Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Madison Ave, E. 120 St. to E. 124 St.
Parkid
M058
Latitude
40.805102
Longitude
-73.943837
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION
6586
Trackerid: 6586 • Fmsid: 846 P-6PDPLPB • Title: Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Trackerid
6586
Fmsid
846 P-6PDPLPB
Title
Citywide Pool Plumbing Systems Reconstruction (CNYG-915M)
Summary
This project will reconstruct deteriorated plumbing systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-06-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$976,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jerome Av to River Av bet E 164 St & McClellan St at Cromwell Ave
Parkid
X034
Latitude
40.83173
Longitude
-73.924326
Borough
QueensStaten IslandManhattanBronx
VIEW LOCATION
10496
Trackerid: 10496 • Fmsid: 846 P-2BDCHOS • Title: Flatbush African Burial Ground
Trackerid
10496
Fmsid
846 P-2BDCHOS
Title
Flatbush African Burial Ground
Summary
This project will construct an African Burial Memorial at Bedford Avenue and Church Avenue.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-04-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designadjustedcompletion
2026-09-01T00:00:00.000
Procurementadjustedcompletion
2025-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Bedford Avenue and Church Avenue
Parkid
B596
Latitude
40.65021743
Longitude
-73.95625073
Borough
Brooklyn
VIEW LOCATION
10363
Trackerid: 10363 • Fmsid: 846 P-4INGRVL • Title: Flushing Fields Leonardo Ingravallo Playground Reconstruction
Trackerid
10363
Fmsid
846 P-4INGRVL
Title
Flushing Fields Leonardo Ingravallo Playground Reconstruction
Summary
This project will reconstruct Leonardo Ingravallo Playground in Flushing Fields.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
2.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementprojectedcompletion
2026-09-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-09-01T00:00:00.000
Constructionprojectedcom
2027-09-01T00:00:00.000
Totalfunding
$1,900,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
149th Street and 25th Avenue
Parkid
Q086
Latitude
40.77616472
Longitude
-73.81721358
Borough
Queens
VIEW LOCATION
3101
Trackerid: 3101 • Fmsid: 846 P-407FFRC • Title: Memorial Field of Flushing Ballfield Reconstruction
Trackerid
3101
Fmsid
846 P-407FFRC
Title
Memorial Field of Flushing Ballfield Reconstruction
Summary
This project will reconstruct the ballfield closest to 25th Avenue in Memorial Field of Flushing.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-01-01T00:00:00.000
Designprojectedcompletion
2010-05-01T00:00:00.000
Designadjustedcompletion
2010-09-01T00:00:00.000
Designactualcompletion
2010-09-01T00:00:00.000
Procurementstart
2010-09-01T00:00:00.000
Procurementprojectedcompletion
2011-06-01T00:00:00.000
Procurementactualcompletion
2012-04-01T00:00:00.000
Constructionstart
2012-06-01T00:00:00.000
Constructionprojectedcom
2013-11-01T00:00:00.000
Constructionadjustedcompletion
2013-11-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$690,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
25th Avenue between 149th and 150th Streets
Parkid
Q086
Latitude
40.775927
Longitude
-73.816656
Borough
Queens
VIEW LOCATION
10470
Trackerid: 10470 • Fmsid: 846 P-407FFAR • Title: Flushing Fields Baseball Field 15 and Soccer Field 16 Reconstruction
Trackerid
10470
Fmsid
846 P-407FFAR
Title
Flushing Fields Baseball Field 15 and Soccer Field 16 Reconstruction
Summary
This project will reconstruct baseball field 15 and soccer field 16 at Flushing Fields.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2026-04-01T00:00:00.000
Procurementprojectedcompletion
2027-04-01T00:00:00.000
Constructionstart
2026-11-01T00:00:00.000
Constructionprojectedcom
2027-11-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Bayside Avenue, 25th Avenue, 149th Street and 150th Street
Parkid
Q086
Latitude
40.77416317
Longitude
-73.81682944
Borough
Queens
VIEW LOCATION
1639111
Trackerid: 1639111 • Fmsid: 846 P-4OLMSFA • Title: Olmsted Center Fire Alarm System Reconstruction
Trackerid
1639111
Fmsid
846 P-4OLMSFA
Title
Olmsted Center Fire Alarm System Reconstruction
Summary
This project will reconstruct the fire alarm system at Olmsted Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
85.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2023-11-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2026-09-01T00:00:00.000
Constructionadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
$192,000
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.751579
Longitude
-73.849553
Borough
Queens
VIEW LOCATION
1754111
Trackerid: 1754111 • Fmsid: 846 P-6PAVCW1 • Title: Flushing Meadows Corona Park Garage Bay Entrance Pavement Reconstruction
Trackerid
1754111
Fmsid
846 P-6PAVCW1
Title
Flushing Meadows Corona Park Garage Bay Entrance Pavement Reconstruction
Summary
This project will reconstruct the entrance bay pavement at the Flushing Meadows Corona Park Garage.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-09-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2025-06-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-02-01T00:00:00.000
Constructionactualcompletion
2026-01-01T00:00:00.000
Totalfunding
$160,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.7439689
Longitude
-73.8422393
Borough
Queens
VIEW LOCATION
1806111
Trackerid: 1806111 • Fmsid: 846 P-4FMCPML • Currentphase: completed
Trackerid
1806111
Fmsid
846 P-4FMCPML
Title
Flushing Meadow Corona Park West Meadow Lake Forestry Compound Fence Construction
Summary
This project will construct a fence at the Forestry compound on the west side of Meadow Lake in Flushing Meadow Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-07-01T00:00:00.000
Designprojectedcompletion
2025-02-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-02-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$450,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.7412044
Longitude
-73.8400547
Borough
Queens
VIEW LOCATION
1937111
Trackerid: 1937111 • Fmsid: 846 P-4FMPLUM • Title: Flushing Meadows Corona Park Plumbing Reconstruction
Trackerid
1937111
Fmsid
846 P-4FMPLUM
Title
Flushing Meadows Corona Park Plumbing Reconstruction
Summary
This project will reconstruct plumbing connections in Flushing Meadows Corona Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-11-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designactualcompletion
2026-06-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementprojectedcompletion
2026-04-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2026-12-01T00:00:00.000
Totalfunding
$500,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.7403097
Longitude
-73.8403943
Borough
Queens
VIEW LOCATION
1964111
Trackerid: 1964111 • Fmsid: 846 P-408FMST • Title: Flushing Meadows Corona Park Synthetic Turf Soccer Field 2 Reconstruction
Trackerid
1964111
Fmsid
846 P-408FMST
Title
Flushing Meadows Corona Park Synthetic Turf Soccer Field 2 Reconstruction
Summary
This project will reconstruct the synthetic turf at soccer field 2 in Flushing Meadows Corona Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-11-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.7280218
Longitude
-73.8355469
Borough
Queens
VIEW LOCATION
1036111
Trackerid: 1036111 • Fmsid: 846 P-6POGC15 • Title: Flushing Meadows Corona Park Pool Locker Room Reconstruction
Trackerid
1036111
Fmsid
846 P-6POGC15
Title
Flushing Meadows Corona Park Pool Locker Room Reconstruction
Summary
This project will reconstruct the men's locker room in the FMCP pool facility into a family changing room.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-10-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2017-05-01T00:00:00.000
Constructionactualcompletion
2017-10-01T00:00:00.000
Totalfunding
$145,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.746324
Longitude
-73.841842
Borough
Queens
VIEW LOCATION
1568111
Trackerid: 1568111 • Fmsid: 846 P-4FMAGDN • Title: Flushing Meadows Corona Park Retired Animals Garden Installation
Trackerid
1568111
Fmsid
846 P-4FMAGDN
Title
Flushing Meadows Corona Park Retired Animals Garden Installation
Summary
This project will install a retired animals garden, featuring salvaged animal sculptures from recently reconstructed playgrounds, in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-12-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-01-01T00:00:00.000
Procurementprojectedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2023-10-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$90,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q099
Latitude
40.750669
Longitude
-73.838719
Borough
Queens
VIEW LOCATION
11308
Trackerid: 11308 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
11308
Title
Flushing Meadows Corona Park Playground for All Children and Fieldhouse Reconstruction
Summary
This project will reconstruct the Playground for All Children and the Fieldhouse in Flushing Meadows Corona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
111th Street and Corona Avenue
Parkid
Q099
Latitude
40.746021
Longitude
-73.8420698
Borough
Queens
VIEW LOCATION
8590
Trackerid: 8590 • Fmsid: 846 P-4PWOB01 • Title: Flushing Meadows Corona Park Henry Hudson Entrance Reconstruction
Trackerid
8590
Fmsid
846 P-4PWOB01
Title
Flushing Meadows Corona Park Henry Hudson Entrance Reconstruction
Summary
This project will reconstruct the Henry Hudson entrance at Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2018-04-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-05-01T00:00:00.000
Constructionprojectedcom
2020-05-01T00:00:00.000
Constructionadjustedcompletion
2020-07-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$3,262,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
111th Street between 53rd Avenue and 56th Avenue
Parkid
Q099
Latitude
40.742543
Longitude
-73.850545
Borough
Queens
VIEW LOCATION
10013
Trackerid: 10013 • Fmsid: 846 P-4OLMSRF • Title: Olmsted Center Roof Reconstruction
Trackerid
10013
Fmsid
846 P-4OLMSRF
Title
Olmsted Center Roof Reconstruction
Summary
This project will reconstruct the roof at the Olmsted Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
23.5
Designstart
2021-08-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designadjustedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2025-09-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2027-03-01T00:00:00.000
Totalfunding
$19,583,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
117-02 Roosevelt Avenue
Parkid
Q099
Latitude
40.75122516
Longitude
-73.84954769
Borough
Queens
VIEW LOCATION
5504
Trackerid: 5504 • Fmsid: 846 P-4OLMST4 • Title: Olmsted Center Reconstruction
Trackerid
5504
Fmsid
846 P-4OLMST4
Title
Olmsted Center Reconstruction
Summary
This project will reconstruct the Olmsted Center in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-04-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-02-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-10-01T00:00:00.000
Constructionadjustedcompletion
2022-01-01T00:00:00.000
Constructionactualcompletion
2022-01-01T00:00:00.000
Totalfunding
$31,910,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoralState
Name
117-02 Roosevelt Avenue
Parkid
Q099
Latitude
40.751299
Longitude
-73.849393
Borough
Queens
VIEW LOCATION
10934
Trackerid: 10934 • Fmsid: 846 P-4OLMST8 • Title: Olmsted Center Ramp Reconstruction
Trackerid
10934
Fmsid
846 P-4OLMST8
Title
Olmsted Center Ramp Reconstruction
Summary
This project will reconstruct the ramp at the Olmsted Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Constructionstart
2025-05-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$1,818,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
117-2 Roosevelt Avenue
Parkid
Q099
Latitude
40.751473
Longitude
-73.8507471
Borough
Queens
VIEW LOCATION
8664
Trackerid: 8664 • Title: Flushing Meadows Corona Park Pool Emergency Roof Reconstruction • Summary: This project will reconstruct the roof at the Flushing Meadows Corona Park Pool.
Trackerid
8664
Title
Flushing Meadows Corona Park Pool Emergency Roof Reconstruction
Summary
This project will reconstruct the roof at the Flushing Meadows Corona Park Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designactualcompletion
2017-01-01T00:00:00.000
Procurementstart
2017-01-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-05-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionactualcompletion
2017-10-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Name
131-04 Meridian Road
Parkid
Q099
Latitude
40.751777
Longitude
-73.837496
Borough
Queens
VIEW LOCATION
10220
Trackerid: 10220 • Fmsid: 846 P-415AQFL • Title: Flushing Meadows Corona Park Aquatic Center Pool Floor Reconstruction
Trackerid
10220
Fmsid
846 P-415AQFL
Title
Flushing Meadows Corona Park Aquatic Center Pool Floor Reconstruction
Summary
This project will reconstruct the pool floor at the Aquatic Center in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-11-01T00:00:00.000
Designprojectedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2023-01-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$921,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-04 Meridian Road
Parkid
Q099
Latitude
40.746875
Longitude
-73.843311
Borough
Queens
VIEW LOCATION
9630
Trackerid: 9630 • Fmsid: 846 P-415AQNT • Currentphase: completed
Trackerid
9630
Fmsid
846 P-415AQNT
Title
Flushing Meadows Corona Park Aquatic Center Emergency Netting System Installation
Summary
This project will install a debris netting system at Flushing Meadows Corona Park Aquatic Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-07-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2021-02-01T00:00:00.000
Constructionstart
2020-02-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionadjustedcompletion
2021-05-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$1,877,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-04 Meridian Road
Parkid
Q099
Latitude
40.751826
Longitude
-73.837479
Borough
Queens
VIEW LOCATION
9645
Trackerid: 9645 • Fmsid: 846 P-4FMCPIC • Title: Flushing Meadows Corona Park Aquatic Center Ice Rink Chiller Plant Replacement
Trackerid
9645
Fmsid
846 P-4FMCPIC
Title
Flushing Meadows Corona Park Aquatic Center Ice Rink Chiller Plant Replacement
Summary
This project will replace the chiller plant for the ice skating rink at Flushing Meadows Corona Park Aquatic Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-03-01T00:00:00.000
Designprojectedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Procurementstart
2026-02-01T00:00:00.000
Procurementprojectedcompletion
2027-02-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Constructionstart
2026-12-01T00:00:00.000
Constructionprojectedcom
2027-09-01T00:00:00.000
Totalfunding
$6,348,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-04 Meridian Road
Parkid
Q099
Latitude
40.75186412
Longitude
-73.83776347
Borough
Queens
VIEW LOCATION
8942
Trackerid: 8942 • Fmsid: 846 P-415AQUA • Title: Flushing Meadows Corona Park Aquatic Center Partial Reconstruction
Trackerid
8942
Fmsid
846 P-415AQUA
Title
Flushing Meadows Corona Park Aquatic Center Partial Reconstruction
Summary
This project will partially reconstruct the Flushing Meadows Corona Park Aquatic Center.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2027-06-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-04 Meridian Road
Parkid
Q099
Latitude
40.75174363
Longitude
-73.83732528
Borough
Queens
VIEW LOCATION
10563
Trackerid: 10563 • Fmsid: 846 P-4ALHVAC • Title: Al Oerter Recreation Center HVAC Reconstruction
Trackerid
10563
Fmsid
846 P-4ALHVAC
Title
Al Oerter Recreation Center HVAC Reconstruction
Summary
This project will reconstruct the HVAC systems at the Al Oerter Recreation Center in Flushing Meadows Corona Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2024-01-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementprojectedcompletion
2026-09-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-09-01T00:00:00.000
Constructionprojectedcom
2027-03-01T00:00:00.000
Totalfunding
$3,511,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-40 Fowler Avenue
Parkid
Q099
Latitude
40.75139468
Longitude
-73.83377392
Borough
Queens
VIEW LOCATION
10727
Trackerid: 10727 • Fmsid: 846 P-415ALOT • Title: Al Oerter Recreation Center Gym Floor Reconstruction
Trackerid
10727
Fmsid
846 P-415ALOT
Title
Al Oerter Recreation Center Gym Floor Reconstruction
Summary
This project will reconstruct the gym floor at Al Oerter Recreation Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2025-04-01T00:00:00.000
Procurementstart
2026-01-01T00:00:00.000
Procurementprojectedcompletion
2027-01-01T00:00:00.000
Procurementactualcompletion
2026-07-01T00:00:00.000
Constructionstart
2026-12-01T00:00:00.000
Constructionprojectedcom
2027-06-01T00:00:00.000
Totalfunding
$630,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
131-40 Fowler Avenue
Parkid
Q099
Latitude
40.75122265
Longitude
-73.83411033
Borough
Queens
VIEW LOCATION
11036
Trackerid: 11036 • Title: Al Oerter Recreation Center Boiler and Heating Systems Reconstruction • Currentphase: proposed
Trackerid
11036
Title
Al Oerter Recreation Center Boiler and Heating Systems Reconstruction
Summary
This project will reconstruct the boiler and heating systems at Al Oerter Recreation Center.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
131-40 Fowler Avenue
Parkid
Q099
Latitude
40.74308606
Longitude
-73.84323215
Borough
Queens
VIEW LOCATION
9475
Trackerid: 9475 • Fmsid: 846 P-4QSTORE • Title: Flushing Meadows Corona Park Queens Storehouse Reconstruction
Trackerid
9475
Fmsid
846 P-4QSTORE
Title
Flushing Meadows Corona Park Queens Storehouse Reconstruction
Summary
This project will reconstruct the Queens Storehouse in Flushing Meadows Corona Park. The work will include reconstructing portions of the roof, exterior walls, and floor slab; new screening, signage, and a staging yard; and improved drainage and landscape restoration.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
66.84
Designstart
2020-05-01T00:00:00.000
Designprojectedcompletion
2021-05-01T00:00:00.000
Designadjustedcompletion
2022-03-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2024-02-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionadjustedcompletion
2027-01-01T00:00:00.000
Totalfunding
$15,547,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
43 Meridian Road
Parkid
Q099
Latitude
40.7528161
Longitude
-73.83746496
Borough
Queens
VIEW LOCATION
6075
Trackerid: 6075 • Fmsid: 846 P-400SFR1 • Title: Flushing Meadows Corona Park Synthetic Turf Field 1 Reconstruction
Trackerid
6075
Fmsid
846 P-400SFR1
Title
Flushing Meadows Corona Park Synthetic Turf Field 1 Reconstruction
Summary
This project will reconstruct synthetic turf soccer field 1 in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-02-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-07-01T00:00:00.000
Procurementstart
2013-07-01T00:00:00.000
Procurementprojectedcompletion
2014-04-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2015-09-01T00:00:00.000
Constructionadjustedcompletion
2015-07-01T00:00:00.000
Constructionactualcompletion
2015-07-01T00:00:00.000
Totalfunding
$733,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Avenue of Commerce and Herbert Hoover Promenade
Parkid
Q099
Latitude
40.742091
Longitude
-73.847408
Borough
Queens
VIEW LOCATION
5977
Trackerid: 5977 • Fmsid: 846 P-415FMC2 • Title: Flushing Meadows Corona Park Meadow Lake Promenade Reconstruction
Trackerid
5977
Fmsid
846 P-415FMC2
Title
Flushing Meadows Corona Park Meadow Lake Promenade Reconstruction
Summary
This project will reconstruct the roadway and paths along Meadow Lake Promenade in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2014-09-01T00:00:00.000
Designadjustedcompletion
2015-09-01T00:00:00.000
Designactualcompletion
2015-11-01T00:00:00.000
Procurementstart
2015-11-01T00:00:00.000
Procurementprojectedcompletion
2016-08-01T00:00:00.000
Procurementadjustedcompletion
2017-03-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionadjustedcompletion
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-04-01T00:00:00.000
Totalfunding
$4,030,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Between Boathouse Bridge and Ederle Terrace
Parkid
Q099
Latitude
40.739256
Longitude
-73.838568
Borough
Queens
VIEW LOCATION
8587
Trackerid: 8587 • Fmsid: 846 P-4FMGARG • Title: Flushing Meadows Corona Park Garage Reconstruction
Trackerid
8587
Fmsid
846 P-4FMGARG
Title
Flushing Meadows Corona Park Garage Reconstruction
Summary
This project will reconstruct the Parks Maintenance and Operations garage in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-08-01T00:00:00.000
Designprojectedcompletion
2017-08-01T00:00:00.000
Designadjustedcompletion
2017-10-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2020-06-01T00:00:00.000
Constructionprojectedcom
2021-12-01T00:00:00.000
Constructionadjustedcompletion
2022-04-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$7,027,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between Roosevelt Avenue and the Long Island Rail Road yard
Parkid
Q099
Latitude
40.751531
Longitude
-73.848202
Borough
Queens
VIEW LOCATION
7391
Trackerid: 7391 • Fmsid: 846 P-415FOTF • Title: Flushing Meadows Corona Park Fountain of the Fairs Reconstruction
Trackerid
7391
Fmsid
846 P-415FOTF
Title
Flushing Meadows Corona Park Fountain of the Fairs Reconstruction
Summary
This project will reconstruct and provide for the adaptive re-use of the Reflecting Pool in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-08-01T00:00:00.000
Designprojectedcompletion
2017-07-01T00:00:00.000
Designadjustedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-05-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$6,073,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between Unisphere and Fountain of the Planets
Parkid
Q099
Latitude
40.746978
Longitude
-73.8434
Borough
Queens
VIEW LOCATION
9238
Trackerid: 9238 • Fmsid: 846 P-415FSTF • Title: Flushing Meadows Corona Park Synthetic Turf Fields 8 & 9 Reconstruction
Trackerid
9238
Fmsid
846 P-415FSTF
Title
Flushing Meadows Corona Park Synthetic Turf Fields 8 & 9 Reconstruction
Summary
This project will reconstruct synthetic turf fields 8 & 9 in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-03-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-11-01T00:00:00.000
Procurementstart
2020-11-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-03-01T00:00:00.000
Constructionstart
2023-06-01T00:00:00.000
Constructionprojectedcom
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-09-01T00:00:00.000
Totalfunding
$8,082,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
College Point Boulevard between Fowler Avenue and Booth Memorial Avenue
Parkid
Q099
Latitude
40.750175
Longitude
-73.833754
Borough
Queens
VIEW LOCATION
8874
Trackerid: 8874 • Fmsid: 846 P-415FMWS • Title: Flushing Meadows Corona Park Adult Fitness Equipment Installation
Trackerid
8874
Fmsid
846 P-415FMWS
Title
Flushing Meadows Corona Park Adult Fitness Equipment Installation
Summary
This project will install adult fitness equipment in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designadjustedcompletion
2020-08-01T00:00:00.000
Designactualcompletion
2020-08-01T00:00:00.000
Procurementstart
2020-08-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-01-01T00:00:00.000
Constructionactualcompletion
2022-07-01T00:00:00.000
Totalfunding
$345,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Corona Avenue and 111th Street, next to Playground for All Children
Parkid
Q099
Latitude
40.741169
Longitude
-73.84852
Borough
Queens
VIEW LOCATION
8551
Trackerid: 8551 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
8551
Title
Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Flushing Bay, at 125-00 Northern Boulevard
Parkid
Q099
Latitude
40.75980597
Longitude
-73.84868069
Borough
Queens
VIEW LOCATION
11387
Trackerid: 11387 • Title: Flushing Meadows Corona Park Fountain of the Fairs Reconstruction Phase 2 • Currentphase: proposed
Trackerid
11387
Title
Flushing Meadows Corona Park Fountain of the Fairs Reconstruction Phase 2
Summary
This project will reconstruct the center fountain at Fountain of the Fairs at Flushing Meadows Corona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Fountain of the Fairs Promenade at United Nations Avenue
Parkid
Q099
Latitude
40.746247
Longitude
-73.8449653
Borough
Queens
VIEW LOCATION
10928
Trackerid: 10928 • Title: Fort Washington Park Maintenance and Operations Building Reconstruction • Currentphase: proposed
Trackerid
10928
Title
Fort Washington Park Maintenance and Operations Building Reconstruction
Summary
This project will recosntruct the maintenance and operations building at Fort Washington Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Federal
Name
338 Dyckman Street
Parkid
M028
Latitude
40.8512042
Longitude
-73.94322568
Borough
Manhattan
VIEW LOCATION
7260
Trackerid: 7260 • Fmsid: 846 P-415WRLD • Title: World's Fair Playground Asphalt Field Reconstruction
Trackerid
7260
Fmsid
846 P-415WRLD
Title
World's Fair Playground Asphalt Field Reconstruction
Summary
This project will reconstruct the asphalt field at World's Fair Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-04-01T00:00:00.000
Procurementactualcompletion
2018-04-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$1,563,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Grand Central Parkway near 62nd Road
Parkid
Q099
Latitude
40.737993
Longitude
-73.846105
Borough
Queens
VIEW LOCATION
9321
Trackerid: 9321 • Fmsid: 846 SANDY4-29 • Title: Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Trackerid
9321
Fmsid
846 SANDY4-29
Title
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2026-04-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Grand Central Parkway, Whitestone Expressway between 111th Street and College Point Boulevard, Park Drive East
Parkid
Q099
Latitude
40.74791891
Longitude
-73.84122069
Borough
Queens
VIEW LOCATION
3526
Trackerid: 3526 • Fmsid: 846 P-4PLG11A • Title: Flushing Meadows Corona Park Pavement and Fence Reconstruction
Trackerid
3526
Fmsid
846 P-4PLG11A
Title
Flushing Meadows Corona Park Pavement and Fence Reconstruction
Summary
This project will reconstruct pavements and fences at the tennis courts and near the LIRR tracks in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designactualcompletion
2011-06-01T00:00:00.000
Procurementstart
2011-06-01T00:00:00.000
Procurementprojectedcompletion
2012-03-01T00:00:00.000
Procurementactualcompletion
2012-09-01T00:00:00.000
Constructionstart
2012-10-01T00:00:00.000
Constructionprojectedcom
2014-04-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Federal
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.74814639
Longitude
-73.84129556
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.752122
Longitude
-73.836646
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Baisley & Merrick Boulevards, 115 Avenue
Parkid
Q448
Latitude
40.689658
Longitude
-73.773501
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Yellowstone Blvd. bet. 68 Ave. and 68 Rd.
Parkid
Q425
Latitude
40.726379
Longitude
-73.847707
Borough
Queens
VIEW LOCATION
9199
Trackerid: 9199 • Fmsid: 846 P-415CAND • Currentphase: design
Trackerid
9199
Fmsid
846 P-415CAND
Title
Flushing Meadows Corona Park World's Fair Marina Pavilion Structures Reconstruction
Summary
This project will reconstruct the World's Fair Marina Pavilion Structures at Flushing Meadows Corona Park. The project also includes vehicular and pedestrian improvements at the intersection of Marina Road and Boat Basin Place.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-04-01T00:00:00.000
Designprojectedcompletion
2022-10-01T00:00:00.000
Designadjustedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-09-01T00:00:00.000
Procurementstart
2025-12-01T00:00:00.000
Procurementprojectedcompletion
2026-12-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Marina Road at Boat Basin Place
Parkid
Q099
Latitude
40.75957329
Longitude
-73.84998759
Borough
Queens
VIEW LOCATION
11102
Trackerid: 11102 • Title: Flushing Meadows Corona Park Triassic Playground Reconstruction • Currentphase: proposed
Trackerid
11102
Title
Flushing Meadows Corona Park Triassic Playground Reconstruction
Summary
This project will reconstruct Triassic Playground in Flushing Meadows Corona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Meadow Lake Drive north of Jewel Avenue
Parkid
Q099
Latitude
40.73704308
Longitude
-73.84568977
Borough
Queens
VIEW LOCATION
2883
Trackerid: 2883 • Fmsid: 846 P-400SFR2 • Title: Flushing Meadows Corona Park Fields 2,3,5 Reconstruction
Trackerid
2883
Fmsid
846 P-400SFR2
Title
Flushing Meadows Corona Park Fields 2,3,5 Reconstruction
Summary
This project will reconstruct synthetic turf fields 2, 3, and 5 in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-07-01T00:00:00.000
Designprojectedcompletion
2011-03-01T00:00:00.000
Designadjustedcompletion
2011-05-01T00:00:00.000
Designactualcompletion
2011-05-01T00:00:00.000
Procurementstart
2011-05-01T00:00:00.000
Procurementprojectedcompletion
2012-02-01T00:00:00.000
Procurementactualcompletion
2012-04-01T00:00:00.000
Constructionstart
2012-06-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-07-01T00:00:00.000
Constructionactualcompletion
2013-07-01T00:00:00.000
Totalfunding
$1,973,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Near Fountain of the Fairs
Parkid
Q099
Latitude
40.748346
Longitude
-73.839081
Borough
Queens
VIEW LOCATION
6495
Trackerid: 6495 • Fmsid: 846 P-415MEA2 • Title: Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction
Trackerid
6495
Fmsid
846 P-415MEA2
Title
Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction
Summary
This project will reconstruct the pedestrian and vehicle pathways in Flushing Meadow Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-11-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2022-12-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionadjustedcompletion
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$6,811,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Northwest side of Meadow Lake, east of Grand Central Parkway between Long Island Expressway and 64th Road.
Parkid
Q099
Latitude
40.737182
Longitude
-73.844272
Borough
Queens
VIEW LOCATION
7271
Trackerid: 7271 • Fmsid: 846 P-4FMMAUR • Title: Flushing Meadows Corona Park Mauro Playground Reconstruction
Trackerid
7271
Fmsid
846 P-4FMMAUR
Title
Flushing Meadows Corona Park Mauro Playground Reconstruction
Summary
This project will reconstruct Mauro Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$4,786,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Park Drive East at 73rd Terrace
Parkid
Q099
Latitude
40.723222
Longitude
-73.827194
Borough
Queens
VIEW LOCATION
7009
Trackerid: 7009 • Fmsid: 846 P-415PAVI • Title: New York State Pavilion Observation Towers Reconstruction - Phase 1
Trackerid
7009
Fmsid
846 P-415PAVI
Title
New York State Pavilion Observation Towers Reconstruction - Phase 1
Summary
This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-10-01T00:00:00.000
Constructionprojectedcom
2021-04-01T00:00:00.000
Constructionadjustedcompletion
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$58,237,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralState
Name
Perimeter Road and United Nations Avenue South
Parkid
Q099
Latitude
40.743969
Longitude
-73.844729
Borough
Queens
VIEW LOCATION
10751
Trackerid: 10751 • Title: New York State Pavilion Observation Towers Reconstruction - Phase 2 • Currentphase: construction
Trackerid
10751
Title
New York State Pavilion Observation Towers Reconstruction - Phase 2
Summary
This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
41.8
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionadjustedcompletion
2026-10-01T00:00:00.000
Totalfunding
$56,756,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Name
Perimeter Road and United Nations Avenue South
Parkid
Q099
Latitude
40.74398316
Longitude
-73.84471823
Borough
Queens
VIEW LOCATION
7062
Trackerid: 7062 • Fmsid: 846 P-415ENTR • Title: Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction
Trackerid
7062
Fmsid
846 P-415ENTR
Title
Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction
Summary
This project will reconstruct the Roosevelt Avenue entrance to Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-09-01T00:00:00.000
Designadjustedcompletion
2015-11-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2017-01-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2018-08-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$2,324,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Roosevelt Avenue between Grand Central Parkway and Long Island Rail Road
Parkid
Q099
Latitude
40.752805
Longitude
-73.85026
Borough
Queens
VIEW LOCATION