Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
10430
Trackerid: 10430 • Fmsid: 846 P-502MLPG • Title: Midland Playground Reconstruction
Trackerid
10430
Fmsid
846 P-502MLPG
Title
Midland Playground Reconstruction
Summary
This project will reconstruct the playground area in Midland Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2024-11-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Midland Avenue, Lincoln Avenue, and Oldfield Street
Parkid
R038
Latitude
40.57502607
Longitude
-74.09879
Borough
Staten Island
VIEW LOCATION
1393111
Trackerid: 1393111 • Fmsid: 846 P-1YANK22 • Title: Bronx Children's Museum Roof Reconstruction
Trackerid
1393111
Fmsid
846 P-1YANK22
Title
Bronx Children's Museum Roof Reconstruction
Summary
This project will reconstruct the roof at the Bronx Children's Museum in Mill Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-03-01T00:00:00.000
Designprojectedcompletion
2022-08-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-04-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$1,738,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X344
Latitude
40.823269
Longitude
-73.931808
Borough
Bronx
VIEW LOCATION
6830
Trackerid: 6830 • Fmsid: 846 P-101MBRO • Title: Millbrook Playground Basketball and Handball Court Reconstruction
Trackerid
6830
Fmsid
846 P-101MBRO
Title
Millbrook Playground Basketball and Handball Court Reconstruction
Summary
This project will reconstruct the basketball and handball courts at Millbrook Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-03-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designactualcompletion
2016-04-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-05-01T00:00:00.000
Procurementactualcompletion
2017-04-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$1,003,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Bruckner Boulevard between Cypress and St. Ann's Avenues
Parkid
X182
Latitude
40.80435417
Longitude
-73.91664778
Borough
Bronx
VIEW LOCATION
11430
Trackerid: 11430 • Title: Ocean Breeze Horse Riding Arena Fire Alarm Installation • Summary: This project will install fire alarms at the Ocean Breeze Horse Riding Arena.
Trackerid
11430
Title
Ocean Breeze Horse Riding Arena Fire Alarm Installation
Summary
This project will install fire alarms at the Ocean Breeze Horse Riding Arena.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Quintard Street and Mason Avenue, Seaside Boulevard, (Father Capodanno Boulevard)
Parkid
R149
Latitude
40.5836004
Longitude
-74.0737137
Borough
Staten Island
VIEW LOCATION
9329
Trackerid: 9329 • Fmsid: 846 NDF-MKETT • Title: Monsignor Kett Playground Reconstruction
Trackerid
9329
Fmsid
846 NDF-MKETT
Title
Monsignor Kett Playground Reconstruction
Summary
This project will reconstruct Monsignor Kett Playground, including the court areas, play areas, and security and sports lighting.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-01-01T00:00:00.000
Designprojectedcompletion
2020-01-01T00:00:00.000
Designadjustedcompletion
2020-04-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-07-01T00:00:00.000
Totalfunding
$7,843,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 204th Street between 10th Avenue and Nagle Avenue
Parkid
M199
Latitude
40.862546
Longitude
-73.920825
Borough
Manhattan
VIEW LOCATION
9410
Trackerid: 9410 • Fmsid: 846 NDF-MKECS • Title: Monsignor Kett Playground Public Restroom Building Construction
Trackerid
9410
Fmsid
846 NDF-MKECS
Title
Monsignor Kett Playground Public Restroom Building Construction
Summary
This project will construct a public restroom building in Monsignor Kett Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-01-01T00:00:00.000
Designprojectedcompletion
2020-01-01T00:00:00.000
Designadjustedcompletion
2020-08-01T00:00:00.000
Designactualcompletion
2020-08-01T00:00:00.000
Procurementstart
2020-08-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementadjustedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-06-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$5,126,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 204th Street between 10th Avenue and Nagle Avenue
Parkid
M199
Latitude
40.862627
Longitude
-73.921014
Borough
Manhattan
VIEW LOCATION
9962
Trackerid: 9962 • Fmsid: 846 P-412MBPF • Title: Montbellier Park Synthetic Turf Field Reconstruction
Trackerid
9962
Fmsid
846 P-412MBPF
Title
Montbellier Park Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at Montbellier Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-07-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-01-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Eastgate Plaza, Sloan Street, 139th Avenue, Springfield Boulevard
Parkid
Q396
Latitude
40.674979
Longitude
-73.756496
Borough
Queens
VIEW LOCATION
10975
Trackerid: 10975 • Title: Montbellier Park Green Infrastructure Construction • Currentphase: proposed
Trackerid
10975
Title
Montbellier Park Green Infrastructure Construction
Summary
This project will construct green infrastructure to capture stormwater under the basketball courts at Montbellier Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Springfield Boulevard and 138th Road
Parkid
Q396
Latitude
40.6746535
Longitude
-73.756383
Borough
Queens
VIEW LOCATION
6463
Trackerid: 6463 • Fmsid: 846 P-404CCPS • Title: Clement Clarke Moore Homestead Playground Reconstruction
Trackerid
6463
Fmsid
846 P-404CCPS
Title
Clement Clarke Moore Homestead Playground Reconstruction
Summary
This project will reconstruct the playground, spray shower, and pavements at Clement Clarke Moore Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2019-02-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2019-03-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionadjustedcompletion
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$5,089,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Broadway, 45th Avenue, 82nd Street
Parkid
Q361
Latitude
40.74214194
Longitude
-73.88239694
Borough
Queens
VIEW LOCATION
1323111
Trackerid: 1323111 • Fmsid: 846 P-3MRNGPK • Title: Morningside Park Paths Reconstruction
Trackerid
1323111
Fmsid
846 P-3MRNGPK
Title
Morningside Park Paths Reconstruction
Summary
This project will reconstruct paths in Morningside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-12-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-12-01T00:00:00.000
Constructionprojectedcom
2023-08-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$950,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M056
Latitude
40.807078
Longitude
-73.957961
Borough
Manhattan
VIEW LOCATION
10453
Trackerid: 10453 • Fmsid: 846 P-309MSSC • Title: Morningside Park 114th, 116th and 122nd Streets Staircases Reconstruction
Trackerid
10453
Fmsid
846 P-309MSSC
Title
Morningside Park 114th, 116th and 122nd Streets Staircases Reconstruction
Summary
This project will reconstruct the staircases in Morningside Park at West 114th, 116th, and 122nd Streets.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-09-01T00:00:00.000
Designadjustedcompletion
2025-08-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
113th to 123rd Streets between Morningside Drive and Morningside Avenue
Parkid
M056
Latitude
40.80569717
Longitude
-73.95841239
Borough
Manhattan
VIEW LOCATION
10686
Trackerid: 10686 • Fmsid: 846 P-309MPP1 • Title: Morningside Park Pathways and Dog Run Reconstruction
Trackerid
10686
Fmsid
846 P-309MPP1
Title
Morningside Park Pathways and Dog Run Reconstruction
Summary
This project will reconstruct Morningside Park Pathways and Dog Run.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2027-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Between 113th and 116th Streets
Parkid
M056
Latitude
40.8044345
Longitude
-73.95923564
Borough
Manhattan
VIEW LOCATION
8688
Trackerid: 8688 • Fmsid: 846 P-309MPMP • Title: Morningside Park Middle Playground and Basketball Courts Reconstruction
Trackerid
8688
Fmsid
846 P-309MPMP
Title
Morningside Park Middle Playground and Basketball Courts Reconstruction
Summary
This project will reconstruct Middle Playground and the basketball courts at Morningside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-07-01T00:00:00.000
Designprojectedcompletion
2018-07-01T00:00:00.000
Designadjustedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-10-01T00:00:00.000
Constructionstart
2019-12-01T00:00:00.000
Constructionprojectedcom
2020-12-01T00:00:00.000
Constructionadjustedcompletion
2021-03-01T00:00:00.000
Constructionactualcompletion
2021-03-01T00:00:00.000
Totalfunding
$3,056,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Morningside Drive and 118th Street
Parkid
M056
Latitude
40.807401
Longitude
-73.957414
Borough
Manhattan
VIEW LOCATION
11420
Trackerid: 11420 • Title: Morningside Park Pathways Reconstruction • Summary: This project will reconstruct the pathways at Morningside Park.
Trackerid
11420
Title
Morningside Park Pathways Reconstruction
Summary
This project will reconstruct the pathways at Morningside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Name
West 110 Street To West 123 Street, Manhattan Avenue To Morningside Avenue
Parkid
M056
Latitude
40.8069081552
Longitude
-73.9580485158
Borough
Manhattan
VIEW LOCATION
9866
Trackerid: 9866 • Fmsid: 846 P-3MORNHR • Title: Morningside Park 113th Street Steps Handrails Construction
Trackerid
9866
Fmsid
846 P-3MORNHR
Title
Morningside Park 113th Street Steps Handrails Construction
Summary
This project will construct handrails at the 113th Street steps in Morningside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementadjustedcompletion
2024-01-01T00:00:00.000
Procurementactualcompletion
2024-01-01T00:00:00.000
Constructionstart
2024-04-01T00:00:00.000
Constructionprojectedcom
2025-04-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$550,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
West 113th Street between Morningside Drive and Manhattan Avenue
Parkid
M056
Latitude
40.805165
Longitude
-73.959247
Borough
Manhattan
VIEW LOCATION
2427
Trackerid: 2427 • Fmsid: 846 P-309P123 • Title: Morningside Park 123rd Street Playground Reconstruction Phase I
Trackerid
2427
Fmsid
846 P-309P123
Title
Morningside Park 123rd Street Playground Reconstruction Phase I
Summary
This project will reconstruct a portion of 123rd Street Playground in Morningside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-01-01T00:00:00.000
Designprojectedcompletion
2011-01-01T00:00:00.000
Designadjustedcompletion
2012-01-01T00:00:00.000
Designactualcompletion
2012-01-01T00:00:00.000
Procurementstart
2012-01-01T00:00:00.000
Procurementprojectedcompletion
2012-10-01T00:00:00.000
Procurementactualcompletion
2012-06-01T00:00:00.000
Constructionstart
2012-08-01T00:00:00.000
Constructionprojectedcom
2013-08-01T00:00:00.000
Constructionadjustedcompletion
2013-07-01T00:00:00.000
Constructionactualcompletion
2013-07-01T00:00:00.000
Totalfunding
$2,768,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
West 123rd Street and Morningside Avenue
Parkid
M056
Latitude
40.809734
Longitude
-73.955798
Borough
Manhattan
VIEW LOCATION
6414
Trackerid: 6414 • Fmsid: 846 P-309MOR2 • Title: Morningside Park 123rd Street Playground Reconstruction Phase 2
Trackerid
6414
Fmsid
846 P-309MOR2
Title
Morningside Park 123rd Street Playground Reconstruction Phase 2
Summary
This project will reconstruct the play equipment, seating, planting, lighting, pavements, fencing, and drainage and water supply systems at 123rd Street Playground in Morningside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-10-01T00:00:00.000
Designprojectedcompletion
2016-11-01T00:00:00.000
Designadjustedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2017-04-01T00:00:00.000
Procurementstart
2017-04-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-12-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-03-01T00:00:00.000
Totalfunding
$2,447,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
West 123rd Street and Morningside Avenue
Parkid
M056
Latitude
40.809862
Longitude
-73.955636
Borough
Manhattan
VIEW LOCATION
11214
Trackerid: 11214 • Title: Morris Mesa Playground Reconstruction • Summary: This project will reconstruct Morris Mesa Playground.
Trackerid
11214
Title
Morris Mesa Playground Reconstruction
Summary
This project will reconstruct Morris Mesa Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Cross Bronx Expressway between Morris Avenue and Grand Concourse
Parkid
X148D1
Latitude
40.8453029
Longitude
-73.9096014
Borough
Bronx
VIEW LOCATION
7156
Trackerid: 7156 • Fmsid: 846 P-6BOIL15 • Currentphase: completed
Trackerid
7156
Fmsid
846 P-6BOIL15
Title
Bensonhurst Senior Recreation Center and Mosholu Parkway Public Restroom Building Boiler and Heating System Reconstruction
Summary
This project will reconstruct the boilers and heating systems at Bensonhurst Senior Recreation Center in Brooklyn and at the public restroom building in Mosholu Parkway in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2016-05-01T00:00:00.000
Designadjustedcompletion
2019-02-01T00:00:00.000
Designactualcompletion
2019-02-01T00:00:00.000
Procurementstart
2019-02-01T00:00:00.000
Procurementprojectedcompletion
2019-11-01T00:00:00.000
Procurementadjustedcompletion
2021-11-01T00:00:00.000
Procurementactualcompletion
2021-11-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2024-02-01T00:00:00.000
Totalfunding
$1,072,000
Projectliaison
Contact Us
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Bronx Park to Van Cortlandt Park
Parkid
X033
Latitude
40.868936
Longitude
-73.881244
Borough
Bronx
VIEW LOCATION
7287
Trackerid: 7287 • Fmsid: 846 P-107KOSS • Title: Kossuth Playground Reconstruction
Trackerid
7287
Fmsid
846 P-107KOSS
Title
Kossuth Playground Reconstruction
Summary
This project will reconstruct Kossuth Playground in Mosholu Parkway to include new play equipment, spray shower features, basketball courts, fencing, pavement, benches, lighting and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementadjustedcompletion
2019-09-01T00:00:00.000
Procurementactualcompletion
2019-09-01T00:00:00.000
Constructionstart
2019-10-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$3,356,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
East Mosholu Parkway North between Kossuth Avenue and Steuben Avenue
Parkid
X033
Latitude
40.877866
Longitude
-73.882663
Borough
Bronx
VIEW LOCATION
2165
Trackerid: 2165 • Fmsid: 846 P-301PECK • Title: Peck Slip Reconstruction
Trackerid
2165
Fmsid
846 P-301PECK
Title
Peck Slip Reconstruction
Summary
This project will reconstruct Peck Slip.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-12-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designadjustedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2019-12-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$5,388,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Peck Slip between Water Street and South Street
Parkid
M167
Latitude
40.70757111
Longitude
-74.00138833
Borough
Manhattan
VIEW LOCATION
9587
Trackerid: 9587 • Fmsid: 846 P-111FFBB • Title: Frisch Field Reconstruction
Trackerid
9587
Fmsid
846 P-111FFBB
Title
Frisch Field Reconstruction
Summary
This project will reconstruct the natural turf baseball field at Frisch Field, including grading, drainage, benches, fencing, dugouts, sidewalks, pathways, drinking fountains and bottle fillers.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2021-02-01T00:00:00.000
Designprojectedcompletion
2022-02-01T00:00:00.000
Designadjustedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-12-01T00:00:00.000
Procurementstart
2026-02-01T00:00:00.000
Procurementprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Mosholu Parkway and Webster Avenue
Parkid
X033
Latitude
40.86841412
Longitude
-73.88052498
Borough
Bronx
VIEW LOCATION
1238
Trackerid: 1238 • Fmsid: 846 P-107LIGT • Title: Mosholu Parkway WWI Monument Lighting System Construction
Trackerid
1238
Fmsid
846 P-107LIGT
Title
Mosholu Parkway WWI Monument Lighting System Construction
Summary
This project will construct a lighting system for Mosholu Parkway WWI Monument.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designprojectedcompletion
2012-01-01T00:00:00.000
Designactualcompletion
2012-02-01T00:00:00.000
Procurementstart
2012-02-01T00:00:00.000
Procurementprojectedcompletion
2012-10-01T00:00:00.000
Procurementactualcompletion
2012-12-01T00:00:00.000
Constructionstart
2013-03-01T00:00:00.000
Constructionprojectedcom
2013-08-01T00:00:00.000
Constructionadjustedcompletion
2013-09-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$78,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Mosholu Parkway at Marion & Hull Avenues
Parkid
X033
Latitude
40.871093
Longitude
-73.881073
Borough
Bronx
VIEW LOCATION
11215
Trackerid: 11215 • Title: Mott Playground and Public Restroom Building Construction • Currentphase: proposed
Trackerid
11215
Title
Mott Playground and Public Restroom Building Construction
Summary
This project will reconstruct the playground, basketball courts, handball courts, and a public restroom building at Mott Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Morris Avenue between East 166th Street and East 167th Street
Parkid
X115
Latitude
40.8310906
Longitude
-73.9147873
Borough
Bronx
VIEW LOCATION
1214
Trackerid: 1214 • Fmsid: 846 P-105HOPE • Title: Mt. Hope Garden Play Area Reconstruction
Trackerid
1214
Fmsid
846 P-105HOPE
Title
Mt. Hope Garden Play Area Reconstruction
Summary
This project will reconstruct the retaining walls and play areas at Mt. Hope Garden.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2015-10-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2019-02-01T00:00:00.000
Constructionactualcompletion
2018-12-01T00:00:00.000
Totalfunding
$4,570,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
West side of Creston Avenue between East Burnside Avenue East 179th Streets
Parkid
X274
Latitude
40.85255833
Longitude
-73.90535944
Borough
Bronx
VIEW LOCATION
6641
Trackerid: 6641 • Fmsid: 846 P-201MGRK • Title: McGolrick Park Playground Reconstruction
Trackerid
6641
Fmsid
846 P-201MGRK
Title
McGolrick Park Playground Reconstruction
Summary
This project will reconstruct the playground at McGolrick Park, including the play equipment, spray shower, pavement, fencing, benches, and plantings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-08-01T00:00:00.000
Designprojectedcompletion
2015-08-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-03-01T00:00:00.000
Procurementadjustedcompletion
2017-08-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$2,617,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Nassau Avenue between Monitor Street and Russell Street
Parkid
B114
Latitude
40.72444083
Longitude
-73.94335389
Borough
Brooklyn
VIEW LOCATION
8569
Trackerid: 8569 • Fmsid: 846 P-201MCGK • Title: McGolrick Park Paths Reconstruction
Trackerid
8569
Fmsid
846 P-201MCGK
Title
McGolrick Park Paths Reconstruction
Summary
This project will reconstruct the asphalt paths, benches and damaged sidewalks at McGolrick Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-09-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designadjustedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-11-01T00:00:00.000
Procurementstart
2020-11-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$2,076,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Nassau Avenue, Monitor Street, Russell Street, Driggs Avenue
Parkid
B114
Latitude
40.7239383
Longitude
-73.9433533
Borough
Brooklyn
VIEW LOCATION
2949
Trackerid: 2949 • Fmsid: 846 P-402JFP3 • Title: Murray Playground Dog Run and Sitting Area Reconstruction
Trackerid
2949
Fmsid
846 P-402JFP3
Title
Murray Playground Dog Run and Sitting Area Reconstruction
Summary
This project will reconstruct the park entrance, sitting area, and portions of the dog run and John F. Murray Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-05-01T00:00:00.000
Designprojectedcompletion
2012-07-01T00:00:00.000
Designactualcompletion
2012-08-01T00:00:00.000
Procurementstart
2012-08-01T00:00:00.000
Procurementprojectedcompletion
2013-05-01T00:00:00.000
Procurementactualcompletion
2013-06-01T00:00:00.000
Constructionstart
2013-07-01T00:00:00.000
Constructionprojectedcom
2014-07-01T00:00:00.000
Constructionadjustedcompletion
2014-06-01T00:00:00.000
Constructionactualcompletion
2014-06-01T00:00:00.000
Totalfunding
$900,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
21st Street between 45th Avenue and 45th Road
Parkid
Q141
Latitude
40.74722861
Longitude
-73.9488225
Borough
Queens
VIEW LOCATION
10436
Trackerid: 10436 • Fmsid: 846 P-402MPDR • Title: Murray Playground Synthetic Turf Field and Dog Run Reconstruction
Trackerid
10436
Fmsid
846 P-402MPDR
Title
Murray Playground Synthetic Turf Field and Dog Run Reconstruction
Summary
This project will reconstruct the synthetic turf field, the dog run and northern portions of Murray Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-04-01T00:00:00.000
Designprojectedcompletion
2026-04-01T00:00:00.000
Designactualcompletion
2026-05-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
45th Avenue 45th Road between 11th and 21st Street
Parkid
Q141
Latitude
40.74720071
Longitude
-73.94863469
Borough
Queens
VIEW LOCATION
9545
Trackerid: 9545 • Fmsid: 846 NDF-NMKE1 • Title: Nameoke Park Construction
Trackerid
9545
Fmsid
846 NDF-NMKE1
Title
Nameoke Park Construction
Summary
This project will construct Nameoke Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designadjustedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-08-01T00:00:00.000
Constructionprojectedcom
2023-08-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$2,537,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Nameoke Avenue and Augustina Avenue
Parkid
Q509
Latitude
40.607265
Longitude
-73.75085
Borough
Queens
VIEW LOCATION
9551
Trackerid: 9551 • Fmsid: 846 NDF-NMKE2 • Title: Nameoke Park Public Restroom Building Construction
Trackerid
9551
Fmsid
846 NDF-NMKE2
Title
Nameoke Park Public Restroom Building Construction
Summary
This project will construct a public restroom building at Nameoke Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designadjustedcompletion
2021-11-01T00:00:00.000
Designactualcompletion
2021-12-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementadjustedcompletion
2024-04-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2024-10-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionadjustedcompletion
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-07-01T00:00:00.000
Totalfunding
$3,691,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Nameoke Avenue, Augustina Avenue
Parkid
Q509
Latitude
40.607417
Longitude
-73.750757
Borough
Queens
VIEW LOCATION
8812
Trackerid: 8812 • Fmsid: 846 P-501NAPL • Title: Naples Playground Reconstruction
Trackerid
8812
Fmsid
846 P-501NAPL
Title
Naples Playground Reconstruction
Summary
This project will reconstruct Naples Playground, including the play area, the basketball courts, and the ball field fencing.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-11-01T00:00:00.000
Designprojectedcompletion
2019-11-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$2,667,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Targee Street, Stanwich Street, Rome Avenue
Parkid
R073
Latitude
40.602523
Longitude
-74.090014
Borough
Staten Island
VIEW LOCATION
10675
Trackerid: 10675 • Fmsid: 846 P-3CPINSP • Title: Nathan Straus Playground Reconstruction
Trackerid
10675
Fmsid
846 P-3CPINSP
Title
Nathan Straus Playground Reconstruction
Summary
This project will reconstruct Nathan Straus Playground.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Attorney Street between Stanton Street and Rivington Street
Parkid
M241
Latitude
40.7193889
Longitude
-73.98406018
Borough
Manhattan
VIEW LOCATION
8600
Trackerid: 8600 • Fmsid: 846 P-4LTLBSH • Title: Little Bush Park Playground Reconstruction
Trackerid
8600
Fmsid
846 P-4LTLBSH
Title
Little Bush Park Playground Reconstruction
Summary
This project will reconstruct the playground at Little Bush Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-01-01T00:00:00.000
Procurementactualcompletion
2020-01-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-09-01T00:00:00.000
Totalfunding
$2,504,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Laurel Hill Boulevard between 63rd Street and 64th Street
Parkid
Q205B
Latitude
40.738189
Longitude
-73.902187
Borough
Queens
VIEW LOCATION
1013111
Trackerid: 1013111 • Fmsid: 846 P-2PLG15G • Title: Nautilus Playground Sports Courts Reconstruction
Trackerid
1013111
Fmsid
846 P-2PLG15G
Title
Nautilus Playground Sports Courts Reconstruction
Summary
This project will reconstruct the basketball and handball courts at Nautilus Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-02-01T00:00:00.000
Designprojectedcompletion
2015-02-01T00:00:00.000
Designactualcompletion
2015-02-01T00:00:00.000
Procurementstart
2015-06-01T00:00:00.000
Procurementprojectedcompletion
2015-11-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$218,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B268
Latitude
40.571823
Longitude
-73.996451
Borough
Brooklyn
VIEW LOCATION
8651
Trackerid: 8651 • Fmsid: 846 P-104NELP • Title: Nelson Playground Basketball Court and Bleachers Reconstruction
Trackerid
8651
Fmsid
846 P-104NELP
Title
Nelson Playground Basketball Court and Bleachers Reconstruction
Summary
This project will reconstruct the basketball court and bleachers at Nelson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-02-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2019-08-01T00:00:00.000
Constructionactualcompletion
2018-12-01T00:00:00.000
Totalfunding
$354,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
West 166th Street between Woodycrest Avenue and Nelson Avenue
Parkid
X168
Latitude
40.835088
Longitude
-73.926879
Borough
Bronx
VIEW LOCATION
11142
Trackerid: 11142 • Title: Beach 142nd Street Mall Sprinkler System Reconstruction • Summary: This project will reconstruct the irrigation system in Beach 142nd Street Mall.
Trackerid
11142
Title
Beach 142nd Street Mall Sprinkler System Reconstruction
Summary
This project will reconstruct the irrigation system in Beach 142nd Street Mall.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Beach 142nd Street, bet. Newport Ave and Rockaway Beach Blvd
Parkid
Q037
Latitude
40.5705888
Longitude
-73.8611679
Borough
Queens
VIEW LOCATION
8678
Trackerid: 8678 • Fmsid: 846 P-2CPINEW • Title: Newport Playground Public Restroom Building Reconstruction
Trackerid
8678
Fmsid
846 P-2CPINEW
Title
Newport Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Newport Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-03-01T00:00:00.000
Designadjustedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2019-02-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2020-12-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverdale Avenue between Osborn Street and Thatford Avenue
Parkid
B339
Latitude
40.660884
Longitude
-73.907047
Borough
Brooklyn
VIEW LOCATION
8677
Trackerid: 8677 • Fmsid: 846 P-2CPINPL • Title: Newport Playground Reconstruction
Trackerid
8677
Fmsid
846 P-2CPINPL
Title
Newport Playground Reconstruction
Summary
This project will reconstruct Newport Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-03-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionadjustedcompletion
2019-12-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$3,850,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverdale Avenue between Osborn Street and Thatford Avenue, adjacent to P.S. 41
Parkid
B339
Latitude
40.660825
Longitude
-73.907078
Borough
Brooklyn
VIEW LOCATION
7251
Trackerid: 7251 • Fmsid: 846 P-404NTPG • Title: Newtown Playground Reconstruction
Trackerid
7251
Fmsid
846 P-404NTPG
Title
Newtown Playground Reconstruction
Summary
This project will reconstruct paths and plantings on the upper lawn area of Newtown Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-09-01T00:00:00.000
Totalfunding
$1,315,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
92nd Street and 56th Avenue
Parkid
Q041
Latitude
40.736271
Longitude
-73.869662
Borough
Queens
VIEW LOCATION
6670
Trackerid: 6670 • Fmsid: 846 P-109NBLE • Title: Noble Playground Public Restroom Building Reconstruction
Trackerid
6670
Fmsid
846 P-109NBLE
Title
Noble Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Noble Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-09-01T00:00:00.000
Designprojectedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2020-11-01T00:00:00.000
Procurementactualcompletion
2021-03-01T00:00:00.000
Constructionstart
2021-06-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,399,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 177th Street between Noble Avenue and Bronx River Parkway
Parkid
X123
Latitude
40.83738
Longitude
-73.872197
Borough
Bronx
VIEW LOCATION
9232
Trackerid: 9232 • Fmsid: 846 P-109NOBE • Title: Noble Playground Reconstruction
Trackerid
9232
Fmsid
846 P-109NOBE
Title
Noble Playground Reconstruction
Summary
This project will reconstruct the play area at Noble Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-11-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-05-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$1,593,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Noble Avenue, Bronx River Avenue, Bronx River Parkway, Cross Bronx Expressway
Parkid
X123
Latitude
40.837539
Longitude
-73.872546
Borough
Bronx
VIEW LOCATION
10750
Trackerid: 10750 • Fmsid: 846 P-109NOB1 • Title: Noble Playground Water Service Reconstruction
Trackerid
10750
Fmsid
846 P-109NOB1
Title
Noble Playground Water Service Reconstruction
Summary
This project will reconstruct the water tap and water service to the basketball courts at Noble Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2024-03-01T00:00:00.000
Designprojectedcompletion
2025-02-01T00:00:00.000
Designactualcompletion
2025-02-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementactualcompletion
2026-06-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-06-01T00:00:00.000
Totalfunding
$475,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Noble Avenue, Cross Bronx Expressway, and Bronx River Parkway
Parkid
X123
Latitude
40.83708312
Longitude
-73.87249563
Borough
Bronx
VIEW LOCATION
7253
Trackerid: 7253 • Fmsid: 846 P-412NORI • Title: Norelli-Hargreaves Playground Reconstruction
Trackerid
7253
Fmsid
846 P-412NORI
Title
Norelli-Hargreaves Playground Reconstruction
Summary
This project will reconstruct the play area, spray shower, and seating area at Norelli-Hargreaves Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-05-01T00:00:00.000
Designprojectedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-05-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-09-01T00:00:00.000
Totalfunding
$2,181,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Van Wyck Expressway, 142nd Street, 106th Avenue
Parkid
Q220B
Latitude
40.690156
Longitude
-73.808732
Borough
Queens
VIEW LOCATION
8834
Trackerid: 8834 • Fmsid: 846 P-412NOR2 • Currentphase: completed
Trackerid
8834
Fmsid
846 P-412NOR2
Title
Norelli Hargreaves Playground Basketball Courts and Multi-Purpose Play Area Reconstruction
Summary
This project will install new basketball courts and a multi-purpose play area at Norelli-Hargreaves Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$1,524,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
Van Wyck Expressway, 142nd Street, 106th Avenue
Parkid
Q220B
Latitude
40.690179
Longitude
-73.808738
Borough
Queens
VIEW LOCATION
6156
Trackerid: 6156 • Fmsid: 846 SANDY2-10 • Title: North 5th Street Pier and Park Bulkhead Reconstruction (Hurricane Sandy)
Trackerid
6156
Fmsid
846 SANDY2-10
Title
North 5th Street Pier and Park Bulkhead Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the bulkhead at North 5th Street Pier and Park, which was damaged by Hurricane Sandy.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$1,911,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Kent Avenue between North 4th Street and North 5th Street
Parkid
B536
Latitude
40.72028278
Longitude
-73.96497556
Borough
Brooklyn
VIEW LOCATION
10473
Trackerid: 10473 • Fmsid: 846 P-412NRPG • Title: North Rochdale Playground Reconstruction
Trackerid
10473
Fmsid
846 P-412NRPG
Title
North Rochdale Playground Reconstruction
Summary
This project will reconstruct North Rochdale playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-07-01T00:00:00.000
Designprojectedcompletion
2025-02-01T00:00:00.000
Designactualcompletion
2025-03-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-10-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2027-10-01T00:00:00.000
Totalfunding
$4,800,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Baisley Boulevard 168th Street and Bedell Street
Parkid
Q426
Latitude
40.680182
Longitude
-73.774799
Borough
Queens
VIEW LOCATION
11166
Trackerid: 11166 • Title: North Shore Esplanade Reconstruction • Currentphase: proposed
Trackerid
11166
Title
North Shore Esplanade Reconstruction
Summary
This project will reconstruct the park at North Shore Esplanade, including removals, drainage, drinking fountain, fencing, pavement, wall repair, seating and landscaping.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Richmond Terrace and Nicholas Street
Parkid
R066
Latitude
40.64745666
Longitude
-74.08078584
Borough
Staten Island
VIEW LOCATION
10756
Trackerid: 10756 • Fmsid: 846 P-403NPBB • Title: Northern Playground Basketball Court and Handball Court Reconstruction
Trackerid
10756
Fmsid
846 P-403NPBB
Title
Northern Playground Basketball Court and Handball Court Reconstruction
Summary
This project will reconstruct the basketball court, handball courts and add a drinking fountain to the public restroom building at Northern Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
47.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-12-01T00:00:00.000
Procurementstart
2026-01-01T00:00:00.000
Procurementprojectedcompletion
2027-01-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2027-06-01T00:00:00.000
Totalfunding
$1,178,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Northern Boulevard and 93rd Street
Parkid
Q363
Latitude
40.75623372
Longitude
-73.87467944
Borough
Queens
VIEW LOCATION
8852
Trackerid: 8852 • Fmsid: 846 P-403NORT • Title: Northern Playground Synthetic Turf Reconstruction
Trackerid
8852
Fmsid
846 P-403NORT
Title
Northern Playground Synthetic Turf Reconstruction
Summary
This project will reconstruct the existing multi-use synthetic turf field at Northern Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-05-01T00:00:00.000
Designprojectedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2021-03-01T00:00:00.000
Procurementactualcompletion
2021-02-01T00:00:00.000
Constructionstart
2021-02-01T00:00:00.000
Constructionprojectedcom
2022-02-01T00:00:00.000
Constructionactualcompletion
2021-09-01T00:00:00.000
Totalfunding
$1,272,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Northern Boulevard between 93rd Street and 94th Street
Parkid
Q363
Latitude
40.755837410639
Longitude
-73.874560559109
Borough
Queens
VIEW LOCATION