Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
10460
Trackerid: 10460 • Fmsid: 846 P-3CPIRNP • Title: Renaissance Playground Reconstruction and Public Restroom Building Construction
Trackerid
10460
Fmsid
846 P-3CPIRNP
Title
Renaissance Playground Reconstruction and Public Restroom Building Construction
Summary
This project will reconstruct the playground and construct a new Public Restroom Building at Renaissance Playground.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-09-01T00:00:00.000
Designprojectedcompletion
2027-05-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 144th Street between Frederick Douglass Boulevard and Adam Clayton Powell Jr. Boulevard
Parkid
M245
Latitude
40.82132482
Longitude
-73.94151354
Borough
Manhattan
VIEW LOCATION
1371111
Trackerid: 1371111 • Fmsid: 846 P-102RJPP • Title: Rev. J. Polite Playground Synthetic Turf Field Reconstruction
Trackerid
1371111
Fmsid
846 P-102RJPP
Title
Rev. J. Polite Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at Rev. J. Polite Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-07-01T00:00:00.000
Designprojectedcompletion
2022-08-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2021-09-01T00:00:00.000
Procurementprojectedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2022-08-01T00:00:00.000
Constructionactualcompletion
2022-08-01T00:00:00.000
Totalfunding
$508,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X116
Latitude
40.82718033889
Longitude
-73.896981850209
Borough
Bronx
VIEW LOCATION
7197
Trackerid: 7197 • Fmsid: 846 P-5CPISTP • Title: Rev. Dr. Maggie Howard Playground Reconstruction
Trackerid
7197
Fmsid
846 P-5CPISTP
Title
Rev. Dr. Maggie Howard Playground Reconstruction
Summary
This project will reconstruct the playground, multi-use fields, basketball and handball courts, and water features at Rev. Dr. Maggie Howard Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-03-01T00:00:00.000
Designprojectedcompletion
2017-08-01T00:00:00.000
Designadjustedcompletion
2017-10-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-08-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionadjustedcompletion
2021-04-01T00:00:00.000
Constructionactualcompletion
2021-04-01T00:00:00.000
Totalfunding
$10,034,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Tompkins Avenue between Broad Street and Hill Street
Parkid
R061
Latitude
40.622871
Longitude
-74.07902
Borough
Staten Island
VIEW LOCATION
1384111
Trackerid: 1384111 • Fmsid: 846 P-1DCTMUL • Title: Mullaly Park Telecommunication Lines Reconstruction
Trackerid
1384111
Fmsid
846 P-1DCTMUL
Title
Mullaly Park Telecommunication Lines Reconstruction
Summary
This project will reconstruct the telecommunication lines at Mullaly Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-08-01T00:00:00.000
Designprojectedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2021-10-01T00:00:00.000
Procurementprojectedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-09-01T00:00:00.000
Totalfunding
$80,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X034
Latitude
40.833081
Longitude
-73.924158
Borough
Bronx
VIEW LOCATION
1970111
Trackerid: 1970111 • Fmsid: 846 P-104MPTF • Title: Rev. T. Wendell Foster Park Soccer Field 2 Synthetic Turf Reconstruction
Trackerid
1970111
Fmsid
846 P-104MPTF
Title
Rev. T. Wendell Foster Park Soccer Field 2 Synthetic Turf Reconstruction
Summary
This project will reconstruct the synthetic turf at soccer field 2 at Rev. T. Wendell Foster Park.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-11-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X034
Latitude
40.8333301
Longitude
-73.9237077
Borough
Bronx
VIEW LOCATION
1073111
Trackerid: 1073111 • Fmsid: 846 P-104CAGS • Title: Mullaly Recreation Center Door Replacement
Trackerid
1073111
Fmsid
846 P-104CAGS
Title
Mullaly Recreation Center Door Replacement
Summary
This project will install new entrance doors at Mullaly Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-03-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2018-02-01T00:00:00.000
Constructionstart
2018-02-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-03-01T00:00:00.000
Totalfunding
$97,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
X034
Latitude
40.831786
Longitude
-73.92514
Borough
Bronx
VIEW LOCATION
9447
Trackerid: 9447 • Fmsid: 846 P-104MPSK • Title: Rev. T. Wendell Foster Park Skate and Bike Park Reconstruction
Trackerid
9447
Fmsid
846 P-104MPSK
Title
Rev. T. Wendell Foster Park Skate and Bike Park Reconstruction
Summary
This project will reconstruct the skate and bike park at Rev. T. Wendell Foster Park.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
85.0
Constructionpercentcomplete
0.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-05-01T00:00:00.000
Procurementstart
2026-02-01T00:00:00.000
Procurementprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralState
Name
River Avenue and East 164th Street
Parkid
X034
Latitude
40.83117176
Longitude
-73.92438634
Borough
Bronx
VIEW LOCATION
1221111
Trackerid: 1221111 • Fmsid: 846 P-1ECHORF • Title: Richman (Echo) Park Maintenance Shed Roof Reconstruction
Trackerid
1221111
Fmsid
846 P-1ECHORF
Title
Richman (Echo) Park Maintenance Shed Roof Reconstruction
Summary
This project will reconstruct the maintenance shed roof at Richman (Echo) Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designadjustedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-08-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-12-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$626,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X017
Latitude
40.849473
Longitude
-73.901374
Borough
Bronx
VIEW LOCATION
8545
Trackerid: 8545 • Fmsid: 846 P-1ECHOPK • Title: Echo Park Playground and Basketball Courts Reconstruction
Trackerid
8545
Fmsid
846 P-1ECHOPK
Title
Echo Park Playground and Basketball Courts Reconstruction
Summary
This project will reconstruct the playground, spray shower, and basketball courts at Richman (Echo) Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-12-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designadjustedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2019-09-01T00:00:00.000
Procurementactualcompletion
2019-09-01T00:00:00.000
Constructionstart
2020-02-01T00:00:00.000
Constructionprojectedcom
2021-02-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$3,590,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Valentine Avenue between East Tremont and East Burnside Avenues
Parkid
X017
Latitude
40.849571
Longitude
-73.901981
Borough
Bronx
VIEW LOCATION
11096
Trackerid: 11096 • Title: Woodhull Playground Reconstruction • Currentphase: proposed
Trackerid
11096
Title
Woodhull Playground Reconstruction
Summary
This project will reconstruct the play equipment, drainage, pavement, fencing, removals, landscaping, drinking fountain, spray shower, seating, security lighting, water service and electrical service at Woodhull Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
Woodhull Avenue and Drumgoole Road East
Parkid
R065
Latitude
40.55870637
Longitude
-74.1728892
Borough
Staten Island
VIEW LOCATION
5981
Trackerid: 5981 • Fmsid: 846 HWPLZ001R • Title: Richmond Terrace Park Construction
Trackerid
5981
Fmsid
846 HWPLZ001R
Title
Richmond Terrace Park Construction
Summary
This project will construct Richmond Terrace Park, including a seating area, overlook, paths, barrier rail, lighting and landscaping.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2015-10-01T00:00:00.000
Designactualcompletion
2016-04-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-08-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-11-01T00:00:00.000
Constructionprojectedcom
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$3,783,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Richmond Terrace between Van Name Avenue and Van Pelt Avenue
Parkid
R167
Latitude
40.63811083
Longitude
-74.15374278
Borough
Staten Island
VIEW LOCATION
10967
Trackerid: 10967 • Title: Rienzi Playground Public Restroom Building Reconstruction • Summary: This project will reconstruct the public restroom building at Rienzi Playground.
Trackerid
10967
Title
Rienzi Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Rienzi Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East 225th Street and East 226th Street between White Plains Road and Barnes Avenue
Parkid
X141
Latitude
40.88762345
Longitude
-73.85877452
Borough
Bronx
VIEW LOCATION
10969
Trackerid: 10969 • Title: Rienzi Playground Reconstruction • Summary: This project will reconstruct Rienzi Playground.
Trackerid
10969
Title
Rienzi Playground Reconstruction
Summary
This project will reconstruct Rienzi Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East 225th Street and East 226th Street between White Plains Road and Barnes Avenue
Parkid
X141
Latitude
40.88770482
Longitude
-73.85859114
Borough
Bronx
VIEW LOCATION
1120111
Trackerid: 1120111 • Fmsid: 846 P-6PBBP15 • Title: West 102nd Street Riverside Park Field House Interior Plumbing Reconstruction
Trackerid
1120111
Fmsid
846 P-6PBBP15
Title
West 102nd Street Riverside Park Field House Interior Plumbing Reconstruction
Summary
This project will install new interior plumbing systems for the field house adjacent to West 102nd Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-11-01T00:00:00.000
Designprojectedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-11-01T00:00:00.000
Procurementstart
2018-05-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementactualcompletion
2018-08-01T00:00:00.000
Constructionstart
2019-01-01T00:00:00.000
Constructionprojectedcom
2019-05-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$228,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.801832
Longitude
-73.971393
Borough
Manhattan
VIEW LOCATION
1121111
Trackerid: 1121111 • Fmsid: 846 P-6PBUT15 • Title: Riverside Park 102nd Street Field House Water Service Installation
Trackerid
1121111
Fmsid
846 P-6PBUT15
Title
Riverside Park 102nd Street Field House Water Service Installation
Summary
This project will install a new water service line to the 102nd street field house in Riverside Park
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2018-07-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2018-12-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$183,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Borough President, City Council, State
Parkid
M071
Latitude
40.810093
Longitude
-73.966725
Borough
Manhattan
VIEW LOCATION
1727111
Trackerid: 1727111 • Fmsid: 846 P-3PAVRSP • Title: Riverside Park 119th Street Pavement Reconstruction
Trackerid
1727111
Fmsid
846 P-3PAVRSP
Title
Riverside Park 119th Street Pavement Reconstruction
Summary
This project will reconstruct pavement at 119th street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-02-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2025-01-01T00:00:00.000
Procurementstart
2024-04-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2025-04-01T00:00:00.000
Constructionactualcompletion
2025-04-01T00:00:00.000
Totalfunding
$800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.811969
Longitude
-73.965306
Borough
Manhattan
VIEW LOCATION
1733111
Trackerid: 1733111 • Fmsid: 846 P-6CWSTF2 • Title: Riverside Park 107th-108th Streets Synthetic Turf Field Reconstruction
Trackerid
1733111
Fmsid
846 P-6CWSTF2
Title
Riverside Park 107th-108th Streets Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at West 107th-108th Streets in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2024-06-01T00:00:00.000
Procurementprojectedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2024-11-01T00:00:00.000
Constructionstart
2025-02-01T00:00:00.000
Constructionprojectedcom
2025-08-01T00:00:00.000
Constructionactualcompletion
2025-04-01T00:00:00.000
Totalfunding
$1,343,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.803933537489
Longitude
-73.971382655497
Borough
Manhattan
VIEW LOCATION
1824111
Trackerid: 1824111 • Fmsid: 846 P-6RETW23 • Title: Riverside Park Seawall Reconstruction
Trackerid
1824111
Fmsid
846 P-6RETW23
Title
Riverside Park Seawall Reconstruction
Summary
This project will reconstruct a seawall along the Hudson River at West 97th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-07-01T00:00:00.000
Designprojectedcompletion
2025-09-01T00:00:00.000
Designactualcompletion
2025-03-01T00:00:00.000
Procurementstart
2025-03-01T00:00:00.000
Procurementprojectedcompletion
2025-08-01T00:00:00.000
Procurementactualcompletion
2025-04-01T00:00:00.000
Constructionstart
2025-04-01T00:00:00.000
Constructionprojectedcom
2025-08-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.7974
Longitude
-73.9757193
Borough
Manhattan
VIEW LOCATION
1918111
Trackerid: 1918111 • Fmsid: 846 P-307RSTF • Title: Riverside Park West 104th Street Synthetic Turf Reconstruction
Trackerid
1918111
Fmsid
846 P-307RSTF
Title
Riverside Park West 104th Street Synthetic Turf Reconstruction
Summary
This project will reconstruct the synthetic turf field at Riverside Park West 104th Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-09-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designactualcompletion
2026-03-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-03-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$1,464,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.7985087
Longitude
-73.9756283
Borough
Manhattan
VIEW LOCATION
1328111
Trackerid: 1328111 • Fmsid: 846 P-3RIV105 • Title: Riverside Park 105th Street Paths Reconstruction
Trackerid
1328111
Fmsid
846 P-3RIV105
Title
Riverside Park 105th Street Paths Reconstruction
Summary
This project will reconstruct paths near West 105th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2023-05-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2023-10-01T00:00:00.000
Totalfunding
$840,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M071
Latitude
40.813547
Longitude
-73.965394
Borough
Manhattan
VIEW LOCATION
1329111
Trackerid: 1329111 • Fmsid: 846 P-3RIV148 • Title: Riverside Park 148th Street Paths Reconstruction
Trackerid
1329111
Fmsid
846 P-3RIV148
Title
Riverside Park 148th Street Paths Reconstruction
Summary
This project will reconstruct paths near West 148th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionactualcompletion
2023-10-01T00:00:00.000
Totalfunding
$110,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M072
Latitude
40.829123
Longitude
-73.950858
Borough
Manhattan
VIEW LOCATION
9867
Trackerid: 9867 • Title: Riverside Park 101st Street Soccer Field Reconstruction • Summary: This project will reconstruct the 101st street soccer field in Riverside Park.
Trackerid
9867
Title
Riverside Park 101st Street Soccer Field Reconstruction
Summary
This project will reconstruct the 101st street soccer field in Riverside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
101st Street and Henry Hudson Parkway
Parkid
M072
Latitude
40.80003921
Longitude
-73.97390498
Borough
Manhattan
VIEW LOCATION
6733
Trackerid: 6733 • Fmsid: 846 P-3RVSSCA • Title: Riverside Park 109th Street Skate Park Reconstruction
Trackerid
6733
Fmsid
846 P-3RVSSCA
Title
Riverside Park 109th Street Skate Park Reconstruction
Summary
This project will reconstruct the existing skate park with new skate elements, fencing, benches, picnic tables, and landscaping at West 109th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-05-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2017-04-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-05-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-05-01T00:00:00.000
Constructionprojectedcom
2020-05-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-12-01T00:00:00.000
Totalfunding
$2,864,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Between Henry Hudson Parkway and Riverside Drive at West 109th Street
Parkid
M071
Latitude
40.803631
Longitude
-73.971818
Borough
Manhattan
VIEW LOCATION
2363
Trackerid: 2363 • Fmsid: 846 P-307R97D • Title: Riverside Park 79th Street Boat Basin Dock A Reconstruction
Trackerid
2363
Fmsid
846 P-307R97D
Title
Riverside Park 79th Street Boat Basin Dock A Reconstruction
Summary
This project will reconstruct Dock A at the 79th Street Boat Basin in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-03-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-05-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$5,488,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Hudson River at West 79th Street
Parkid
M071
Latitude
40.785691
Longitude
-73.98515
Borough
Manhattan
VIEW LOCATION
5964
Trackerid: 5964 • Fmsid: 846 P-3RVSDFN • Title: Riverside Park Fence and Pavement Reconstruction
Trackerid
5964
Fmsid
846 P-3RVSDFN
Title
Riverside Park Fence and Pavement Reconstruction
Summary
This project will reconstruct the existing waterfront pipe rail fence with a teak handrail.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-01-01T00:00:00.000
Designactualcompletion
2013-01-01T00:00:00.000
Procurementstart
2013-01-01T00:00:00.000
Procurementprojectedcompletion
2013-10-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2015-09-01T00:00:00.000
Constructionadjustedcompletion
2015-12-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$257,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Hudson River between West 72nd Street and West 99th Street
Parkid
M071
Latitude
40.814643
Longitude
-73.96352
Borough
Manhattan
VIEW LOCATION
6622
Trackerid: 6622 • Fmsid: 846 P-3PLG14C • Currentphase: completed
Trackerid
6622
Fmsid
846 P-3PLG14C
Title
Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction
Summary
This project will reconstruct the bluestone pavement north of Grant's Tomb in Riverside Park and the path and steps leading to the dog run in St. Nicholas Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-02-01T00:00:00.000
Designactualcompletion
2016-12-01T00:00:00.000
Procurementstart
2016-12-01T00:00:00.000
Procurementprojectedcompletion
2017-09-01T00:00:00.000
Procurementactualcompletion
2017-08-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-11-01T00:00:00.000
Totalfunding
$869,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverside Dr. to Hudson River, W. 72 St.to St Clair Pl.
Parkid
M071
Latitude
40.81385
Longitude
-73.962873
Borough
Manhattan
VIEW LOCATION
6622
Trackerid: 6622 • Fmsid: 846 P-3PLG14C • Currentphase: completed
Trackerid
6622
Fmsid
846 P-3PLG14C
Title
Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction
Summary
This project will reconstruct the bluestone pavement north of Grant's Tomb in Riverside Park and the path and steps leading to the dog run in St. Nicholas Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-06-01T00:00:00.000
Designprojectedcompletion
2015-01-01T00:00:00.000
Designadjustedcompletion
2015-02-01T00:00:00.000
Designactualcompletion
2016-12-01T00:00:00.000
Procurementstart
2016-12-01T00:00:00.000
Procurementprojectedcompletion
2017-09-01T00:00:00.000
Procurementactualcompletion
2017-08-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-11-01T00:00:00.000
Totalfunding
$869,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
St Nicholas Av To St Nicholas Terr, W 128 St To W 141 St
Parkid
M077
Latitude
40.818328
Longitude
-73.948536
Borough
Manhattan
VIEW LOCATION
11428
Trackerid: 11428 • Title: Riverside Park West 108th Street Staircase Reconstruction • Currentphase: proposed
Trackerid
11428
Title
Riverside Park West 108th Street Staircase Reconstruction
Summary
This project will reconstruct the staircase and cheek wall at 108th Street in Riverside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Riverside Drive and 108th Street
Parkid
M071
Latitude
40.7966879301
Longitude
-73.9760375766
Borough
Manhattan
VIEW LOCATION
10122
Trackerid: 10122 • Fmsid: 846 P-307RPRP • Title: Riverside Park 78th Street Ramp Reconstruction
Trackerid
10122
Fmsid
846 P-307RPRP
Title
Riverside Park 78th Street Ramp Reconstruction
Summary
This project will reconstruct the ramp near 78th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-03-01T00:00:00.000
Designprojectedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2025-02-01T00:00:00.000
Procurementactualcompletion
2025-02-01T00:00:00.000
Constructionstart
2025-04-01T00:00:00.000
Constructionprojectedcom
2026-04-01T00:00:00.000
Constructionactualcompletion
2025-09-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Riverside Drive and West 78th Street
Parkid
M071
Latitude
40.7846372
Longitude
-73.9843601
Borough
Manhattan
VIEW LOCATION
10160
Trackerid: 10160 • Fmsid: 846 P-3RIVDIN • Title: Riverside Park Dinosaur Playground Reconstruction
Trackerid
10160
Fmsid
846 P-3RIVDIN
Title
Riverside Park Dinosaur Playground Reconstruction
Summary
This project will reconstruct the Dinosaur Playground in Riverside Park. Improvements to address severe drainage issue, ADA access, play equipment, safety surface, spray shower, seating, landscaping and fencing.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-11-01T00:00:00.000
Designadjustedcompletion
2025-09-01T00:00:00.000
Designactualcompletion
2025-09-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilFederalMayoralState
Name
Riverside Drive at West 97th Street
Parkid
M071
Latitude
40.79701103
Longitude
-73.97496553
Borough
Manhattan
VIEW LOCATION
10845
Trackerid: 10845 • Title: Riverside Park 105th Street Tot Lot Reconstruction • Summary: This project will reconstruct 105th Street Tot Lot in Riverside Park.
Trackerid
10845
Title
Riverside Park 105th Street Tot Lot Reconstruction
Summary
This project will reconstruct 105th Street Tot Lot in Riverside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
State
Name
Riverside Drive between West 105th Street and West 106th Street
Parkid
M071
Latitude
40.80167617
Longitude
-73.97097752
Borough
Manhattan
VIEW LOCATION
11086
Trackerid: 11086 • Title: Riverside Park Riverbank Playground Reconstruction • Summary: This project will reconstruct Riverbank Playground in Riverside Park .
Trackerid
11086
Title
Riverside Park Riverbank Playground Reconstruction
Summary
This project will reconstruct Riverbank Playground in Riverside Park .
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Riverside Drive between West 142nd Street and West 143rd Street
Parkid
M072
Latitude
40.8258266
Longitude
-73.95368538
Borough
Manhattan
VIEW LOCATION
11196
Trackerid: 11196 • Fmsid: 846 P-308RUPR • Title: Ruppert Park Public Restroom Building Construction
Trackerid
11196
Fmsid
846 P-308RUPR
Title
Ruppert Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Ruppert Park.
Currentphase
design
Designpercentcomplete
35.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-12-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Second Avenue between East 90th Street and East 91st Street
Parkid
M294
Latitude
40.78103636
Longitude
-73.95044714
Borough
Manhattan
VIEW LOCATION
6732
Trackerid: 6732 • Fmsid: 846 P-3RVSP91 • Title: Riverside Park West 91st-96th Streets Sidewalk Reconstruction
Trackerid
6732
Fmsid
846 P-3RVSP91
Title
Riverside Park West 91st-96th Streets Sidewalk Reconstruction
Summary
This project will install hexagonal asphalt pavers, benches, and granite block pavement to replace existing deteriorated paving and site furnishings, clear drainage systems, repaint the retaining wall, and plant new street trees from West 91st Street to West 96th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-10-01T00:00:00.000
Designprojectedcompletion
2015-10-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-10-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2017-10-01T00:00:00.000
Constructionactualcompletion
2017-10-01T00:00:00.000
Totalfunding
$747,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Riverside Drive between West 91st Street and West 95th Street in Riverside Park, Borough of Manhattan.
Parkid
M071
Latitude
40.80758
Longitude
-73.967945
Borough
Manhattan
VIEW LOCATION
6151
Trackerid: 6151 • Fmsid: 846 P-309RBUS • Title: Riverside Drive Bus Stop and Safety Measure Installation
Trackerid
6151
Fmsid
846 P-309RBUS
Title
Riverside Drive Bus Stop and Safety Measure Installation
Summary
This project will reconstruct the bus stops and perimeter sidewalks along Riverside Drive.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-07-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2017-10-01T00:00:00.000
Designactualcompletion
2017-10-01T00:00:00.000
Procurementstart
2017-10-01T00:00:00.000
Procurementprojectedcompletion
2018-07-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2019-03-01T00:00:00.000
Constructionprojectedcom
2020-05-01T00:00:00.000
Constructionadjustedcompletion
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$2,729,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentFederalMayoral
Name
Riverside Drive between West 97th Street and West 125th Street
Parkid
M071
Latitude
40.806559
Longitude
-73.967848
Borough
Manhattan
VIEW LOCATION
10048
Trackerid: 10048 • Fmsid: 846 P-3RIVRMP • Title: Riverside Park 105th Street Staircase Reconstruction
Trackerid
10048
Fmsid
846 P-3RIVRMP
Title
Riverside Park 105th Street Staircase Reconstruction
Summary
This project will reconstruct the staircase at West 105th Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-05-01T00:00:00.000
Designprojectedcompletion
2023-08-01T00:00:00.000
Designadjustedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-12-01T00:00:00.000
Procurementstart
2023-12-01T00:00:00.000
Procurementprojectedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2025-06-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$2,700,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Riverside Drive near West 105th Street
Parkid
M071
Latitude
40.80198152
Longitude
-73.97077758
Borough
Manhattan
VIEW LOCATION
11421
Trackerid: 11421 • Title: Russell Sage Playground Basketball Court Reconstruction • Summary: This project will reconstruct the Basketball Court at Russell Sage Playground.
Trackerid
11421
Title
Russell Sage Playground Basketball Court Reconstruction
Summary
This project will reconstruct the Basketball Court at Russell Sage Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Name
Booth Street between 68 Avenue and 68 Drive
Parkid
Q335
Latitude
40.7239081962
Longitude
-73.8515287228
Borough
Queens
VIEW LOCATION
7321
Trackerid: 7321 • Fmsid: 846 P-307RPTH • Title: Riverside Park Path Reconstruction, West 72-83, 91-95, 122-125 Streets
Trackerid
7321
Fmsid
846 P-307RPTH
Title
Riverside Park Path Reconstruction, West 72-83, 91-95, 122-125 Streets
Summary
This project will include paving and landscape improvements in Riverside Park. At Riverside Drive between West 122nd and West 125th Streets, the project will reconstruct the existing perimeter sidewalk, including asphalt pavement and new bluestone curb, benches and fencing. At Crabapple Grove between West 91st and West 95th Streets, the project will reconstruct park paths and install new benches. Along the Hudson River Greenway between West 72nd and West 83rd Streets, the project will install additional greenway signage, improve park lighting and reconstruct pavements.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-04-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$1,768,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Riverside Drive: West 125th-122nd Streets, West 95th-91st Streets, West 83rd-72nd Streets
Parkid
M071
Latitude
40.803394
Longitude
-73.971509
Borough
Manhattan
VIEW LOCATION
10599
Trackerid: 10599 • Fmsid: 846 P-307RIVR • Title: Riverside Park River Run Playground Reconstruction
Trackerid
10599
Fmsid
846 P-307RIVR
Title
Riverside Park River Run Playground Reconstruction
Summary
This project will reconstruct River Run Playground.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-02-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designadjustedcompletion
2026-10-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Riverside Park at West 83rd Street
Parkid
M071
Latitude
40.78702356
Longitude
-73.98218826
Borough
Manhattan
VIEW LOCATION
10576
Trackerid: 10576 • Fmsid: 846 P-307SASM • Title: Riverside Park Soldiers' and Sailors' Monument Restoration
Trackerid
10576
Fmsid
846 P-307SASM
Title
Riverside Park Soldiers' and Sailors' Monument Restoration
Summary
This project will restore the Soldiers' and Sailors' Monument in Riverside Park.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverside Park at West 89th street
Parkid
M071
Latitude
40.79212055
Longitude
-73.97893696
Borough
Manhattan
VIEW LOCATION
10454
Trackerid: 10454 • Fmsid: 846 P-307RS91 • Title: Riverside Park 91st Street Staircase Reconstruction
Trackerid
10454
Fmsid
846 P-307RS91
Title
Riverside Park 91st Street Staircase Reconstruction
Summary
This project will reconstruct the staircase at Riverside Park 91st Street.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
67.0
Designstart
2023-04-01T00:00:00.000
Designprojectedcompletion
2024-04-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2024-05-01T00:00:00.000
Procurementprojectedcompletion
2025-05-01T00:00:00.000
Procurementadjustedcompletion
2025-11-01T00:00:00.000
Procurementactualcompletion
2025-10-01T00:00:00.000
Constructionstart
2026-02-01T00:00:00.000
Constructionprojectedcom
2027-02-01T00:00:00.000
Totalfunding
$1,501,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Riverside Park at West 91st Street.
Parkid
M071
Latitude
40.79287067
Longitude
-73.97732888
Borough
Manhattan
VIEW LOCATION
9661
Trackerid: 9661 • Fmsid: 846 P-3DIRVPK • Title: Riverside Park Drainage System Reconstruction From 108th to 116th Street
Trackerid
9661
Fmsid
846 P-3DIRVPK
Title
Riverside Park Drainage System Reconstruction From 108th to 116th Street
Summary
This project will reconstruct the drainage system at Riverside Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
37.68
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2022-12-01T00:00:00.000
Designadjustedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-12-01T00:00:00.000
Procurementstart
2023-12-01T00:00:00.000
Procurementprojectedcompletion
2024-12-01T00:00:00.000
Procurementadjustedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2025-10-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
$25,606,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverside Park from 108th to 116th Street
Parkid
M071
Latitude
40.80629259
Longitude
-73.96862161
Borough
Manhattan
VIEW LOCATION
5940
Trackerid: 5940 • Fmsid: 846 P-309RTIE • Title: Riverside Park Tiemann Place Stairs and Sidewalk Reconstruction
Trackerid
5940
Fmsid
846 P-309RTIE
Title
Riverside Park Tiemann Place Stairs and Sidewalk Reconstruction
Summary
This project will reconstruct the stairs and adjacent perimeter sidewalk between Tiemann Place and Riverside Drive in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-10-01T00:00:00.000
Designprojectedcompletion
2013-06-01T00:00:00.000
Designactualcompletion
2013-10-01T00:00:00.000
Procurementstart
2013-10-01T00:00:00.000
Procurementprojectedcompletion
2014-07-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-07-01T00:00:00.000
Constructionprojectedcom
2015-07-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$525,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Tiemann Place and Riverside Drive
Parkid
M071
Latitude
40.815946
Longitude
-73.960684
Borough
Manhattan
VIEW LOCATION
10897
Trackerid: 10897 • Fmsid: 846 P-307RIBF • Title: Riverside Park Drinking Fountains Construction
Trackerid
10897
Fmsid
846 P-307RIBF
Title
Riverside Park Drinking Fountains Construction
Summary
This project will construct drinking fountains in Riverside Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-03-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designadjustedcompletion
2026-08-01T00:00:00.000
Designactualcompletion
2026-08-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various locations between West 54th Street and West 96th Street
Parkid
M071
Latitude
40.79817678
Longitude
-73.9746191
Borough
Manhattan
VIEW LOCATION
9465
Trackerid: 9465 • Fmsid: 846 P-3RVPFWP • Title: Riverside Park Cherry Walk Greenway Reconstruction
Trackerid
9465
Fmsid
846 P-3RVPFWP
Title
Riverside Park Cherry Walk Greenway Reconstruction
Summary
This project will reconstruct portions of the Cherry Walk greenway in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-05-01T00:00:00.000
Designprojectedcompletion
2022-07-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-03-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2025-03-01T00:00:00.000
Totalfunding
$1,314,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 100th Street to St. Clair Place between the Hudson River and Henry Hudson Parkway
Parkid
M071
Latitude
40.800438
Longitude
-73.973883
Borough
Manhattan
VIEW LOCATION
8850
Trackerid: 8850 • Fmsid: 846 P-3RIVSTR • Title: Riverside Park 102nd Street Staircase Reconstruction
Trackerid
8850
Fmsid
846 P-3RIVSTR
Title
Riverside Park 102nd Street Staircase Reconstruction
Summary
This project will reconstruct the staircase at West 102nd Street in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$2,051,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
West 102nd Street and Riverside Drive
Parkid
M071
Latitude
40.800347
Longitude
-73.973475
Borough
Manhattan
VIEW LOCATION
11205
Trackerid: 11205 • Title: Riverside Park 140th Street Fence Reconstruction (Hurricane Ida) • Summary: This project will reconstruct the fence at 140th Street in Riverside Park.
Trackerid
11205
Title
Riverside Park 140th Street Fence Reconstruction (Hurricane Ida)
Summary
This project will reconstruct the fence at 140th Street in Riverside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalState
Name
West 140th Street and Riverside Drive
Parkid
M071
Latitude
40.82446954
Longitude
-73.95475401
Borough
Manhattan
VIEW LOCATION
2625
Trackerid: 2625 • Fmsid: 846 P-314RPDR • Title: Riverside Park West 142nd Street Dog Run Construction
Trackerid
2625
Fmsid
846 P-314RPDR
Title
Riverside Park West 142nd Street Dog Run Construction
Summary
This project will construct a dog run in Riverside Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-04-01T00:00:00.000
Designprojectedcompletion
2022-03-01T00:00:00.000
Designadjustedcompletion
2023-04-01T00:00:00.000
Designactualcompletion
2023-05-01T00:00:00.000
Procurementstart
2023-05-01T00:00:00.000
Procurementprojectedcompletion
2023-01-01T00:00:00.000
Procurementadjustedcompletion
2024-05-01T00:00:00.000
Procurementactualcompletion
2024-02-01T00:00:00.000
Constructionstart
2024-04-01T00:00:00.000
Constructionprojectedcom
2025-04-01T00:00:00.000
Constructionactualcompletion
2025-04-01T00:00:00.000
Totalfunding
$767,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
West 142nd Street and Riverside Drive
Parkid
M072
Latitude
40.825381
Longitude
-73.954167
Borough
Manhattan
VIEW LOCATION
11121
Trackerid: 11121 • Title: Riverside Park West 72nd Street Wall Reconstruction • Summary: This project will reconstruct a wall near West 72nd Street in Riverside Park.
Trackerid
11121
Title
Riverside Park West 72nd Street Wall Reconstruction
Summary
This project will reconstruct a wall near West 72nd Street in Riverside Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
West 72nd Street between Riverside Boulevard and Empire State Trail
Parkid
M071
Latitude
40.78118953
Longitude
-73.98589734
Borough
Manhattan
VIEW LOCATION
1004
Trackerid: 1004 • Fmsid: 846 P-3W69SB2 • Title: Riverside Park South West 69th Street Transfer Bridge Reconstruction
Trackerid
1004
Fmsid
846 P-3W69SB2
Title
Riverside Park South West 69th Street Transfer Bridge Reconstruction
Summary
This project will stabilize and restore existing structures with historically appropriate materials at Riverside Park South. This project will also include adding lighting on gantry towers, providing interpretive signage at ground level and removing 65 additional piles at Pier F.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2016-12-01T00:00:00.000
Designadjustedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementadjustedcompletion
2024-10-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2025-01-01T00:00:00.000
Constructionprojectedcom
2026-04-01T00:00:00.000
Constructionactualcompletion
2026-07-01T00:00:00.000
Totalfunding
$8,636,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoralPrivate
Name
Hudson River at West 69th Street
Parkid
M353
Latitude
40.77926486
Longitude
-73.9885717
Borough
Manhattan
VIEW LOCATION