Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
6265
Trackerid: 6265 • Fmsid: 846 P-303JACK • Title: Jackie Robinson Recreation Center Exterior Facade & Roofing Reconstruction
Trackerid
6265
Fmsid
846 P-303JACK
Title
Jackie Robinson Recreation Center Exterior Facade & Roofing Reconstruction
Summary
This project will reconstruct the exterior facades and roof of Jackie Robinson Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designadjustedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2016-06-01T00:00:00.000
Procurementstart
2016-06-01T00:00:00.000
Procurementprojectedcompletion
2017-02-01T00:00:00.000
Procurementadjustedcompletion
2018-03-01T00:00:00.000
Procurementactualcompletion
2018-02-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$2,336,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Bradhurst Avenue between West 145th Street and West 147th Street
Parkid
M014
Latitude
40.824165
Longitude
-73.942481
Borough
Manhattan
VIEW LOCATION
8567
Trackerid: 8567 • Fmsid: 846 P-3PWBJRP • Title: Jackie Robinson Park Reconstruction (M014-117M)
Trackerid
8567
Fmsid
846 P-3PWBJRP
Title
Jackie Robinson Park Reconstruction (M014-117M)
Summary
This project will reconstruct stairways, fencing, sidewalks, and entrances in Jackie Robinson Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-08-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionadjustedcompletion
2020-05-01T00:00:00.000
Constructionactualcompletion
2020-05-01T00:00:00.000
Totalfunding
$4,358,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 145th Street, West 155th Street, Edgecombe Avenue, Bradhurst Avenue
Parkid
M014
Latitude
40.825438
Longitude
-73.941674
Borough
Manhattan
VIEW LOCATION
10611
Trackerid: 10611 • Fmsid: 846 P-2JRCOUR • Title: Jackie Robinson Playground Reconstruction
Trackerid
10611
Fmsid
846 P-2JRCOUR
Title
Jackie Robinson Playground Reconstruction
Summary
This project will reconstruct the playground at Jackie Robinson Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-12-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designactualcompletion
2026-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Malcom X Blvd between Chauncey Street and Marion Street
Parkid
B294
Latitude
40.6802997
Longitude
-73.92759624
Borough
Brooklyn
VIEW LOCATION
6293
Trackerid: 6293 • Fmsid: 846 P-3PLG15B • Title: Jane Street Garden Fence Construction and Jackson Square Park Reconstruction
Trackerid
6293
Fmsid
846 P-3PLG15B
Title
Jane Street Garden Fence Construction and Jackson Square Park Reconstruction
Summary
This project will construct a new fence at Jane Street Garden and reconstruct Jackson Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-02-01T00:00:00.000
Designprojectedcompletion
2015-04-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-03-01T00:00:00.000
Procurementstart
2017-03-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementactualcompletion
2017-12-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$2,282,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
8 Ave. To Greenwich Ave., Horatio St.
Parkid
M044
Latitude
40.738994
Longitude
-74.002816
Borough
Manhattan
VIEW LOCATION
6293
Trackerid: 6293 • Fmsid: 846 P-3PLG15B • Title: Jane Street Garden Fence Construction and Jackson Square Park Reconstruction
Trackerid
6293
Fmsid
846 P-3PLG15B
Title
Jane Street Garden Fence Construction and Jackson Square Park Reconstruction
Summary
This project will construct a new fence at Jane Street Garden and reconstruct Jackson Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-02-01T00:00:00.000
Designprojectedcompletion
2015-04-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-03-01T00:00:00.000
Procurementstart
2017-03-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementactualcompletion
2017-12-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$2,282,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jane St. at 8th Ave.
Parkid
M390
Latitude
40.738029
Longitude
-74.004508
Borough
Manhattan
VIEW LOCATION
7301
Trackerid: 7301 • Fmsid: 846 P-309JSPL • Title: Jacob H. Schiff Playground Basketball and Handball Courts Reconstruction
Trackerid
7301
Fmsid
846 P-309JSPL
Title
Jacob H. Schiff Playground Basketball and Handball Courts Reconstruction
Summary
This project will reconstruct basketball and handball courts at Jacob H. Schiff Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-05-01T00:00:00.000
Procurementstart
2018-05-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$942,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Amsterdam Avenue Between 136th Street and 138th Street
Parkid
M223
Latitude
40.82021
Longitude
-73.952094
Borough
Manhattan
VIEW LOCATION
9443
Trackerid: 9443 • Fmsid: 846 P-309SSTF • Title: Jacob Schiff Playground Synthetic Turf Field Reconstruction
Trackerid
9443
Fmsid
846 P-309SSTF
Title
Jacob Schiff Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at Jacob Schiff Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2021-12-01T00:00:00.000
Procurementactualcompletion
2021-12-01T00:00:00.000
Constructionstart
2022-02-01T00:00:00.000
Constructionprojectedcom
2023-02-01T00:00:00.000
Constructionactualcompletion
2022-11-01T00:00:00.000
Totalfunding
$1,737,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Amsterdam Avenue Between West 136th Street and West 138th Street
Parkid
M223
Latitude
40.820275
Longitude
-73.952408
Borough
Manhattan
VIEW LOCATION
9558
Trackerid: 9558 • Fmsid: 846 P-309JSST • Title: Jacob Schiff Playground Sitting Area Reconstruction
Trackerid
9558
Fmsid
846 P-309JSST
Title
Jacob Schiff Playground Sitting Area Reconstruction
Summary
This project will reconstruct the sitting area in Jacob Schiff Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-11-01T00:00:00.000
Procurementstart
2020-11-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$1,107,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Amsterdam Avenue between West 136th Street and West 138th Street
Parkid
M223
Latitude
40.820626
Longitude
-73.952396
Borough
Manhattan
VIEW LOCATION
7233
Trackerid: 7233 • Fmsid: 846 P-218JCOB • Currentphase: completed
Trackerid
7233
Fmsid
846 P-218JCOB
Title
Jacob Joffe Fields Adult Fitness Area Construction and Sport Courts Reconstruction
Summary
This project will reconstruct the basketball and handball courts at Jacob Joffe Fields.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2016-11-01T00:00:00.000
Designactualcompletion
2016-12-01T00:00:00.000
Procurementstart
2016-12-01T00:00:00.000
Procurementprojectedcompletion
2017-09-01T00:00:00.000
Procurementadjustedcompletion
2018-03-01T00:00:00.000
Procurementactualcompletion
2018-02-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-04-01T00:00:00.000
Totalfunding
$767,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Avenue K between 58th Street and 59th Street
Parkid
B324
Latitude
40.626038
Longitude
-73.919378
Borough
Brooklyn
VIEW LOCATION
8570
Trackerid: 8570 • Fmsid: 846 P-218JFEE • Title: Jacob Joffe Fields Playground Reconstruction
Trackerid
8570
Fmsid
846 P-218JFEE
Title
Jacob Joffe Fields Playground Reconstruction
Summary
This project will reconstruct the playground at Jacob Joffe Fields.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-09-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2018-01-01T00:00:00.000
Procurementstart
2018-01-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-06-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$2,601,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 58th Street and East 59th Street near Avenue L
Parkid
B324
Latitude
40.624884
Longitude
-73.91927
Borough
Brooklyn
VIEW LOCATION
1076111
Trackerid: 1076111 • Fmsid: 846 P-201JAME • Title: Jaime Campiz Playground Basketball Courts and Adult Fitness Area Reconstruction
Trackerid
1076111
Fmsid
846 P-201JAME
Title
Jaime Campiz Playground Basketball Courts and Adult Fitness Area Reconstruction
Summary
This project will reconstruct the basketball courts and adult fitness area in Jaime Campiz Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2017-09-01T00:00:00.000
Designactualcompletion
2017-10-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2017-09-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2018-07-01T00:00:00.000
Constructionactualcompletion
2018-08-01T00:00:00.000
Totalfunding
$223,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B223R
Latitude
40.713815
Longitude
-73.95419
Borough
Brooklyn
VIEW LOCATION
9192
Trackerid: 9192 • Fmsid: 846 P-412JMIC • Title: Jamaica Playground Reconstruction
Trackerid
9192
Fmsid
846 P-412JMIC
Title
Jamaica Playground Reconstruction
Summary
This project will reconstruct Jamaica Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-04-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designactualcompletion
2020-05-01T00:00:00.000
Procurementstart
2020-05-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$3,552,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
110th Avenue between 160th Street and Union Hall Street
Parkid
Q301
Latitude
40.693178299331
Longitude
-73.790273782016
Borough
Queens
VIEW LOCATION
9844
Trackerid: 9844 • Fmsid: 846 P-412JAMP • Title: Jamaica Playground Multipurpose Play Area Reconstruction
Trackerid
9844
Fmsid
846 P-412JAMP
Title
Jamaica Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in Jamaica Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-09-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-09-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$3,985,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
160th Street between 109th Avenue and Brinkerhoff Avenue
Parkid
Q301
Latitude
40.693330369467
Longitude
-73.791068458532
Borough
Queens
VIEW LOCATION
8871
Trackerid: 8871 • Fmsid: 846 P-407BLND • Title: James A. Bland Playground Reconstruction
Trackerid
8871
Fmsid
846 P-407BLND
Title
James A. Bland Playground Reconstruction
Summary
This project will reconstruct James A. Bland Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-03-01T00:00:00.000
Designprojectedcompletion
2021-03-01T00:00:00.000
Designactualcompletion
2021-04-01T00:00:00.000
Procurementstart
2021-04-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementadjustedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2023-01-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionadjustedcompletion
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$5,999,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
40th Road and Prince Street
Parkid
Q326
Latitude
40.758271
Longitude
-73.831132
Borough
Queens
VIEW LOCATION
11062
Trackerid: 11062 • Title: James Forten Playground Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
11062
Title
James Forten Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at James Forten Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Underhill Avenue between Prospect Place and Park Place
Parkid
B161
Latitude
40.67662626
Longitude
-73.96548356
Borough
Brooklyn
VIEW LOCATION
11063
Trackerid: 11063 • Title: James Forten Playground Reconstruction • Summary: This project will reconstruct James Forten Playground.
Trackerid
11063
Title
James Forten Playground Reconstruction
Summary
This project will reconstruct James Forten Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Underhill Avenue between Prospect Place and Park Place
Parkid
B161
Latitude
40.67665796
Longitude
-73.96581451
Borough
Brooklyn
VIEW LOCATION
2185
Trackerid: 2185 • Fmsid: 846 P-302JJWP • Title: James J. Walker Park Synthetic Turf Ballfield Construction
Trackerid
2185
Fmsid
846 P-302JJWP
Title
James J. Walker Park Synthetic Turf Ballfield Construction
Summary
This project will convert the natural turf field at James J. Walker Park to a synthetic turf field.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-09-01T00:00:00.000
Designprojectedcompletion
2011-06-01T00:00:00.000
Designadjustedcompletion
2011-08-01T00:00:00.000
Designactualcompletion
2011-08-01T00:00:00.000
Procurementstart
2011-08-01T00:00:00.000
Procurementprojectedcompletion
2012-05-01T00:00:00.000
Procurementactualcompletion
2012-04-01T00:00:00.000
Constructionstart
2012-09-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-08-01T00:00:00.000
Constructionactualcompletion
2013-08-01T00:00:00.000
Totalfunding
$1,074,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Hudson Street between Leroy and Clarkson Streets
Parkid
M038
Latitude
40.729799
Longitude
-74.006152
Borough
Manhattan
VIEW LOCATION
2246
Trackerid: 2246 • Fmsid: 846 P-303JMPZ • Title: James Madison Plaza Reconstruction
Trackerid
2246
Fmsid
846 P-303JMPZ
Title
James Madison Plaza Reconstruction
Summary
This project will reconstruct James Madison Plaza.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2007-06-01T00:00:00.000
Designprojectedcompletion
2008-08-01T00:00:00.000
Designadjustedcompletion
2009-01-01T00:00:00.000
Designactualcompletion
2009-01-01T00:00:00.000
Procurementstart
2009-01-01T00:00:00.000
Procurementprojectedcompletion
2009-10-01T00:00:00.000
Procurementactualcompletion
2009-11-01T00:00:00.000
Constructionstart
2010-03-01T00:00:00.000
Constructionprojectedcom
2011-03-01T00:00:00.000
Constructionadjustedcompletion
2013-10-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,972,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Federal
Name
Pearl Street, Madison Street and St. James Place
Parkid
M255
Latitude
40.711472
Longitude
-74.000465
Borough
Manhattan
VIEW LOCATION
7037
Trackerid: 7037 • Fmsid: 846 P-3CPIJWJ • Title: James Weldon Johnson Playground Reconstruction
Trackerid
7037
Fmsid
846 P-3CPIJWJ
Title
James Weldon Johnson Playground Reconstruction
Summary
This project will reconstruct the playground, active recreation and joint operated playground with the adjacent school.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-11-01T00:00:00.000
Constructionprojectedcom
2018-02-01T00:00:00.000
Constructionactualcompletion
2018-02-01T00:00:00.000
Totalfunding
$4,397,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
South of East 115th Street between Third Avenue and Lexington Avenue
Parkid
M111
Latitude
40.79717833
Longitude
-73.94185667
Borough
Manhattan
VIEW LOCATION
10341
Trackerid: 10341 • Fmsid: 846 P-1CPIJJP • Title: Jennie Jerome Playground Reconstruction
Trackerid
10341
Fmsid
846 P-1CPIJJP
Title
Jennie Jerome Playground Reconstruction
Summary
This project will reconstruct Jennie Jerome Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-09-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2024-12-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$2,889,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jerome Avenue and East 174th Street
Parkid
X148C5
Latitude
40.845571
Longitude
-73.913476
Borough
Bronx
VIEW LOCATION
4652
Trackerid: 4652 • Fmsid: 846 P-1CROT28 • Title: Jerome Park Reservoir Jogging Trail Construction
Trackerid
4652
Fmsid
846 P-1CROT28
Title
Jerome Park Reservoir Jogging Trail Construction
Summary
This project will construct a 5-foot wide jogging trail around the perimeter of the Jerome Park Reservoir, with new seating, plantings and adult fitness equipment. The project will also reconstruct the jogging trail, dog run, and basketball courts at Fort Independence Park, and construct new adult fitness equipment.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2007-04-01T00:00:00.000
Designprojectedcompletion
2012-04-01T00:00:00.000
Designactualcompletion
2012-04-01T00:00:00.000
Procurementstart
2012-04-01T00:00:00.000
Procurementprojectedcompletion
2013-01-01T00:00:00.000
Procurementactualcompletion
2013-03-01T00:00:00.000
Constructionstart
2013-04-01T00:00:00.000
Constructionprojectedcom
2014-04-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-12-01T00:00:00.000
Totalfunding
$3,365,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Goulden Avenue, Reservoir Avenue, Sedgwick Avenue
Parkid
X137
Latitude
40.87936556
Longitude
-73.89146167
Borough
Bronx
VIEW LOCATION
1523111
Trackerid: 1523111 • Fmsid: 846 P-2CPIJCS • Title: Jerome Playground Public Restroom Building Reconstruction
Trackerid
1523111
Fmsid
846 P-2CPIJCS
Title
Jerome Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Jerome Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2024-11-01T00:00:00.000
Designprojectedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2025-01-01T00:00:00.000
Procurementprojectedcompletion
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Totalfunding
$2,028,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B246
Latitude
40.658915
Longitude
-73.879449
Borough
Brooklyn
VIEW LOCATION
10222
Trackerid: 10222 • Fmsid: 846 P-2CPIJRM • Title: Jerome Playground Reconstruction
Trackerid
10222
Fmsid
846 P-2CPIJRM
Title
Jerome Playground Reconstruction
Summary
This project will reconstruct the basketball courts, playground, and track and field in Jerome Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
46.5
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2026-02-01T00:00:00.000
Procurementactualcompletion
2025-11-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2027-03-01T00:00:00.000
Totalfunding
$5,400,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Wortman Avenue & Warwick Street
Parkid
B246
Latitude
40.658947
Longitude
-73.879647
Borough
Brooklyn
VIEW LOCATION
9274
Trackerid: 9274 • Fmsid: 846 P-104JRME • Title: Jerome Playground South Skate Park Construction
Trackerid
9274
Fmsid
846 P-104JRME
Title
Jerome Playground South Skate Park Construction
Summary
This project will demolish the handball courts and construct a new skate park in their place at Jerome Playground South.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-07-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$2,399,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Cross-Bronx Expressway between Townsend Avenue and Jerome Avenue
Parkid
X148C7
Latitude
40.844866
Longitude
-73.913904
Borough
Bronx
VIEW LOCATION
7027
Trackerid: 7027 • Fmsid: 846 P-2CPIBN2 • Currentphase: completed
Trackerid
7027
Fmsid
846 P-2CPIBN2
Title
Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom buildings Jesse Owens Playground, Stockton Playground, and Stroud Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-10-01T00:00:00.000
Procurementprojectedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-12-01T00:00:00.000
Constructionadjustedcompletion
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$4,732,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Lafayette Ave. bet. Stuyvesant Ave. and Malcom X Blvd.
Parkid
B269
Latitude
40.691625
Longitude
-73.932456
Borough
Brooklyn
VIEW LOCATION
7027
Trackerid: 7027 • Fmsid: 846 P-2CPIBN2 • Currentphase: completed
Trackerid
7027
Fmsid
846 P-2CPIBN2
Title
Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom buildings Jesse Owens Playground, Stockton Playground, and Stroud Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-10-01T00:00:00.000
Procurementprojectedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-12-01T00:00:00.000
Constructionadjustedcompletion
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$4,732,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Park Av, Floyd St, E/o Marcy Av
Parkid
B298
Latitude
40.697112
Longitude
-73.948612
Borough
Brooklyn
VIEW LOCATION
7027
Trackerid: 7027 • Fmsid: 846 P-2CPIBN2 • Currentphase: completed
Trackerid
7027
Fmsid
846 P-2CPIBN2
Title
Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom buildings Jesse Owens Playground, Stockton Playground, and Stroud Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designadjustedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-10-01T00:00:00.000
Procurementprojectedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-12-01T00:00:00.000
Constructionadjustedcompletion
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$4,732,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Classon Av, Sterling Pl and Park Pl
Parkid
B350
Latitude
40.674986
Longitude
-73.962248
Borough
Brooklyn
VIEW LOCATION
7412
Trackerid: 7412 • Fmsid: 846 P-2CPIJOP • Title: Jesse Owens Playground Reconstruction
Trackerid
7412
Fmsid
846 P-2CPIJOP
Title
Jesse Owens Playground Reconstruction
Summary
This project will reconstruct the play equipment, spray shower, synthetic turf field, painted track, lighting, fencing, pavement, plantings and furnishings at Jesse Owens Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designadjustedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-03-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-03-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionadjustedcompletion
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$5,826,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Lafayette Avenue between Stuyvesant Avenue and Malcolm X Boulevard
Parkid
B269
Latitude
40.691513
Longitude
-73.93221
Borough
Brooklyn
VIEW LOCATION
8668
Trackerid: 8668 • Fmsid: 846 P-3RIVJOA • Currentphase: completed
Trackerid
8668
Fmsid
846 P-3RIVJOA
Title
Joan of Arc Park Reconstruction and Riverside Park Adult Fitness Equipment Installation
Summary
This project will reconstruct the concrete stairs and asphalt paths in Joan of Arc Park, and install adult fitness equipment, bike racks and benches adjacent to the basketball courts at Neufeld Playground near West 76th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementactualcompletion
2019-02-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$617,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Riverside Drive, West 91 - 95 Streets
Parkid
M048
Latitude
40.794234
Longitude
-73.976575
Borough
Manhattan
VIEW LOCATION
2005111
Trackerid: 2005111 • Title: Julio Carballo Field Pavement Reconstruction • Currentphase: proposed
Trackerid
2005111
Title
Julio Carballo Field Pavement Reconstruction
Summary
This project will reconstruct the basketball court paved surfaces and color seal.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
X260
Latitude
40.8158231
Longitude
-73.8892191
Borough
Bronx
VIEW LOCATION
8668
Trackerid: 8668 • Fmsid: 846 P-3RIVJOA • Currentphase: completed
Trackerid
8668
Fmsid
846 P-3RIVJOA
Title
Joan of Arc Park Reconstruction and Riverside Park Adult Fitness Equipment Installation
Summary
This project will reconstruct the concrete stairs and asphalt paths in Joan of Arc Park, and install adult fitness equipment, bike racks and benches adjacent to the basketball courts at Neufeld Playground near West 76th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementactualcompletion
2019-02-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$617,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
West 76th Street & Riverside Drive
Parkid
M071
Latitude
40.783167
Longitude
-73.985016
Borough
Manhattan
VIEW LOCATION
5986
Trackerid: 5986 • Fmsid: 846 P-207JAPN • Title: John Allen Payne Playground Reconstruction
Trackerid
5986
Fmsid
846 P-207JAPN
Title
John Allen Payne Playground Reconstruction
Summary
This project will reconstruct the play area to include new play equipment, swings, and spray shower area at John Allen Payne Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designadjustedcompletion
2016-04-01T00:00:00.000
Designactualcompletion
2016-04-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionadjustedcompletion
2018-07-01T00:00:00.000
Constructionactualcompletion
2018-07-01T00:00:00.000
Totalfunding
$2,449,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
3rd Avenue between 64th Street and 65th Street
Parkid
B210A
Latitude
40.63997222
Longitude
-74.02388083
Borough
Brooklyn
VIEW LOCATION
8994
Trackerid: 8994 • Fmsid: 846 P-5WHITEP • Title: John E. White Park Playground Reconstruction
Trackerid
8994
Fmsid
846 P-5WHITEP
Title
John E. White Park Playground Reconstruction
Summary
This project will reconstruct the playground in John E. White Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-07-01T00:00:00.000
Designprojectedcompletion
2019-07-01T00:00:00.000
Designactualcompletion
2019-07-01T00:00:00.000
Procurementstart
2019-07-01T00:00:00.000
Procurementprojectedcompletion
2020-04-01T00:00:00.000
Procurementadjustedcompletion
2021-03-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-10-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
State
Name
Lyman Avenue between High Street and Bay Street
Parkid
R012
Latitude
40.607683
Longitude
-74.062935
Borough
Staten Island
VIEW LOCATION
11067
Trackerid: 11067 • Title: John Hancock Playground Reconstruction • Summary: This project will reconstruct John Hancock Playground.
Trackerid
11067
Title
John Hancock Playground Reconstruction
Summary
This project will reconstruct John Hancock Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Bedford Ave., Hancock St., Jefferson Ave.
Parkid
B237
Latitude
40.68219581
Longitude
-73.95501924
Borough
Brooklyn
VIEW LOCATION
11066
Trackerid: 11066 • Title: John Hancock Playground Public Restroom Building Construction • Currentphase: proposed
Trackerid
11066
Title
John Hancock Playground Public Restroom Building Construction
Summary
This project will construct a public eestroom building at John Hancock Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Bedford Avenue, Hancock Street, Jefferson Avenue
Parkid
B237
Latitude
40.68215786
Longitude
-73.95472882
Borough
Brooklyn
VIEW LOCATION
7063
Trackerid: 7063 • Fmsid: 846 P-210JCAR • Title: John J Carty Park Tennis Courts Reconstruction
Trackerid
7063
Fmsid
846 P-210JCAR
Title
John J Carty Park Tennis Courts Reconstruction
Summary
This project will reconstruct the tennis courts in John J. Carty Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-10-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-05-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionadjustedcompletion
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$2,203,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East side of Fort Hamilton Parkway between Marine Avenue and 101st Street
Parkid
B210W
Latitude
40.61327194
Longitude
-74.03015917
Borough
Brooklyn
VIEW LOCATION
9554
Trackerid: 9554 • Fmsid: 846 P-210JJCP • Title: John J. Carty Park Playground Reconstruction
Trackerid
9554
Fmsid
846 P-210JJCP
Title
John J. Carty Park Playground Reconstruction
Summary
This project will reconstruct the playground at John J. Carty Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-04-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-05-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$4,212,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Fort Hamilton Parkway between 94th Street and 101st Street
Parkid
B210W
Latitude
40.613456
Longitude
-74.03019
Borough
Brooklyn
VIEW LOCATION
1527111
Trackerid: 1527111 • Fmsid: 846 P-308JJAD • Title: John Jay Park Ramp Construction
Trackerid
1527111
Fmsid
846 P-308JJAD
Title
John Jay Park Ramp Construction
Summary
This project will construct an ADA compliant ramp in John Jay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-07-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$998,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
M045
Latitude
40.769584
Longitude
-73.94921
Borough
Manhattan
VIEW LOCATION
1610111
Trackerid: 1610111 • Fmsid: 846 P-6POOL18 • Title: John Jay Park Pool Deck Reconstruction
Trackerid
1610111
Fmsid
846 P-6POOL18
Title
John Jay Park Pool Deck Reconstruction
Summary
This project will reconstruct the pool deck and John Jay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2023-11-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-05-01T00:00:00.000
Procurementprojectedcompletion
2023-10-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$1,400,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M045
Latitude
40.769342
Longitude
-73.949416
Borough
Manhattan
VIEW LOCATION
6110
Trackerid: 6110 • Fmsid: 846 SANDY3-03 • Currentphase: completed
Trackerid
6110
Fmsid
846 SANDY3-03
Title
Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct boiler components damaged by Hurricane Sandy at Tony Dapolito Recreation Center and John Jay Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-02-01T00:00:00.000
Designactualcompletion
2013-03-01T00:00:00.000
Procurementstart
2013-03-01T00:00:00.000
Procurementprojectedcompletion
2013-12-01T00:00:00.000
Procurementactualcompletion
2014-05-01T00:00:00.000
Constructionstart
2014-06-01T00:00:00.000
Constructionprojectedcom
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-02-01T00:00:00.000
Totalfunding
$899,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
East 76-East 78 Streets, Cherokee Place
Parkid
M045
Latitude
40.769181
Longitude
-73.948999
Borough
Manhattan
VIEW LOCATION
6110
Trackerid: 6110 • Fmsid: 846 SANDY3-03 • Currentphase: completed
Trackerid
6110
Fmsid
846 SANDY3-03
Title
Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct boiler components damaged by Hurricane Sandy at Tony Dapolito Recreation Center and John Jay Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-02-01T00:00:00.000
Designactualcompletion
2013-03-01T00:00:00.000
Procurementstart
2013-03-01T00:00:00.000
Procurementprojectedcompletion
2013-12-01T00:00:00.000
Procurementactualcompletion
2014-05-01T00:00:00.000
Constructionstart
2014-06-01T00:00:00.000
Constructionprojectedcom
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-02-01T00:00:00.000
Totalfunding
$899,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Carmine St. and Clarkson St., 7 Ave.
Parkid
M103
Latitude
40.7297
Longitude
-74.005496
Borough
Manhattan
VIEW LOCATION
7308
Trackerid: 7308 • Fmsid: 846 P-308JJPK • Title: John Jay Park Sitting Area Reconstruction
Trackerid
7308
Fmsid
846 P-308JJPK
Title
John Jay Park Sitting Area Reconstruction
Summary
This project will reconstruct the sitting area at John Jay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2019-03-01T00:00:00.000
Designadjustedcompletion
2019-06-01T00:00:00.000
Designactualcompletion
2019-06-01T00:00:00.000
Procurementstart
2019-06-01T00:00:00.000
Procurementprojectedcompletion
2020-03-01T00:00:00.000
Procurementadjustedcompletion
2021-05-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$632,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
FDR Drive between East 76th Street and East 78th Street
Parkid
M045
Latitude
40.769292
Longitude
-73.949507
Borough
Manhattan
VIEW LOCATION
1751111
Trackerid: 1751111 • Fmsid: 846 P-210JPPT • Title: John Paul Jones Park Pavement Reconstruction
Trackerid
1751111
Fmsid
846 P-210JPPT
Title
John Paul Jones Park Pavement Reconstruction
Summary
This project will reconstruct pavement in John Paul Jones Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-09-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2025-06-01T00:00:00.000
Constructionstart
2025-06-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-08-01T00:00:00.000
Totalfunding
$1,406,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
B035
Latitude
40.6111946
Longitude
-74.0341286
Borough
Brooklyn
VIEW LOCATION
6238
Trackerid: 6238 • Fmsid: 846 P-303ERSF • Currentphase: completed
Trackerid
6238
Fmsid
846 P-303ERSF
Title
East River Park East 6th Street Synthetic Turf Soccer Field & Running Track Reconstruction
Summary
This project will reconstruct the synthetic turf soccer field and resurface the running track in East River Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-11-01T00:00:00.000
Procurementstart
2016-11-01T00:00:00.000
Procurementprojectedcompletion
2017-08-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$3,076,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 6th Street and East River Park
Parkid
M144
Latitude
40.721687
Longitude
-73.973354
Borough
Manhattan
VIEW LOCATION
6335
Trackerid: 6335 • Fmsid: 846 P-408AUS2 • Title: Joseph Austin Playground Synthetic Turf Field Reconstruction
Trackerid
6335
Fmsid
846 P-408AUS2
Title
Joseph Austin Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf ballfield and drainage system at Joe Austin Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-10-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2016-05-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-02-01T00:00:00.000
Procurementadjustedcompletion
2017-08-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-08-01T00:00:00.000
Constructionprojectedcom
2018-08-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$2,670,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Grand Central Parkway, 164th Place, 168th Street
Parkid
Q391
Latitude
40.715959
Longitude
-73.800448
Borough
Queens
VIEW LOCATION
8721
Trackerid: 8721 • Fmsid: 846 P-3CPISUR • Title: Joseph Sauer Park Reconstruction
Trackerid
8721
Fmsid
846 P-3CPISUR
Title
Joseph Sauer Park Reconstruction
Summary
This project will reconstruct Joseph Sauer Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-10-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionadjustedcompletion
2020-12-01T00:00:00.000
Constructionactualcompletion
2020-12-01T00:00:00.000
Totalfunding
$3,520,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East 12th Street between Avenue A & Avenue B
Parkid
M113
Latitude
40.728173
Longitude
-73.979735
Borough
Manhattan
VIEW LOCATION
9837
Trackerid: 9837 • Fmsid: 846 P-404JCPI • Title: Josephine Caminiti Playground Reconstruction
Trackerid
9837
Fmsid
846 P-404JCPI
Title
Josephine Caminiti Playground Reconstruction
Summary
This project will reconstruct Josephine Caminiti Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
97.0
Designstart
2022-03-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2025-05-01T00:00:00.000
Procurementactualcompletion
2025-05-01T00:00:00.000
Constructionstart
2025-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Totalfunding
$3,955,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
102nd Street between Corona Avenue and Alstyne Avenue
Parkid
Q046
Latitude
40.74402871
Longitude
-73.86146914
Borough
Queens
VIEW LOCATION
6185
Trackerid: 6185 • Fmsid: 846 P-104JKIL • Title: Joyce Kilmer Park Perimeter Fence Construction
Trackerid
6185
Fmsid
846 P-104JKIL
Title
Joyce Kilmer Park Perimeter Fence Construction
Summary
This project will construct a steel perimeter fence in Joyce Kilmer Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2015-07-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-03-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-03-01T00:00:00.000
Totalfunding
$715,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Grand Concourse between East 161st and East 164th Streets
Parkid
X028
Latitude
40.82852583
Longitude
-73.92266028
Borough
Bronx
VIEW LOCATION
1316111
Trackerid: 1316111 • Fmsid: 846 P-1HUNTPT • Title: Hunts Point Recreation Center Gymnasium Floor and Stage Reconstruction
Trackerid
1316111
Fmsid
846 P-1HUNTPT
Title
Hunts Point Recreation Center Gymnasium Floor and Stage Reconstruction
Summary
This project will reconstruct the gymnasium floor and stage at Hunts Point Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2023-12-01T00:00:00.000
Totalfunding
$648,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X260
Latitude
40.814896
Longitude
-73.889227
Borough
Bronx
VIEW LOCATION
10728
Trackerid: 10728 • Fmsid: 846 P-102HPRC • Title: Hunts Point Recreation Center Indoor Track and Lift Reconstruction
Trackerid
10728
Fmsid
846 P-102HPRC
Title
Hunts Point Recreation Center Indoor Track and Lift Reconstruction
Summary
This project will reconstruct the indoor track and lift at Hunts Point Recreation Center.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2025-04-01T00:00:00.000
Designactualcompletion
2025-05-01T00:00:00.000
Procurementstart
2026-05-01T00:00:00.000
Procurementprojectedcompletion
2027-05-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
765 Manida Street
Bronx, NY, 10474
Parkid
X260
Latitude
40.81495692
Longitude
-73.88918928
Borough
Bronx
VIEW LOCATION