Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
9818
Trackerid: 9818 • Fmsid: 846 P-210RUPP • Title: Russell Pedersen Playground Reconstruction
Trackerid
9818
Fmsid
846 P-210RUPP
Title
Russell Pedersen Playground Reconstruction
Summary
This project will reconstruct the play area at Russell Pedersen Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-12-01T00:00:00.000
Designprojectedcompletion
2021-12-01T00:00:00.000
Designadjustedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2025-05-01T00:00:00.000
Constructionactualcompletion
2025-05-01T00:00:00.000
Totalfunding
$4,707,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Colonial Road between 83rd and 85th Streets
Parkid
B192
Latitude
40.626466
Longitude
-74.036023
Borough
Brooklyn
VIEW LOCATION
10703
Trackerid: 10703 • Title: Russell Pedersen Playground Sports Courts Reconstruction • Summary: This project will reconstruct the sports courts at Russell Pedersen Playground.
Trackerid
10703
Title
Russell Pedersen Playground Sports Courts Reconstruction
Summary
This project will reconstruct the sports courts at Russell Pedersen Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Colonial Road from 83rd Street to 85th Street
Parkid
B192
Latitude
40.62644264
Longitude
-74.03617952
Borough
Brooklyn
VIEW LOCATION
8690
Trackerid: 8690 • Fmsid: 846 P-309SKRP • Title: Sakura Park Stairs Reconstruction
Trackerid
8690
Fmsid
846 P-309SKRP
Title
Sakura Park Stairs Reconstruction
Summary
This project will reconstruct the staircase at the northeast corner of Sakura Park. The work will include a new foundation and resetting the existing granite steps and walls.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designadjustedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-05-01T00:00:00.000
Procurementadjustedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-01-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2021-11-01T00:00:00.000
Constructionactualcompletion
2021-11-01T00:00:00.000
Totalfunding
$1,999,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
West 122nd Street between Riverside Drive and Claremont Avenue
Parkid
M087
Latitude
40.813069
Longitude
-73.962079
Borough
Manhattan
VIEW LOCATION
1095111
Trackerid: 1095111 • Fmsid: 846 P-211SGBG • Title: Samuel Goldberg Triangle Reconstruction
Trackerid
1095111
Fmsid
846 P-211SGBG
Title
Samuel Goldberg Triangle Reconstruction
Summary
This project will reconstruct Samuel Goldberg Triangle with new seating, planting beds, and sidewalk pavement.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-09-01T00:00:00.000
Designprojectedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2018-01-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-01-01T00:00:00.000
Constructionadjustedcompletion
2019-02-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$123,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Parkid
B231
Latitude
40.611129
Longitude
-73.977228
Borough
Brooklyn
VIEW LOCATION
6267
Trackerid: 6267 • Fmsid: 846 P-307BENN • Title: Bennerson Playground Reconstruction
Trackerid
6267
Fmsid
846 P-307BENN
Title
Bennerson Playground Reconstruction
Summary
This project will reconstruct Samuel N. Bennerson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2016-12-01T00:00:00.000
Procurementactualcompletion
2016-11-01T00:00:00.000
Constructionstart
2016-11-01T00:00:00.000
Constructionprojectedcom
2017-11-01T00:00:00.000
Constructionactualcompletion
2018-01-01T00:00:00.000
Totalfunding
$2,260,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
West 64th Street between Amsterdam Avenue and West End Avenue, Manhattan
Parkid
M184
Latitude
40.77382389
Longitude
-73.98695389
Borough
Manhattan
VIEW LOCATION
11294
Trackerid: 11294 • Title: Samuel Seabury Playground Reconstruction • Summary: This project will reconstruct Samuel Seabury Playground.
Trackerid
11294
Title
Samuel Seabury Playground Reconstruction
Summary
This project will reconstruct Samuel Seabury Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council, Federal
Name
Lexington Avenue between East 95th Street and East 96th Street
Parkid
M236
Latitude
40.7852584
Longitude
-73.95081771
Borough
Manhattan
VIEW LOCATION
7277
Trackerid: 7277 • Fmsid: 846 P-205SHNK • Title: Sankofa Park Reconstruction
Trackerid
7277
Fmsid
846 P-205SHNK
Title
Sankofa Park Reconstruction
Summary
This project will reconstruct the playground and construct an African Burial Ground commemorative area at Sankofa Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2021-06-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-02-01T00:00:00.000
Procurementstart
2022-02-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2023-09-01T00:00:00.000
Procurementactualcompletion
2023-07-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-11-01T00:00:00.000
Constructionadjustedcompletion
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$4,889,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralState
Name
Livonia Avenue between Barbey Street and Schenck Avenue
Parkid
B261
Latitude
40.665642
Longitude
-73.886326
Borough
Brooklyn
VIEW LOCATION
1728111
Trackerid: 1728111 • Fmsid: 846 P-3SRAWIN • Title: Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction
Trackerid
1728111
Fmsid
846 P-3SRAWIN
Title
Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction
Summary
This project will reconstruct the windows and HVAC systems at the BRC Senior Center in Sara D. Roosevelt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2024-06-01T00:00:00.000
Designactualcompletion
2025-05-01T00:00:00.000
Procurementstart
2025-01-01T00:00:00.000
Procurementprojectedcompletion
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-05-01T00:00:00.000
Constructionstart
2023-08-01T00:00:00.000
Constructionprojectedcom
2023-10-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M105
Latitude
40.721741
Longitude
-73.991543
Borough
Manhattan
VIEW LOCATION
1789111
Trackerid: 1789111 • Fmsid: 846 P-3SRAWIN • Currentphase: completed
Trackerid
1789111
Fmsid
846 P-3SRAWIN
Title
Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction (Supplemental WO 2B)
Summary
This project will reconstruct the windows and HVAC systems at the BRC Senior Center in Sara D. Roosevelt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-08-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-05-01T00:00:00.000
Procurementstart
2025-01-01T00:00:00.000
Procurementprojectedcompletion
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-05-01T00:00:00.000
Constructionstart
2023-08-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M105
Latitude
40.7194448
Longitude
-73.9926759
Borough
Manhattan
VIEW LOCATION
1253111
Trackerid: 1253111 • Fmsid: 846 P-6COMF18 • Title: Sara D. Roosevelt Park Central Communications Office Restrooms Reconstruction
Trackerid
1253111
Fmsid
846 P-6COMF18
Title
Sara D. Roosevelt Park Central Communications Office Restrooms Reconstruction
Summary
This project will reconstruct the plumbing, interior walls, and fixtures in the public restroom, and the roof of the entire building, at the Central Communications Office at Sara D. Roosevelt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-08-01T00:00:00.000
Designadjustedcompletion
2021-02-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementactualcompletion
2021-02-01T00:00:00.000
Constructionstart
2021-10-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M105
Latitude
40.721483
Longitude
-73.991676
Borough
Manhattan
VIEW LOCATION
1315111
Trackerid: 1315111 • Fmsid: 846 P-3SRAWIN • Title: Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction
Trackerid
1315111
Fmsid
846 P-3SRAWIN
Title
Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction
Summary
This project will reconstruct the windows and HVAC systems at the BRC Senior Center in Sara D. Roosevelt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2022-10-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2022-04-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M105
Latitude
40.720823
Longitude
-73.992032
Borough
Manhattan
VIEW LOCATION
10358
Trackerid: 10358 • Fmsid: 846 P-3SARDRO • Title: Sara D. Roosevelt Park Reconstruction
Trackerid
10358
Fmsid
846 P-3SARDRO
Title
Sara D. Roosevelt Park Reconstruction
Summary
This project will reconstruct Sara D. Roosevelt Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2025-03-01T00:00:00.000
Designadjustedcompletion
2025-12-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
East Houston to Canal Streets between Chrystie and Forsyth Streets
Parkid
M105
Latitude
40.71924112
Longitude
-73.99277963
Borough
Manhattan
VIEW LOCATION
7299
Trackerid: 7299 • Fmsid: 846 P-303SDRP • Title: Sara D. Roosevelt Park Rivington Street Playground Reconstruction
Trackerid
7299
Fmsid
846 P-303SDRP
Title
Sara D. Roosevelt Park Rivington Street Playground Reconstruction
Summary
This project will reconstruct Rivington Street Playground at Sara D. Roosevelt Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-12-01T00:00:00.000
Designprojectedcompletion
2023-03-01T00:00:00.000
Designadjustedcompletion
2025-08-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Rivington Street between Chrystie Street and Forsyth Street
Parkid
M105
Latitude
40.7213136
Longitude
-73.99175769
Borough
Manhattan
VIEW LOCATION
6409
Trackerid: 6409 • Fmsid: 846 P-303SDRB • Title: Sara D. Roosevelt Park Public Restroom Building Reconstruction
Trackerid
6409
Fmsid
846 P-303SDRB
Title
Sara D. Roosevelt Park Public Restroom Building Reconstruction
Summary
This project will reconstruct a Public restroom building in building A in Sara D Roosevelt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-07-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-11-01T00:00:00.000
Procurementprojectedcompletion
2018-08-01T00:00:00.000
Procurementadjustedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2018-12-01T00:00:00.000
Constructionstart
2019-01-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionactualcompletion
2020-01-01T00:00:00.000
Totalfunding
$1,417,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Stanton Street between Chrystie Street and Forsyth Street
Parkid
M105
Latitude
40.722405
Longitude
-73.991185
Borough
Manhattan
VIEW LOCATION
9817
Trackerid: 9817 • Fmsid: 846 P-201MDLT • Title: Sarah J.S. Tompkins Garnet Playground Basketball Courts Reconstruction
Trackerid
9817
Fmsid
846 P-201MDLT
Title
Sarah J.S. Tompkins Garnet Playground Basketball Courts Reconstruction
Summary
This project will reconstruct the basketball courts at Sarah J.S. Tompkins Garnet Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-12-01T00:00:00.000
Designprojectedcompletion
2021-12-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2022-04-01T00:00:00.000
Procurementprojectedcompletion
2023-01-01T00:00:00.000
Procurementadjustedcompletion
2023-08-01T00:00:00.000
Procurementactualcompletion
2023-09-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-11-01T00:00:00.000
Constructionactualcompletion
2024-07-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Lynch Street, Middleton Street between Lee Avenue and Bedford Avenue
Parkid
B022
Latitude
40.700735
Longitude
-73.955445
Borough
Brooklyn
VIEW LOCATION
9281
Trackerid: 9281 • Fmsid: 846 P-203SRTG • Title: Saratoga Park Playground Reconstruction
Trackerid
9281
Fmsid
846 P-203SRTG
Title
Saratoga Park Playground Reconstruction
Summary
This project will reconstruct the playground in Saratoga Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-02-01T00:00:00.000
Constructionprojectedcom
2023-02-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
$1,873,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Halsey Street, Howard Avenue, Macon Street
Parkid
B079
Latitude
40.685001
Longitude
-73.919426
Borough
Brooklyn
VIEW LOCATION
1502
Trackerid: 1502 • Fmsid: 846 P-203D17C • Title: Saratoga Park Memorial Reconstruction
Trackerid
1502
Fmsid
846 P-203D17C
Title
Saratoga Park Memorial Reconstruction
Summary
This project will restore the war memorial in Saratoga Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-06-01T00:00:00.000
Designactualcompletion
2011-09-01T00:00:00.000
Procurementstart
2011-09-01T00:00:00.000
Procurementprojectedcompletion
2012-06-01T00:00:00.000
Procurementadjustedcompletion
2013-05-01T00:00:00.000
Procurementactualcompletion
2013-05-01T00:00:00.000
Constructionstart
2013-09-01T00:00:00.000
Constructionprojectedcom
2014-09-01T00:00:00.000
Constructionadjustedcompletion
2004-08-01T00:00:00.000
Constructionactualcompletion
2014-08-01T00:00:00.000
Totalfunding
$216,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Macon Street, Howard Ave, Halsey Street and Saratoga Avenue
Parkid
B079
Latitude
40.68498083
Longitude
-73.91899944
Borough
Brooklyn
VIEW LOCATION
8561
Trackerid: 8561 • Fmsid: 846 P-411SWP2 • Title: Saul Weprin Playground Plaza Reconstruction
Trackerid
8561
Fmsid
846 P-411SWP2
Title
Saul Weprin Playground Plaza Reconstruction
Summary
This project will reconstruct the pavements, seating, and fencing at the plaza in Saul Weprin Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-08-01T00:00:00.000
Designprojectedcompletion
2018-08-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$818,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
56th Avenue between 201st Street and 202nd Street
Parkid
Q293
Latitude
40.748142
Longitude
-73.776367
Borough
Queens
VIEW LOCATION
10757
Trackerid: 10757 • Title: Saw Mill Creek Forest Tree Replacement • Currentphase: proposed
Trackerid
10757
Title
Saw Mill Creek Forest Tree Replacement
Summary
This project will replace trees removed during wetland mitigation in Saw Mill Creek Marsh.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
South of Edward Curry Ave between Chelsea Rd and West Shore Expressway
Parkid
R130
Latitude
40.60698303
Longitude
-74.18711682
Borough
Staten Island
VIEW LOCATION
10124
Trackerid: 10124 • Fmsid: 846 P-502SHML • Title: Schmul Park Playground Reconstruction
Trackerid
10124
Fmsid
846 P-502SHML
Title
Schmul Park Playground Reconstruction
Summary
This project will reconstruct a portion of the playground in Schmul Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designadjustedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2024-10-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-10-01T00:00:00.000
Constructionprojectedcom
2026-01-01T00:00:00.000
Constructionactualcompletion
2025-10-01T00:00:00.000
Totalfunding
$2,477,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Wild Avenue, Melvin Avenue, and Pearson Street
Parkid
R045
Latitude
40.5901871
Longitude
-74.1888516
Borough
Staten Island
VIEW LOCATION
7047
Trackerid: 7047 • Fmsid: 846 P-1CPISEA • Title: Seabury Playground Reconstruction
Trackerid
7047
Fmsid
846 P-1CPISEA
Title
Seabury Playground Reconstruction
Summary
This project will construct a new basketball half-court, fencing, and lighting at Seabury Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-12-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2017-10-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$777,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Southern Boulevard between East 173rd Street and East 174th Street
Parkid
X282
Latitude
40.83648833
Longitude
-73.88787056
Borough
Bronx
VIEW LOCATION
6345
Trackerid: 6345 • Fmsid: 846 P-401SEAN • Title: Sean's Place Reconstruction
Trackerid
6345
Fmsid
846 P-401SEAN
Title
Sean's Place Reconstruction
Summary
This project will install new play equipment, spray showers, fencing and benches at Sean's Place.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2015-09-01T00:00:00.000
Designactualcompletion
2015-10-01T00:00:00.000
Procurementstart
2015-10-01T00:00:00.000
Procurementprojectedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-07-01T00:00:00.000
Constructionstart
2016-09-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$955,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
38th Street between 31st Avenue and Broadway
Parkid
Q444
Latitude
40.760721
Longitude
-73.918415
Borough
Queens
VIEW LOCATION
6624
Trackerid: 6624 • Title: Nelson Avenue Waterfront Park Reconstruction (Hurricane Sandy) • Currentphase: completed
Trackerid
6624
Title
Nelson Avenue Waterfront Park Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the Hurricane Sandy-damaged playground and landscape at Nelson Avenue Waterfront Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-06-01T00:00:00.000
Designactualcompletion
2015-01-01T00:00:00.000
Procurementstart
2015-01-01T00:00:00.000
Procurementprojectedcompletion
2015-10-01T00:00:00.000
Procurementadjustedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2019-05-01T00:00:00.000
Constructionactualcompletion
2019-03-01T00:00:00.000
Totalfunding
$1,228,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Name
Cleveland Avenue and Nelson Avenue
Parkid
R145
Latitude
40.541238
Longitude
-74.142888
Borough
Staten Island
VIEW LOCATION
6396
Trackerid: 6396 • Fmsid: 846 P-503SNCS • Title: Seaside Wildlife Nature Park Public Restroom Building Construction
Trackerid
6396
Fmsid
846 P-503SNCS
Title
Seaside Wildlife Nature Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Seaside Wildlife Nature Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-12-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designadjustedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-06-01T00:00:00.000
Procurementstart
2020-06-01T00:00:00.000
Procurementprojectedcompletion
2021-03-01T00:00:00.000
Procurementadjustedcompletion
2023-02-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2025-01-01T00:00:00.000
Constructionadjustedcompletion
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$6,764,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Nelson Avenue at Tennyson Drive
Parkid
R145
Latitude
40.540664245788
Longitude
-74.143149610139
Borough
Staten Island
VIEW LOCATION
1014111
Trackerid: 1014111 • Fmsid: 846 P-2PLG13E • Title: Seeley Park Reconstruction
Trackerid
1014111
Fmsid
846 P-2PLG13E
Title
Seeley Park Reconstruction
Summary
This project will reconstruct the play units and water service at Seeley Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-05-01T00:00:00.000
Procurementstart
2015-06-01T00:00:00.000
Procurementprojectedcompletion
2015-11-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2014-11-01T00:00:00.000
Constructionactualcompletion
2014-12-01T00:00:00.000
Totalfunding
$258,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B255J
Latitude
40.653382
Longitude
-73.977843
Borough
Brooklyn
VIEW LOCATION
9272
Trackerid: 9272 • Fmsid: 846 P-112SETW • Title: Seton Falls Park Sidewalk and Fence Reconstruction
Trackerid
9272
Fmsid
846 P-112SETW
Title
Seton Falls Park Sidewalk and Fence Reconstruction
Summary
This project will reconstruct the sidewalks and fencing at Seton Falls Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2021-12-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2022-12-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$1,156,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 233rd Street between Baychester Avenue and Seton Avenue
Parkid
X046
Latitude
40.888553
Longitude
-73.838729
Borough
Bronx
VIEW LOCATION
8882
Trackerid: 8882 • Fmsid: 846 P-108SPBC • Title: Seton Park Adult Fitness Area and Skate Park Construction
Trackerid
8882
Fmsid
846 P-108SPBC
Title
Seton Park Adult Fitness Area and Skate Park Construction
Summary
This project will construct an adult fitness area and a skate park at Seton Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-11-01T00:00:00.000
Designprojectedcompletion
2021-11-01T00:00:00.000
Designadjustedcompletion
2022-02-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-11-01T00:00:00.000
Procurementadjustedcompletion
2023-08-01T00:00:00.000
Procurementactualcompletion
2023-06-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$4,100,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council, State
Name
Between Palisade and Independence Avenues and West 232nd and West 235th Streets
Parkid
X201
Latitude
40.886074
Longitude
-73.916492
Borough
Bronx
VIEW LOCATION
10862
Trackerid: 10862 • Title: Seton Park Tennis Courts Reconstruction and Pickleball Court Construction • Currentphase: proposed
Trackerid
10862
Title
Seton Park Tennis Courts Reconstruction and Pickleball Court Construction
Summary
This project will reconstruct the tennis courts and construct a pickleball court at Seton Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Independence Avenue and West 232nd Street
Parkid
X201
Latitude
40.88565576
Longitude
-73.91690014
Borough
Bronx
VIEW LOCATION
6087
Trackerid: 6087 • Fmsid: 846 P-108SETN • Title: Seton Park Ballfields Reconstruction
Trackerid
6087
Fmsid
846 P-108SETN
Title
Seton Park Ballfields Reconstruction
Summary
This project will reconstruct the ballfields with synthetic turf at Seton Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2016-11-01T00:00:00.000
Designactualcompletion
2016-12-01T00:00:00.000
Procurementstart
2016-12-01T00:00:00.000
Procurementprojectedcompletion
2017-09-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-11-01T00:00:00.000
Constructionprojectedcom
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$1,696,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council, State
Name
Independence Avenue and West 235 Street
Parkid
X201
Latitude
40.88605194
Longitude
-73.91671889
Borough
Bronx
VIEW LOCATION
11129
Trackerid: 11129 • Title: Seward Park South Playground Reconstruction • Summary: This project will reconstruct the south playground in Seward Park.
Trackerid
11129
Title
Seward Park South Playground Reconstruction
Summary
This project will reconstruct the south playground in Seward Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
East Broadway at Canal Street
Parkid
M082
Latitude
40.71496153
Longitude
-73.98940629
Borough
Manhattan
VIEW LOCATION
8566
Trackerid: 8566 • Fmsid: 846 P-3PWBSEP • Title: Seward Park Reconstruction
Trackerid
8566
Fmsid
846 P-3PWBSEP
Title
Seward Park Reconstruction
Summary
This project will reconstruct the courtyard, gardens, paths, and fencing at Seward Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementadjustedcompletion
2018-10-01T00:00:00.000
Procurementactualcompletion
2018-10-01T00:00:00.000
Constructionstart
2018-11-01T00:00:00.000
Constructionprojectedcom
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$4,364,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East Broadway, Canal Street, Essex Street
Parkid
M082
Latitude
40.714842
Longitude
-73.98944
Borough
Manhattan
VIEW LOCATION
8944
Trackerid: 8944 • Fmsid: 846 SANDY2-16 • Currentphase: completed
Trackerid
8944
Fmsid
846 SANDY2-16
Title
Sheepshead Bay Piers Electrical & Structural Components Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the electrical and structural components at Sheepshead Bay Piers.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-08-01T00:00:00.000
Designprojectedcompletion
2018-08-01T00:00:00.000
Designadjustedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-09-01T00:00:00.000
Procurementstart
2020-09-01T00:00:00.000
Procurementprojectedcompletion
2021-06-01T00:00:00.000
Procurementadjustedcompletion
2023-04-01T00:00:00.000
Procurementactualcompletion
2023-03-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionadjustedcompletion
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$14,264,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Emmons Avenue between East 21st Street and East 26th Street
Parkid
B393
Latitude
40.583486
Longitude
-73.944163
Borough
Brooklyn
VIEW LOCATION
1611111
Trackerid: 1611111 • Fmsid: 846 P-6POOL18 • Title: Sheltering Arms Pool Deck Reconstruction
Trackerid
1611111
Fmsid
846 P-6POOL18
Title
Sheltering Arms Pool Deck Reconstruction
Summary
This project will reconstruct the deck at Sheltering Arms Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2023-11-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-05-01T00:00:00.000
Procurementprojectedcompletion
2023-10-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-04-01T00:00:00.000
Totalfunding
$1,842,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M190
Latitude
40.815073
Longitude
-73.955655
Borough
Manhattan
VIEW LOCATION
1983111
Trackerid: 1983111 • Title: Sheltering Arms Pool Perimeter Fence Reconstruction • Summary: This project will reconstruct the perimeter fence.
Trackerid
1983111
Title
Sheltering Arms Pool Perimeter Fence Reconstruction
Summary
This project will reconstruct the perimeter fence.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M190
Latitude
40.8150444
Longitude
-73.9557632
Borough
Manhattan
VIEW LOCATION
9409
Trackerid: 9409 • Fmsid: 846 P-3SHARCS • Title: Sheltering Arms Playground Public Restroom Building Reconstruction
Trackerid
9409
Fmsid
846 P-3SHARCS
Title
Sheltering Arms Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Sheltering Arms Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionadjustedcompletion
2024-09-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$2,331,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 129th Street, Amsterdam Avenue, West 126th Street, Old Broadway
Parkid
M190
Latitude
40.815091
Longitude
-73.955617
Borough
Manhattan
VIEW LOCATION
9696
Trackerid: 9696 • Fmsid: 846 P-3PL14A5 • Title: Sherman Creek Water Service Installation
Trackerid
9696
Fmsid
846 P-3PL14A5
Title
Sherman Creek Water Service Installation
Summary
This project will install water service at Sherman Creek.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designactualcompletion
2016-06-01T00:00:00.000
Procurementstart
2016-06-01T00:00:00.000
Procurementprojectedcompletion
2017-03-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2018-02-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-03-01T00:00:00.000
Totalfunding
$71,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
10th Avenue, Dyckman Street, Harlem River Drive
Parkid
M300
Latitude
40.857804
Longitude
-73.922046
Borough
Manhattan
VIEW LOCATION
2563
Trackerid: 2563 • Fmsid: 846 P-312SWIN • Title: Sherman Creek Entrance, Path, and Fencing Construction
Trackerid
2563
Fmsid
846 P-312SWIN
Title
Sherman Creek Entrance, Path, and Fencing Construction
Summary
This project will construct an entrance, path and fencing at Sherman Creek.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-04-01T00:00:00.000
Designprojectedcompletion
2012-09-01T00:00:00.000
Designactualcompletion
2012-10-01T00:00:00.000
Procurementstart
2012-10-01T00:00:00.000
Procurementprojectedcompletion
2013-07-01T00:00:00.000
Procurementactualcompletion
2013-06-01T00:00:00.000
Constructionstart
2013-09-01T00:00:00.000
Constructionprojectedcom
2014-09-01T00:00:00.000
Constructionadjustedcompletion
2014-05-01T00:00:00.000
Constructionactualcompletion
2014-05-01T00:00:00.000
Totalfunding
$420,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Dyckman Street at 10th Avenue
Parkid
M300
Latitude
40.85849806
Longitude
-73.92104472
Borough
Manhattan
VIEW LOCATION
9557
Trackerid: 9557 • Fmsid: 846 P-210VINP • Title: Shore Park and Parkway Vinland Playground Reconstruction
Trackerid
9557
Fmsid
846 P-210VINP
Title
Shore Park and Parkway Vinland Playground Reconstruction
Summary
This project will reconstruct Vinland Playground at Shore Park and Parkway.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementadjustedcompletion
2023-09-01T00:00:00.000
Procurementactualcompletion
2023-05-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionadjustedcompletion
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-11-01T00:00:00.000
Totalfunding
$3,400,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
94th Street & Ridge Boulevard
Parkid
B082
Latitude
40.617507291005
Longitude
-74.040048701482
Borough
Brooklyn
VIEW LOCATION
7113
Trackerid: 7113 • Fmsid: 846 P-210SHRD • Title: Shore Park and Parkway Field House Reconstruction
Trackerid
7113
Fmsid
846 P-210SHRD
Title
Shore Park and Parkway Field House Reconstruction
Summary
This project will reconstruct the field house at Shore Park and Parkway.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2021-11-01T00:00:00.000
Constructionactualcompletion
2021-11-01T00:00:00.000
Totalfunding
$4,584,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
95th Street between Shore Road and Belt Parkway
Parkid
B082
Latitude
40.616317
Longitude
-74.039533
Borough
Brooklyn
VIEW LOCATION
10347
Trackerid: 10347 • Fmsid: 846 P-2DSTG03 • Title: Shore Park Parkway Promenade and 4th Avenue Entrance Greenway Reconstruction
Trackerid
10347
Fmsid
846 P-2DSTG03
Title
Shore Park Parkway Promenade and 4th Avenue Entrance Greenway Reconstruction
Summary
This project will reconstruct the promenade, greenway and 4th Avenue greenway entrance.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-11-01T00:00:00.000
Designprojectedcompletion
2025-05-01T00:00:00.000
Designadjustedcompletion
2026-06-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoralPrivate
Name
Shore Parkway Greenway West Between Bay Ridge Avenue and 4th Avenue Greenway Entrance
Parkid
B082
Latitude
40.61143118
Longitude
-74.03523487
Borough
Brooklyn
VIEW LOCATION
10932
Trackerid: 10932 • Title: Shore Road Park Public Restroom Building Construction • Summary: This project will construct a new public restroom building in Shore Road Park.
Trackerid
10932
Title
Shore Road Park Public Restroom Building Construction
Summary
This project will construct a new public restroom building in Shore Road Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
State
Name
Shore Road and Bay Ridge Avenue
Parkid
B082
Latitude
40.61618929
Longitude
-74.0394836
Borough
Brooklyn
VIEW LOCATION
9597
Trackerid: 9597 • Fmsid: 846 P-210DOG • Title: Shore Park and Parkway Dog Run Construction
Trackerid
9597
Fmsid
846 P-210DOG
Title
Shore Park and Parkway Dog Run Construction
Summary
This project will construct a dog run in Shore Park and Parkway.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-11-01T00:00:00.000
Procurementstart
2020-11-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$805,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Shore Road at 3rd Avenue
Parkid
B082
Latitude
40.612086
Longitude
-74.036464
Borough
Brooklyn
VIEW LOCATION
7102
Trackerid: 7102 • Fmsid: 846 P-210SHRE • Currentphase: completed
Trackerid
7102
Fmsid
846 P-210SHRE
Title
Shore Park and Parkway Steel Fence Installation, Vegetation Removal and Erosion Control
Summary
This project will reconstruct steel fencing, clear vegetation, and control erosion at Shore Park and Parkway.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-09-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2015-07-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$1,757,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
Shore Road between 3rd Avenue and 95th Street
Parkid
B082
Latitude
40.628144
Longitude
-74.040559
Borough
Brooklyn
VIEW LOCATION
10726
Trackerid: 10726 • Title: Shore Road Park Public Restroom Building Demolition • Summary: This project will demolish the public restroom building at Shore Road Park.
Trackerid
10726
Title
Shore Road Park Public Restroom Building Demolition
Summary
This project will demolish the public restroom building at Shore Road Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Shore Road between Third Avenue and Fourth Avenue
Parkid
B082
Latitude
40.63208393
Longitude
-74.03874273
Borough
Brooklyn
VIEW LOCATION
8992
Trackerid: 8992 • Fmsid: 846 P-210SHCP • Title: Shore Park and Parkway Path and Pavement Reconstruction
Trackerid
8992
Fmsid
846 P-210SHCP
Title
Shore Park and Parkway Path and Pavement Reconstruction
Summary
This project will reconstruct a portion of the western Shore Road Park path and the pavement surrounding the Field House.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2022-07-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-07-01T00:00:00.000
Totalfunding
$918,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Shore Road Park between 95th and 99th Streets
Parkid
B082
Latitude
40.614661793639
Longitude
-74.039342092707
Borough
Brooklyn
VIEW LOCATION
1098111
Trackerid: 1098111 • Fmsid: 846 P-5PL15A5 • Title: Silver Lake Park Path Reconstruction
Trackerid
1098111
Fmsid
846 P-5PL15A5
Title
Silver Lake Park Path Reconstruction
Summary
This project will reconstruct the paths at Silver Lake Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-07-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-02-01T00:00:00.000
Procurementprojectedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-02-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$775,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
R022
Latitude
40.622855
Longitude
-74.100413
Borough
Staten Island
VIEW LOCATION
1220111
Trackerid: 1220111 • Fmsid: 846 P-6PVMNT1 • Title: Silver Lake Park Pavement Reconstruction
Trackerid
1220111
Fmsid
846 P-6PVMNT1
Title
Silver Lake Park Pavement Reconstruction
Summary
This project will reconstruct paths and pavement in the southern half of Silver Lake Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2020-06-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-02-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2021-10-01T00:00:00.000
Constructionactualcompletion
2021-09-01T00:00:00.000
Totalfunding
$1,138,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
R022
Latitude
40.622629
Longitude
-74.100976
Borough
Staten Island
VIEW LOCATION
1514111
Trackerid: 1514111 • Fmsid: 846 P-5SLVLK1 • Title: Silver Lake Park Pathway Reconstruction
Trackerid
1514111
Fmsid
846 P-5SLVLK1
Title
Silver Lake Park Pathway Reconstruction
Summary
This project will reconstruct pathways at Silver Lake Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-08-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2022-12-01T00:00:00.000
Procurementstart
2022-10-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementactualcompletion
2022-11-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
R022
Latitude
40.627064
Longitude
-74.093322
Borough
Staten Island
VIEW LOCATION
10856
Trackerid: 10856 • Fmsid: 846 P-501SLTL • Title: Silver Lake Park Playground Reconstruction
Trackerid
10856
Fmsid
846 P-501SLTL
Title
Silver Lake Park Playground Reconstruction
Summary
This project will reconstruct a playground in Silver Lake Park.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-03-01T00:00:00.000
Designprojectedcompletion
2027-03-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Revere Street and University Place
Parkid
R022
Latitude
40.6281002
Longitude
-74.09862567
Borough
Staten Island
VIEW LOCATION
11422
Trackerid: 11422 • Title: Silver Lake Park Pathways Reconstruction • Summary: This project will reconstruct the pathways at Silver Lake Park.
Trackerid
11422
Title
Silver Lake Park Pathways Reconstruction
Summary
This project will reconstruct the pathways at Silver Lake Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Name
Victory Boulevard, Clove Road and Forest Avenue
Parkid
R022
Latitude
40.6226019172
Longitude
-74.1014635994
Borough
Staten Island
VIEW LOCATION