1504111
Trackerid: 1504111 • Fmsid: 846 P-1SERTRF • Title: PO Serrano Playground Synthetic Turf Field Reconstruction
Trackerid
1504111
Fmsid
846 P-1SERTRF
Title
PO Serrano Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at PO Serrano Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2022-10-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementactualcompletion
2023-06-01T00:00:00.000
Constructionstart
2023-06-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X151
Latitude
40.823453
Longitude
-73.850877
Borough
Bronx
VIEW LOCATION
9220
Trackerid: 9220 • Fmsid: 846 P-216PS25 • Title: P.S. 125 Playground Reconstruction
Trackerid
9220
Fmsid
846 P-216PS25
Title
P.S. 125 Playground Reconstruction
Summary
This project will reconstruct P.S. 125 Playground, including the basketball half-courts, play equipment, safety surfacing, lighting, and benches.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2019-09-01T00:00:00.000
Designadjustedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-08-01T00:00:00.000
Procurementstart
2020-08-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-07-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$806,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Rockaway Avenue between Blake Avenue and Dumont Avenue
Parkid
B227
Latitude
40.66511
Longitude
-73.909121
Borough
Brooklyn
VIEW LOCATION
1518111
Trackerid: 1518111 • Fmsid: 846 P-3P155CS • Title: PS 155 Playground Public Restroom Building Reconstruction
Trackerid
1518111
Fmsid
846 P-3P155CS
Title
PS 155 Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at PS 155 Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-09-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-01-01T00:00:00.000
Procurementstart
2024-10-01T00:00:00.000
Procurementprojectedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2024-12-01T00:00:00.000
Constructionstart
2025-10-01T00:00:00.000
Constructionprojectedcom
2026-09-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$1,800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Parkid
M239
Latitude
40.797409
Longitude
-73.935399
Borough
Manhattan
VIEW LOCATION
1747111
Trackerid: 1747111 • Fmsid: 846 P-311P155 • Title: P.S. 155 Playground Multipurpose Play Area Reconstruction
Trackerid
1747111
Fmsid
846 P-311P155
Title
P.S. 155 Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in P.S. 155 Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2025-07-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$530,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
M239
Latitude
40.7973164
Longitude
-73.9354954
Borough
Manhattan
VIEW LOCATION
8667
Trackerid: 8667 • Fmsid: 846 P-3PS155M • Title: P.S. 155 Playground Reconstruction
Trackerid
8667
Fmsid
846 P-3PS155M
Title
P.S. 155 Playground Reconstruction
Summary
This project will reconstruct P.S. 155 Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designadjustedcompletion
2021-04-01T00:00:00.000
Designactualcompletion
2021-04-01T00:00:00.000
Procurementstart
2021-04-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-01-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$3,085,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 117th Street and East 118th Street between 1st Avenue and 2nd Avenue
Parkid
M239
Latitude
40.797317
Longitude
-73.935443
Borough
Manhattan
VIEW LOCATION
1094111
Trackerid: 1094111 • Fmsid: 846 P-217PBYC • Title: Paerdegat Basin Yacht Club Parking Lot Reconstruction
Trackerid
1094111
Fmsid
846 P-217PBYC
Title
Paerdegat Basin Yacht Club Parking Lot Reconstruction
Summary
This project will reconstruct the asphalt pavement car parking lot at Paerdegat Basin Yacht Club in Paerdegat Basin Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2018-01-01T00:00:00.000
Constructionstart
2018-02-01T00:00:00.000
Constructionprojectedcom
2018-05-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$143,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B406
Latitude
40.62771
Longitude
-73.905224
Borough
Brooklyn
VIEW LOCATION
8948
Trackerid: 8948 • Fmsid: 846 SANDY2-35 • Title: Paerdegat Basin Park Paerdegat Athletic Center Reconstruction (Hurricane Sandy)
Trackerid
8948
Fmsid
846 SANDY2-35
Title
Paerdegat Basin Park Paerdegat Athletic Center Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the Paerdegat Athletic Center at Paerdegat Basin Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2022-05-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
1500 Paerdegat Ave North
Parkid
B406
Latitude
40.62643964
Longitude
-73.90191649
Borough
Brooklyn
VIEW LOCATION
9722
Trackerid: 9722 • Fmsid: 846 P-217AQBO • Title: Paerdegat Athletic Center Boiler Reconstruction
Trackerid
9722
Fmsid
846 P-217AQBO
Title
Paerdegat Athletic Center Boiler Reconstruction
Summary
This project will reconstruct the boiler at the Paerdegat Athletic Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-02-01T00:00:00.000
Designprojectedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-05-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$458,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
1500 Paerdegat Avenue North
Parkid
B406
Latitude
40.626837243028
Longitude
-73.902725494793
Borough
Brooklyn
VIEW LOCATION
10021
Trackerid: 10021 • Fmsid: 846 EXPENS112 • Title: Paerdegat Basin Park Yacht Clubs Reconstruction (Hurricane Sandy)
Trackerid
10021
Fmsid
846 EXPENS112
Title
Paerdegat Basin Park Yacht Clubs Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct Paerdegat Squadron, Midget Squadron, Diamond Point, and Hudson River Yacht Clubs in Paerdegat Basin Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2022-10-01T00:00:00.000
Designprojectedcompletion
2024-04-01T00:00:00.000
Designadjustedcompletion
2025-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Bergen Avenue, East 76th Street, Paerdegat Avenue North
Parkid
B406
Latitude
40.625762726006
Longitude
-73.902131597661
Borough
Brooklyn
VIEW LOCATION
1748111
Trackerid: 1748111 • Fmsid: 846 P-407PG21 • Title: Playground Twenty-One Multipurpose Play Area Reconstruction
Trackerid
1748111
Fmsid
846 P-407PG21
Title
Playground Twenty-One Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area in Playground Twenty-One.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$925,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q334
Latitude
40.778383
Longitude
-73.798585
Borough
Queens
VIEW LOCATION
6295
Trackerid: 6295 • Fmsid: 846 P-217PDGT • Title: Paerdegat Athletic Center Air Conditioning Reconstruction
Trackerid
6295
Fmsid
846 P-217PDGT
Title
Paerdegat Athletic Center Air Conditioning Reconstruction
Summary
This project will reconstruct the air conditioning equipment at Paerdegat Athletic Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-03-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-04-01T00:00:00.000
Designactualcompletion
2015-04-01T00:00:00.000
Procurementstart
2015-04-01T00:00:00.000
Procurementprojectedcompletion
2016-01-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-03-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$2,800,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Paerdegat Avenue North between Paerdegat 13th Street and Seaview Avenue
Parkid
B406
Latitude
40.626795
Longitude
-73.902676
Borough
Brooklyn
VIEW LOCATION
1027
Trackerid: 1027 • Fmsid: 846 P-217PAER • Title: Paerdegat Park Basketball Court Reconstruction
Trackerid
1027
Fmsid
846 P-217PAER
Title
Paerdegat Park Basketball Court Reconstruction
Summary
This project will remove and reset the granite block sidewalks; install new security lighting on the basketball court, playground, and around the public restroom building; and reconstruct the basketball court and plant surrounding lawn areas to prevent erosion. In addition, this project will install safety surface at the play area, reconstruct the tot area, and reconstruct the handball walls.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-07-01T00:00:00.000
Designprojectedcompletion
2012-06-01T00:00:00.000
Designadjustedcompletion
2013-02-01T00:00:00.000
Designactualcompletion
2013-02-01T00:00:00.000
Procurementstart
2013-02-01T00:00:00.000
Procurementprojectedcompletion
2013-11-01T00:00:00.000
Procurementactualcompletion
2013-10-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionactualcompletion
2015-03-01T00:00:00.000
Totalfunding
$1,395,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
East 40th Street, Foster Avenue, Albany Avenue, and Farragut Road
Parkid
B218
Latitude
40.63806139
Longitude
-73.93813389
Borough
Brooklyn
VIEW LOCATION
10086
Trackerid: 10086 • Fmsid: 846 P-217PADG • Title: Paerdegat Park Ballfields Reconstruction
Trackerid
10086
Fmsid
846 P-217PADG
Title
Paerdegat Park Ballfields Reconstruction
Summary
This project will reconstruct the ballfields at Paerdegat Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-12-01T00:00:00.000
Designprojectedcompletion
2022-12-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-02-01T00:00:00.000
Procurementprojectedcompletion
2024-02-01T00:00:00.000
Procurementadjustedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$5,499,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Farragut Road between East 40th Street and East 41st Street
Parkid
B218
Latitude
40.63744632
Longitude
-73.93807072
Borough
Brooklyn
VIEW LOCATION
1314111
Trackerid: 1314111 • Fmsid: 846 P-2PEPWIN • Currentphase: completed
Trackerid
1314111
Fmsid
846 P-2PEPWIN
Title
Parade Ground Parks Enforcement Facility Windows, Storefront and HVAC Reconstruction
Summary
This project will reconstruct the windows, storefront and HVAC at the Parade Grounds Park Enforcement Facility.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2022-10-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2022-04-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B068
Latitude
40.651196
Longitude
-73.96735
Borough
Brooklyn
VIEW LOCATION
1529111
Trackerid: 1529111 • Fmsid: 846 P-2BKSTF1 • Title: Prospect Park Parade Ground Synthetic Turf Field 7&8 Reconstruction
Trackerid
1529111
Fmsid
846 P-2BKSTF1
Title
Prospect Park Parade Ground Synthetic Turf Field 7&8 Reconstruction
Summary
This project will reconstruct the synthetic turf at Fields 7&8 at Prospect Park Parade Ground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2024-07-01T00:00:00.000
Procurementprojectedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2024-11-01T00:00:00.000
Constructionstart
2025-04-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$3,300,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B068
Latitude
40.650695
Longitude
-73.969206
Borough
Brooklyn
VIEW LOCATION
1575111
Trackerid: 1575111 • Fmsid: 846 EXPENS179 • Title: Prospect Park Parade Ground Ball Field Lighting Fixture Replacement
Trackerid
1575111
Fmsid
846 EXPENS179
Title
Prospect Park Parade Ground Ball Field Lighting Fixture Replacement
Summary
This project will replace lighting fixtures at the Parade Ground ball fields in Prospect Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-06-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-01-01T00:00:00.000
Procurementprojectedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-03-01T00:00:00.000
Constructionstart
2023-05-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$92,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B068
Latitude
40.65109
Longitude
-73.968297
Borough
Brooklyn
VIEW LOCATION
1780111
Trackerid: 1780111 • Fmsid: 846 P-2PEPWIN • Currentphase: completed
Trackerid
1780111
Fmsid
846 P-2PEPWIN
Title
Parade Ground Parks Enforcement Facility Windows, Storefront and HVAC Reconstruction
Summary
This project will reconstruct the windows, storefront and HVAC at the Parade Grounds Park Enforcement Facility.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-07-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-05-01T00:00:00.000
Procurementstart
2025-01-01T00:00:00.000
Procurementprojectedcompletion
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-05-01T00:00:00.000
Constructionstart
2024-04-01T00:00:00.000
Constructionprojectedcom
2024-05-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B068
Latitude
40.6501717
Longitude
-73.968767
Borough
Brooklyn
VIEW LOCATION
1826111
Trackerid: 1826111 • Title: Gateway Estates Park Prefabricated Public Restroom Building Construction • Currentphase: proposed
Trackerid
1826111
Title
Gateway Estates Park Prefabricated Public Restroom Building Construction
Summary
This project will reconstruct a prefabricated public restroom building in Gateway Estates Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designprojectedcompletion
2026-01-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B548
Latitude
40.6543296
Longitude
-73.8753625
Borough
Brooklyn
VIEW LOCATION
9556
Trackerid: 9556 • Fmsid: 846 P-2PPESIT • Title: Ocean Parkway Sitting Areas Reconstruction
Trackerid
9556
Fmsid
846 P-2PPESIT
Title
Ocean Parkway Sitting Areas Reconstruction
Summary
This project will reconstruct two sitting areas along Ocean Parkway at East 8th Street and at Sherman Street with new pavement, benches and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-02-01T00:00:00.000
Designprojectedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-12-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2023-01-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-04-01T00:00:00.000
Totalfunding
$720,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Northside Ocean Parkway & Sherman Street
Parkid
B255M
Latitude
40.650889643433
Longitude
-73.973969100918
Borough
Brooklyn
VIEW LOCATION
9556
Trackerid: 9556 • Fmsid: 846 P-2PPESIT • Title: Ocean Parkway Sitting Areas Reconstruction
Trackerid
9556
Fmsid
846 P-2PPESIT
Title
Ocean Parkway Sitting Areas Reconstruction
Summary
This project will reconstruct two sitting areas along Ocean Parkway at East 8th Street and at Sherman Street with new pavement, benches and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-02-01T00:00:00.000
Designprojectedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-12-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2023-01-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-04-01T00:00:00.000
Totalfunding
$720,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Southside Ocean Parkway & East 8th Street
Parkid
B255N
Latitude
40.650050316396
Longitude
-73.973577134728
Borough
Brooklyn
VIEW LOCATION
11304
Trackerid: 11304 • Title: Gateway Estates Public Restroom Building Construction • Currentphase: proposed
Trackerid
11304
Title
Gateway Estates Public Restroom Building Construction
Summary
This project will construct a new public restroom building in Gateway Estates Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Vandalia Avenue and Berriman Street, Erskine Street and Schroeders Avenue
Parkid
B548
Latitude
40.6543652
Longitude
-73.8755494
Borough
Brooklyn
VIEW LOCATION
8895
Trackerid: 8895 • Fmsid: 846 P-2GATE10 • Title: Gateway Estates Phase II Park Construction
Trackerid
8895
Fmsid
846 P-2GATE10
Title
Gateway Estates Phase II Park Construction
Summary
This project will construct a new park, including a multi-purpose synthetic turf field, skate park, basketball courts, adult fitness equipment, and seating areas at Gateway Estates.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-06-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designadjustedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2020-11-01T00:00:00.000
Procurementstart
2020-11-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-08-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$7,520,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Vandalia Avenue, Schroeders Avenue, Walker Street, Ashford Street
Parkid
B548
Latitude
40.654387
Longitude
-73.875261
Borough
Brooklyn
VIEW LOCATION
1078111
Trackerid: 1078111 • Fmsid: 846 P-4PL15A4 • Title: Beach 108 - Beach Channel Drive Sidewalk Reconstruction
Trackerid
1078111
Fmsid
846 P-4PL15A4
Title
Beach 108 - Beach Channel Drive Sidewalk Reconstruction
Summary
This project will reconstruct the sidewalks, including drop curbs, steel face curb and a new 4' high chain link fence, from Beach 108th Street to Beach 111th Street along Beach Channel Drive.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-12-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-05-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-08-01T00:00:00.000
Constructionstart
2017-03-01T00:00:00.000
Constructionprojectedcom
2017-04-01T00:00:00.000
Constructionadjustedcompletion
2017-04-01T00:00:00.000
Constructionactualcompletion
2017-04-01T00:00:00.000
Totalfunding
$124,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q496
Latitude
40.583547
Longitude
-73.83304
Borough
Queens
VIEW LOCATION
8979
Trackerid: 8979 • Fmsid: 846 P-414B108 • Title: Beach 108th Street Esplanade Reconstruction
Trackerid
8979
Fmsid
846 P-414B108
Title
Beach 108th Street Esplanade Reconstruction
Summary
This project will reconstruct Beach 108th Street Esplanade.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-03-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designadjustedcompletion
2021-03-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-12-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-07-01T00:00:00.000
Constructionstart
2022-09-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$1,669,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Federal
Name
Beach Channel Drive between Beach 108th Street and Rockaway Freeway
Parkid
Q496
Latitude
40.583678
Longitude
-73.832728
Borough
Queens
VIEW LOCATION
9073
Trackerid: 9073 • Fmsid: 846 P-404PKAM • Title: Park of the Americas Public Restroom Building Reconstruction
Trackerid
9073
Fmsid
846 P-404PKAM
Title
Park of the Americas Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Park of the Americas.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-08-01T00:00:00.000
Designprojectedcompletion
2025-12-01T00:00:00.000
Designadjustedcompletion
2026-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
103-02 41 ST AVENUE
QUEENS, NY, 11368
Parkid
Q026
Latitude
40.74897605
Longitude
-73.86179981
Borough
Queens
VIEW LOCATION
9269
Trackerid: 9269 • Fmsid: 846 P-404PATF • Title: Park of the Americas Adult Fitness Area Reconstruction
Trackerid
9269
Fmsid
846 P-404PATF
Title
Park of the Americas Adult Fitness Area Reconstruction
Summary
This project will reconstruct the adult fitness area at Park of the Americas.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-12-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designactualcompletion
2019-12-01T00:00:00.000
Procurementstart
2019-12-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$710,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
103rd Street, 104th Street, 41st Avenue, 42nd Avenue
Parkid
Q026
Latitude
40.748597238216
Longitude
-73.861574647508
Borough
Queens
VIEW LOCATION
10075
Trackerid: 10075 • Fmsid: 846 P-404LIND • Title: Park of the Americas Basketball Court Reconstruction
Trackerid
10075
Fmsid
846 P-404LIND
Title
Park of the Americas Basketball Court Reconstruction
Summary
This project will reconstruct the basketball court and adjacent entrance at Park of the Americas.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
55.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2023-07-01T00:00:00.000
Designactualcompletion
2023-08-01T00:00:00.000
Procurementstart
2023-08-01T00:00:00.000
Procurementprojectedcompletion
2024-08-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-05-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionadjustedcompletion
2026-12-01T00:00:00.000
Totalfunding
$4,999,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
104th Street and 42nd Avenue
Parkid
Q026
Latitude
40.74855309
Longitude
-73.86132559
Borough
Queens
VIEW LOCATION
7075
Trackerid: 7075 • Fmsid: 846 P-4LINDE2 • Title: Park of the Americas Synthetic Turf and Playground Reconstruction
Trackerid
7075
Fmsid
846 P-4LINDE2
Title
Park of the Americas Synthetic Turf and Playground Reconstruction
Summary
This project will reconstruct the playground, spray shower and synthetic turf field at Park of the Americas.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-06-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$3,709,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
41st Avenue, 103rd Street, 42nd Avenue, 104th Street
Parkid
Q026
Latitude
40.748565
Longitude
-73.86192278
Borough
Queens
VIEW LOCATION
8775
Trackerid: 8775 • Fmsid: 846 GXBXBKQ1 • Title: Parkside Playground Green Infrastructure Construction
Trackerid
8775
Fmsid
846 GXBXBKQ1
Title
Parkside Playground Green Infrastructure Construction
Summary
This project will construct green infrastructure to capture stormwater at Parkside Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-08-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designadjustedcompletion
2020-07-01T00:00:00.000
Designactualcompletion
2020-06-01T00:00:00.000
Procurementstart
2020-06-01T00:00:00.000
Procurementprojectedcompletion
2021-03-01T00:00:00.000
Procurementadjustedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-11-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionactualcompletion
2024-07-01T00:00:00.000
Totalfunding
$547,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Arnow Avenue, Olinville Avenue.
Parkid
X162
Latitude
40.868587
Longitude
-73.867896
Borough
Bronx
VIEW LOCATION
6012
Trackerid: 6012 • Fmsid: 846 P-210PTRK • Title: Patrick O'Rourke Playground Reconstruction
Trackerid
6012
Fmsid
846 P-210PTRK
Title
Patrick O'Rourke Playground Reconstruction
Summary
This project will reconstruct PS 201 (Patrick O'Rourke) Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-07-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-10-01T00:00:00.000
Constructionprojectedcom
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-09-01T00:00:00.000
Totalfunding
$925,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
12th Avenue between 80th and 81st Streets, Brooklyn
Parkid
B282
Latitude
40.61914694
Longitude
-74.01399722
Borough
Brooklyn
VIEW LOCATION
1336111
Trackerid: 1336111 • Fmsid: 846 P-1PVMNTX • Title: Patterson Playground Entry Pavement Reconstruction
Trackerid
1336111
Fmsid
846 P-1PVMNTX
Title
Patterson Playground Entry Pavement Reconstruction
Summary
This project will reconstruct the pavement at the entrance to Patterson Playground at Morris Avenue and East 144th Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-04-01T00:00:00.000
Designprojectedcompletion
2021-11-01T00:00:00.000
Designactualcompletion
2021-09-01T00:00:00.000
Procurementstart
2021-06-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementactualcompletion
2021-08-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-03-01T00:00:00.000
Constructionactualcompletion
2022-03-01T00:00:00.000
Totalfunding
$330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X155
Latitude
40.815784
Longitude
-73.92217
Borough
Bronx
VIEW LOCATION
7310
Trackerid: 7310 • Fmsid: 846 P-1PTSNPK • Title: Patterson Playground Reconstruction
Trackerid
7310
Fmsid
846 P-1PTSNPK
Title
Patterson Playground Reconstruction
Summary
This project will reconstruct the playground and basketball courts at Patterson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2018-02-01T00:00:00.000
Designactualcompletion
2018-03-01T00:00:00.000
Procurementstart
2018-03-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-02-01T00:00:00.000
Constructionstart
2019-06-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-07-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$3,689,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East 145th Street, Morris and Bronx Avenues.
Parkid
X155
Latitude
40.815783
Longitude
-73.922285
Borough
Bronx
VIEW LOCATION
1043
Trackerid: 1043 • Fmsid: 846 P-4RAIMON • Title: Raimonda Playground Reconstruction
Trackerid
1043
Fmsid
846 P-4RAIMON
Title
Raimonda Playground Reconstruction
Summary
This project will reconstruct Paul Raimonda Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-02-01T00:00:00.000
Designprojectedcompletion
2014-03-01T00:00:00.000
Designadjustedcompletion
2014-06-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementactualcompletion
2015-04-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$1,593,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
20th Avenue Between 47th and 48th Streets, Queens
Parkid
Q298
Latitude
40.7728025
Longitude
-73.89744611
Borough
Queens
VIEW LOCATION
2165
Trackerid: 2165 • Fmsid: 846 P-301PECK • Title: Peck Slip Reconstruction
Trackerid
2165
Fmsid
846 P-301PECK
Title
Peck Slip Reconstruction
Summary
This project will reconstruct Peck Slip.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-12-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designadjustedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2019-12-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$5,388,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Peck Slip between Water Street and South Street
Parkid
M167
Latitude
40.70757111
Longitude
-74.00138833
Borough
Manhattan
VIEW LOCATION
1427111
Trackerid: 1427111 • Fmsid: 846 P-6SUSTN1 • Title: Pelham Bay Park Ballfield Lighting Reconstruction
Trackerid
1427111
Fmsid
846 P-6SUSTN1
Title
Pelham Bay Park Ballfield Lighting Reconstruction
Summary
This project will reconstruct the ballfield lighting at Pelham Bay Park with energy-efficient LED fixtures.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designactualcompletion
2022-12-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2023-12-01T00:00:00.000
Constructionprojectedcom
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-02-01T00:00:00.000
Totalfunding
$225,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.878975
Longitude
-73.80342
Borough
Bronx
VIEW LOCATION
1512111
Trackerid: 1512111 • Fmsid: 846 P-1STFPEL • Title: Pelham Bay Park Synthetic Turf and Track Reconstruction
Trackerid
1512111
Fmsid
846 P-1STFPEL
Title
Pelham Bay Park Synthetic Turf and Track Reconstruction
Summary
This project will reconstruct the synthetic turf field and track at Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-11-01T00:00:00.000
Designprojectedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-04-01T00:00:00.000
Procurementstart
2023-09-01T00:00:00.000
Procurementprojectedcompletion
2024-02-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2024-03-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-09-01T00:00:00.000
Totalfunding
$3,290,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.868728
Longitude
-73.793377
Borough
Bronx
VIEW LOCATION
1618111
Trackerid: 1618111 • Fmsid: 846 P-1PAVBRX • Title: Orchard Beach in Pelham Bay Park Partial Path Reconstruction
Trackerid
1618111
Fmsid
846 P-1PAVBRX
Title
Orchard Beach in Pelham Bay Park Partial Path Reconstruction
Summary
This project will reconstruct a portion of paths at Orchard Beach in Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-05-01T00:00:00.000
Designactualcompletion
2024-04-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-05-01T00:00:00.000
Constructionactualcompletion
2025-05-01T00:00:00.000
Totalfunding
$800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.867661
Longitude
-73.795637
Borough
Bronx
VIEW LOCATION
1948111
Trackerid: 1948111 • Fmsid: 846 P-110PPTH • Title: Pelham Bay Park - Orchard Beach Path Pavement Reconstruction
Trackerid
1948111
Fmsid
846 P-110PPTH
Title
Pelham Bay Park - Orchard Beach Path Pavement Reconstruction
Summary
This project will reconstruct paved pathways in Pelham Bay Park - Orchard Beach.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Procurementstart
2026-05-01T00:00:00.000
Procurementprojectedcompletion
2026-10-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$1,700,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
X039
Latitude
40.868709
Longitude
-73.8019791
Borough
Bronx
VIEW LOCATION
1999111
Trackerid: 1999111 • Title: Pelham Bay Nature Center Roof Reconstruction • Summary: This project will reconstruct the nature center roof.
Trackerid
1999111
Title
Pelham Bay Nature Center Roof Reconstruction
Summary
This project will reconstruct the nature center roof.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.8660593
Longitude
-73.7950264
Borough
Bronx
VIEW LOCATION
2015111
Trackerid: 2015111 • Fmsid: 846 EXPENS201 • Title: Pelham Bay Nature Center Heating Systems Reconstruction
Trackerid
2015111
Fmsid
846 EXPENS201
Title
Pelham Bay Nature Center Heating Systems Reconstruction
Summary
This project reconstructs the nature center heating system.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-09-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.8667765
Longitude
-73.7947716
Borough
Bronx
VIEW LOCATION
1048111
Trackerid: 1048111 • Fmsid: 846 P-6GDRL15 • Title: Pelham Bay Park Guiderail Installation
Trackerid
1048111
Fmsid
846 P-6GDRL15
Title
Pelham Bay Park Guiderail Installation
Summary
This project will install a Cor-Ten steel beam guiderail in Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2016-04-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-07-01T00:00:00.000
Constructionstart
2016-09-01T00:00:00.000
Constructionprojectedcom
2016-09-01T00:00:00.000
Constructionadjustedcompletion
2016-09-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$163,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Parkid
X039
Latitude
40.864824
Longitude
-73.808121
Borough
Bronx
VIEW LOCATION
1097111
Trackerid: 1097111 • Fmsid: 846 P-6ROOF15 • Title: Orchard Beach Nature Center Roof Reconstruction
Trackerid
1097111
Fmsid
846 P-6ROOF15
Title
Orchard Beach Nature Center Roof Reconstruction
Summary
This project will reconstruct the roof at Orchard Beach Nature Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-04-01T00:00:00.000
Designprojectedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-07-01T00:00:00.000
Totalfunding
$208,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X039
Latitude
40.877156
Longitude
-73.804776
Borough
Bronx
VIEW LOCATION
9448
Trackerid: 9448 • Fmsid: 846 P-110MAN2 • Title: Bartow-Pell Mansion Museum Structural Stabilization and Interior Reconstruction
Trackerid
9448
Fmsid
846 P-110MAN2
Title
Bartow-Pell Mansion Museum Structural Stabilization and Interior Reconstruction
Summary
This project will stabilize and reconstruct portions of the interiors at the Bartow-Pell Mansion Museum in Pelham Bay Park.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-02-01T00:00:00.000
Designprojectedcompletion
2025-08-01T00:00:00.000
Designadjustedcompletion
2026-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralState
Name
895 Shore Road
Parkid
X039
Latitude
40.87177242
Longitude
-73.80558282
Borough
Bronx
VIEW LOCATION
7375
Trackerid: 7375 • Fmsid: 846 P-1PELSHO • Title: Pelham Bay Park Natural Shoreline Reconstruction
Trackerid
7375
Fmsid
846 P-1PELSHO
Title
Pelham Bay Park Natural Shoreline Reconstruction
Summary
This project will remove intrusive infrastructure from the natural rocky shore of Pelham Bay Park, restore coastal habitats, and improve public access to the scenic bay.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-10-01T00:00:00.000
Designadjustedcompletion
2017-03-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-05-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-09-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$2,678,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Along the waterfront between Pelham Bay Landfill and Watt Avenue
Parkid
X039
Latitude
40.852586
Longitude
-73.817232
Borough
Bronx
VIEW LOCATION
8801
Trackerid: 8801 • Fmsid: 846 P-100PBSG • Title: Pelham Bay Park Sensory Garden Construction
Trackerid
8801
Fmsid
846 P-100PBSG
Title
Pelham Bay Park Sensory Garden Construction
Summary
This project will construct a barrier-free participatory garden that engages all the senses in enjoying the outdoors in Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-09-01T00:00:00.000
Designprojectedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2019-01-01T00:00:00.000
Procurementstart
2019-01-01T00:00:00.000
Procurementprojectedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$497,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Bruckner Boulevard and Middletown Road next to Playground For All Children
Parkid
X039
Latitude
40.848111
Longitude
-73.825925
Borough
Bronx
VIEW LOCATION
10304
Trackerid: 10304 • Fmsid: 846 P-1PELFTR • Title: Pelham Bay Park Forest Tree Replacement, Phase II
Trackerid
10304
Fmsid
846 P-1PELFTR
Title
Pelham Bay Park Forest Tree Replacement, Phase II
Summary
This project will plant replacement trees and restore native species habitat within forested natural areas in Pelham Bay Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
5.61
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2024-12-01T00:00:00.000
Constructionstart
2025-09-01T00:00:00.000
Constructionprojectedcom
2028-08-01T00:00:00.000
Totalfunding
$3,277,000
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East of Bruckner Blvd between Watt Ave and Bronx and Pelham Parkway
Parkid
X039
Latitude
40.86408531
Longitude
-73.80432241
Borough
Bronx
VIEW LOCATION
4639
Trackerid: 4639 • Fmsid: 846 P-1CROT09 • Title: Pelham Bay Park Waterfront Reconstruction
Trackerid
4639
Fmsid
846 P-1CROT09
Title
Pelham Bay Park Waterfront Reconstruction
Summary
This project will reconstruct and restore the shoreline, remove invasive plants, and construct a new pathway to improve public access to the waterfront at Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2007-08-01T00:00:00.000
Designprojectedcompletion
2012-03-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementactualcompletion
2014-03-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2015-08-01T00:00:00.000
Constructionactualcompletion
2015-09-01T00:00:00.000
Totalfunding
$1,040,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Eastchester Bay between Pelham Bay landfill and Watt Avenue
Parkid
X039
Latitude
40.8509162
Longitude
-73.8171311
Borough
Bronx
VIEW LOCATION
11252
Trackerid: 11252 • Title: Pelham Bay Park Turtle Cove Shoreline Restoration • Summary: This project will restore the shoreline of Turtle Cove in Pelham Bay Park.
Trackerid
11252
Title
Pelham Bay Park Turtle Cove Shoreline Restoration
Summary
This project will restore the shoreline of Turtle Cove in Pelham Bay Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral State
Name
Eastchester Bay, City Island Road wet of Park Drive.
Parkid
X039
Latitude
40.8696379
Longitude
-73.8027161
Borough
Bronx
VIEW LOCATION
10978
Trackerid: 10978 • Title: Pelham Bay Park Tallapoosa Wetland Restoration • Currentphase: proposed
Trackerid
10978
Title
Pelham Bay Park Tallapoosa Wetland Restoration
Summary
This project will restore a historic wetland area in Pelham Bay Park by removing fill, reconnecting inland ponds with tidal flows, and expanding existing low and high marsh habitat.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Eastchester Bay, Erskine Place, New England Thruway, Pelham Parkway
Parkid
X039
Latitude
40.8683987
Longitude
-73.8038245
Borough
Bronx
VIEW LOCATION
6184
Trackerid: 6184 • Fmsid: 846 P-1PNYFL6 • Title: Pelham Bay Park Ballfields 4 & 5 Lighting Reconstruction
Trackerid
6184
Fmsid
846 P-1PNYFL6
Title
Pelham Bay Park Ballfields 4 & 5 Lighting Reconstruction
Summary
This project will reconstruct the electrical feeders and conduits at ballfields 4 and 5 in Pelham Bay Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-07-01T00:00:00.000
Designprojectedcompletion
2014-03-01T00:00:00.000
Designactualcompletion
2014-10-01T00:00:00.000
Procurementstart
2014-10-01T00:00:00.000
Procurementprojectedcompletion
2015-06-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-08-01T00:00:00.000
Constructionstart
2016-01-01T00:00:00.000
Constructionprojectedcom
2017-01-01T00:00:00.000
Constructionadjustedcompletion
2017-05-01T00:00:00.000
Constructionactualcompletion
2017-05-01T00:00:00.000
Totalfunding
$875,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Middletown Road and Bruckner Boulevard
Parkid
X039
Latitude
40.848885
Longitude
-73.824543
Borough
Bronx
VIEW LOCATION