Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
1922111
Trackerid: 1922111 • Fmsid: 846 P-312HBRC • Title: Highbridge Recreation Center Fire Alarm System Reconstruction
Trackerid
1922111
Fmsid
846 P-312HBRC
Title
Highbridge Recreation Center Fire Alarm System Reconstruction
Summary
This project will furnish and install new fire alarm devices and tie the mechanical units to the existing fire alarm control panel at Highbridge Recreation Center.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2025-11-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Constructionprojectedcom
2026-09-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M037
Latitude
40.8468114
Longitude
-73.9298246
Borough
Manhattan
VIEW LOCATION
1938111
Trackerid: 1938111 • Title: Highbridge Recreation Center Retaining Walls Reconstruction • Currentphase: proposed
Trackerid
1938111
Title
Highbridge Recreation Center Retaining Walls Reconstruction
Summary
This project will reconstruct the retaining walls at the north side of the Highbridge Recreation Center in M037 Highbridge Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designprojectedcompletion
2026-10-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M037
Latitude
40.843192
Longitude
-73.933688
Borough
Manhattan
VIEW LOCATION
2008111
Trackerid: 2008111 • Title: Highbridge Park Pavement Reconstruction • Currentphase: proposed
Trackerid
2008111
Title
Highbridge Park Pavement Reconstruction
Summary
This project will reconstruct the basketball court paved surfaces and color seal.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M037
Latitude
40.8464149
Longitude
-73.9301775
Borough
Manhattan
VIEW LOCATION
2009111
Trackerid: 2009111 • Title: Raoul Wallenberg Playground Pavement Reconstruction • Currentphase: proposed
Trackerid
2009111
Title
Raoul Wallenberg Playground Pavement Reconstruction
Summary
This project will reconstruct the basketball court paved surfaces and color seal.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
M037
Latitude
40.8472449
Longitude
-73.9310191
Borough
Manhattan
VIEW LOCATION
2010111
Trackerid: 2010111 • Title: Sunken Playground Pavement Reconstruction • Currentphase: proposed
Trackerid
2010111
Title
Sunken Playground Pavement Reconstruction
Summary
This project will reconstruct the basketball court paved surfaces and color seal.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M037
Latitude
40.8453827
Longitude
-73.932411
Borough
Manhattan
VIEW LOCATION
8693
Trackerid: 8693 • Fmsid: 846 P-311HCTR • Title: Highbridge Bathhouse Boiler Reconstruction and Air Conditioning Construction
Trackerid
8693
Fmsid
846 P-311HCTR
Title
Highbridge Bathhouse Boiler Reconstruction and Air Conditioning Construction
Summary
This project will reconstruct boilers and related plumbing and provide a new heating, ventilating, and air conditioning system for Highbridge Bathhouse.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
90.03
Designstart
2016-12-01T00:00:00.000
Designprojectedcompletion
2018-03-01T00:00:00.000
Designadjustedcompletion
2018-11-01T00:00:00.000
Designactualcompletion
2018-12-01T00:00:00.000
Procurementstart
2018-12-01T00:00:00.000
Procurementprojectedcompletion
2019-08-01T00:00:00.000
Procurementadjustedcompletion
2021-04-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
$5,015,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
2301 Amsterdam Avenue
Parkid
M037
Latitude
40.84258665
Longitude
-73.93364113
Borough
Manhattan
VIEW LOCATION
8749
Trackerid: 8749 • Fmsid: 846 P-3ANCH02 • Title: Highbridge Anchor Park Reconstruction Phase II
Trackerid
8749
Fmsid
846 P-3ANCH02
Title
Highbridge Anchor Park Reconstruction Phase II
Summary
This project will reconstruct Adventure Playground and Sunken Playground, install park pathway lighting to the historic High Bridge, and construct a new synthetic turf practice field at Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designadjustedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-07-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$11,353,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Along Edgecombe Avenue between West 163rd and West 166th Streets
Parkid
M037
Latitude
40.836316
Longitude
-73.936713
Borough
Manhattan
VIEW LOCATION
8999
Trackerid: 8999 • Fmsid: 846 P-3QUISCS • Title: Quisqueya Playground Public Restroom Building Reconstruction
Trackerid
8999
Fmsid
846 P-3QUISCS
Title
Quisqueya Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Quisqueya Playground in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designadjustedcompletion
2021-06-01T00:00:00.000
Designactualcompletion
2021-06-01T00:00:00.000
Procurementstart
2021-06-01T00:00:00.000
Procurementprojectedcompletion
2022-03-01T00:00:00.000
Procurementadjustedcompletion
2023-02-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-10-01T00:00:00.000
Constructionadjustedcompletion
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$1,711,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Amsterdam Avenue between West 179th Street and West 180th Street
Parkid
M037
Latitude
40.847228
Longitude
-73.931197
Borough
Manhattan
VIEW LOCATION
9330
Trackerid: 9330 • Fmsid: 846 NDF-DYMAN • Title: Highbridge Park Dyckman Rest Reconstruction
Trackerid
9330
Fmsid
846 NDF-DYMAN
Title
Highbridge Park Dyckman Rest Reconstruction
Summary
The project will reconstruct Dyckman Rest in Highbridge Park with a playground and seating areas.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2023-08-01T00:00:00.000
Procurementactualcompletion
2023-07-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-07-01T00:00:00.000
Totalfunding
$5,000,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Dyckman Street, Nagle Avenue, Fort George Hill
Parkid
M037
Latitude
40.860746
Longitude
-73.924506
Borough
Manhattan
VIEW LOCATION
8767
Trackerid: 8767 • Fmsid: 846 P-3ANCH03 • Title: Highbridge Park Public Restroom Building Construction
Trackerid
8767
Fmsid
846 P-3ANCH03
Title
Highbridge Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-09-01T00:00:00.000
Designprojectedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-02-01T00:00:00.000
Constructionstart
2021-07-01T00:00:00.000
Constructionprojectedcom
2022-10-01T00:00:00.000
Constructionadjustedcompletion
2023-07-01T00:00:00.000
Constructionactualcompletion
2024-02-01T00:00:00.000
Totalfunding
$4,242,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Edgecombe Avenue between West 164th Street and West 165th Street
Parkid
M037
Latitude
40.836991
Longitude
-73.936528
Borough
Manhattan
VIEW LOCATION
2569
Trackerid: 2569 • Fmsid: 846 P-312HBBS • Title: Highbridge Park Brush Stairway Reconstruction
Trackerid
2569
Fmsid
846 P-312HBBS
Title
Highbridge Park Brush Stairway Reconstruction
Summary
This project will demolish and reconstruct the Brush Stairway in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-05-01T00:00:00.000
Designprojectedcompletion
2010-01-01T00:00:00.000
Designadjustedcompletion
2010-11-01T00:00:00.000
Designactualcompletion
2010-11-01T00:00:00.000
Procurementstart
2010-11-01T00:00:00.000
Procurementprojectedcompletion
2011-08-01T00:00:00.000
Procurementactualcompletion
2011-07-01T00:00:00.000
Constructionstart
2011-09-01T00:00:00.000
Constructionprojectedcom
2012-09-01T00:00:00.000
Constructionadjustedcompletion
2014-02-01T00:00:00.000
Constructionactualcompletion
2014-02-01T00:00:00.000
Totalfunding
$792,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, Private
Name
Near West 158th Street between Edgecombe Avenue and Harlem River Drive
Parkid
M037
Latitude
40.832462
Longitude
-73.939358
Borough
Manhattan
VIEW LOCATION
11206
Trackerid: 11206 • Title: Highbridge Park Interior Staircase Reconstruction (Hurricane Ida) • Summary: This project will reconstruct the interior staircase at Highbridge Park.
Trackerid
11206
Title
Highbridge Park Interior Staircase Reconstruction (Hurricane Ida)
Summary
This project will reconstruct the interior staircase at Highbridge Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalState
Name
W 155 St and Dyckman Street, Edgecombe Avenue & Amsterdam Avenue
Parkid
M037
Latitude
40.84445866
Longitude
-73.93265382
Borough
Manhattan
VIEW LOCATION
1190
Trackerid: 1190 • Fmsid: 846 P-104HGBG • Title: Highbridge Park Step Street Reconstruction
Trackerid
1190
Fmsid
846 P-104HGBG
Title
Highbridge Park Step Street Reconstruction
Summary
This project will restore the step street and surrounding landscape in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-08-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2020-01-01T00:00:00.000
Procurementactualcompletion
2020-01-01T00:00:00.000
Constructionstart
2020-03-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-10-01T00:00:00.000
Totalfunding
$5,121,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilFederalMayoral
Name
West 170th Street between University Avenue and Sedgwick Avenue
Parkid
X120
Latitude
40.84204472
Longitude
-73.92671528
Borough
Bronx
VIEW LOCATION
5937
Trackerid: 5937 • Fmsid: 846 P-311HWTR • Title: Highbridge Park Water Tower Reconstruction
Trackerid
5937
Fmsid
846 P-311HWTR
Title
Highbridge Park Water Tower Reconstruction
Summary
This project will reconstruct the water tower in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2018-04-01T00:00:00.000
Designactualcompletion
2018-03-01T00:00:00.000
Procurementstart
2018-03-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-05-01T00:00:00.000
Procurementactualcompletion
2019-05-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-04-01T00:00:00.000
Constructionadjustedcompletion
2021-10-01T00:00:00.000
Constructionactualcompletion
2021-10-01T00:00:00.000
Totalfunding
$4,571,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
West 173rd Street and Amsterdam Avenue
Parkid
M037
Latitude
40.844314
Longitude
-73.931137
Borough
Manhattan
VIEW LOCATION
8988
Trackerid: 8988 • Fmsid: 846 P-3ANCH04 • Title: Highbridge Anchor Park Reconstruction Phase I
Trackerid
8988
Fmsid
846 P-3ANCH04
Title
Highbridge Anchor Park Reconstruction Phase I
Summary
This project will reconstruct the staircase and pathways, including pavement, drainage, lighting and planting, in Highbridge Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementadjustedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2018-12-01T00:00:00.000
Constructionstart
2018-12-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2021-04-01T00:00:00.000
Constructionactualcompletion
2021-04-01T00:00:00.000
Totalfunding
$9,673,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 181st Street to Dyckman Street
Parkid
M037
Latitude
40.842556
Longitude
-73.933545
Borough
Manhattan
VIEW LOCATION
11367
Trackerid: 11367 • Title: Highbridge Park Raoul Wallenberg Playground Reconstruction • Summary: This project will reconstruct Raoul Wallenberg Playground in Highbridge Park.
Trackerid
11367
Title
Highbridge Park Raoul Wallenberg Playground Reconstruction
Summary
This project will reconstruct Raoul Wallenberg Playground in Highbridge Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
West 189th Street and Amsterdam Avenue
Parkid
M037
Latitude
40.8419594
Longitude
-73.9338729
Borough
Manhattan
VIEW LOCATION
1724111
Trackerid: 1724111 • Fmsid: 846 P-4HILNDP • Title: Highland Park Path Reconstruction Phase 2
Trackerid
1724111
Fmsid
846 P-4HILNDP
Title
Highland Park Path Reconstruction Phase 2
Summary
This project will reconstruct paths in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-03-01T00:00:00.000
Designprojectedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2024-04-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q020
Latitude
40.689046
Longitude
-73.886387
Borough
Queens
VIEW LOCATION
1764111
Trackerid: 1764111 • Fmsid: 846 P-4HILNDP • Title: Highland Park Path Reconstruction
Trackerid
1764111
Fmsid
846 P-4HILNDP
Title
Highland Park Path Reconstruction
Summary
This project will reconstruct paths in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-07-01T00:00:00.000
Designprojectedcompletion
2025-03-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Procurementstart
2024-07-01T00:00:00.000
Procurementprojectedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q020
Latitude
40.6888227
Longitude
-73.8885793
Borough
Queens
VIEW LOCATION
1968111
Trackerid: 1968111 • Fmsid: 846 P-405HGLD • Title: Highland Park Synthetic Turf Field Reconstruction
Trackerid
1968111
Fmsid
846 P-405HGLD
Title
Highland Park Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf soccer field at Highland Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-11-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q020
Latitude
40.6881474
Longitude
-73.8886896
Borough
Queens
VIEW LOCATION
1424111
Trackerid: 1424111 • Fmsid: 846 P-4HLNDSW • Title: Upper Highland Park Playground Public Restroom Building Sewer Reconstruction
Trackerid
1424111
Fmsid
846 P-4HLNDSW
Title
Upper Highland Park Playground Public Restroom Building Sewer Reconstruction
Summary
This project will reconstruct the sewer line of the public restroom building in Upper Highland Park Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-07-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-07-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-02-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
Q020
Latitude
40.68787
Longitude
-73.889089
Borough
Queens
VIEW LOCATION
1569111
Trackerid: 1569111 • Fmsid: 846 P-4HILNDP • Title: Highland Park Path Reconstruction
Trackerid
1569111
Fmsid
846 P-4HILNDP
Title
Highland Park Path Reconstruction
Summary
This project will reconstruct paths in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-12-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-01-01T00:00:00.000
Procurementprojectedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$1,600,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q020
Latitude
40.687918
Longitude
-73.889081
Borough
Queens
VIEW LOCATION
8784
Trackerid: 8784 • Title: Highland Park Ridgewood Reservoir Site Restoration • Currentphase: proposed
Trackerid
8784
Title
Highland Park Ridgewood Reservoir Site Restoration
Summary
This project will enhance the natural environment and site features at Ridgewood Reservoir.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q020
Latitude
40.689235
Longitude
-73.886492
Borough
Queens
VIEW LOCATION
8885
Trackerid: 8885 • Fmsid: 846 NDF-HLDN5 • Title: Highland Park Pedestrian Paths and Sidewalks Reconstruction
Trackerid
8885
Fmsid
846 NDF-HLDN5
Title
Highland Park Pedestrian Paths and Sidewalks Reconstruction
Summary
This project will reconstruct the sidewalk and improve pedestrian access along a portion of Highland Boulevard.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-11-01T00:00:00.000
Designprojectedcompletion
2018-11-01T00:00:00.000
Designactualcompletion
2018-11-01T00:00:00.000
Procurementstart
2018-11-01T00:00:00.000
Procurementprojectedcompletion
2019-08-01T00:00:00.000
Procurementadjustedcompletion
2020-01-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-08-01T00:00:00.000
Totalfunding
$942,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Highland Boulevard between Jamaica Avenue and Vermont Place
Parkid
Q020
Latitude
40.686326
Longitude
-73.885437
Borough
Queens
VIEW LOCATION
6121
Trackerid: 6121 • Fmsid: 846 P-4PLG13G • Title: Queens General Site Work (QG-913M)
Trackerid
6121
Fmsid
846 P-4PLG13G
Title
Queens General Site Work (QG-913M)
Summary
This multisite contract will reconstruct pavements, drainage, plantings, safety surface and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2016-03-01T00:00:00.000
Constructionadjustedcompletion
2015-04-01T00:00:00.000
Constructionactualcompletion
2015-07-01T00:00:00.000
Totalfunding
$943,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Highland Boulevard, Jamaica Avenue, Jackie Robinson Parkway
Parkid
Q020
Latitude
40.690678
Longitude
-73.886869
Borough
Queens
VIEW LOCATION
6121
Trackerid: 6121 • Fmsid: 846 P-4PLG13G • Title: Queens General Site Work (QG-913M)
Trackerid
6121
Fmsid
846 P-4PLG13G
Title
Queens General Site Work (QG-913M)
Summary
This multisite contract will reconstruct pavements, drainage, plantings, safety surface and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2016-03-01T00:00:00.000
Constructionadjustedcompletion
2015-04-01T00:00:00.000
Constructionactualcompletion
2015-07-01T00:00:00.000
Totalfunding
$943,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Peck Avenue & Harding Boulevard
Parkid
Q300A1
Latitude
40.741564
Longitude
-73.777146
Borough
Queens
VIEW LOCATION
11140
Trackerid: 11140 • Title: J. Hood Wright Park Entrance Plaza Reconstruction • Summary: This project will reconstruct the entrance plaza at J. Hood Wright Park.
Trackerid
11140
Title
J. Hood Wright Park Entrance Plaza Reconstruction
Summary
This project will reconstruct the entrance plaza at J. Hood Wright Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Fort Washington Avenue, bet. W. 175th St, and W. 174th St
Parkid
M099
Latitude
40.84609609
Longitude
-73.94133627
Borough
Manhattan
VIEW LOCATION
8835
Trackerid: 8835 • Fmsid: 846 P-205HPSB • Title: Highland Park Stone Bridge Overlook Area Reconstruction
Trackerid
8835
Fmsid
846 P-205HPSB
Title
Highland Park Stone Bridge Overlook Area Reconstruction
Summary
This project will reconstruct the overlook area around the stone bridge with new pathways, reconstructing steps and stone walls in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$3,219,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Highland Boulevard, Vermont Place, Jackie Robinson Parkway, Heath Place
Parkid
Q020
Latitude
40.684668
Longitude
-73.891873
Borough
Queens
VIEW LOCATION
3534
Trackerid: 3534 • Fmsid: 846 P-4PNYC03 • Title: Highland Park Perimeter Pathways, Fencing and Security Lighting Reconstruction
Trackerid
3534
Fmsid
846 P-4PNYC03
Title
Highland Park Perimeter Pathways, Fencing and Security Lighting Reconstruction
Summary
This project will reconstruct the perimeter pathways, fencing, and security lighting around Ridgewood Reservoir in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designprojectedcompletion
2009-06-01T00:00:00.000
Designadjustedcompletion
2010-01-01T00:00:00.000
Designactualcompletion
2010-01-01T00:00:00.000
Procurementstart
2010-01-01T00:00:00.000
Procurementprojectedcompletion
2010-10-01T00:00:00.000
Procurementactualcompletion
2011-03-01T00:00:00.000
Constructionstart
2011-05-01T00:00:00.000
Constructionprojectedcom
2012-02-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$6,737,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Highland Boulevard, Vermont Place, Jackie Robinson Parkway.
Parkid
Q020
Latitude
40.689536
Longitude
-73.885507
Borough
Queens
VIEW LOCATION
9071
Trackerid: 9071 • Fmsid: 846 P-405RRGH • Title: Highland Park Ridgewood Reservoir Gatehouse 27 Reconstruction
Trackerid
9071
Fmsid
846 P-405RRGH
Title
Highland Park Ridgewood Reservoir Gatehouse 27 Reconstruction
Summary
This project will reconstruct Gatehouse 27 next to Ridgewood Reservoir in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2019-03-01T00:00:00.000
Designadjustedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2023-02-01T00:00:00.000
Constructionprojectedcom
2024-08-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$5,299,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jackie Robinson Parkway between Vermont Place and Cypress Hills Street
Parkid
Q020
Latitude
40.690302
Longitude
-73.889228
Borough
Queens
VIEW LOCATION
7170
Trackerid: 7170 • Fmsid: 846 P-205HLND • Title: Highland Park Basketball Courts Reconstruction
Trackerid
7170
Fmsid
846 P-205HLND
Title
Highland Park Basketball Courts Reconstruction
Summary
This project will reconstruct four basketball courts in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-07-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-01-01T00:00:00.000
Procurementstart
2017-01-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementadjustedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-12-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$836,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jamaica Avenue at Cleveland Street
Parkid
Q020
Latitude
40.683855
Longitude
-73.886925
Borough
Queens
VIEW LOCATION
7388
Trackerid: 7388 • Fmsid: 846 NDF-HLND • Title: Highland Park Lower Western Playground Reconstruction
Trackerid
7388
Fmsid
846 NDF-HLND
Title
Highland Park Lower Western Playground Reconstruction
Summary
This project will reconstruct Lower Western Playground in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2017-05-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-04-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$2,088,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jamaica Avenue Between Elton Street and Cleveland Street
Parkid
Q020
Latitude
40.683863
Longitude
-73.886137
Borough
Queens
VIEW LOCATION
1546
Trackerid: 1546 • Fmsid: 846 P-205D17H • Title: Highland Park Ballfields 1 & 2 Reconstruction
Trackerid
1546
Fmsid
846 P-205D17H
Title
Highland Park Ballfields 1 & 2 Reconstruction
Summary
This project will reconstruct natural turf ballfields 1 and 2 in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designprojectedcompletion
2013-02-01T00:00:00.000
Designadjustedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-10-01T00:00:00.000
Constructionstart
2014-11-01T00:00:00.000
Constructionprojectedcom
2016-05-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$2,758,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jamaica Avenue between Linwood Street and Shepherd Avenue
Parkid
Q020
Latitude
40.687773
Longitude
-73.890973
Borough
Queens
VIEW LOCATION
9365
Trackerid: 9365 • Fmsid: 846 NDF-HLDN3 • Title: Highland Park Lower East Playground Reconstruction
Trackerid
9365
Fmsid
846 NDF-HLDN3
Title
Highland Park Lower East Playground Reconstruction
Summary
This project will reconstruct the eastern half of the lower playground area, and performance area at Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2021-03-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-06-01T00:00:00.000
Constructionprojectedcom
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$3,939,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jamaica Avenue between Lynwood and Elton Streets
Parkid
Q020
Latitude
40.684164
Longitude
-73.885332
Borough
Queens
VIEW LOCATION
9366
Trackerid: 9366 • Fmsid: 846 NDF-HLDN4 • Title: Highland Park Lower East Playground Public Restroom Building Reconstruction
Trackerid
9366
Fmsid
846 NDF-HLDN4
Title
Highland Park Lower East Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at the lower east playground in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2021-07-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-10-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$1,362,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jamaica Avenue between Lynwood Street and Elton Street
Parkid
Q020
Latitude
40.684042
Longitude
-73.885795
Borough
Queens
VIEW LOCATION
9110
Trackerid: 9110 • Fmsid: 846 P-405RRIV • Title: Ridgewood Reservoir Invasive Species Removal
Trackerid
9110
Fmsid
846 P-405RRIV
Title
Ridgewood Reservoir Invasive Species Removal
Summary
This project will remove invasive species and plant new and replacement trees at Ridgewood Reservoir in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designadjustedcompletion
2019-07-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-08-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$3,250,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Vermont Place, Highland Boulevard, Jackie Robinson Parkway, Cypress Hills Street
Parkid
Q020
Latitude
40.68928
Longitude
-73.886616
Borough
Queens
VIEW LOCATION
10064
Trackerid: 10064 • Fmsid: 846 P-405HIDR • Title: Highland Park Dog Run Construction
Trackerid
10064
Fmsid
846 P-405HIDR
Title
Highland Park Dog Run Construction
Summary
This project will construct a dog run in Highland Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2025-02-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-04-01T00:00:00.000
Totalfunding
$1,732,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Western side of Lower Highland Park adjacent to Jamaica Avenue
Parkid
Q020
Latitude
40.6863818
Longitude
-73.885652
Borough
Queens
VIEW LOCATION
7410
Trackerid: 7410 • Fmsid: 846 P-2CPISBF • Title: Hilltop Playground Reconstruction
Trackerid
7410
Fmsid
846 P-2CPISBF
Title
Hilltop Playground Reconstruction
Summary
This project will construct new play equipment, a spray shower, a synthetic turf field, a painted track, adult fitness equipment, basketball court, lighting, fencing, pavement, planting and site furnishings at Hilltop Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-07-01T00:00:00.000
Constructionstart
2016-09-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$3,976,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Dean Street, Pacific Street, Thomas S. Boyland Street
Parkid
B387
Latitude
40.675321
Longitude
-73.914336
Borough
Brooklyn
VIEW LOCATION
1965111
Trackerid: 1965111 • Fmsid: 846 P-403HTST • Title: Hinton Park Synthetic Turf Field Reconstruction
Trackerid
1965111
Fmsid
846 P-403HTST
Title
Hinton Park Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the multi-use synthetic turf field at Hinton Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-11-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q410
Latitude
40.7443252
Longitude
-73.842647
Borough
Queens
VIEW LOCATION
6263
Trackerid: 6263 • Fmsid: 846 P-403HIN3 • Title: Hinton Park Reconstruction
Trackerid
6263
Fmsid
846 P-403HIN3
Title
Hinton Park Reconstruction
Summary
This project will reconstruct the northern and southern portions of Hinton Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-03-01T00:00:00.000
Designprojectedcompletion
2014-12-01T00:00:00.000
Designadjustedcompletion
2015-01-01T00:00:00.000
Designactualcompletion
2015-02-01T00:00:00.000
Procurementstart
2015-02-01T00:00:00.000
Procurementprojectedcompletion
2015-11-01T00:00:00.000
Procurementactualcompletion
2015-11-01T00:00:00.000
Constructionstart
2015-11-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-07-01T00:00:00.000
Totalfunding
$1,203,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Bounded by 113th and 114th Streets and 34th and 37th Avenues
Parkid
Q410
Latitude
40.75602694
Longitude
-73.85495583
Borough
Queens
VIEW LOCATION
1522111
Trackerid: 1522111 • Fmsid: 846 P-4CPIHCS • Title: Hoffman Park Public Restroom Building Reconstruction
Trackerid
1522111
Fmsid
846 P-4CPIHCS
Title
Hoffman Park Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Hoffman Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2022-09-01T00:00:00.000
Designprojectedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2027-06-01T00:00:00.000
Totalfunding
$1,531,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q360N
Latitude
40.732945
Longitude
-73.87152
Borough
Queens
VIEW LOCATION
10062
Trackerid: 10062 • Fmsid: 846 P-404HOPK • Title: Hoffman Park Reconstruction
Trackerid
10062
Fmsid
846 P-404HOPK
Title
Hoffman Park Reconstruction
Summary
This project will reconstruct Hoffman Park.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
60.0
Constructionpercentcomplete
0.0
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designadjustedcompletion
2026-07-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementprojectedcompletion
2026-06-01T00:00:00.000
Constructionstart
2026-05-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Hoffman Drive between 58th Avenue and Woodhaven Boulevard
Parkid
Q360N
Latitude
40.732975
Longitude
-73.872345
Borough
Queens
VIEW LOCATION
10744
Trackerid: 10744 • Fmsid: 846 P-3CPIHRL • Title: Holcombe Rucker Park Sports Lighting Reconstruction
Trackerid
10744
Fmsid
846 P-3CPIHRL
Title
Holcombe Rucker Park Sports Lighting Reconstruction
Summary
This project will reconstruct the sports lighting at the basketball court in Holcombe Rucker Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Procurementstart
2025-11-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-04-01T00:00:00.000
Constructionprojectedcom
2026-10-01T00:00:00.000
Constructionactualcompletion
2026-07-01T00:00:00.000
Totalfunding
$1,500,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Frederick Douglass Boulevard and West 155th Street
Parkid
M216
Latitude
40.8294655
Longitude
-73.93615207
Borough
Manhattan
VIEW LOCATION
10629
Trackerid: 10629 • Fmsid: 846 P-3CPIHRP • Title: Holcombe Rucker Park Playground Reconstruction
Trackerid
10629
Fmsid
846 P-3CPIHRP
Title
Holcombe Rucker Park Playground Reconstruction
Summary
This project will reconstruct the playground in Holcombe Rucker Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-02-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designadjustedcompletion
2026-08-01T00:00:00.000
Designactualcompletion
2026-08-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 155th Street and Frederick Douglass Boulevard
Parkid
M216
Latitude
40.8295554
Longitude
-73.93648474
Borough
Manhattan
VIEW LOCATION
10764
Trackerid: 10764 • Fmsid: 846 P-3CPIHPR • Title: Holcombe Rucker Park Public Restroom Building Construction
Trackerid
10764
Fmsid
846 P-3CPIHPR
Title
Holcombe Rucker Park Public Restroom Building Construction
Summary
This project will construct the public restroom building at Holcombe Rucker Park.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-10-01T00:00:00.000
Designprojectedcompletion
2026-10-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 155th Street between Frederick Douglass Boulevard and Harlem River Drive
Parkid
M216
Latitude
40.82918307
Longitude
-73.93617186
Borough
Manhattan
VIEW LOCATION
2006111
Trackerid: 2006111 • Title: Homecrest Playground Pavement Reconstruction • Summary: This project will reconstruct paved surfaces at Homecrest Playground.
Trackerid
2006111
Title
Homecrest Playground Pavement Reconstruction
Summary
This project will reconstruct paved surfaces at Homecrest Playground.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B166B
Latitude
40.5864401
Longitude
-73.9574972
Borough
Brooklyn
VIEW LOCATION
11115
Trackerid: 11115 • Title: Homecrest Playground Expansion Construction and Handball Court Reconstruction • Currentphase: proposed
Trackerid
11115
Title
Homecrest Playground Expansion Construction and Handball Court Reconstruction
Summary
This project will reconstruct the handball court and expand the playground at Homecrest Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Homecrest Avenue and William Court
Parkid
B166B
Latitude
40.58642883
Longitude
-73.9572497
Borough
Brooklyn
VIEW LOCATION
8636
Trackerid: 8636 • Fmsid: 846 P-215HCPL • Title: Homecrest Playground Reconstruction
Trackerid
8636
Fmsid
846 P-215HCPL
Title
Homecrest Playground Reconstruction
Summary
This project will reconstruct the children's play area in Homecrest Playground, including the spray shower, play equipment, paving, site furniture, landscaping and utilities.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designadjustedcompletion
2018-08-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-05-01T00:00:00.000
Procurementadjustedcompletion
2019-09-01T00:00:00.000
Procurementactualcompletion
2019-09-01T00:00:00.000
Constructionstart
2019-10-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$3,375,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Williams Court, East 14th Street, Homecrest Avenue, Shore Parkway
Parkid
B166B
Latitude
40.5861
Longitude
-73.957292
Borough
Brooklyn
VIEW LOCATION
9247
Trackerid: 9247 • Fmsid: 846 P-308HNYL • Title: Honey Locust Park Reconstruction
Trackerid
9247
Fmsid
846 P-308HNYL
Title
Honey Locust Park Reconstruction
Summary
This project will reconstruct Honey Locust Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2021-12-01T00:00:00.000
Procurementactualcompletion
2021-12-01T00:00:00.000
Constructionstart
2022-01-01T00:00:00.000
Constructionprojectedcom
2023-01-01T00:00:00.000
Constructionactualcompletion
2022-09-01T00:00:00.000
Totalfunding
$993,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 59th Street between 1st Avenue and 2nd Avenue.
Parkid
M177
Latitude
40.760161
Longitude
-73.96294
Borough
Manhattan
VIEW LOCATION
8740
Trackerid: 8740 • Title: Hook Creek Park Sediment Application • Currentphase: completed
Trackerid
8740
Title
Hook Creek Park Sediment Application
Summary
This project will apply a thin layer of sediment within the wetland area of Hook Creek Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-07-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-07-01T00:00:00.000
Procurementstart
2021-07-01T00:00:00.000
Procurementprojectedcompletion
2022-04-01T00:00:00.000
Procurementadjustedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Name
In the wetland area near Huxley Street and Craft Avenue.
Parkid
Q454
Latitude
40.64958
Longitude
-73.737718
Borough
Queens
VIEW LOCATION
7266
Trackerid: 7266 • Fmsid: 846 P-408HOV2 • Title: Hoover Playground Reconstruction
Trackerid
7266
Fmsid
846 P-408HOV2
Title
Hoover Playground Reconstruction
Summary
This project will reconstruct Hoover Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2024-08-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Van Wyck Expressway, Queens Boulevard, Main Street, Manton Street
Parkid
Q220G
Latitude
40.7103249
Longitude
-73.82019242
Borough
Queens
VIEW LOCATION