Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
7084
Trackerid: 7084 • Fmsid: 846 P-212DMPG • Title: Dome Playground Basketball and Handball Courts Reconstruction
Trackerid
7084
Fmsid
846 P-212DMPG
Title
Dome Playground Basketball and Handball Courts Reconstruction
Summary
This project will reconstruct the basketball & handball courts located in Dome Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designadjustedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionactualcompletion
2018-03-01T00:00:00.000
Totalfunding
$1,231,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Dahill Road & 38th Street
Parkid
B151
Latitude
40.638241
Longitude
-73.980247
Borough
Brooklyn
VIEW LOCATION
1029
Trackerid: 1029 • Fmsid: 846 P-212DOME • Title: Dome Playground Play Area and Lawn Reconstruction
Trackerid
1029
Fmsid
846 P-212DOME
Title
Dome Playground Play Area and Lawn Reconstruction
Summary
This project will reconstruct the play area and lawn at Dome Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designprojectedcompletion
2013-06-01T00:00:00.000
Designactualcompletion
2014-05-01T00:00:00.000
Procurementstart
2014-05-01T00:00:00.000
Procurementprojectedcompletion
2015-02-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionadjustedcompletion
2016-05-01T00:00:00.000
Constructionactualcompletion
2016-04-01T00:00:00.000
Totalfunding
$2,114,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Dahill Road and 38th Street
Parkid
B151
Latitude
40.638532
Longitude
-73.980517
Borough
Brooklyn
VIEW LOCATION
9538
Trackerid: 9538 • Fmsid: 846 P-5DONGAN • Title: Dongan Playground Reconstruction
Trackerid
9538
Fmsid
846 P-5DONGAN
Title
Dongan Playground Reconstruction
Summary
This project will reconstruct the play area and sidewalks at Dongan Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-01-01T00:00:00.000
Designprojectedcompletion
2021-01-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2023-02-01T00:00:00.000
Procurementadjustedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2023-12-01T00:00:00.000
Constructionstart
2024-03-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$2,815,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Dongan Hills Avenue, Mason Avenue, Buel Avenue
Parkid
R087
Latitude
40.582963
Longitude
-74.089357
Borough
Staten Island
VIEW LOCATION
11083
Trackerid: 11083 • Fmsid: 846 P-502DNGN • Title: Dongan Playground Multipurpose Play Area and Sports Courts Reconstruction
Trackerid
11083
Fmsid
846 P-502DNGN
Title
Dongan Playground Multipurpose Play Area and Sports Courts Reconstruction
Summary
This project will reconstruct the handball courts, basketball courts, multipurpose play area, landscaping, seating area and security lighting in Dongan Playground.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2027-03-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Mason Avenue and Dongan Hills Avenue
Parkid
R087
Latitude
40.58256772
Longitude
-74.089482
Borough
Staten Island
VIEW LOCATION
8837
Trackerid: 8837 • Fmsid: 846 P-402DBOY • Title: Doughboy Plaza Seating Area Reconstruction
Trackerid
8837
Fmsid
846 P-402DBOY
Title
Doughboy Plaza Seating Area Reconstruction
Summary
This project will reconstruct the seating area surrounding the monument at Doughboy Plaza, including the drinking fountain and pathways.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-09-01T00:00:00.000
Designprojectedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-09-01T00:00:00.000
Totalfunding
$1,742,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Woodside Avenue between 54th Street and 56th Street
Parkid
Q031A
Latitude
40.746489
Longitude
-73.909029
Borough
Queens
VIEW LOCATION
5923
Trackerid: 5923 • Fmsid: 846 P-413COMM • Title: Douglaston Golf Course Net Barrier Installation
Trackerid
5923
Fmsid
846 P-413COMM
Title
Douglaston Golf Course Net Barrier Installation
Summary
This project will install net fencing at Douglaston Park Golf Course.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-04-01T00:00:00.000
Designprojectedcompletion
2013-01-01T00:00:00.000
Designactualcompletion
2013-03-01T00:00:00.000
Procurementstart
2013-03-01T00:00:00.000
Procurementprojectedcompletion
2013-12-01T00:00:00.000
Procurementactualcompletion
2013-12-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionactualcompletion
2014-07-01T00:00:00.000
Totalfunding
$175,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Commonwealth Boulevard between Grand Central Parkway and 246th Street.
Parkid
Q411
Latitude
40.75186472
Longitude
-73.73265972
Borough
Queens
VIEW LOCATION
10439
Trackerid: 10439 • Fmsid: 846 P-412CRDP • Title: Dr. Charles Drew Park Natural Turf Field Reconstruction
Trackerid
10439
Fmsid
846 P-412CRDP
Title
Dr. Charles Drew Park Natural Turf Field Reconstruction
Summary
This project will reconstruct the natural turf fields, security lighting and sidewalks at Dr. Charles Drew Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-09-01T00:00:00.000
Designprojectedcompletion
2025-04-01T00:00:00.000
Designadjustedcompletion
2025-09-01T00:00:00.000
Designactualcompletion
2025-10-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
139-05 116th Avenue
Parkid
Q220C
Latitude
40.68081918
Longitude
-73.80274069
Borough
Queens
VIEW LOCATION
10982
Trackerid: 10982 • Fmsid: 846 P-3CPIMCN • Title: Dr. Ronald E. McNair Playground Reconstruction
Trackerid
10982
Fmsid
846 P-3CPIMCN
Title
Dr. Ronald E. McNair Playground Reconstruction
Summary
This project will reconstruct Dr. Ronald E. McNair Playground.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 122nd Street between Lexington Avenue and 3rd Avenue.
Parkid
M285
Latitude
40.80252832
Longitude
-73.93812355
Borough
Manhattan
VIEW LOCATION
6832
Trackerid: 6832 • Fmsid: 846 NDF-DVDSO • Title: Davidson Park Construction
Trackerid
6832
Fmsid
846 NDF-DVDSO
Title
Davidson Park Construction
Summary
This project will construct Davidson Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-12-01T00:00:00.000
Designprojectedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2021-01-01T00:00:00.000
Procurementstart
2021-01-01T00:00:00.000
Procurementprojectedcompletion
2021-10-01T00:00:00.000
Procurementadjustedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2022-11-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$9,799,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
1801 Davidson Avenue between West 176th Street and West 177th Street
Parkid
X367
Latitude
40.849555
Longitude
-73.912471
Borough
Bronx
VIEW LOCATION
11306
Trackerid: 11306 • Title: Drew Playground Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
11306
Title
Drew Playground Public Restroom Building Reconstruction
Summary
This project will demolish the existing public restroom building and construct a new public restroom building at Drew Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Federal
Name
Fulton Avenue between East 169th Street and East 170th Street
Parkid
X021
Latitude
40.83297883
Longitude
-73.90333433
Borough
Bronx
VIEW LOCATION
9190
Trackerid: 9190 • Fmsid: 846 P-103DPLS • Title: Drew Playground Park Security Lighting Construction
Trackerid
9190
Fmsid
846 P-103DPLS
Title
Drew Playground Park Security Lighting Construction
Summary
This project will construct new park security lighting in Drew Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-08-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2018-12-01T00:00:00.000
Procurementstart
2018-12-01T00:00:00.000
Procurementprojectedcompletion
2019-09-01T00:00:00.000
Procurementadjustedcompletion
2020-01-01T00:00:00.000
Procurementactualcompletion
2020-01-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2021-12-01T00:00:00.000
Constructionactualcompletion
2021-12-01T00:00:00.000
Totalfunding
$433,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fulton Avenue between East 169th Street and East 170th Street
Parkid
X021
Latitude
40.83332
Longitude
-73.903385
Borough
Bronx
VIEW LOCATION
1213111
Trackerid: 1213111 • Fmsid: 846 P-3DDOKPL • Title: Dry Dock Pool Deck Reconstruction
Trackerid
1213111
Fmsid
846 P-3DDOKPL
Title
Dry Dock Pool Deck Reconstruction
Summary
This project will reconstruct the pool deck at Dry Dock Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-09-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designadjustedcompletion
2021-12-01T00:00:00.000
Designactualcompletion
2021-09-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2021-09-01T00:00:00.000
Constructionstart
2021-11-01T00:00:00.000
Constructionprojectedcom
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,200,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M270
Latitude
40.725552
Longitude
-73.975359
Borough
Manhattan
VIEW LOCATION
2181
Trackerid: 2181 • Fmsid: 846 P-302DRYD • Title: Dry Dock Playground Reconstruction
Trackerid
2181
Fmsid
846 P-302DRYD
Title
Dry Dock Playground Reconstruction
Summary
This project will reconstruct the play equipment and security lighting at Dry Dock Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-01-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$1,557,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Szold Place, Avenue D and East 10th Street
Parkid
M270
Latitude
40.72546083
Longitude
-73.97545556
Borough
Manhattan
VIEW LOCATION
11127
Trackerid: 11127 • Title: Duane Park Reconstruction • Summary: This project will reconstruct Duane Park.
Trackerid
11127
Title
Duane Park Reconstruction
Summary
This project will reconstruct Duane Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Duane Street between Hudson Street and Staple Street
Parkid
M025
Latitude
40.71718825
Longitude
-74.00942247
Borough
Manhattan
VIEW LOCATION
6153
Trackerid: 6153 • Fmsid: 846 P-4PLG13K • Currentphase: completed
Trackerid
6153
Fmsid
846 P-4PLG13K
Title
Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction
Summary
This project will reconstruct Dunningham Triangle and the basketball court and spray shower at Playground Ninety.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-07-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$562,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
82nd Street, Baxter Avenue to Ithaca Street
Parkid
Q058
Latitude
40.746341
Longitude
-73.883603
Borough
Queens
VIEW LOCATION
6153
Trackerid: 6153 • Fmsid: 846 P-4PLG13K • Currentphase: completed
Trackerid
6153
Fmsid
846 P-4PLG13K
Title
Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction
Summary
This project will reconstruct Dunningham Triangle and the basketball court and spray shower at Playground Ninety.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-07-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$562,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
90th Street between Northern Boulevard & 32 Avenue
Parkid
Q362
Latitude
40.757415
Longitude
-73.878565
Borough
Queens
VIEW LOCATION
1398111
Trackerid: 1398111 • Fmsid: 846 P-6SUSTN1 • Title: Dutch Kills Playground Ballfield Lighting Reconstruction
Trackerid
1398111
Fmsid
846 P-6SUSTN1
Title
Dutch Kills Playground Ballfield Lighting Reconstruction
Summary
This project will reconstruct the ballfield lighting at Dutch Kills Playground with energy-efficient LED fixtures.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-12-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-12-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2024-04-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$140,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q218
Latitude
40.757257
Longitude
-73.93326
Borough
Queens
VIEW LOCATION
1745111
Trackerid: 1745111 • Fmsid: 846 P-401DKPG • Title: Dutch Kills Playground Multipurpose Play Area Reconstruction
Trackerid
1745111
Fmsid
846 P-401DKPG
Title
Dutch Kills Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in Dutch Kills Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-09-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$900,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q218
Latitude
40.7571684
Longitude
-73.9332197
Borough
Queens
VIEW LOCATION
8488
Trackerid: 8488 • Fmsid: 846 P-401DKLL • Title: Dutch Kills Playground and Court Area Reconstruction
Trackerid
8488
Fmsid
846 P-401DKLL
Title
Dutch Kills Playground and Court Area Reconstruction
Summary
This project will reconstruct the playground and court area in Dutch Kills Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designadjustedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-05-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-04-01T00:00:00.000
Constructionstart
2018-05-01T00:00:00.000
Constructionprojectedcom
2019-05-01T00:00:00.000
Constructionactualcompletion
2019-05-01T00:00:00.000
Totalfunding
$2,924,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Crescent Street, 28th Street, 36th Avenue, 37th Avenue
Parkid
Q218
Latitude
40.757882
Longitude
-73.933262
Borough
Queens
VIEW LOCATION
8514
Trackerid: 8514 • Fmsid: 846 P-4DUTCH1 • Title: Dutch Kills Playground Public Restroom Building Reconstruction
Trackerid
8514
Fmsid
846 P-4DUTCH1
Title
Dutch Kills Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Building at Dutch Kills Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2017-05-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$1,439,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Crescent Street, 28th Street, 36th Avenue, 37th Avenue
Parkid
Q218
Latitude
40.757094
Longitude
-73.933181
Borough
Queens
VIEW LOCATION
1980111
Trackerid: 1980111 • Fmsid: 846 P-210DBPP • Currentphase: design-procurement
Trackerid
1980111
Fmsid
846 P-210DBPP
Title
Dyker Beach Park Path, Tennis, Handball and Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the paths, tennis court, handball court and multipurpose play area in Dyker Beach Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2026-08-01T00:00:00.000
Designprojectedcompletion
2026-10-01T00:00:00.000
Procurementstart
2026-09-01T00:00:00.000
Procurementprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B028
Latitude
40.6123562
Longitude
-74.0158768
Borough
Brooklyn
VIEW LOCATION
1402111
Trackerid: 1402111 • Fmsid: 846 P-6SUSTN1 • Title: Dyker Beach Park Ballfield Lighting Reconstruction
Trackerid
1402111
Fmsid
846 P-6SUSTN1
Title
Dyker Beach Park Ballfield Lighting Reconstruction
Summary
This project will reconstruct the ballfield lighting at Dyker Beach Park with energy-efficient LED fixtures.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-12-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-12-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2024-03-01T00:00:00.000
Constructionprojectedcom
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$149,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B028
Latitude
40.613908
Longitude
-74.018702
Borough
Brooklyn
VIEW LOCATION
1537111
Trackerid: 1537111 • Fmsid: 846 P-210DBPK • Title: Dyker Beach Park Synthetic Turf Fields Reconstruction
Trackerid
1537111
Fmsid
846 P-210DBPK
Title
Dyker Beach Park Synthetic Turf Fields Reconstruction
Summary
This project will reconstruct the synthetic turf fields at Dyker Beach Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2024-08-01T00:00:00.000
Procurementprojectedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2024-11-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2025-07-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$1,604,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B028
Latitude
40.61154
Longitude
-74.015147
Borough
Brooklyn
VIEW LOCATION
1559111
Trackerid: 1559111 • Fmsid: 846 P-210DBPP • Currentphase: construction
Trackerid
1559111
Fmsid
846 P-210DBPP
Title
Dyker Beach Park Path, Tennis, Handball and Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the paths, tennis court, handball court and multipurpose play area in Dyker Beach Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-03-01T00:00:00.000
Procurementprojectedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2026-05-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
$5,180,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B028
Latitude
40.611437
Longitude
-74.015475
Borough
Brooklyn
VIEW LOCATION
9512
Trackerid: 9512 • Fmsid: 846 P-2BKPLG1 • Title: Brooklyn Multipurpose Play Areas Reconstruction
Trackerid
9512
Fmsid
846 P-2BKPLG1
Title
Brooklyn Multipurpose Play Areas Reconstruction
Summary
This project will reconstruct the multipurpose play areas at Dyker Playground in Dyker Beach Park, Patrick O'Rourke Playground and Wilson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-09-01T00:00:00.000
Procurementprojectedcompletion
2021-06-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$3,798,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
14 Avenue & 86 Street
Parkid
B028
Latitude
40.613305
Longitude
-74.013754
Borough
Brooklyn
VIEW LOCATION
9512
Trackerid: 9512 • Fmsid: 846 P-2BKPLG1 • Title: Brooklyn Multipurpose Play Areas Reconstruction
Trackerid
9512
Fmsid
846 P-2BKPLG1
Title
Brooklyn Multipurpose Play Areas Reconstruction
Summary
This project will reconstruct the multipurpose play areas at Dyker Playground in Dyker Beach Park, Patrick O'Rourke Playground and Wilson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-09-01T00:00:00.000
Procurementprojectedcompletion
2021-06-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$3,798,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
80 to 81 Streets, 11 to 12 Avenues
Parkid
B282
Latitude
40.619042
Longitude
-74.013834
Borough
Brooklyn
VIEW LOCATION
9512
Trackerid: 9512 • Fmsid: 846 P-2BKPLG1 • Title: Brooklyn Multipurpose Play Areas Reconstruction
Trackerid
9512
Fmsid
846 P-2BKPLG1
Title
Brooklyn Multipurpose Play Areas Reconstruction
Summary
This project will reconstruct the multipurpose play areas at Dyker Playground in Dyker Beach Park, Patrick O'Rourke Playground and Wilson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-09-01T00:00:00.000
Procurementprojectedcompletion
2021-06-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$3,798,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Avenues J & K, East 100 to East 101 Streets
Parkid
B279
Latitude
40.642483
Longitude
-73.894762
Borough
Brooklyn
VIEW LOCATION
7230
Trackerid: 7230 • Fmsid: 846 P-210DBSF • Title: Dyker Beach Park Synthetic Turf Soccer Field Reconstruction
Trackerid
7230
Fmsid
846 P-210DBSF
Title
Dyker Beach Park Synthetic Turf Soccer Field Reconstruction
Summary
This project will reconstruct the existing synthetic turf soccer field, bleachers, and drinking fountain at Dyker Beach Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-02-01T00:00:00.000
Designprojectedcompletion
2016-08-01T00:00:00.000
Designadjustedcompletion
2016-09-01T00:00:00.000
Designactualcompletion
2016-09-01T00:00:00.000
Procurementstart
2016-09-01T00:00:00.000
Procurementprojectedcompletion
2017-06-01T00:00:00.000
Procurementadjustedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$1,697,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
14th Avenue between Benson Avenue and Bath Avenue
Parkid
B028
Latitude
40.611335
Longitude
-74.015473
Borough
Brooklyn
VIEW LOCATION
10781
Trackerid: 10781 • Fmsid: 846 P-210DBDM • Title: Dyker Beach Park Bleachers Reconstruction
Trackerid
10781
Fmsid
846 P-210DBDM
Title
Dyker Beach Park Bleachers Reconstruction
Summary
This project will reconstruct the bleachers at Dyker Beach Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-04-01T00:00:00.000
Designprojectedcompletion
2026-04-01T00:00:00.000
Designactualcompletion
2026-04-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
86th Street and Belt Parkway between 14th Avenue and 7th Avenue
Parkid
B028
Latitude
40.606909
Longitude
-74.0227729
Borough
Brooklyn
VIEW LOCATION
8816
Trackerid: 8816 • Fmsid: 846 P-5PRESPL • Title: Prescott Playground Reconstruction
Trackerid
8816
Fmsid
846 P-5PRESPL
Title
Prescott Playground Reconstruction
Summary
This project will reconstruct Prescott Playground, including fencing, retaining walls, play equipment, and pavements.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-06-01T00:00:00.000
Totalfunding
$3,741,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Irvington Street and Edith Avenue
Parkid
R085
Latitude
40.522604
Longitude
-74.186091
Borough
Staten Island
VIEW LOCATION
10631
Trackerid: 10631 • Fmsid: 846 P-1CPIEJM • Title: Eae J. Mitchell Park Reconstruction
Trackerid
10631
Fmsid
846 P-1CPIEJM
Title
Eae J. Mitchell Park Reconstruction
Summary
This project will reconstruct the plaza in Eae J. Mitchell Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-01-01T00:00:00.000
Designprojectedcompletion
2026-01-01T00:00:00.000
Designadjustedcompletion
2026-06-01T00:00:00.000
Designactualcompletion
2026-08-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
E. 174th Street and Longfellow Avenue
Parkid
X267
Latitude
40.83648758
Longitude
-73.88439031
Borough
Bronx
VIEW LOCATION
1381111
Trackerid: 1381111 • Fmsid: 846 EXPENS121 • Title: East River Esplanade Pavement Reconstruction
Trackerid
1381111
Fmsid
846 EXPENS121
Title
East River Esplanade Pavement Reconstruction
Summary
This project will reconstruct sections of pavement along the East River Esplanade between East 100th Street and East 101st Street and at East 107th Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-08-01T00:00:00.000
Designprojectedcompletion
2022-07-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-08-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2021-10-01T00:00:00.000
Constructionstart
2021-12-01T00:00:00.000
Constructionprojectedcom
2022-12-01T00:00:00.000
Constructionactualcompletion
2021-12-01T00:00:00.000
Totalfunding
$160,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M108T01
Latitude
40.78929
Longitude
-73.937169
Borough
Manhattan
VIEW LOCATION
6274
Trackerid: 6274 • Fmsid: 846 SANDY3-17 • Title: Glick Park Electrical Systems Reconstruction (Hurricane Sandy)
Trackerid
6274
Fmsid
846 SANDY3-17
Title
Glick Park Electrical Systems Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the electrical systems at Glick Park due to damage from Hurricane Sandy.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-11-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designadjustedcompletion
2017-03-01T00:00:00.000
Designactualcompletion
2017-04-01T00:00:00.000
Procurementstart
2017-04-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$693,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
East River between East 36th and East 38th Streets
Parkid
M289
Latitude
40.7449775
Longitude
-73.97050194
Borough
Manhattan
VIEW LOCATION
9368
Trackerid: 9368 • Fmsid: 846 P-308ERP2 • Title: East River Esplanade Stabilization and Reconstruction Phase 2
Trackerid
9368
Fmsid
846 P-308ERP2
Title
East River Esplanade Stabilization and Reconstruction Phase 2
Summary
This project will stabilize and reconstruct portions of the East River Esplanade.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
15.5
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designadjustedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$47,804,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East River Esplanade between East 96th Street and East 125th Street
Parkid
M108T01
Latitude
40.79391183
Longitude
-73.93156536
Borough
Manhattan
VIEW LOCATION
9375
Trackerid: 9375 • Fmsid: 846 P-306GLIC • Title: East River Esplanade East 36th-38th Streets Seawall Reconstruction
Trackerid
9375
Fmsid
846 P-306GLIC
Title
East River Esplanade East 36th-38th Streets Seawall Reconstruction
Summary
This project will reconstruct the seawall and waterfront infrastructure at the East River Esplanade .
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
40.0
Constructionpercentcomplete
0.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2024-06-01T00:00:00.000
Designactualcompletion
2024-06-01T00:00:00.000
Procurementstart
2026-07-01T00:00:00.000
Procurementprojectedcompletion
2027-07-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
FDR Drive between East 36th and East 38th Streets
Parkid
M289
Latitude
40.74594538
Longitude
-73.96948623
Borough
Manhattan
VIEW LOCATION
1136111
Trackerid: 1136111 • Fmsid: 846 P-3PEDB81 • Title: John Finley Walk 82nd Street ADA Ramp Reconstruction
Trackerid
1136111
Fmsid
846 P-3PEDB81
Title
John Finley Walk 82nd Street ADA Ramp Reconstruction
Summary
This project will construct a masonry ramp to provide ADA access to John Finley Walk at East 82nd Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-08-01T00:00:00.000
Designprojectedcompletion
2019-08-01T00:00:00.000
Designactualcompletion
2019-06-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-05-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$224,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M108T
Latitude
40.766146
Longitude
-73.951015
Borough
Manhattan
VIEW LOCATION
1299111
Trackerid: 1299111 • Fmsid: 846 P-6RETW18 • Title: East River Esplanade East 76th Street Seawall Reconstruction
Trackerid
1299111
Fmsid
846 P-6RETW18
Title
East River Esplanade East 76th Street Seawall Reconstruction
Summary
This project will reconstruct the seawall, fill sinkholes, and restore the walking surface along the East River Esplanade at East 76th Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-07-01T00:00:00.000
Designprojectedcompletion
2021-07-01T00:00:00.000
Designactualcompletion
2021-01-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementactualcompletion
2020-10-01T00:00:00.000
Constructionstart
2020-08-01T00:00:00.000
Constructionprojectedcom
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$875,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M108T
Latitude
40.768335
Longitude
-73.949222
Borough
Manhattan
VIEW LOCATION
1931111
Trackerid: 1931111 • Fmsid: 846 P-6RETW23 • Title: East River Esplanade Seawall Reconstruction
Trackerid
1931111
Fmsid
846 P-6RETW23
Title
East River Esplanade Seawall Reconstruction
Summary
This project will reconstruct a seawall along the East River at East 70th Street along the East River Esplanade.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-08-01T00:00:00.000
Designprojectedcompletion
2025-08-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M108T
Latitude
40.7655518
Longitude
-73.9514928
Borough
Manhattan
VIEW LOCATION
8633
Trackerid: 8633 • Fmsid: 846 P-308EREI • Title: East River Esplanade Reconstruction, East 68th-70th Streets
Trackerid
8633
Fmsid
846 P-308EREI
Title
East River Esplanade Reconstruction, East 68th-70th Streets
Summary
This project will reconstruct the East River Esplanade from East 68th Street to East 70th Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2019-07-01T00:00:00.000
Procurementstart
2019-07-01T00:00:00.000
Procurementprojectedcompletion
2020-04-01T00:00:00.000
Procurementadjustedcompletion
2021-01-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-05-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,859,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
between the East River and FDR Drive, East 68th Street to East 70th Street
Parkid
M108T
Latitude
40.763887
Longitude
-73.953124
Borough
Manhattan
VIEW LOCATION
10474
Trackerid: 10474 • Fmsid: 846 P-413ESPG • Title: East Springfield Playground Reconstruction
Trackerid
10474
Fmsid
846 P-413ESPG
Title
East Springfield Playground Reconstruction
Summary
This project will reconstruct East Springfield playground.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2023-07-01T00:00:00.000
Designprojectedcompletion
2025-02-01T00:00:00.000
Designactualcompletion
2025-03-01T00:00:00.000
Procurementstart
2026-01-01T00:00:00.000
Procurementprojectedcompletion
2027-01-01T00:00:00.000
Constructionstart
2026-10-01T00:00:00.000
Constructionprojectedcom
2027-12-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
115th Road between 218th Street and 219th Street
Parkid
Q404
Latitude
40.69874997
Longitude
-73.74001096
Borough
Queens
VIEW LOCATION
10109
Trackerid: 10109 • Fmsid: 846 P-111ESPG • Title: Eastchester Playground Reconstruction
Trackerid
10109
Fmsid
846 P-111ESPG
Title
Eastchester Playground Reconstruction
Summary
This project will reconstruct the playground and handball courts in Eastchester Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-12-01T00:00:00.000
Designprojectedcompletion
2022-12-01T00:00:00.000
Designadjustedcompletion
2023-04-01T00:00:00.000
Designactualcompletion
2023-04-01T00:00:00.000
Procurementstart
2023-04-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementadjustedcompletion
2025-02-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2025-10-01T00:00:00.000
Totalfunding
$5,943,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Adee Avenue and Tenbroeck Ave
Parkid
X156
Latitude
40.869797
Longitude
-73.852829
Borough
Bronx
VIEW LOCATION
10968
Trackerid: 10968 • Title: Eastchester Playground Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
10968
Title
Eastchester Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Eastchester Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Adee Avenue at Tenbroeck Avenue
Parkid
X156
Latitude
40.86976709
Longitude
-73.85271018
Borough
Bronx
VIEW LOCATION
6824
Trackerid: 6824 • Fmsid: 846 P-1EDENPG • Title: Edenwald Playground Basketball Courts and Mini Pool Reconstruction
Trackerid
6824
Fmsid
846 P-1EDENPG
Title
Edenwald Playground Basketball Courts and Mini Pool Reconstruction
Summary
This project will reconstruct the basketball courts, demolish the existing above-ground mini-pool and construct a new in-ground mini-pool at Edenwald Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-10-01T00:00:00.000
Designprojectedcompletion
2016-10-01T00:00:00.000
Designadjustedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-07-01T00:00:00.000
Procurementstart
2020-07-01T00:00:00.000
Procurementprojectedcompletion
2021-03-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-08-01T00:00:00.000
Constructionstart
2022-11-01T00:00:00.000
Constructionprojectedcom
2024-02-01T00:00:00.000
Constructionadjustedcompletion
2024-05-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$4,216,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Schieffelin Avenue between East 225th and East 229th Streets
Parkid
X165
Latitude
40.884128
Longitude
-73.84553
Borough
Bronx
VIEW LOCATION
1088111
Trackerid: 1088111 • Fmsid: 846 P-6BLGC15 • Title: Ehrenreich-Austin Playground Public Restroom Building Reconstruction
Trackerid
1088111
Fmsid
846 P-6BLGC15
Title
Ehrenreich-Austin Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Ehrenreich-Austin Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$316,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
Q304
Latitude
40.715776
Longitude
-73.837056
Borough
Queens
VIEW LOCATION
8873
Trackerid: 8873 • Fmsid: 846 P-409EQTY • Title: Equity Park Playground Reconstruction
Trackerid
8873
Fmsid
846 P-409EQTY
Title
Equity Park Playground Reconstruction
Summary
This project will reconstruct Equity Park Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
90th Street between 88th and 89th Avenues
Parkid
Q053
Latitude
40.691303
Longitude
-73.853387
Borough
Queens
VIEW LOCATION
1090111
Trackerid: 1090111 • Fmsid: 846 P-6PBBP15 • Currentphase: completed
Trackerid
1090111
Fmsid
846 P-6PBBP15
Title
Ehrenreich-Austin Playground Public Restroom Building Plumbing System Reconstruction
Summary
This project will reconstruct the plumbing system of the public restroom building in Ehrenreich-Austin Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionadjustedcompletion
2018-12-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$100,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
Q304
Latitude
40.715806
Longitude
-73.837051
Borough
Queens
VIEW LOCATION
1092111
Trackerid: 1092111 • Fmsid: 846 P-6ELBR15 • Currentphase: completed
Trackerid
1092111
Fmsid
846 P-6ELBR15
Title
Ehrenreich-Austin Playground Public Restroom Building Electrical System Reconstruction
Summary
This project will reconstruct the electrical system of the public restroom building in Ehrenreich-Austin Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-10-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionadjustedcompletion
2018-12-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$50,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
Q304
Latitude
40.715782
Longitude
-73.837082
Borough
Queens
VIEW LOCATION
7133
Trackerid: 7133 • Fmsid: 846 P-4PLG15C • Title: Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Trackerid
7133
Fmsid
846 P-4PLG15C
Title
Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Summary
This project will reconstruct the play areas at Ehrenreich-Austin Playground, Utopia Playground, and Giovannelli Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-03-01T00:00:00.000
Procurementstart
2016-03-01T00:00:00.000
Procurementprojectedcompletion
2016-11-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionactualcompletion
2017-12-01T00:00:00.000
Totalfunding
$2,142,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Austin Street between 76 Avenue & 76 Drive
Parkid
Q304
Latitude
40.715708
Longitude
-73.837094
Borough
Queens
VIEW LOCATION
7133
Trackerid: 7133 • Fmsid: 846 P-4PLG15C • Title: Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Trackerid
7133
Fmsid
846 P-4PLG15C
Title
Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Summary
This project will reconstruct the play areas at Ehrenreich-Austin Playground, Utopia Playground, and Giovannelli Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-03-01T00:00:00.000
Procurementstart
2016-03-01T00:00:00.000
Procurementprojectedcompletion
2016-11-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionactualcompletion
2017-12-01T00:00:00.000
Totalfunding
$2,142,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Myrtle Avenue, Union Turnpike, Park Lane South
Parkid
Q015
Latitude
40.698974
Longitude
-73.847749
Borough
Queens
VIEW LOCATION
7133
Trackerid: 7133 • Fmsid: 846 P-4PLG15C • Title: Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Trackerid
7133
Fmsid
846 P-4PLG15C
Title
Austin, Giovanelli, and Utopia Playgrounds Reconstruction
Summary
This project will reconstruct the play areas at Ehrenreich-Austin Playground, Utopia Playground, and Giovannelli Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-03-01T00:00:00.000
Procurementstart
2016-03-01T00:00:00.000
Procurementprojectedcompletion
2016-11-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionactualcompletion
2017-12-01T00:00:00.000
Totalfunding
$2,142,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Utopia Parkway & 73rd Avenue
Parkid
Q294
Latitude
40.730779
Longitude
-73.792227
Borough
Queens
VIEW LOCATION