Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
1915111
Trackerid: 1915111 • Fmsid: 846 P-410SFTF • Title: Southern Fields Limited Scope Synthetic Turf Reconstruction
Trackerid
1915111
Fmsid
846 P-410SFTF
Title
Southern Fields Limited Scope Synthetic Turf Reconstruction
Summary
This project will reconstruct the synthetic turf field at Southern Fields.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-09-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designactualcompletion
2026-03-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-03-01T00:00:00.000
Constructionstart
2025-12-01T00:00:00.000
Constructionprojectedcom
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-04-01T00:00:00.000
Totalfunding
$1,381,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q096E
Latitude
40.6655101
Longitude
-73.8212316
Borough
Queens
VIEW LOCATION
9165
Trackerid: 9165 • Fmsid: 846 P-4WPJAMC • Title: NYCHA Pomonok Houses Open Space Construction
Trackerid
9165
Fmsid
846 P-4WPJAMC
Title
NYCHA Pomonok Houses Open Space Construction
Summary
This project will construct a new open space within the NYCHA Pomonok Houses.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-06-01T00:00:00.000
Constructionprojectedcom
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-06-01T00:00:00.000
Totalfunding
$2,057,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
71st Avenue between Kissena Boulevard and Parsons Boulevard
Parkid
Q515
Latitude
40.730404
Longitude
-73.81212
Borough
Queens
VIEW LOCATION
1693
Trackerid: 1693 • Fmsid: 846 P-210DBCS • Title: Leif Ericson Park Public Restroom Building Construction
Trackerid
1693
Fmsid
846 P-210DBCS
Title
Leif Ericson Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Leif Ericson Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-07-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementactualcompletion
2013-09-01T00:00:00.000
Constructionstart
2013-11-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-12-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$1,424,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
66th Street, 8th Avenue, 67th Street, 9th Avenue
Parkid
B052
Latitude
40.63081194
Longitude
-74.01189528
Borough
Brooklyn
VIEW LOCATION
10348
Trackerid: 10348 • Fmsid: 846 P-2DSTG01 • Title: Leif Ericson Park Greenway Construction
Trackerid
10348
Fmsid
846 P-2DSTG01
Title
Leif Ericson Park Greenway Construction
Summary
This project will construct a greenway at Leif Ericson Park.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-10-01T00:00:00.000
Designprojectedcompletion
2025-04-01T00:00:00.000
Designadjustedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoralPrivate
Name
67th Street, 66th Street between 2nd Avenue and 7th Avenue
Parkid
B052
Latitude
40.63395
Longitude
-74.016966
Borough
Brooklyn
VIEW LOCATION
1488111
Trackerid: 1488111 • Fmsid: 846 P-5SEGNRF • Title: Lemon Creek Park Seguine Mansion Roof Reconstruction
Trackerid
1488111
Fmsid
846 P-5SEGNRF
Title
Lemon Creek Park Seguine Mansion Roof Reconstruction
Summary
This project will reconstruct the roof of the Seguine Mansion in Lemon Creek Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-11-01T00:00:00.000
Procurementstart
2022-08-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2023-09-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$158,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
R079
Latitude
40.511854
Longitude
-74.197886
Borough
Staten Island
VIEW LOCATION
1022111
Trackerid: 1022111 • Fmsid: 846 SANDY5-41 • Title: Lemon Creek Park Timber Barrier Rail Reconstruction
Trackerid
1022111
Fmsid
846 SANDY5-41
Title
Lemon Creek Park Timber Barrier Rail Reconstruction
Summary
This project will reconstruct timber barrier rail damaged from Hurricane Sandy at Lemon Creek Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-09-01T00:00:00.000
Designactualcompletion
2015-08-01T00:00:00.000
Procurementstart
2016-02-01T00:00:00.000
Procurementprojectedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-02-01T00:00:00.000
Constructionstart
2016-05-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionactualcompletion
2016-08-01T00:00:00.000
Totalfunding
$87,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, Federal
Parkid
R079
Latitude
40.512043
Longitude
-74.197868
Borough
Staten Island
VIEW LOCATION
9356
Trackerid: 9356 • Fmsid: 846 SANDY5-43 • Title: Lemon Creek Marina Waterfront Reconstruction
Trackerid
9356
Fmsid
846 SANDY5-43
Title
Lemon Creek Marina Waterfront Reconstruction
Summary
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Lemon Creek Marina.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2020-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-09-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Hylan Boulevard & Seguine Avenue
Parkid
R079
Latitude
40.51531068
Longitude
-74.20111453
Borough
Staten Island
VIEW LOCATION
10111
Trackerid: 10111 • Fmsid: 846 P-503LEMN • Title: Lemon Creek Park Playground Reconstruction
Trackerid
10111
Fmsid
846 P-503LEMN
Title
Lemon Creek Park Playground Reconstruction
Summary
This project will reconstruct the playground in Lemon Creek Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-07-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementadjustedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2024-11-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-02-01T00:00:00.000
Totalfunding
$2,012,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Seguine Avenue and Johnston Terrace
Parkid
R079
Latitude
40.513586
Longitude
-74.199786
Borough
Staten Island
VIEW LOCATION
11076
Trackerid: 11076 • Title: Levy Playground Public Restroom Building Reconstruction (Hurricane Ida) • Currentphase: proposed
Trackerid
11076
Title
Levy Playground Public Restroom Building Reconstruction (Hurricane Ida)
Summary
This project will reconstruct the public restroom building damaged by Hurricane Ida at Levy Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoralState
Name
133 Jewett Avenue
Parkid
R033
Latitude
40.63380211
Longitude
-74.12912623
Borough
Staten Island
VIEW LOCATION
7035
Trackerid: 7035 • Fmsid: 846 P-5CPILEV • Title: Levy Playground Reconstruction
Trackerid
7035
Fmsid
846 P-5CPILEV
Title
Levy Playground Reconstruction
Summary
This project will reconstruct Levy Playground with a new basketball court, play equipment, safety surfacing, interactive water features and landscaping.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-12-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2016-11-01T00:00:00.000
Procurementactualcompletion
2016-11-01T00:00:00.000
Constructionstart
2016-11-01T00:00:00.000
Constructionprojectedcom
2018-05-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$1,977,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jewett Avenue and Castleton Avenue
Parkid
R033
Latitude
40.63391417
Longitude
-74.12893861
Borough
Staten Island
VIEW LOCATION
8839
Trackerid: 8839 • Fmsid: 846 P-2CPILWS • Title: Lewis Playground Reconstruction
Trackerid
8839
Fmsid
846 P-2CPILWS
Title
Lewis Playground Reconstruction
Summary
This project will reconstruct Lewis Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementadjustedcompletion
2023-11-01T00:00:00.000
Procurementactualcompletion
2023-12-01T00:00:00.000
Constructionstart
2024-01-01T00:00:00.000
Constructionprojectedcom
2025-01-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$1,418,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Willoughby Avenue between Lewis Avenue and Marcus Garvey Boulevard
Parkid
B430
Latitude
40.695451
Longitude
-73.937892
Borough
Brooklyn
VIEW LOCATION
10874
Trackerid: 10874 • Fmsid: 846 P-412LBRT • Title: Liberty Triangle Reconstruction
Trackerid
10874
Fmsid
846 P-412LBRT
Title
Liberty Triangle Reconstruction
Summary
This project will reconstruct Liberty Triangle.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-06-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
Farmers Boulevard and Liberty Avenue
Parkid
QZ39
Latitude
40.7377558
Longitude
-73.8770629
Borough
Queens
VIEW LOCATION
7028
Trackerid: 7028 • Fmsid: 846 P-208LTCS • Title: Lincoln Terrace Park Field House Construction
Trackerid
7028
Fmsid
846 P-208LTCS
Title
Lincoln Terrace Park Field House Construction
Summary
This project will demolish the existing public restroom building and construct a new field house in Lincoln Terrace Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
45.0
Designstart
2015-04-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designadjustedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionadjustedcompletion
2027-02-01T00:00:00.000
Totalfunding
$6,809,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Buffalo Avenue between Eastern Parkway and East New York Avenue
Parkid
B054
Latitude
40.6675212
Longitude
-73.9254323
Borough
Brooklyn
VIEW LOCATION
4105
Trackerid: 4105 • Fmsid: 846 P-208LINC • Title: Lincoln Terrace Park Tennis Courts Reconstruction
Trackerid
4105
Fmsid
846 P-208LINC
Title
Lincoln Terrace Park Tennis Courts Reconstruction
Summary
This project will reconstruct the tennis courts in Lincoln Terrace Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-09-01T00:00:00.000
Designprojectedcompletion
2012-02-01T00:00:00.000
Designactualcompletion
2012-03-01T00:00:00.000
Procurementstart
2012-03-01T00:00:00.000
Procurementprojectedcompletion
2012-12-01T00:00:00.000
Procurementactualcompletion
2012-10-01T00:00:00.000
Constructionstart
2012-11-01T00:00:00.000
Constructionprojectedcom
2013-11-01T00:00:00.000
Constructionadjustedcompletion
2013-11-01T00:00:00.000
Constructionactualcompletion
2013-11-01T00:00:00.000
Totalfunding
$1,365,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Buffalo Avenue, East New York Avenue, Portal Street, Eastern Parkway
Parkid
B054
Latitude
40.667015
Longitude
-73.925266
Borough
Brooklyn
VIEW LOCATION
6208
Trackerid: 6208 • Fmsid: 846 P-2PLG14B • Currentphase: completed
Trackerid
6208
Fmsid
846 P-2PLG14B
Title
Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction
Summary
This project will reconstruct the netball and handball courts at Lincoln Terrace Park and the perimeter paths, basketball and handball courts at Seth Low Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-08-01T00:00:00.000
Designprojectedcompletion
2013-11-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-08-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-09-01T00:00:00.000
Constructionactualcompletion
2016-08-01T00:00:00.000
Totalfunding
$2,335,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Eastern Parkway, East New York Avenue between Rochester Avenue and Portal Street
Parkid
B054
Latitude
40.666413
Longitude
-73.927181
Borough
Brooklyn
VIEW LOCATION
6208
Trackerid: 6208 • Fmsid: 846 P-2PLG14B • Currentphase: completed
Trackerid
6208
Fmsid
846 P-2PLG14B
Title
Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction
Summary
This project will reconstruct the netball and handball courts at Lincoln Terrace Park and the perimeter paths, basketball and handball courts at Seth Low Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-08-01T00:00:00.000
Designprojectedcompletion
2013-11-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-08-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-09-01T00:00:00.000
Constructionactualcompletion
2016-08-01T00:00:00.000
Totalfunding
$2,335,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Avenue P, Bay Parkway, West 12 Street
Parkid
B100
Latitude
40.607835
Longitude
-73.985947
Borough
Brooklyn
VIEW LOCATION
9218
Trackerid: 9218 • Fmsid: 846 P-208LIN2 • Title: Lincoln Terrace Park Pavement Reconstruction
Trackerid
9218
Fmsid
846 P-208LIN2
Title
Lincoln Terrace Park Pavement Reconstruction
Summary
This project will reconstruct path pavements and seating areas in Lincoln Terrace Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2019-09-01T00:00:00.000
Designadjustedcompletion
2019-10-01T00:00:00.000
Designactualcompletion
2019-10-01T00:00:00.000
Procurementstart
2019-10-01T00:00:00.000
Procurementprojectedcompletion
2020-07-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-02-01T00:00:00.000
Constructionprojectedcom
2023-02-01T00:00:00.000
Constructionactualcompletion
2023-03-01T00:00:00.000
Totalfunding
$3,456,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Eastern Parkway, Rochester Avenue, East New York Avenue, Portal Street
Parkid
B054
Latitude
40.666833
Longitude
-73.927303
Borough
Brooklyn
VIEW LOCATION
10686
Trackerid: 10686 • Fmsid: 846 P-309MPP1 • Title: Morningside Park Pathways and Dog Run Reconstruction
Trackerid
10686
Fmsid
846 P-309MPP1
Title
Morningside Park Pathways and Dog Run Reconstruction
Summary
This project will reconstruct Morningside Park Pathways and Dog Run.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2027-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between 113th and 116th Streets
Parkid
M056
Latitude
40.8044345
Longitude
-73.95923564
Borough
Manhattan
VIEW LOCATION
7359
Trackerid: 7359 • Fmsid: 846 P-208LTPG • Title: Lincoln Terrace Park Playground Reconstruction
Trackerid
7359
Fmsid
846 P-208LTPG
Title
Lincoln Terrace Park Playground Reconstruction
Summary
This project will reconstruct the playground at Lincoln Terrace Park, including play equipment for 2-5 and 5-12 years old, swings, spray shower, a seating area for general public, benches, lighting, fencing, drainage, water supply systems and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-12-01T00:00:00.000
Designprojectedcompletion
2016-12-01T00:00:00.000
Designadjustedcompletion
2017-02-01T00:00:00.000
Designactualcompletion
2017-03-01T00:00:00.000
Procurementstart
2017-03-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementadjustedcompletion
2018-03-01T00:00:00.000
Procurementactualcompletion
2018-02-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$4,039,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Rochester Avenue between President Street and Carroll Street
Parkid
B054
Latitude
40.666407
Longitude
-73.928015
Borough
Brooklyn
VIEW LOCATION
8562
Trackerid: 8562 • Fmsid: 846 P-2LINDTF • Title: Linden Park Synthetic Turf Field and Rubberized Track Reconstruction
Trackerid
8562
Fmsid
846 P-2LINDTF
Title
Linden Park Synthetic Turf Field and Rubberized Track Reconstruction
Summary
This project will reconstruct the existing synthetic turf field and running track and construct new drinking fountains and sports field spray misters in Linden Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-08-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-10-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$3,784,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Linden Boulevard and Vermont Street
Parkid
B214
Latitude
40.659112
Longitude
-73.887871
Borough
Brooklyn
VIEW LOCATION
9561
Trackerid: 9561 • Fmsid: 846 P-205LIN1 • Title: Linden Park Playground Reconstruction
Trackerid
9561
Fmsid
846 P-205LIN1
Title
Linden Park Playground Reconstruction
Summary
This project will reconstruct the playground at Linden Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-06-01T00:00:00.000
Constructionstart
2023-05-01T00:00:00.000
Constructionprojectedcom
2024-05-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$3,799,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Linden Boulevard, Miller Avenue, Stanley Avenue, Vermont Street
Parkid
B214
Latitude
40.6581277324
Longitude
-73.887627697522
Borough
Brooklyn
VIEW LOCATION
9606
Trackerid: 9606 • Fmsid: 846 P-205LIN2 • Title: Linden Park Multipurpose Play Area Reconstruction
Trackerid
9606
Fmsid
846 P-205LIN2
Title
Linden Park Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at Linden Park.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2026-07-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2025-03-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Linden Boulevard, Miller Avenue, Stanley Avenue, Vermont Street
Parkid
B214
Latitude
40.659172608411
Longitude
-73.885783095618
Borough
Brooklyn
VIEW LOCATION
7006
Trackerid: 7006 • Fmsid: 846 P-205LIND • Title: Linden Park Adult Fitness Area Construction
Trackerid
7006
Fmsid
846 P-205LIND
Title
Linden Park Adult Fitness Area Construction
Summary
This project will construct and adult fitness area and install fitness equipment at Linden Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-07-01T00:00:00.000
Designprojectedcompletion
2014-12-01T00:00:00.000
Designadjustedcompletion
2015-02-01T00:00:00.000
Designactualcompletion
2015-03-01T00:00:00.000
Procurementstart
2015-03-01T00:00:00.000
Procurementprojectedcompletion
2015-12-01T00:00:00.000
Procurementadjustedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-01-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-03-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$280,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Vermont Street and Stanley Avenue
Parkid
B214
Latitude
40.6589525
Longitude
-73.88699861
Borough
Brooklyn
VIEW LOCATION
5967
Trackerid: 5967 • Fmsid: 846 P-218LIND • Title: Lindower Park Ballfield Reconstruction
Trackerid
5967
Fmsid
846 P-218LIND
Title
Lindower Park Ballfield Reconstruction
Summary
This project will reconstruct the natural turf ballfields in Lindower Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-11-01T00:00:00.000
Designprojectedcompletion
2013-11-01T00:00:00.000
Designadjustedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-06-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$1,578,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Strickland Avenue, East 60th Street and Mill Avenue, Brooklyn
Parkid
B329
Latitude
40.61210194
Longitude
-73.91152111
Borough
Brooklyn
VIEW LOCATION
9217
Trackerid: 9217 • Fmsid: 846 P-205LION • Title: Lion's Pride Playground Reconstruction
Trackerid
9217
Fmsid
846 P-205LION
Title
Lion's Pride Playground Reconstruction
Summary
This project will reconstruct Lion's Pride Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-08-01T00:00:00.000
Designprojectedcompletion
2019-08-01T00:00:00.000
Designadjustedcompletion
2019-11-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2023-03-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$4,115,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Van Sinderen Avenue, Riverdale Avenue, Snediker Avenue
Parkid
B107
Latitude
40.66273
Longitude
-73.899541
Borough
Brooklyn
VIEW LOCATION
10628
Trackerid: 10628 • Fmsid: 846 P-5CPILIP • Title: Liotti Ikefugi Playground Reconstruction
Trackerid
10628
Fmsid
846 P-5CPILIP
Title
Liotti Ikefugi Playground Reconstruction
Summary
This project will reconstruct Liotti Ikefugi Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-03-01T00:00:00.000
Designprojectedcompletion
2025-03-01T00:00:00.000
Designadjustedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Winter and Bismark Avenues
Parkid
R037
Latitude
40.63876607
Longitude
-74.083883
Borough
Staten Island
VIEW LOCATION
9354
Trackerid: 9354 • Fmsid: 846 SANDY4-27 • Title: Little Bay Park Waterfront Reconstruction
Trackerid
9354
Fmsid
846 SANDY4-27
Title
Little Bay Park Waterfront Reconstruction
Summary
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Little Bay Park.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
40.0
Constructionpercentcomplete
0.0
Designstart
2020-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2024-07-01T00:00:00.000
Designactualcompletion
2024-12-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2027-06-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Between Totten Avenue and Throgs Neck Bridge
Parkid
Q010A
Latitude
40.79034276
Longitude
-73.78637532
Borough
Queens
VIEW LOCATION
6074
Trackerid: 6074 • Fmsid: 846 P-407LBSF • Title: Little Bay Park Soccer Fields Reconstruction
Trackerid
6074
Fmsid
846 P-407LBSF
Title
Little Bay Park Soccer Fields Reconstruction
Summary
This project will reconstruct the natural turf soccer fields at Little Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-10-01T00:00:00.000
Designadjustedcompletion
2015-04-01T00:00:00.000
Designactualcompletion
2015-04-01T00:00:00.000
Procurementstart
2015-04-01T00:00:00.000
Procurementprojectedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2016-04-01T00:00:00.000
Constructionprojectedcom
2017-04-01T00:00:00.000
Constructionactualcompletion
2017-05-01T00:00:00.000
Totalfunding
$1,407,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Little Bay and the Cross Island Parkway
Parkid
Q010A
Latitude
40.789194
Longitude
-73.790171
Borough
Queens
VIEW LOCATION
1021
Trackerid: 1021 • Fmsid: 846 P-407LBCS • Title: Little Bay Parking Lot Reconstruction and Public Restroom Building Construction
Trackerid
1021
Fmsid
846 P-407LBCS
Title
Little Bay Parking Lot Reconstruction and Public Restroom Building Construction
Summary
This project will construct a public restroom building and reconstruct the parking lot at Little Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2005-09-01T00:00:00.000
Designprojectedcompletion
2012-04-01T00:00:00.000
Designactualcompletion
2012-05-01T00:00:00.000
Procurementstart
2012-05-01T00:00:00.000
Procurementprojectedcompletion
2013-02-01T00:00:00.000
Procurementactualcompletion
2013-01-01T00:00:00.000
Constructionstart
2013-03-01T00:00:00.000
Constructionprojectedcom
2014-09-01T00:00:00.000
Constructionadjustedcompletion
2016-02-01T00:00:00.000
Constructionactualcompletion
2016-01-01T00:00:00.000
Totalfunding
$5,528,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilFederalMayoral
Name
Totten Avenue, Cross Island Parkway
Parkid
Q010A
Latitude
40.790041
Longitude
-73.785101
Borough
Queens
VIEW LOCATION
7408
Trackerid: 7408 • Fmsid: 846 P-1CPILCM • Title: Little Claremont Playground Reconstruction
Trackerid
7408
Fmsid
846 P-1CPILCM
Title
Little Claremont Playground Reconstruction
Summary
This project will reconstruct Little Claremont Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-04-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionadjustedcompletion
2018-12-01T00:00:00.000
Constructionactualcompletion
2018-12-01T00:00:00.000
Totalfunding
$3,192,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Park Avenue and Claremont Parkway
Parkid
X299
Latitude
40.838748
Longitude
-73.903735
Borough
Bronx
VIEW LOCATION
1202111
Trackerid: 1202111 • Fmsid: 846 P-3LGTURF • Title: Little Flower Playground Synthetic Turf Field Construction
Trackerid
1202111
Fmsid
846 P-3LGTURF
Title
Little Flower Playground Synthetic Turf Field Construction
Summary
This project will construct a synthetic turf field at Little Flower Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-04-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designactualcompletion
2019-12-01T00:00:00.000
Procurementstart
2019-07-01T00:00:00.000
Procurementprojectedcompletion
2019-12-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2020-03-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$531,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M132
Latitude
40.712491
Longitude
-73.988193
Borough
Manhattan
VIEW LOCATION
1517111
Trackerid: 1517111 • Fmsid: 846 P-3LFLWER • Title: Little Flower Playground Public Restroom Building Reconstruction
Trackerid
1517111
Fmsid
846 P-3LFLWER
Title
Little Flower Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Little Flower Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-12-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-01-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2024-12-01T00:00:00.000
Constructionstart
2024-12-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$1,800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M132
Latitude
40.712565
Longitude
-73.988578
Borough
Manhattan
VIEW LOCATION
9781
Trackerid: 9781 • Fmsid: 846 P-303LFPG • Title: Little Flower Playground Reconstruction
Trackerid
9781
Fmsid
846 P-303LFPG
Title
Little Flower Playground Reconstruction
Summary
This project will reconstruct Little Flower Playground, including the play equipment, spray shower, sitting area, safety surfacing, pavements, plantings, drainage and water supply systems, and lighting.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2022-03-01T00:00:00.000
Designadjustedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-03-01T00:00:00.000
Constructionstart
2025-05-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$5,651,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Madison Street and Jefferson Street
Parkid
M132
Latitude
40.712381
Longitude
-73.988484
Borough
Manhattan
VIEW LOCATION
10677
Trackerid: 10677 • Fmsid: 846 P-2CPILIP • Title: Livonia Park Reconstruction
Trackerid
10677
Fmsid
846 P-2CPILIP
Title
Livonia Park Reconstruction
Summary
This project will reconstruct the passive recreation, sitting area, and sidewalks in Livonia Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-06-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Livonia Avenue, Powell Street, and Junius Street
Parkid
B367
Latitude
40.663986
Longitude
-73.90199
Borough
Brooklyn
VIEW LOCATION
11106
Trackerid: 11106 • Title: Locust Manor Multipurpose Play Area Reconstruction • Currentphase: proposed
Trackerid
11106
Title
Locust Manor Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the Locust Manor Playground Multipurpose Play Area.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Lucas Street, 121st Avenue. 192nd Street
Parkid
Q330
Latitude
40.68601039
Longitude
-73.75591966
Borough
Queens
VIEW LOCATION
1815111
Trackerid: 1815111 • Fmsid: 846 P-110LOCP • Title: Locust Point Marina Fence Reconstruction
Trackerid
1815111
Fmsid
846 P-110LOCP
Title
Locust Point Marina Fence Reconstruction
Summary
This project will reconstruct a section of fence and install a gate at Locust Point Marina.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-10-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-05-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-04-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$125,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
State
Parkid
X310
Latitude
40.8162075
Longitude
-73.8055798
Borough
Bronx
VIEW LOCATION
8548
Trackerid: 8548 • Fmsid: 846 SANDY1-10 • Title: Hammond Cove Marina Reconstruction (Hurricane Sandy)
Trackerid
8548
Fmsid
846 SANDY1-10
Title
Hammond Cove Marina Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct Sandy-damaged elements of the bulkhead, docks, and electrical systems at Hammond Cove Marina.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
19.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-07-01T00:00:00.000
Designadjustedcompletion
2023-01-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2026-01-01T00:00:00.000
Constructionstart
2026-02-01T00:00:00.000
Constructionprojectedcom
2027-02-01T00:00:00.000
Totalfunding
$6,135,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilFederalMayoral
Name
Reynolds Avenue at Harding Avenue
Parkid
X310
Latitude
40.81475691
Longitude
-73.80612616
Borough
Bronx
VIEW LOCATION
7406
Trackerid: 7406 • Fmsid: 846 P-1CPILFG • Title: Longfellow Gardens Reconstruction
Trackerid
7406
Fmsid
846 P-1CPILFG
Title
Longfellow Gardens Reconstruction
Summary
This project will reconstruct Longfellow Gardens, including new play equipment, spray shower, seating, lighting, fencing, pavements and planting.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-08-01T00:00:00.000
Procurementstart
2016-08-01T00:00:00.000
Procurementprojectedcompletion
2017-05-01T00:00:00.000
Procurementadjustedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$2,248,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Longfellow Avenue, Lowell Street, East 165th Street
Parkid
X290
Latitude
40.825559
Longitude
-73.88758
Borough
Bronx
VIEW LOCATION
8814
Trackerid: 8814 • Fmsid: 846 P-5LILOPL • Title: Lopez Playground Reconstruction
Trackerid
8814
Fmsid
846 P-5LILOPL
Title
Lopez Playground Reconstruction
Summary
This project will reconstruct Lopez Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-01-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-01-01T00:00:00.000
Procurementstart
2019-01-01T00:00:00.000
Procurementprojectedcompletion
2019-10-01T00:00:00.000
Procurementadjustedcompletion
2020-01-01T00:00:00.000
Procurementactualcompletion
2019-12-01T00:00:00.000
Constructionstart
2020-03-01T00:00:00.000
Constructionprojectedcom
2021-05-01T00:00:00.000
Constructionadjustedcompletion
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$2,994,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Palma Drive between Targee Street and Oder Avenue
Parkid
R125
Latitude
40.611487
Longitude
-74.085054
Borough
Staten Island
VIEW LOCATION
9442
Trackerid: 9442 • Fmsid: 846 P-501LLCS • Title: Lopez Playground Modular Public Restroom Building Construction
Trackerid
9442
Fmsid
846 P-501LLCS
Title
Lopez Playground Modular Public Restroom Building Construction
Summary
This project will construct a modular public restroom building at Lopez Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designadjustedcompletion
2021-06-01T00:00:00.000
Designactualcompletion
2021-06-01T00:00:00.000
Procurementstart
2021-06-01T00:00:00.000
Procurementprojectedcompletion
2022-02-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
$3,865,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Palma Drive between Targee Street and Oder Avenue
Parkid
R125
Latitude
40.611645
Longitude
-74.084934
Borough
Staten Island
VIEW LOCATION
10987
Trackerid: 10987 • Title: Loreto Playground Public Restroom Building Reconstruction • Summary: This project will reconstruct the public restroom building in Loreto Playground.
Trackerid
10987
Title
Loreto Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Loreto Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
1700 Haight Avenue
Parkid
X163
Latitude
40.84884811
Longitude
-73.85200659
Borough
Bronx
VIEW LOCATION
7285
Trackerid: 7285 • Fmsid: 846 P-111LRTO • Title: Loreto Playground Asphalt Multi-Purpose Play Area Construction
Trackerid
7285
Fmsid
846 P-111LRTO
Title
Loreto Playground Asphalt Multi-Purpose Play Area Construction
Summary
This project will construct an expanded asphalt multi-purpose play area in Loreto Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-02-01T00:00:00.000
Designprojectedcompletion
2019-02-01T00:00:00.000
Designactualcompletion
2019-02-01T00:00:00.000
Procurementstart
2019-02-01T00:00:00.000
Procurementprojectedcompletion
2019-11-01T00:00:00.000
Procurementadjustedcompletion
2019-12-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-08-01T00:00:00.000
Totalfunding
$2,271,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
StateBorough PresidentMayoral
Name
Morris Park Avenue, Tomlinson Avenue, Haight Avenue, and Van Nest Avenue
Parkid
X163
Latitude
40.849058
Longitude
-73.852119
Borough
Bronx
VIEW LOCATION
11002
Trackerid: 11002 • Title: Loreto Playground Reconstruction • Currentphase: proposed
Trackerid
11002
Title
Loreto Playground Reconstruction
Summary
This project will reconstruct the playground, basketball, handball courts, including new play equipment, safety surfacing, the spray shower, fencing, landscaping, pavement, park security lighting, water and drainage systems, and sidewalks in Loreto Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Morris Park Avenue. between Haight Avenue and Tomlinson Avenue
Parkid
X163
Latitude
40.84912987
Longitude
-73.85208312
Borough
Bronx
VIEW LOCATION
6328
Trackerid: 6328 • Fmsid: 846 P-4PDLBRC • Title: Lost Battalion Hall Recreation Center Reconstruction
Trackerid
6328
Fmsid
846 P-4PDLBRC
Title
Lost Battalion Hall Recreation Center Reconstruction
Summary
This project will reconstruct Lost Battalion Hall Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designadjustedcompletion
2020-04-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionadjustedcompletion
2026-02-01T00:00:00.000
Constructionactualcompletion
2026-07-01T00:00:00.000
Totalfunding
$25,932,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Queens Boulevard between 62nd Avenue and 62nd Drive
Parkid
Q401
Latitude
40.731661
Longitude
-73.865625
Borough
Queens
VIEW LOCATION
2045
Trackerid: 2045 • Fmsid: 846 P-2PLGR9E • Title: Brooklyn General Site Work (BG-1007M)
Trackerid
2045
Fmsid
846 P-2PLGR9E
Title
Brooklyn General Site Work (BG-1007M)
Summary
This project will reconstruct play equipment, safety surfacing, skate parks, pavements, and plantings at various parks in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-12-01T00:00:00.000
Designprojectedcompletion
2010-03-01T00:00:00.000
Designadjustedcompletion
2011-02-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2011-11-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2013-09-01T00:00:00.000
Constructionadjustedcompletion
2013-10-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Albemarle Road between Lott Street & Veronica Place
Parkid
B392
Latitude
40.64818
Longitude
-73.954092
Borough
Brooklyn
VIEW LOCATION
2045
Trackerid: 2045 • Fmsid: 846 P-2PLGR9E • Title: Brooklyn General Site Work (BG-1007M)
Trackerid
2045
Fmsid
846 P-2PLGR9E
Title
Brooklyn General Site Work (BG-1007M)
Summary
This project will reconstruct play equipment, safety surfacing, skate parks, pavements, and plantings at various parks in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-12-01T00:00:00.000
Designprojectedcompletion
2010-03-01T00:00:00.000
Designadjustedcompletion
2011-02-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2011-11-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2013-09-01T00:00:00.000
Constructionadjustedcompletion
2013-10-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
West 11th Street & Avenue W
Parkid
B272
Latitude
40.591219
Longitude
-73.980843
Borough
Brooklyn
VIEW LOCATION
2045
Trackerid: 2045 • Fmsid: 846 P-2PLGR9E • Title: Brooklyn General Site Work (BG-1007M)
Trackerid
2045
Fmsid
846 P-2PLGR9E
Title
Brooklyn General Site Work (BG-1007M)
Summary
This project will reconstruct play equipment, safety surfacing, skate parks, pavements, and plantings at various parks in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-12-01T00:00:00.000
Designprojectedcompletion
2010-03-01T00:00:00.000
Designadjustedcompletion
2011-02-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2011-11-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2013-09-01T00:00:00.000
Constructionadjustedcompletion
2013-10-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Scholes Street between Manhattan Avenue and Graham Avenue
Parkid
B127
Latitude
40.709072
Longitude
-73.944603
Borough
Brooklyn
VIEW LOCATION
2045
Trackerid: 2045 • Fmsid: 846 P-2PLGR9E • Title: Brooklyn General Site Work (BG-1007M)
Trackerid
2045
Fmsid
846 P-2PLGR9E
Title
Brooklyn General Site Work (BG-1007M)
Summary
This project will reconstruct play equipment, safety surfacing, skate parks, pavements, and plantings at various parks in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-12-01T00:00:00.000
Designprojectedcompletion
2010-03-01T00:00:00.000
Designadjustedcompletion
2011-02-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2011-11-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2013-09-01T00:00:00.000
Constructionadjustedcompletion
2013-10-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Schermerhorn & Nevins Street
Parkid
B137
Latitude
40.686792
Longitude
-73.981006
Borough
Brooklyn
VIEW LOCATION
3448
Trackerid: 3448 • Fmsid: 846 P-4ELMCOR • Title: Louis Armstrong Center HVAC Center Reconstruction
Trackerid
3448
Fmsid
846 P-4ELMCOR
Title
Louis Armstrong Center HVAC Center Reconstruction
Summary
This project will reconstruct the HVAC system at the Louis Armstrong Community Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2007-11-01T00:00:00.000
Designprojectedcompletion
2009-04-01T00:00:00.000
Designadjustedcompletion
2010-03-01T00:00:00.000
Designactualcompletion
2010-03-01T00:00:00.000
Procurementstart
2010-03-01T00:00:00.000
Procurementprojectedcompletion
2010-12-01T00:00:00.000
Procurementactualcompletion
2011-06-01T00:00:00.000
Constructionstart
2011-09-01T00:00:00.000
Constructionprojectedcom
2012-09-01T00:00:00.000
Constructionadjustedcompletion
2013-08-01T00:00:00.000
Constructionactualcompletion
2013-08-01T00:00:00.000
Totalfunding
$2,833,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
33-16 108th Street
Parkid
Q468
Latitude
40.757255
Longitude
-73.861348
Borough
Queens
VIEW LOCATION
7416
Trackerid: 7416 • Fmsid: 846 P-403MOS2 • Title: Louis C. Moser Park Playground Reconstruction
Trackerid
7416
Fmsid
846 P-403MOS2
Title
Louis C. Moser Park Playground Reconstruction
Summary
This project will reconstruct the playground at Louis C. Moser Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-12-01T00:00:00.000
Designprojectedcompletion
2016-10-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-10-01T00:00:00.000
Procurementprojectedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-05-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$1,674,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
77th Street and 25th Avenue
Parkid
Q366
Latitude
40.763095
Longitude
-73.892235
Borough
Queens
VIEW LOCATION