Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Gravesend Bay, Bay 44 St. to Bay 49 St., Shore Pkwy.
Parkid
B125
Latitude
40.583173
Longitude
-73.998857
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Seaview Ave. bet. Paerdegat Basin and E. 93 St., E. 102 St. and Fresh Creek Basin
Parkid
B018
Latitude
40.624287
Longitude
-73.898933
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Pittsville St., Hylan Blvd. Richard Ave.
Parkid
R006
Latitude
40.501941
Longitude
-74.252218
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.746357
Longitude
-73.842717
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Forest Ave. Wilcox Ave., between Van Name Ave. & Eunice Pl.
Parkid
R150
Latitude
40.625318
Longitude
-74.153947
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jackie Robinson Pkwy., Vermont Ave., Highland Blvd. bet. Bulwer Pl. and Cypress Hills St.
Parkid
Q020
Latitude
40.686661
Longitude
-73.885762
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Page Ave., Hylan Blvd., and Amboy Rd.
Parkid
R027
Latitude
40.512532
Longitude
-74.226734
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Quintard St. and Mason Ave, Seaside Blvd., (Father Capodanno Blvd.)
Parkid
R149
Latitude
40.585942
Longitude
-74.077906
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Randall Ave., Lacombe Ave., Soundview Ave. bet. White Plains Rd. and Olmstead Ave.
Parkid
X088
Latitude
40.812674
Longitude
-73.851687
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Riverside Drive to Hudson River, West 59 Street to Clair Place
Parkid
M071
Latitude
40.803083
Longitude
-73.972337
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Bronx River, Bronx River Ave. bet. Lafayette Ave., Surf Dr.
Parkid
X118
Latitude
40.81095
Longitude
-73.859644
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fountain Ave., 75 St. bet. Belt Pkwy., Flatlands Ave.,
Parkid
B165
Latitude
40.659846
Longitude
-73.859769
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
1st Avenue to FDR Drive, East 111 to East 114 Streets
Parkid
M047
Latitude
40.7926
Longitude
-73.93437
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Holton Ave., Chisolm St., Luten Ave., Arbutus Ave. and Raritan Bay
Parkid
R031
Latitude
40.519333
Longitude
-74.191198
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Westchester Circle, Schley, Emerson Avenues, East River
Parkid
X126
Latitude
40.814721
Longitude
-73.837985
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
3222
Trackerid: 3222 • Fmsid: 846 P-411APE2 • Title: Alley Pond Environmental Center Reconstruction
Trackerid
3222
Fmsid
846 P-411APE2
Title
Alley Pond Environmental Center Reconstruction
Summary
This project will construct a new environmental center in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-02-01T00:00:00.000
Designprojectedcompletion
2013-07-01T00:00:00.000
Designadjustedcompletion
2017-09-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-05-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2023-03-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$28,774,000
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Northern Boulevard and Cross Island Parkway
Parkid
Q001
Latitude
40.762731
Longitude
-73.753366
Borough
Queens
VIEW LOCATION
9590
Trackerid: 9590 • Fmsid: 846 P-411OKPT • Title: Oakland Lake Pathways Reconstruction
Trackerid
9590
Fmsid
846 P-411OKPT
Title
Oakland Lake Pathways Reconstruction
Summary
This project will reconstruct pathways at Oakland Lake in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-06-01T00:00:00.000
Designprojectedcompletion
2021-06-01T00:00:00.000
Designadjustedcompletion
2022-04-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-09-01T00:00:00.000
Constructionactualcompletion
2024-10-01T00:00:00.000
Totalfunding
$415,000
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Springfield Boulevard, 46th Avenue, Garland Drive, 56th Avenue
Parkid
Q001
Latitude
40.758710563006
Longitude
-73.758260989437
Borough
Queens
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
West of Cross Island Parkway from 46th Avenue to LIE
Parkid
Q001
Latitude
40.757951
Longitude
-73.74496
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East End Avenue to East River, East 84 to East 90 Streets
Parkid
M081
Latitude
40.767678
Longitude
-73.949686
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Slosson Avenue, Victory Boulevard, Clove Road
Parkid
R005
Latitude
40.622387
Longitude
-74.118268
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
FDR Drive, East 90 to East 125 Streets
Parkid
M108T01
Latitude
40.790024
Longitude
-73.936711
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Myrtle Ave., Union Turnpike, Park Lane South bet. Brooklyn-Queens County Line and Park Lane
Parkid
Q015
Latitude
40.6963923
Longitude
-73.8662026
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fort Totten, Cross Island Parkway, Totten Road to 15 Road
Parkid
Q458
Latitude
40.795782
Longitude
-73.780982
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Riverside Drive to Broadway, West 192 to Dyckman Streets
Parkid
M029
Latitude
40.860698
Longitude
-73.930894
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Dyckman St, Hudson River, Harlem River S
Parkid
M042
Latitude
40.873754
Longitude
-73.929062
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Riverside Drive to Hudson River, West 59 Street to Clair Place
Parkid
M071
Latitude
40.787865
Longitude
-73.982969
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Harbor View to 92nd Street
Parkid
B082
Latitude
40.632629
Longitude
-74.038446
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
1932111
Trackerid: 1932111 • Title: Bushwick Playground Retaining Wall and Stair Reconstruction • Currentphase: proposed
Trackerid
1932111
Title
Bushwick Playground Retaining Wall and Stair Reconstruction
Summary
This project will reconstruct a retaining wall along Woodbine Street between Nickerbocker Avenue and Irving Avenue in Bushwick Playground.
Currentphase
proposed
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designprojectedcompletion
2026-10-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Parkid
B017
Latitude
40.696426
Longitude
-73.912771
Borough
Brooklyn
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Battery Place, State & Whitehall Street
Parkid
M005
Latitude
40.702593
Longitude
-74.015253
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
6212
Trackerid: 6212 • Fmsid: 846 P-6RETW14 • Title: Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Trackerid
6212
Fmsid
846 P-6RETW14
Title
Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M)
Summary
This project will reconstruct and stabilize retaining walls and seawalls in parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionadjustedcompletion
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-02-01T00:00:00.000
Totalfunding
$22,554,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Van Cortlandt Avenue East, Bainbridge Avenue, Reservoir Oval
Parkid
X104
Latitude
40.87859
Longitude
-73.876152
Borough
QueensManhattanStaten IslandBrooklynBronx
VIEW LOCATION
9002
Trackerid: 9002 • Fmsid: 846 P-4NFWF01 • Title: Alley Pond Park Living Shoreline Construction Phase 1
Trackerid
9002
Fmsid
846 P-4NFWF01
Title
Alley Pond Park Living Shoreline Construction Phase 1
Summary
This project will construct a living shoreline with oyster habitats along the western shore of Alley Creek at Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designactualcompletion
2019-10-01T00:00:00.000
Procurementstart
2019-10-01T00:00:00.000
Procurementprojectedcompletion
2020-06-01T00:00:00.000
Procurementactualcompletion
2020-11-01T00:00:00.000
Constructionstart
2021-02-01T00:00:00.000
Constructionprojectedcom
2021-08-01T00:00:00.000
Constructionactualcompletion
2021-03-01T00:00:00.000
Totalfunding
$89,000
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Federal
Name
Western shoreline of Alley Creek near Cross Island Parkway and Northern Boulevard
Parkid
Q001
Latitude
40.757424
Longitude
-73.74524
Borough
Queens
VIEW LOCATION
11143
Trackerid: 11143 • Title: Allison Pond Dredging and Shoreline Restoration • Summary: This project will dredge and restore shoreline
Trackerid
11143
Title
Allison Pond Dredging and Shoreline Restoration
Summary
This project will dredge and restore shoreline
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City Council
Name
Prospect Ave., N Randall Ave. and Brentwood Ave.
Parkid
R052
Latitude
40.63704902
Longitude
-74.1012658
Borough
Staten Island
VIEW LOCATION
8604
Trackerid: 8604 • Fmsid: 846 P-4CPIALM • Title: Almeda Playground Reconstruction
Trackerid
8604
Fmsid
846 P-4CPIALM
Title
Almeda Playground Reconstruction
Summary
This project will reconstruct Almeda Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2018-04-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-05-01T00:00:00.000
Constructionstart
2019-07-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$7,179,000
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Name
Beach Channel Drive between Beach 65th Street and Beach 66th Street
Parkid
Q443
Latitude
40.59315
Longitude
-73.794863
Borough
Queens
VIEW LOCATION
11124
Trackerid: 11124 • Title: Amelia Gorman Park Reconstruction • Summary: This project will reconstruct Amelia Gorman Park.
Trackerid
11124
Title
Amelia Gorman Park Reconstruction
Summary
This project will reconstruct Amelia Gorman Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Wadsworth Terrace and Broadway between West 189th Street and West 190th Street
Parkid
M031
Latitude
40.85577686
Longitude
-73.93239183
Borough
Manhattan
VIEW LOCATION
10887
Trackerid: 10887 • Fmsid: 846 P-201AMPU • Title: American Playground Reconstruction
Trackerid
10887
Fmsid
846 P-201AMPU
Title
American Playground Reconstruction
Summary
This project will reconstruct American Playground.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-01-01T00:00:00.000
Designprojectedcompletion
2026-04-01T00:00:00.000
Designadjustedcompletion
2026-11-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City Council
Name
Franklin St. between Milton St. and Noble St.
Parkid
B001
Latitude
40.7287776
Longitude
-73.9578798
Borough
Brooklyn
VIEW LOCATION
10060
Trackerid: 10060 • Fmsid: 846 P-404ATRI • Title: American Triangle Reconstruction
Trackerid
10060
Fmsid
846 P-404ATRI
Title
American Triangle Reconstruction
Summary
This project will reconstruct American Triangle.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2023-04-01T00:00:00.000
Designactualcompletion
2023-05-01T00:00:00.000
Procurementstart
2023-05-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$364,000
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City Council
Name
102nd Street, 41st Avenue, National Street
Parkid
Q173
Latitude
40.748441
Longitude
-73.863362
Borough
Queens
VIEW LOCATION
2088
Trackerid: 2088 • Fmsid: 846 P-2SPUD69 • Title: Bay Ridge Eco-Dock Construction
Trackerid
2088
Fmsid
846 P-2SPUD69
Title
Bay Ridge Eco-Dock Construction
Summary
This project will install a community eco-dock at American Veterans Memorial Pier.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-04-01T00:00:00.000
Designactualcompletion
2011-11-01T00:00:00.000
Procurementstart
2011-11-01T00:00:00.000
Procurementprojectedcompletion
2012-08-01T00:00:00.000
Procurementactualcompletion
2012-07-01T00:00:00.000
Constructionstart
2012-09-01T00:00:00.000
Constructionprojectedcom
2013-02-01T00:00:00.000
Constructionadjustedcompletion
2013-06-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$933,000
Projectliaison
James Morris
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough President, City Council
Name
Bay Ridge Avenue and Shore Road
Parkid
B432
Latitude
40.639645
Longitude
-74.037782
Borough
Brooklyn
VIEW LOCATION
5236
Trackerid: 5236 • Fmsid: 846 P-3HELIP2 • Title: Andrew Haswell Green Searail and Rooftop Sitting Area Construction
Trackerid
5236
Fmsid
846 P-3HELIP2
Title
Andrew Haswell Green Searail and Rooftop Sitting Area Construction
Summary
This project will construct a rooftop sitting area and searail in East River Esplanade.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-04-01T00:00:00.000
Designprojectedcompletion
2012-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementadjustedcompletion
2015-04-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-08-01T00:00:00.000
Constructionprojectedcom
2017-01-01T00:00:00.000
Constructionactualcompletion
2017-01-01T00:00:00.000
Totalfunding
$4,443,000
Projectliaison
Steve Simon
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough President, City Council, State
Name
FDR Drive between East 60th Street and East 62nd Street
Parkid
M108Q1
Latitude
40.75957167
Longitude
-73.95759806
Borough
Manhattan
VIEW LOCATION
9394
Trackerid: 9394 • Fmsid: 846 P-308ERP3 • Title: East River Esplanade Stabilization and Reconstruction Phase 3
Trackerid
9394
Fmsid
846 P-308ERP3
Title
East River Esplanade Stabilization and Reconstruction Phase 3
Summary
This project will stabilize and reconstruct portions of the East River Esplanade.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-07-01T00:00:00.000
Designadjustedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementadjustedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-04-01T00:00:00.000
Constructionprojectedcom
2028-04-01T00:00:00.000
Totalfunding
$85,183,000
Projectliaison
Steve Simon
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
FDR, East River, East 59 & East 63 Streets
Parkid
M108Q1
Latitude
40.7603347
Longitude
-73.9566596
Borough
Manhattan
VIEW LOCATION
9394
Trackerid: 9394 • Fmsid: 846 P-308ERP3 • Title: East River Esplanade Stabilization and Reconstruction Phase 3
Trackerid
9394
Fmsid
846 P-308ERP3
Title
East River Esplanade Stabilization and Reconstruction Phase 3
Summary
This project will stabilize and reconstruct portions of the East River Esplanade.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-07-01T00:00:00.000
Designadjustedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementadjustedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-04-01T00:00:00.000
Constructionprojectedcom
2028-04-01T00:00:00.000
Totalfunding
$85,183,000
Projectliaison
Steve Simon
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
FDR Drive, East 90 to East 125 Streets
Parkid
M108T01
Latitude
40.7798193
Longitude
-73.9434739
Borough
Manhattan
VIEW LOCATION
9394
Trackerid: 9394 • Fmsid: 846 P-308ERP3 • Title: East River Esplanade Stabilization and Reconstruction Phase 3
Trackerid
9394
Fmsid
846 P-308ERP3
Title
East River Esplanade Stabilization and Reconstruction Phase 3
Summary
This project will stabilize and reconstruct portions of the East River Esplanade.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-07-01T00:00:00.000
Designadjustedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementadjustedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-04-01T00:00:00.000
Constructionprojectedcom
2028-04-01T00:00:00.000
Totalfunding
$85,183,000
Projectliaison
Steve Simon
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
FDR Drive, East 63 to East 81 Streets
Parkid
M108T
Latitude
40.765118
Longitude
-73.95187
Borough
Manhattan
VIEW LOCATION
11078
Trackerid: 11078 • Title: Andrews Grove Reconstruction • Summary: This project will reconstruct the playground at Andrews Grove.
Trackerid
11078
Title
Andrews Grove Reconstruction
Summary
This project will reconstruct the playground at Andrews Grove.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City Council
Name
49th Avenue between 5th Street and Vernon Boulevard
Parkid
Q045
Latitude
40.7433983
Longitude
-73.95482884
Borough
Queens
VIEW LOCATION
9979
Trackerid: 9979 • Title: Andries Playground Reconstruction • Summary: This project will reconstruct the playground at Andries Playground.
Trackerid
9979
Title
Andries Playground Reconstruction
Summary
This project will reconstruct the playground at Andries Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City Council
Name
Avenue K & Nostrand Avenue
Parkid
B287
Latitude
40.62285572
Longitude
-73.94646337
Borough
Brooklyn
VIEW LOCATION
10223
Trackerid: 10223 • Fmsid: 846 P-3CPIAAP • Title: Anibal Aviles Playground Reconstruction
Trackerid
10223
Fmsid
846 P-3CPIAAP
Title
Anibal Aviles Playground Reconstruction
Summary
This project will reconstruct Anibal Aviles Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2023-04-01T00:00:00.000
Designadjustedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-02-01T00:00:00.000
Constructionprojectedcom
2026-02-01T00:00:00.000
Constructionactualcompletion
2026-02-01T00:00:00.000
Totalfunding
$5,359,000
Projectliaison
Steve Simon
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
City CouncilMayoral
Name
West 108th Street between Columbus Avenue and Amsterdam Avenue
Parkid
M200A
Latitude
40.801203
Longitude
-73.962875
Borough
Manhattan
VIEW LOCATION
10433
Trackerid: 10433 • Fmsid: 846 P-503ANNA • Title: Annadale Green Reconstruction
Trackerid
10433
Fmsid
846 P-503ANNA
Title
Annadale Green Reconstruction
Summary
This project will reconstruct the passive park and sidewalks at Annadale Green.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-01-01T00:00:00.000
Designprojectedcompletion
2024-01-01T00:00:00.000
Designactualcompletion
2024-01-01T00:00:00.000
Procurementstart
2024-01-01T00:00:00.000
Procurementprojectedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2025-04-01T00:00:00.000
Constructionstart
2025-04-01T00:00:00.000
Constructionprojectedcom
2026-04-01T00:00:00.000
Constructionactualcompletion
2026-04-01T00:00:00.000
Totalfunding
$2,500,000
Projectliaison
Katrina Toal
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough President, City Council
Name
Jefferson Boulevard and Annadale Road
Parkid
R080
Latitude
40.541449
Longitude
-74.177634
Borough
Staten Island
VIEW LOCATION
9782
Trackerid: 9782 • Fmsid: 846 P-6RPZBKQ • Title: Queens RPZ Installation and Plumbing Systems Reconstruction
Trackerid
9782
Fmsid
846 P-6RPZBKQ
Title
Queens RPZ Installation and Plumbing Systems Reconstruction
Summary
This project will install reduced pressure zone (RPZ) devices in the public restroom buildings at Annadale Playground, Playground Seventy-Five, Vleigh Playground and Farm Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$733,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Name
Yellowstone Boulevard, 64 Road, 65 Avenue
Parkid
Q319
Latitude
40.731099
Longitude
-73.851714
Borough
Queens
VIEW LOCATION
9782
Trackerid: 9782 • Fmsid: 846 P-6RPZBKQ • Title: Queens RPZ Installation and Plumbing Systems Reconstruction
Trackerid
9782
Fmsid
846 P-6RPZBKQ
Title
Queens RPZ Installation and Plumbing Systems Reconstruction
Summary
This project will install reduced pressure zone (RPZ) devices in the public restroom buildings at Annadale Playground, Playground Seventy-Five, Vleigh Playground and Farm Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$733,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Name
73 Avenue, 195 Street & 196 Place
Parkid
Q221
Latitude
40.736062
Longitude
-73.777262
Borough
Queens
VIEW LOCATION
9782
Trackerid: 9782 • Fmsid: 846 P-6RPZBKQ • Title: Queens RPZ Installation and Plumbing Systems Reconstruction
Trackerid
9782
Fmsid
846 P-6RPZBKQ
Title
Queens RPZ Installation and Plumbing Systems Reconstruction
Summary
This project will install reduced pressure zone (RPZ) devices in the public restroom buildings at Annadale Playground, Playground Seventy-Five, Vleigh Playground and Farm Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$733,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Name
160th Street & 75th Avenue
Parkid
Q354
Latitude
40.726381
Longitude
-73.808427
Borough
Queens
VIEW LOCATION
9782
Trackerid: 9782 • Fmsid: 846 P-6RPZBKQ • Title: Queens RPZ Installation and Plumbing Systems Reconstruction
Trackerid
9782
Fmsid
846 P-6RPZBKQ
Title
Queens RPZ Installation and Plumbing Systems Reconstruction
Summary
This project will install reduced pressure zone (RPZ) devices in the public restroom buildings at Annadale Playground, Playground Seventy-Five, Vleigh Playground and Farm Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$733,000
Projectliaison
Contact Us
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Mayoral
Name
70 Road to 71 Avenue
Parkid
Q320
Latitude
40.7298032
Longitude
-73.8164272
Borough
Queens
VIEW LOCATION
5747
Trackerid: 5747 • Fmsid: 846 P-4BWIDEK • Title: Queens General Site Work (QG-1011M)
Trackerid
5747
Fmsid
846 P-4BWIDEK
Title
Queens General Site Work (QG-1011M)
Summary
This project will reconstruct pavements, fencing, tennis courts, handball courts, and plantings in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-04-01T00:00:00.000
Designactualcompletion
2012-02-01T00:00:00.000
Procurementstart
2012-02-01T00:00:00.000
Procurementprojectedcompletion
2012-11-01T00:00:00.000
Procurementactualcompletion
2012-08-01T00:00:00.000
Constructionstart
2013-01-01T00:00:00.000
Constructionprojectedcom
2014-07-01T00:00:00.000
Constructionadjustedcompletion
2014-07-01T00:00:00.000
Constructionactualcompletion
2014-07-01T00:00:00.000
Totalfunding
$1,504,000
Projectliaison
Meira Berkower
Lastupdated
2026-09-30T00:00:00.000
Fundingsource
Borough President, City Council, State
Name
Yellowstone Boulevard, 64 Road, 65 Avenue
Parkid
Q319
Latitude
40.731135
Longitude
-73.851809
Borough
Queens
VIEW LOCATION