crotona Park Hill & Dale Playground Reconstruction • Summary: This project will reconstruct Hill & Dale Playground in Crotona Park.
Trackerid
11399
Title
Crotona Park Hill & Dale Playground Reconstruction
Summary
This project will reconstruct Hill & Dale Playground in Crotona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Name
Crotona Park East and East 173 Street
Parkid
X010
Latitude
40.8369755
Longitude
-73.8942622
Borough
Bronx
VIEW LOCATION
6084
Trackerid: 6084 • Fmsid: 846 P-103CRO1 • Title: Crotona Park Ballfield 1 Lighting Installation
Trackerid
6084
Fmsid
846 P-103CRO1
Title
Crotona Park Ballfield 1 Lighting Installation
Summary
This project will construct sports lighting at ballfield 1 in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-08-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-06-01T00:00:00.000
Procurementstart
2016-06-01T00:00:00.000
Procurementprojectedcompletion
2017-03-01T00:00:00.000
Procurementadjustedcompletion
2017-12-01T00:00:00.000
Procurementactualcompletion
2017-12-01T00:00:00.000
Constructionstart
2018-02-01T00:00:00.000
Constructionprojectedcom
2019-02-01T00:00:00.000
Constructionadjustedcompletion
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$1,293,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Crotona Park East between Claremont Parkway and Crotona Avenue
Parkid
X010
Latitude
40.835569
Longitude
-73.896426
Borough
Bronx
VIEW LOCATION
6085
Trackerid: 6085 • Fmsid: 846 P-103CPB5 • Title: Crotona Park Ballfield 5 Synthetic Turf Field Construction
Trackerid
6085
Fmsid
846 P-103CPB5
Title
Crotona Park Ballfield 5 Synthetic Turf Field Construction
Summary
This project will demolish softball field 5 at Crotona Park and construct a synthetic turf soccer field.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designadjustedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2019-08-01T00:00:00.000
Constructionadjustedcompletion
2022-12-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$5,712,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Crotona Park North and Crotona Avenue
Parkid
X010
Latitude
40.840192
Longitude
-73.892643
Borough
Bronx
VIEW LOCATION
10767
Trackerid: 10767 • Title: East River Playground Parkhouse Construction • Summary: This project will construct a new parkhouse at East River Playground.
Trackerid
10767
Title
East River Playground Parkhouse Construction
Summary
This project will construct a new parkhouse at East River Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
FDR Drive between East 106th Street and East 107th Street
Parkid
M258
Latitude
40.7893608
Longitude
-73.93808325
Borough
Manhattan
VIEW LOCATION
4750
Trackerid: 4750 • Fmsid: 846 P-1PLG10B • Title: Bronx General Site Work (XG-410M)
Trackerid
4750
Fmsid
846 P-1PLG10B
Title
Bronx General Site Work (XG-410M)
Summary
This project will reconstruct play equipment, safety surfacing, pavements, and handball courts at various parks in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-11-01T00:00:00.000
Designactualcompletion
2010-04-01T00:00:00.000
Procurementstart
2010-04-01T00:00:00.000
Procurementprojectedcompletion
2011-01-01T00:00:00.000
Procurementactualcompletion
2011-10-01T00:00:00.000
Constructionstart
2011-12-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$1,431,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Crotona Park North to South, Fulton Av to Southern Blvd & Crotona Park East
Parkid
X010
Latitude
40.837974
Longitude
-73.89846
Borough
Bronx
VIEW LOCATION
4750
Trackerid: 4750 • Fmsid: 846 P-1PLG10B • Title: Bronx General Site Work (XG-410M)
Trackerid
4750
Fmsid
846 P-1PLG10B
Title
Bronx General Site Work (XG-410M)
Summary
This project will reconstruct play equipment, safety surfacing, pavements, and handball courts at various parks in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-11-01T00:00:00.000
Designactualcompletion
2010-04-01T00:00:00.000
Procurementstart
2010-04-01T00:00:00.000
Procurementprojectedcompletion
2011-01-01T00:00:00.000
Procurementactualcompletion
2011-10-01T00:00:00.000
Constructionstart
2011-12-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$1,431,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Hammersley Ave. to Burke Ave. bet. Ely Ave. and Gunther Ave.
Parkid
X196
Latitude
40.873683
Longitude
-73.839166
Borough
Bronx
VIEW LOCATION
4750
Trackerid: 4750 • Fmsid: 846 P-1PLG10B • Title: Bronx General Site Work (XG-410M)
Trackerid
4750
Fmsid
846 P-1PLG10B
Title
Bronx General Site Work (XG-410M)
Summary
This project will reconstruct play equipment, safety surfacing, pavements, and handball courts at various parks in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-11-01T00:00:00.000
Designactualcompletion
2010-04-01T00:00:00.000
Procurementstart
2010-04-01T00:00:00.000
Procurementprojectedcompletion
2011-01-01T00:00:00.000
Procurementactualcompletion
2011-10-01T00:00:00.000
Constructionstart
2011-12-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$1,431,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
W. 168 St. bet. Dr. MLK Jr. Blvd. and Merriam Ave.
Parkid
X153
Latitude
40.840422
Longitude
-73.927011
Borough
Bronx
VIEW LOCATION
4750
Trackerid: 4750 • Fmsid: 846 P-1PLG10B • Title: Bronx General Site Work (XG-410M)
Trackerid
4750
Fmsid
846 P-1PLG10B
Title
Bronx General Site Work (XG-410M)
Summary
This project will reconstruct play equipment, safety surfacing, pavements, and handball courts at various parks in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-11-01T00:00:00.000
Designactualcompletion
2010-04-01T00:00:00.000
Procurementstart
2010-04-01T00:00:00.000
Procurementprojectedcompletion
2011-01-01T00:00:00.000
Procurementactualcompletion
2011-10-01T00:00:00.000
Constructionstart
2011-12-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$1,431,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
E 168 St bet Park Av & Washington Av
Parkid
X206
Latitude
40.832274
Longitude
-73.907435
Borough
Bronx
VIEW LOCATION
4750
Trackerid: 4750 • Fmsid: 846 P-1PLG10B • Title: Bronx General Site Work (XG-410M)
Trackerid
4750
Fmsid
846 P-1PLG10B
Title
Bronx General Site Work (XG-410M)
Summary
This project will reconstruct play equipment, safety surfacing, pavements, and handball courts at various parks in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-11-01T00:00:00.000
Designactualcompletion
2010-04-01T00:00:00.000
Procurementstart
2010-04-01T00:00:00.000
Procurementprojectedcompletion
2011-01-01T00:00:00.000
Procurementactualcompletion
2011-10-01T00:00:00.000
Constructionstart
2011-12-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$1,431,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Resevoir Av bet Sedgwick Av & Goulden Av
Parkid
X038
Latitude
40.873641
Longitude
-73.899623
Borough
Bronx
VIEW LOCATION
6237
Trackerid: 6237 • Fmsid: 846 P-103CRCS • Title: Crotona Par Public Restroom Building Reconstruction
Trackerid
6237
Fmsid
846 P-103CRCS
Title
Crotona Par Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Playground of the Stars in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designadjustedcompletion
2016-08-01T00:00:00.000
Designactualcompletion
2018-03-01T00:00:00.000
Procurementstart
2018-03-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-02-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-06-01T00:00:00.000
Totalfunding
$1,373,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Franklin Avenue and Crotona Park South
Parkid
X010
Latitude
40.835595
Longitude
-73.899722
Borough
Bronx
VIEW LOCATION
4691
Trackerid: 4691 • Fmsid: 846 P-1CRPOHS • Title: Crotona Park Bathhouse Entrance Reconstruction
Trackerid
4691
Fmsid
846 P-1CRPOHS
Title
Crotona Park Bathhouse Entrance Reconstruction
Summary
This project will reconstruct the entrance towers, mezzanine roof and bridge at the entrance to the Crotona Park Bathhouse.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-04-01T00:00:00.000
Designprojectedcompletion
2012-10-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2019-12-01T00:00:00.000
Constructionadjustedcompletion
2021-02-01T00:00:00.000
Constructionactualcompletion
2021-03-01T00:00:00.000
Totalfunding
$2,816,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fulton Avenue and East 173rd Street
Parkid
X010
Latitude
40.840615
Longitude
-73.898068
Borough
Bronx
VIEW LOCATION
6316
Trackerid: 6316 • Fmsid: 846 P-1CRPOFW • Title: Crotona Pool Wall and Fence Reconstruction
Trackerid
6316
Fmsid
846 P-1CRPOFW
Title
Crotona Pool Wall and Fence Reconstruction
Summary
This project will demolish and reconstruct the steel fence and perimeter wall around the pool in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-05-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2019-08-01T00:00:00.000
Constructionactualcompletion
2019-08-01T00:00:00.000
Totalfunding
$2,575,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fulton Avenue bewteen East 172nd Street and East 173rd Street
Parkid
X010
Latitude
40.839822
Longitude
-73.898543
Borough
Bronx
VIEW LOCATION
10232
Trackerid: 10232 • Fmsid: 846 P-103CPBT • Title: Crotona Park Tree Planting
Trackerid
10232
Fmsid
846 P-103CPBT
Title
Crotona Park Tree Planting
Summary
This project will plant trees in Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-07-01T00:00:00.000
Designprojectedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2024-09-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$137,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fulton Avenue, Crotona Park N, Crotona Park E, Crotona Park S.
Parkid
X010
Latitude
40.839014
Longitude
-73.893317
Borough
Bronx
VIEW LOCATION
10260
Trackerid: 10260 • Fmsid: 846 P-6GMBXGI • Title: Crotona Park Green Infrastructure Construction
Trackerid
10260
Fmsid
846 P-6GMBXGI
Title
Crotona Park Green Infrastructure Construction
Summary
This project will install green infrastructure within Crotona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-08-01T00:00:00.000
Designprojectedcompletion
2023-07-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$514,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
North of Claremont Pkwy and Fulton Ave Intersection
Parkid
X010
Latitude
40.840156
Longitude
-73.894915
Borough
Bronx
VIEW LOCATION
1435111
Trackerid: 1435111 • Fmsid: 846 P-1CRTMAL • Title: Crotona Parkway Malls Reconstruction
Trackerid
1435111
Fmsid
846 P-1CRTMAL
Title
Crotona Parkway Malls Reconstruction
Summary
This project will reconstruct pavements at Crotona Parkway Malls.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2022-10-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-04-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2022-11-01T00:00:00.000
Constructionactualcompletion
2022-11-01T00:00:00.000
Totalfunding
$558,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X011
Latitude
40.845376
Longitude
-73.884711
Borough
Bronx
VIEW LOCATION
1753111
Trackerid: 1753111 • Fmsid: 846 P-106CRTN • Title: Crotona Parkway Malls Reconstruction
Trackerid
1753111
Fmsid
846 P-106CRTN
Title
Crotona Parkway Malls Reconstruction
Summary
This project will reconstruct portions of the Crotona Parkway Malls.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-08-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2025-06-01T00:00:00.000
Constructionstart
2025-09-01T00:00:00.000
Constructionprojectedcom
2026-09-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$2,000,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
X011
Latitude
40.8441695
Longitude
-73.8851899
Borough
Bronx
VIEW LOCATION
6181
Trackerid: 6181 • Fmsid: 846 P-1CPMSGS • Title: Crotona Parkway Green Infrastructure Construction
Trackerid
6181
Fmsid
846 P-1CPMSGS
Title
Crotona Parkway Green Infrastructure Construction
Summary
This project will construct a stormwater greenstreet on Crotona Parkway between East 178th Street and East Tremont Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-09-01T00:00:00.000
Designprojectedcompletion
2013-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementactualcompletion
2014-10-01T00:00:00.000
Constructionstart
2014-10-01T00:00:00.000
Constructionprojectedcom
2015-07-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$294,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, Private
Name
East 178th Street and East Tremont Avenue
Parkid
X011
Latitude
40.843387
Longitude
-73.88532
Borough
Bronx
VIEW LOCATION
7289
Trackerid: 7289 • Fmsid: 846 P-404CROW • Title: Crowley Playground Reconstruction
Trackerid
7289
Fmsid
846 P-404CROW
Title
Crowley Playground Reconstruction
Summary
This project will reconstruct Crowley Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-08-01T00:00:00.000
Procurementstart
2022-08-01T00:00:00.000
Procurementprojectedcompletion
2023-05-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-07-01T00:00:00.000
Constructionstart
2024-08-01T00:00:00.000
Constructionprojectedcom
2025-08-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$3,770,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
57th Avenue at 83rd Street
Parkid
Q360J
Latitude
40.729645
Longitude
-73.879532
Borough
Queens
VIEW LOCATION
6122
Trackerid: 6122 • Fmsid: 846 P-4PLG13F • Title: Queens General Site Work (QG-1313M)
Trackerid
6122
Fmsid
846 P-4PLG13F
Title
Queens General Site Work (QG-1313M)
Summary
This project will reconstruct Frank O'Connor Playground, Crowley Playground, and Real Good Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-11-01T00:00:00.000
Constructionprojectedcom
2017-05-01T00:00:00.000
Constructionadjustedcompletion
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-02-01T00:00:00.000
Totalfunding
$1,925,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Queens Midtown Exwy., 57 Ave. bet. 84 St. and 82 St.
Parkid
Q360J
Latitude
40.729623
Longitude
-73.879659
Borough
Queens
VIEW LOCATION
6122
Trackerid: 6122 • Fmsid: 846 P-4PLG13F • Title: Queens General Site Work (QG-1313M)
Trackerid
6122
Fmsid
846 P-4PLG13F
Title
Queens General Site Work (QG-1313M)
Summary
This project will reconstruct Frank O'Connor Playground, Crowley Playground, and Real Good Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-11-01T00:00:00.000
Constructionprojectedcom
2017-05-01T00:00:00.000
Constructionadjustedcompletion
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-02-01T00:00:00.000
Totalfunding
$1,925,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Broadway, Woodside Ave. bet. 77 St. and Baxter Ave.
Parkid
Q098
Latitude
40.744275
Longitude
-73.886684
Borough
Queens
VIEW LOCATION
6122
Trackerid: 6122 • Fmsid: 846 P-4PLG13F • Title: Queens General Site Work (QG-1313M)
Trackerid
6122
Fmsid
846 P-4PLG13F
Title
Queens General Site Work (QG-1313M)
Summary
This project will reconstruct Frank O'Connor Playground, Crowley Playground, and Real Good Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-11-01T00:00:00.000
Constructionprojectedcom
2017-05-01T00:00:00.000
Constructionadjustedcompletion
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-02-01T00:00:00.000
Totalfunding
$1,925,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Horace Harding Exwy. Sr. Rd. S., 62 Ave. bet. 99 St. and 102 St.
Parkid
Q357B
Latitude
40.735446
Longitude
-73.857695
Borough
Queens
VIEW LOCATION
1251111
Trackerid: 1251111 • Fmsid: 846 P-4CUNNSL • Currentphase: completed
Trackerid
1251111
Fmsid
846 P-4CUNNSL
Title
Cunningham Park Redwood Playground Public Restroom Building Sewer Line Reconstruction
Summary
This project will reconstruct the sewer line of the public restroom building in Redwood Playground in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-01-01T00:00:00.000
Designprojectedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2020-12-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-07-01T00:00:00.000
Constructionactualcompletion
2021-11-01T00:00:00.000
Totalfunding
$350,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q021
Latitude
40.735336
Longitude
-73.768261
Borough
Queens
VIEW LOCATION
7254
Trackerid: 7254 • Fmsid: 846 P-4CUNPLG • Title: Cunningham Park Lower Redwood Playground Tot Lot Reconstruction
Trackerid
7254
Fmsid
846 P-4CUNPLG
Title
Cunningham Park Lower Redwood Playground Tot Lot Reconstruction
Summary
This project will reconstruct Lower Redwood Playground in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionadjustedcompletion
2020-04-01T00:00:00.000
Constructionactualcompletion
2020-04-01T00:00:00.000
Totalfunding
$1,837,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
193rd Street and Aberdeen Road
Parkid
Q021
Latitude
40.73925
Longitude
-73.765286
Borough
Queens
VIEW LOCATION
9195
Trackerid: 9195 • Fmsid: 846 P-4CPPLGD • Title: Cunningham Park Redwood Upper Playground Reconstruction
Trackerid
9195
Fmsid
846 P-4CPPLGD
Title
Cunningham Park Redwood Upper Playground Reconstruction
Summary
This project will reconstruct Redwood Upper Playground in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-06-01T00:00:00.000
Procurementstart
2020-06-01T00:00:00.000
Procurementprojectedcompletion
2021-03-01T00:00:00.000
Procurementadjustedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-10-01T00:00:00.000
Constructionactualcompletion
2023-10-01T00:00:00.000
Totalfunding
$3,622,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
193rd Street and Aberdeen Road and Radnor Road
Parkid
Q021
Latitude
40.726438556174
Longitude
-73.775154442449
Borough
Queens
VIEW LOCATION
9546
Trackerid: 9546 • Fmsid: 846 P-4CUN210 • Title: Cunningham Park 210th Street Playground Reconstruction
Trackerid
9546
Fmsid
846 P-4CUN210
Title
Cunningham Park 210th Street Playground Reconstruction
Summary
This project will reconstruct 210th Street Playground at Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-12-01T00:00:00.000
Designprojectedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2021-01-01T00:00:00.000
Procurementstart
2021-01-01T00:00:00.000
Procurementprojectedcompletion
2021-10-01T00:00:00.000
Procurementadjustedcompletion
2023-09-01T00:00:00.000
Procurementactualcompletion
2023-07-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionactualcompletion
2024-09-01T00:00:00.000
Totalfunding
$3,800,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
210th Street and 73rd Avenue
Parkid
Q021
Latitude
40.739309
Longitude
-73.765353
Borough
Queens
VIEW LOCATION
10303
Trackerid: 10303 • Title: Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction • Currentphase: completed
Trackerid
10303
Title
Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction
Summary
This project will reconstruct the spray shower area at Lower Redwood Playground in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designactualcompletion
2022-09-01T00:00:00.000
Procurementstart
2022-09-01T00:00:00.000
Procurementprojectedcompletion
2023-06-01T00:00:00.000
Procurementadjustedcompletion
2023-09-01T00:00:00.000
Procurementactualcompletion
2023-08-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2023-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Name
East side of Cunningham Park at 193rd Street and Aberdeen Road.
Parkid
Q021
Latitude
40.738989
Longitude
-73.772655
Borough
Queens
VIEW LOCATION
11077
Trackerid: 11077 • Title: Cunningham Park Ballfields 18 and 19 Reconstruction • Summary: This project will reconstruct the ballfields 18 and 19 at Cunningham Park.
Trackerid
11077
Title
Cunningham Park Ballfields 18 and 19 Reconstruction
Summary
This project will reconstruct the ballfields 18 and 19 at Cunningham Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Francis Lewis Boulevard north of 73rd Avenue
Parkid
Q021
Latitude
40.73523027
Longitude
-73.76949591
Borough
Queens
VIEW LOCATION
6486
Trackerid: 6486 • Fmsid: 846 P-408CPPA • Title: Cunningham Park Picnic Area Reconstruction and Performance Area Construction
Trackerid
6486
Fmsid
846 P-408CPPA
Title
Cunningham Park Picnic Area Reconstruction and Performance Area Construction
Summary
This project will reconstruct the picnic area and the adjacent pathways, and construct a performance area in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-04-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2016-04-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$2,506,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Grand Central Parkway between 193rd Street, Francis Lewis Boulevard, Hollis Hills Terrace and 210th Street.
Parkid
Q021
Latitude
40.729473
Longitude
-73.770314
Borough
Queens
VIEW LOCATION
11261
Trackerid: 11261 • Title: Cunningham Park Pickleball Court Construction and Parking Lot Reconstruction • Currentphase: proposed
Trackerid
11261
Title
Cunningham Park Pickleball Court Construction and Parking Lot Reconstruction
Summary
This project will reconstruct pickleball courts and reconstruct the parking lot on Hollis Hills Terrace in Cunningham Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council, State
Name
Hollis Hills Terrace near 73rd Avenue
Parkid
Q021
Latitude
40.73441044
Longitude
-73.76866908
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Horace Harding Expressway, Grand Central Parkway
Parkid
Q021
Latitude
40.734757
Longitude
-73.768316
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Underhill Avenue, Peck Avenue, 199 Street between Fresh Meadow Lane and Francis Lewis Bouelvard, Union Turnpike
Parkid
Q300A
Latitude
40.737211
Longitude
-73.773801
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Cloverdale-Hollis Court Boulevards, Kingsbury-Richland Avenues
Parkid
Q130
Latitude
40.736724
Longitude
-73.755357
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
LIE., 73 Ave., Union Turnpike, GCP bet. 193 St., Francis Lewis Blvd., Hollis Hills Ter., and 210 St.
Parkid
Q021
Latitude
40.735687
Longitude
-73.76924
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
58 Ave. bet. Brown Pl. and 69 St.
Parkid
Q360M
Latitude
40.724703
Longitude
-73.895263
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
52 St., Woodside Ave. bet. 39 Rd. and 39 Dr.
Parkid
Q031
Latitude
40.747507
Longitude
-73.910736
Borough
Queens
VIEW LOCATION
3157
Trackerid: 3157 • Fmsid: 846 P-408CPB2 • Title: Cunningham Park Ballfields 2-4 Reconstruction
Trackerid
3157
Fmsid
846 P-408CPB2
Title
Cunningham Park Ballfields 2-4 Reconstruction
Summary
This project will reconstruct ballfields 2, 3 and 4 in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-08-01T00:00:00.000
Designprojectedcompletion
2009-06-01T00:00:00.000
Designadjustedcompletion
2011-05-01T00:00:00.000
Designactualcompletion
2011-05-01T00:00:00.000
Procurementstart
2011-05-01T00:00:00.000
Procurementprojectedcompletion
2012-02-01T00:00:00.000
Procurementactualcompletion
2012-05-01T00:00:00.000
Constructionstart
2012-07-01T00:00:00.000
Constructionprojectedcom
2013-07-01T00:00:00.000
Constructionadjustedcompletion
2013-07-01T00:00:00.000
Constructionactualcompletion
2013-07-01T00:00:00.000
Totalfunding
$1,461,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Near Union Turnpike and 193rd Street.
Parkid
Q021
Latitude
40.729602
Longitude
-73.776011
Borough
Queens
VIEW LOCATION
8649
Trackerid: 8649 • Fmsid: 846 P-408CPGA • Title: Cunningham Park Garage Reconstruction
Trackerid
8649
Fmsid
846 P-408CPGA
Title
Cunningham Park Garage Reconstruction
Summary
This project will reconstruct the garage in Cunningham Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
57.25
Designstart
2018-11-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designadjustedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionadjustedcompletion
2026-12-01T00:00:00.000
Totalfunding
$41,294,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Union Turnpike and 199th Street
Parkid
Q021
Latitude
40.730905
Longitude
-73.771143
Borough
Queens
VIEW LOCATION
9821
Trackerid: 9821 • Fmsid: 846 P-202CUGP • Title: Cuyler Gore Park Reconstruction
Trackerid
9821
Fmsid
846 P-202CUGP
Title
Cuyler Gore Park Reconstruction
Summary
This project will reconstruct the entrances, playground and passive recreation area at Cuyler Gore Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2023-02-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-07-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$5,600,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Carlton Avenue, Fulton Street, Greene Avenue
Parkid
B026
Latitude
40.685788
Longitude
-73.971849
Borough
Brooklyn
VIEW LOCATION
7083
Trackerid: 7083 • Fmsid: 846 P-205CYPS • Title: Cypress Hills Playground Synthetic Turf Field Construction
Trackerid
7083
Fmsid
846 P-205CYPS
Title
Cypress Hills Playground Synthetic Turf Field Construction
Summary
This project will construct a new synthetic turf multi-purpose athletic field to replace an existing natural turf field at Cypress Hills Playground. The work will include a new perimeter recreation path, reconstructed dugouts, drinking fountains and misting stations.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$5,464,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Euclid Avenue, Blake Avenue, Dumont Avenue
Parkid
B103
Latitude
40.67044361
Longitude
-73.87168111
Borough
Brooklyn
VIEW LOCATION