Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
11305
Trackerid: 11305 • Title: El Shabazz Playground Reconstruction • Summary: This project will reconstruct El Shabazz Playground.
Trackerid
11305
Title
El Shabazz Playground Reconstruction
Summary
This project will reconstruct El Shabazz Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Macdonough Street between Malcolm X Boulevard and Stuyvesant Avenue
Parkid
B313
Latitude
40.6828372
Longitude
-73.93013279
Borough
Brooklyn
VIEW LOCATION
1942111
Trackerid: 1942111 • Fmsid: 846 P-2BKPAV2 • Title: Eleanor Roosevelt Playground Pavement Reconstruction
Trackerid
1942111
Fmsid
846 P-2BKPAV2
Title
Eleanor Roosevelt Playground Pavement Reconstruction
Summary
This project will reconstruct paved surfaces at Eleanor Roosevelt Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2026-05-01T00:00:00.000
Designprojectedcompletion
2026-08-01T00:00:00.000
Designactualcompletion
2026-09-01T00:00:00.000
Procurementstart
2026-05-01T00:00:00.000
Procurementprojectedcompletion
2026-10-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2026-12-01T00:00:00.000
Totalfunding
$500,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, Borough President, City Council, State
Parkid
B359
Latitude
40.6928211
Longitude
-73.9354645
Borough
Brooklyn
VIEW LOCATION
1981111
Trackerid: 1981111 • Fmsid: 846 P-2BKPAV2 • Title: Eleanor Roosevelt Playground Pavement Reconstruction
Trackerid
1981111
Fmsid
846 P-2BKPAV2
Title
Eleanor Roosevelt Playground Pavement Reconstruction
Summary
This project will reconstruct paved surfaces at Eleanor Roosevelt Playground.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2026-08-01T00:00:00.000
Designprojectedcompletion
2026-10-01T00:00:00.000
Procurementstart
2026-09-01T00:00:00.000
Procurementprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B359
Latitude
40.6927779
Longitude
-73.9352176
Borough
Brooklyn
VIEW LOCATION
10780
Trackerid: 10780 • Fmsid: 846 P-203SBIP • Title: Eleanor Roosevelt Playground Reconstruction
Trackerid
10780
Fmsid
846 P-203SBIP
Title
Eleanor Roosevelt Playground Reconstruction
Summary
This project will reconstruct Eleanor Roosevelt Playground.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-12-01T00:00:00.000
Designprojectedcompletion
2026-06-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Kosciuszko Street between Lewis Avenue and Stuyvesant Avenue
Parkid
B359
Latitude
40.69276047
Longitude
-73.93522516
Borough
Brooklyn
VIEW LOCATION
8713
Trackerid: 8713 • Fmsid: 846 GQQNGI-01 • Title: Queens Green Infrastructure Construction (QG-518M)
Trackerid
8713
Fmsid
846 GQQNGI-01
Title
Queens Green Infrastructure Construction (QG-518M)
Summary
This project will construct green infrastructure to capture storm water at Helen Marshall Playground, Electric Playground, Horace Harding Playground, London Planetree Playground, and Joseph P. Addabbo Memorial Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-02-01T00:00:00.000
Designprojectedcompletion
2019-06-01T00:00:00.000
Designadjustedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2021-02-01T00:00:00.000
Procurementstart
2021-02-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-06-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-09-01T00:00:00.000
Totalfunding
$2,224,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
W/S 164 Street, S/O 65 Avenue
Parkid
Q342
Latitude
40.73606850414
Longitude
-73.80531143435
Borough
Queens
VIEW LOCATION
8713
Trackerid: 8713 • Fmsid: 846 GQQNGI-01 • Title: Queens Green Infrastructure Construction (QG-518M)
Trackerid
8713
Fmsid
846 GQQNGI-01
Title
Queens Green Infrastructure Construction (QG-518M)
Summary
This project will construct green infrastructure to capture storm water at Helen Marshall Playground, Electric Playground, Horace Harding Playground, London Planetree Playground, and Joseph P. Addabbo Memorial Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-02-01T00:00:00.000
Designprojectedcompletion
2019-06-01T00:00:00.000
Designadjustedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2021-02-01T00:00:00.000
Procurementstart
2021-02-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-06-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-09-01T00:00:00.000
Totalfunding
$2,224,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
62 Drive between 97 Place & 98 Street
Parkid
Q428
Latitude
40.733371
Longitude
-73.860591
Borough
Queens
VIEW LOCATION
5994
Trackerid: 5994 • Fmsid: 846 P-301EPPK • Title: Elizabeth H. Berger Plaza Construction
Trackerid
5994
Fmsid
846 P-301EPPK
Title
Elizabeth H. Berger Plaza Construction
Summary
This project will construct Elizabeth H. Berger Plaza, closing the slip road between two smaller parks to create one larger plaza with plantings, a lawn mound, and seating.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-10-01T00:00:00.000
Designprojectedcompletion
2015-09-01T00:00:00.000
Designadjustedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-03-01T00:00:00.000
Procurementstart
2018-03-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-05-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2021-01-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$5,494,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Trinity Place, Greenwich Street, Morris Street and Egdar Street
Parkid
MZ25
Latitude
40.706862
Longitude
-74.01386
Borough
Manhattan
VIEW LOCATION
11192
Trackerid: 11192 • Title: Elizabeth Stroud Playground Reconstruction • Summary: This project will reconstruct Elizabeth Stroud Playground.
Trackerid
11192
Title
Elizabeth Stroud Playground Reconstruction
Summary
This project will reconstruct Elizabeth Stroud Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fulton Avenue and Stuyvesant Avenue
Parkid
B200
Latitude
40.6796907
Longitude
-73.931063
Borough
Brooklyn
VIEW LOCATION
6479
Trackerid: 6479 • Fmsid: 846 P-4VIETNA • Title: Elmhurst Park Vietnam Veterans Memorial Construction
Trackerid
6479
Fmsid
846 P-4VIETNA
Title
Elmhurst Park Vietnam Veterans Memorial Construction
Summary
This project will construct a memorial to Vietnam War veterans from Queens in Elmhurst Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-09-01T00:00:00.000
Designprojectedcompletion
2017-09-01T00:00:00.000
Designactualcompletion
2017-10-01T00:00:00.000
Procurementstart
2017-10-01T00:00:00.000
Procurementprojectedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-12-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$1,958,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Grand Avenue between 57th Avenue and 79th Street
Parkid
Q492
Latitude
40.72989583
Longitude
-73.88512722
Borough
Queens
VIEW LOCATION
1255111
Trackerid: 1255111 • Fmsid: 846 P-4EMLDRF • Title: Emerald Playground Public Restroom Building Roof Reconstruction
Trackerid
1255111
Fmsid
846 P-4EMLDRF
Title
Emerald Playground Public Restroom Building Roof Reconstruction
Summary
This project will reconstruct the roof of the public restroom building in Emerald Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-08-01T00:00:00.000
Designadjustedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-08-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2022-02-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-03-01T00:00:00.000
Totalfunding
$142,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q344
Latitude
40.731229
Longitude
-73.805874
Borough
Queens
VIEW LOCATION
7237
Trackerid: 7237 • Fmsid: 846 P-206ENIS • Title: Ennis Playground Reconstruction
Trackerid
7237
Fmsid
846 P-206ENIS
Title
Ennis Playground Reconstruction
Summary
This project will reconstruct Ennis Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$2,580,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
11th Street, 12th Street, 2nd Avenue, 3rd Avenue
Parkid
B095
Latitude
40.670824
Longitude
-73.993569
Borough
Brooklyn
VIEW LOCATION
7200
Trackerid: 7200 • Fmsid: 846 P-2CPIEPP • Title: Epiphany Playground Reconstruction
Trackerid
7200
Fmsid
846 P-2CPIEPP
Title
Epiphany Playground Reconstruction
Summary
This project will reconstruct the playground, spray shower, seating, handball and basketball courts, perimeter fence, and security lighting at Epiphany Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-03-01T00:00:00.000
Designprojectedcompletion
2017-03-01T00:00:00.000
Designadjustedcompletion
2020-10-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-07-01T00:00:00.000
Constructionstart
2022-08-01T00:00:00.000
Constructionprojectedcom
2023-08-01T00:00:00.000
Constructionadjustedcompletion
2024-03-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
$3,252,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Berry Street between South 9th Street and South 10th Street
Parkid
B405
Latitude
40.708691
Longitude
-73.965581
Borough
Brooklyn
VIEW LOCATION
1158
Trackerid: 1158 • Fmsid: 846 P-103RRP2 • Title: Estella Diggs Park Reconstruction
Trackerid
1158
Fmsid
846 P-103RRP2
Title
Estella Diggs Park Reconstruction
Summary
This project will construct additional fencing, paths, seating and miscellaneous site amenities at Rocks & Roots Park (Estella Diggs).
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-10-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-10-01T00:00:00.000
Constructionprojectedcom
2016-10-01T00:00:00.000
Constructionadjustedcompletion
2017-05-01T00:00:00.000
Constructionactualcompletion
2017-05-01T00:00:00.000
Totalfunding
$1,523,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 167th Street between Third and Fulton Avenues
Parkid
X243
Latitude
40.82898472
Longitude
-73.90616944
Borough
Bronx
VIEW LOCATION
10718
Trackerid: 10718 • Fmsid: 846 P-311MCST • Title: Eugene McCabe Field Reconstruction
Trackerid
10718
Fmsid
846 P-311MCST
Title
Eugene McCabe Field Reconstruction
Summary
This project will reconstruct Eugene McCabe Field with new synthetic turf, fencing, and sidewalks.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-04-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Park Avenue between East 120th Street and East 121st Street
Parkid
M243
Latitude
40.80238506
Longitude
-73.94166591
Borough
Manhattan
VIEW LOCATION
8609
Trackerid: 8609 • Fmsid: 846 P-1CPIGAR • Title: Garrison Playground Reconstruction
Trackerid
8609
Fmsid
846 P-1CPIGAR
Title
Garrison Playground Reconstruction
Summary
This project will reconstruct the seating area and playground at Garrison Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designadjustedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2020-01-01T00:00:00.000
Totalfunding
$4,749,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Grand Concourse between East 144th Street and East 149th Street
Parkid
X106
Latitude
40.8175838
Longitude
-73.9282982
Borough
Bronx
VIEW LOCATION
8897
Trackerid: 8897 • Fmsid: 846 P-405EVE2 • Title: Evergreen Park Multipurpose Play Area Reconstruction
Trackerid
8897
Fmsid
846 P-405EVE2
Title
Evergreen Park Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in Evergreen Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2020-11-01T00:00:00.000
Designprojectedcompletion
2021-11-01T00:00:00.000
Designadjustedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-09-01T00:00:00.000
Procurementstart
2023-09-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementadjustedcompletion
2024-12-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Forest Avenue and 75th Avenue
Parkid
Q302
Latitude
40.697247
Longitude
-73.8965
Borough
Queens
VIEW LOCATION
1022
Trackerid: 1022 • Fmsid: 846 P-405EGPK • Title: Evergreen Park Playground and Spray Shower Reconstruction
Trackerid
1022
Fmsid
846 P-405EGPK
Title
Evergreen Park Playground and Spray Shower Reconstruction
Summary
This project will demolish the bocce and shuffleboard courts, install play equipment, and reconstruct the spray shower at Evergreen Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-02-01T00:00:00.000
Designprojectedcompletion
2013-02-01T00:00:00.000
Designadjustedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementadjustedcompletion
2015-02-01T00:00:00.000
Procurementactualcompletion
2015-01-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-03-01T00:00:00.000
Constructionadjustedcompletion
2016-07-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$938,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Saint Felix Avenue between 60th Street and 60th Lane, Queens
Parkid
Q302
Latitude
40.69708
Longitude
-73.896749
Borough
Queens
VIEW LOCATION
7081
Trackerid: 7081 • Fmsid: 846 P-405EVER • Title: Evergreen Park Playground Reconstruction
Trackerid
7081
Fmsid
846 P-405EVER
Title
Evergreen Park Playground Reconstruction
Summary
This project will install new play equipment, pavement, fencing, drainage, site furniture, and lighting at the playground in Evergreen Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-03-01T00:00:00.000
Designprojectedcompletion
2017-02-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$2,189,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
St. Felix Avenue between 60th Street and 60th Lane
Parkid
Q302
Latitude
40.697732
Longitude
-73.896609
Borough
Queens
VIEW LOCATION
10107
Trackerid: 10107 • Fmsid: 846 P-108EWPK • Title: Ewen Park Staircase Reconstruction
Trackerid
10107
Fmsid
846 P-108EWPK
Title
Ewen Park Staircase Reconstruction
Summary
This project will reconstruct the staircase at Ewen Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
10.5
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designadjustedcompletion
2024-07-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2025-12-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$3,826,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Johnson Avenue between West 231st and West 232nd Streets
Parkid
X019
Latitude
40.88309299
Longitude
-73.91035895
Borough
Bronx
VIEW LOCATION
9233
Trackerid: 9233 • Fmsid: 846 P-108EWNP • Title: Ewen Park Adult Fitness Equipment Construction
Trackerid
9233
Fmsid
846 P-108EWNP
Title
Ewen Park Adult Fitness Equipment Construction
Summary
This project will construct an adult fitness area in Ewen Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-03-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$600,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Johnson Avenue, West 232nd Street and Riverdale Avenue
Parkid
X019
Latitude
40.883139
Longitude
-73.909805
Borough
Bronx
VIEW LOCATION
4702
Trackerid: 4702 • Fmsid: 846 P-1EWENPK • Title: Ewen Park Tot Lot Construction and Basketball Court Reconstruction
Trackerid
4702
Fmsid
846 P-1EWENPK
Title
Ewen Park Tot Lot Construction and Basketball Court Reconstruction
Summary
This project will reconstruct a basketball court and construct a tot lot and miscellaneous site work in Ewen Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-08-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designadjustedcompletion
2014-06-01T00:00:00.000
Designactualcompletion
2014-09-01T00:00:00.000
Procurementstart
2014-09-01T00:00:00.000
Procurementprojectedcompletion
2015-06-01T00:00:00.000
Procurementadjustedcompletion
2015-08-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2016-09-01T00:00:00.000
Constructionadjustedcompletion
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$997,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Johnson Avenue, West 232nd Street and Riverdale Avenue, the Bronx
Parkid
X019
Latitude
40.88219111
Longitude
-73.91002056
Borough
Bronx
VIEW LOCATION
1019111
Trackerid: 1019111 • Fmsid: 846 SANDY5-34 • Title: Faber Park Safety Surfacing Reconstruction
Trackerid
1019111
Fmsid
846 SANDY5-34
Title
Faber Park Safety Surfacing Reconstruction
Summary
This project will install new safety surfacing damaged from Hurricane Sandy at Faber Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-09-01T00:00:00.000
Designprojectedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2015-03-01T00:00:00.000
Procurementprojectedcompletion
2015-08-01T00:00:00.000
Procurementactualcompletion
2015-02-01T00:00:00.000
Constructionstart
2015-02-01T00:00:00.000
Constructionprojectedcom
2015-05-01T00:00:00.000
Constructionactualcompletion
2015-05-01T00:00:00.000
Totalfunding
$128,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, Federal
Parkid
R008
Latitude
40.640602
Longitude
-74.136121
Borough
Staten Island
VIEW LOCATION
1637111
Trackerid: 1637111 • Fmsid: 846 P-501FPFA • Title: Faber Park Recreation Center Fire Alarm System Reconstruction
Trackerid
1637111
Fmsid
846 P-501FPFA
Title
Faber Park Recreation Center Fire Alarm System Reconstruction
Summary
This project will reconstruct the fire alarm system at Faber Park Recreation Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
85.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2023-11-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-09-01T00:00:00.000
Constructionadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
$219,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
R008
Latitude
40.64115
Longitude
-74.135412
Borough
Staten Island
VIEW LOCATION
8563
Trackerid: 8563 • Fmsid: 846 P-501FABL • Title: Faber Park Active Recreation, Lighting and Seating Area Construction
Trackerid
8563
Fmsid
846 P-501FABL
Title
Faber Park Active Recreation, Lighting and Seating Area Construction
Summary
This project will construct new active recreation areas, paths, seating, lighting and an expanded public gathering area at Faber Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-03-01T00:00:00.000
Procurementstart
2018-03-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-05-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionadjustedcompletion
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$5,412,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
2175 Richmond Terrace, between Faber Street and Sharpe Avenue
Parkid
R008
Latitude
40.64079
Longitude
-74.135444
Borough
Staten Island
VIEW LOCATION
3659
Trackerid: 3659 • Fmsid: 846 P-501FABE • Title: Faber Park Skate Park Construction
Trackerid
3659
Fmsid
846 P-501FABE
Title
Faber Park Skate Park Construction
Summary
This project will construct a plaza-type skate park at Faber Park, including new drainage structures and trees.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-07-01T00:00:00.000
Designprojectedcompletion
2012-08-01T00:00:00.000
Designactualcompletion
2013-03-01T00:00:00.000
Procurementstart
2013-03-01T00:00:00.000
Procurementprojectedcompletion
2013-11-01T00:00:00.000
Procurementactualcompletion
2013-11-01T00:00:00.000
Constructionstart
2014-01-01T00:00:00.000
Constructionprojectedcom
2015-01-01T00:00:00.000
Constructionadjustedcompletion
2015-01-01T00:00:00.000
Constructionactualcompletion
2015-01-01T00:00:00.000
Totalfunding
$1,695,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Faber Street and Sharpe Avenue
Parkid
R008
Latitude
40.64100194
Longitude
-74.13572056
Borough
Staten Island
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Richmond Ter. To Kill Van Kull, Faber St.
Parkid
R008
Latitude
40.64131
Longitude
-74.135353
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
2301 Amsterdam Avenue
Parkid
M037
Latitude
40.842707
Longitude
-73.933763
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Marcy Av & Kosciuszko St, Dekalb & Nostrand
Parkid
B351
Latitude
40.691188
Longitude
-73.94956
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Otsego, Bay, Hicks, Lorraine, Court, Halleck Streets
Parkid
B126
Latitude
40.672703
Longitude
-74.003881
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 129 Street, Amsterdam Avenue
Parkid
M190
Latitude
40.814892
Longitude
-73.955564
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
5054
Trackerid: 5054 • Fmsid: 846 P-6POL11B • Title: Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Trackerid
5054
Fmsid
846 P-6POL11B
Title
Citywide Plumbing Systems Reconstruction (CNYG-1711MA1)
Summary
This project will reconstruct deteriorated plumbing systems at parks and recreation pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2011-12-01T00:00:00.000
Procurementstart
2011-12-01T00:00:00.000
Procurementprojectedcompletion
2012-09-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-01-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,046,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
41 Street, 44 Street, between 5 Avenue and 7 Avenue
Parkid
B087
Latitude
40.647482
Longitude
-74.003493
Borough
Staten Island, Manhattan, Brooklyn
VIEW LOCATION
6300
Trackerid: 6300 • Fmsid: 846 P-501FABB • Title: Faber Pool and Lyons Pool Boiler Reconstruction
Trackerid
6300
Fmsid
846 P-501FABB
Title
Faber Pool and Lyons Pool Boiler Reconstruction
Summary
This project will reconstruct the boilers and heating systems at Faber Pool and Lyons Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-06-01T00:00:00.000
Designactualcompletion
2015-06-01T00:00:00.000
Procurementstart
2015-06-01T00:00:00.000
Procurementprojectedcompletion
2016-03-01T00:00:00.000
Procurementadjustedcompletion
2016-11-01T00:00:00.000
Procurementactualcompletion
2016-10-01T00:00:00.000
Constructionstart
2017-01-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionadjustedcompletion
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-07-01T00:00:00.000
Totalfunding
$1,994,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Richmond Ter. To Kill Van Kull, Faber St.
Parkid
R008
Latitude
40.641534
Longitude
-74.135376
Borough
Staten Island
VIEW LOCATION
6300
Trackerid: 6300 • Fmsid: 846 P-501FABB • Title: Faber Pool and Lyons Pool Boiler Reconstruction
Trackerid
6300
Fmsid
846 P-501FABB
Title
Faber Pool and Lyons Pool Boiler Reconstruction
Summary
This project will reconstruct the boilers and heating systems at Faber Pool and Lyons Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-06-01T00:00:00.000
Designactualcompletion
2015-06-01T00:00:00.000
Procurementstart
2015-06-01T00:00:00.000
Procurementprojectedcompletion
2016-03-01T00:00:00.000
Procurementadjustedcompletion
2016-11-01T00:00:00.000
Procurementactualcompletion
2016-10-01T00:00:00.000
Constructionstart
2017-01-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionadjustedcompletion
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-07-01T00:00:00.000
Totalfunding
$1,994,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Murray Hulbert Avenue between Victory Boulevard and Hannah Street
Parkid
R043
Latitude
40.63696
Longitude
-74.073941
Borough
Staten Island
VIEW LOCATION
9277
Trackerid: 9277 • Fmsid: 846 P-5FABBAS • Title: Faber Park Basketball Courts Construction
Trackerid
9277
Fmsid
846 P-5FABBAS
Title
Faber Park Basketball Courts Construction
Summary
This project will demolish an existing play area and construct two basketball courts at Faber Park with new lighting, bleachers, a drinking fountain, benches, and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2020-10-01T00:00:00.000
Designadjustedcompletion
2021-04-01T00:00:00.000
Designactualcompletion
2021-05-01T00:00:00.000
Procurementstart
2021-05-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementadjustedcompletion
2024-02-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-03-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionadjustedcompletion
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$1,967,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Richmond Terrace between Sharpe Avenue and Faber Street
Parkid
R008
Latitude
40.641554
Longitude
-74.135321
Borough
Staten Island
VIEW LOCATION
1391111
Trackerid: 1391111 • Fmsid: 846 P-5DCTFRV • Title: Fairview Park Telecommunication Lines Reconstruction
Trackerid
1391111
Fmsid
846 P-5DCTFRV
Title
Fairview Park Telecommunication Lines Reconstruction
Summary
This project will reconstruct the telecommunication lines at Fairview Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-10-01T00:00:00.000
Designprojectedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2022-07-01T00:00:00.000
Constructionactualcompletion
2022-06-01T00:00:00.000
Totalfunding
$110,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
R153
Latitude
40.53197
Longitude
-74.228917
Borough
Staten Island
VIEW LOCATION
8779
Trackerid: 8779 • Fmsid: 846 SANDY5-50 • Title: Fairview Park Multi-Purpose Field and Landscape Construction
Trackerid
8779
Fmsid
846 SANDY5-50
Title
Fairview Park Multi-Purpose Field and Landscape Construction
Summary
This project will construct a multi-purpose field, baseball field, tennis courts, pickleball courts, adult fitness equipment, picnic area, parking area, bio-retention areas, paths, and landscape elements at Fairview Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-06-01T00:00:00.000
Designprojectedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-05-01T00:00:00.000
Procurementadjustedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2018-12-01T00:00:00.000
Constructionstart
2019-02-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$14,386,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilFederalMayoral
Name
Arthur Kill Road and Veterans Road West
Parkid
R153
Latitude
40.53061
Longitude
-74.234167
Borough
Staten Island
VIEW LOCATION
8774
Trackerid: 8774 • Fmsid: 846 P-5CHARCS • Title: Fairview Park Public Restroom Building Construction
Trackerid
8774
Fmsid
846 P-5CHARCS
Title
Fairview Park Public Restroom Building Construction
Summary
This project will construct a new public restroom building at Fairview Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-06-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designadjustedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-01-01T00:00:00.000
Procurementstart
2018-01-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2022-10-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$4,419,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilFederalMayoral
Name
Bricktown Way between Arthur Kill Road & Veterans Road West
Parkid
R153
Latitude
40.531125
Longitude
-74.233741
Borough
Staten Island
VIEW LOCATION
8550
Trackerid: 8550 • Fmsid: 846 P-5TREEFA • Title: Fairview Park Reforestation
Trackerid
8550
Fmsid
846 P-5TREEFA
Title
Fairview Park Reforestation
Summary
This project will remove invasive species, seed and install groundcover, and plant trees in Fairview Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-02-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designadjustedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-11-01T00:00:00.000
Procurementprojectedcompletion
2018-08-01T00:00:00.000
Procurementadjustedcompletion
2018-10-01T00:00:00.000
Procurementactualcompletion
2018-09-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-05-01T00:00:00.000
Constructionactualcompletion
2021-04-01T00:00:00.000
Totalfunding
$699,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Englewood Avenue, West Shore Expressway, Veterans Road West
Parkid
R153
Latitude
40.531559
Longitude
-74.23155
Borough
Staten Island
VIEW LOCATION
10516
Trackerid: 10516 • Fmsid: 846 P-6PREFA1 • Currentphase: completed
Trackerid
10516
Fmsid
846 P-6PREFA1
Title
Father Macris Park and Irving Square Park Compact Prefabricated Public Restroom Buildings Construction
Summary
This project will construct compact prefabricated public restroom buildings at Father Macris Park and Irving Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-01-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-05-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2025-01-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$2,601,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Southside of Staten Island Expressway, Fahy Avenue, Lamberts Lane
Parkid
R075A
Latitude
40.616957
Longitude
-74.161917
Borough
Staten IslandBrooklyn
VIEW LOCATION
10516
Trackerid: 10516 • Fmsid: 846 P-6PREFA1 • Currentphase: completed
Trackerid
10516
Fmsid
846 P-6PREFA1
Title
Father Macris Park and Irving Square Park Compact Prefabricated Public Restroom Buildings Construction
Summary
This project will construct compact prefabricated public restroom buildings at Father Macris Park and Irving Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-01-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-05-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2025-01-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$2,601,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Wilson Avenue, Knickerbocker Avenue, between Halsey Street and Weirfield Street
Parkid
B049
Latitude
40.692604
Longitude
-73.909153
Borough
Staten IslandBrooklyn
VIEW LOCATION
7336
Trackerid: 7336 • Fmsid: 846 P-1CPIBPG • Title: Black Rock Playground Reconstruction
Trackerid
7336
Fmsid
846 P-1CPIBPG
Title
Black Rock Playground Reconstruction
Summary
This project will reconstruct Black Rock Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-03-01T00:00:00.000
Designprojectedcompletion
2017-03-01T00:00:00.000
Designactualcompletion
2017-04-01T00:00:00.000
Procurementstart
2017-04-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementadjustedcompletion
2018-02-01T00:00:00.000
Procurementactualcompletion
2018-02-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-04-01T00:00:00.000
Totalfunding
$1,557,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Watson Avenue, Black Rock Avenue between Virginia Avenue and Pugsley Avenue
Parkid
X205
Latitude
40.828531
Longitude
-73.858035
Borough
Bronx
VIEW LOCATION
1219111
Trackerid: 1219111 • Fmsid: 846 P-6PVMNT1 • Title: Wyckoff House Pavement Reconstruction
Trackerid
1219111
Fmsid
846 P-6PVMNT1
Title
Wyckoff House Pavement Reconstruction
Summary
This project will reconstruct paths and pavement at Wyckoff House.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-02-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$200,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B376
Latitude
40.644691
Longitude
-73.920521
Borough
Brooklyn
VIEW LOCATION
1894
Trackerid: 1894 • Fmsid: 846 P-217WYKF • Title: Wyckoff House Roof Reconstruction
Trackerid
1894
Fmsid
846 P-217WYKF
Title
Wyckoff House Roof Reconstruction
Summary
This project will reconstruct the roof at the Wyckoff House in M. Fidler/Wyckoff House Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-06-01T00:00:00.000
Designprojectedcompletion
2015-04-01T00:00:00.000
Designadjustedcompletion
2015-07-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-05-01T00:00:00.000
Procurementactualcompletion
2017-05-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2018-07-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$519,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
Ditmas Avenue and Clarendon Road
Parkid
B376
Latitude
40.64433
Longitude
-73.920775
Borough
Brooklyn
VIEW LOCATION
5955
Trackerid: 5955 • Fmsid: 846 P-217D017 • Title: Wyckoff House Park Public Restroom Building Construction
Trackerid
5955
Fmsid
846 P-217D017
Title
Wyckoff House Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Wyckoff House Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-12-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designadjustedcompletion
2019-12-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionadjustedcompletion
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-04-01T00:00:00.000
Totalfunding
$6,505,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Ralph Avenue, Ditmas Avenue and Clarendon Road.
Parkid
B376
Latitude
40.644672
Longitude
-73.920956
Borough
Brooklyn
VIEW LOCATION
1936111
Trackerid: 1936111 • Fmsid: 846 P-102FDBP • Title: Field of Dreams Court Plumbing Installation and Reconstruction
Trackerid
1936111
Fmsid
846 P-102FDBP
Title
Field of Dreams Court Plumbing Installation and Reconstruction
Summary
This project will reconstruct plumbing connections at Field of Dreams Court.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-11-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designactualcompletion
2026-06-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementprojectedcompletion
2026-04-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$550,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X264
Latitude
40.8265459
Longitude
-73.8921738
Borough
Bronx
VIEW LOCATION
9542
Trackerid: 9542 • Fmsid: 846 P-403GOR2 • Title: Gorman Playground Reconstruction
Trackerid
9542
Fmsid
846 P-403GOR2
Title
Gorman Playground Reconstruction
Summary
This project will reconstruct Gorman Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2020-10-01T00:00:00.000
Designadjustedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-02-01T00:00:00.000
Constructionprojectedcom
2024-02-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$2,937,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
84th Street, 85th Street, 25th Avenue, 30th Avenue
Parkid
Q085
Latitude
40.761706134937
Longitude
-73.884118804645
Borough
Queens
VIEW LOCATION
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
32 Ave. bet. 99 St. and 100 St.
Parkid
Q441
Latitude
40.75903
Longitude
-73.869279
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Dongan Hills Ave. and Jefferson St.
Parkid
R067
Latitude
40.585917
Longitude
-74.100626
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 76-East 78 Streets, Cherokee Place
Parkid
M045
Latitude
40.769599
Longitude
-73.948931
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
E 180 St bet Prospect Av & Mapes Av
Parkid
X236
Latitude
40.84647
Longitude
-73.885907
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION