Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
10624
Trackerid: 10624 • Fmsid: 846 P-2CPISMP • Title: St. Mark's Playground Reconstruction
Trackerid
10624
Fmsid
846 P-2CPISMP
Title
St. Mark's Playground Reconstruction
Summary
This project will reconstruct St. Mark's Playground.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2025-04-01T00:00:00.000
Designadjustedcompletion
2026-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
St. Marks Avenue between Kingston and Albany Avenues
Parkid
BT16
Latitude
40.67469429
Longitude
-73.94037064
Borough
Brooklyn
VIEW LOCATION
1919111
Trackerid: 1919111 • Fmsid: 846 P-1PDSMRC • Title: Saint Mary's Recreation Center Partial Reconstruction
Trackerid
1919111
Fmsid
846 P-1PDSMRC
Title
Saint Mary's Recreation Center Partial Reconstruction
Summary
This project will reconstruct select areas in Saint Mary's Recreation Center.
Currentphase
design-procurement
Designpercentcomplete
90.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-09-01T00:00:00.000
Designprojectedcompletion
2025-11-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementprojectedcompletion
2026-02-01T00:00:00.000
Procurementactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$988,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X045
Latitude
40.812181
Longitude
-73.9115224
Borough
Bronx
VIEW LOCATION
7217
Trackerid: 7217 • Fmsid: 846 P-101STMH • Title: St. Mary's Recreation Center Pool and Gymnasium HVAC Reconstruction
Trackerid
7217
Fmsid
846 P-101STMH
Title
St. Mary's Recreation Center Pool and Gymnasium HVAC Reconstruction
Summary
This project will provide a heating, ventilation, air conditioning, and dehumidification system to serve the swimming pool and gymnasium at St. Mary's Recreation Center, as well as ventilation upgrades throughout the building.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-05-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designactualcompletion
2016-10-01T00:00:00.000
Procurementstart
2016-10-01T00:00:00.000
Procurementprojectedcompletion
2017-07-01T00:00:00.000
Procurementadjustedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2017-12-01T00:00:00.000
Constructionprojectedcom
2018-12-01T00:00:00.000
Constructionactualcompletion
2018-12-01T00:00:00.000
Totalfunding
$1,993,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
450 Saint Anns Avenue
Parkid
X045
Latitude
40.811415
Longitude
-73.914025
Borough
Bronx
VIEW LOCATION
7109
Trackerid: 7109 • Fmsid: 846 P-206MARY • Title: St. Mary's Playground Reconstruction
Trackerid
7109
Fmsid
846 P-206MARY
Title
St. Mary's Playground Reconstruction
Summary
This project will construct new play equipment, benches, and pavements at St. Mary's Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-02-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionactualcompletion
2018-04-01T00:00:00.000
Totalfunding
$1,468,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council, Private
Name
Huntington Street and Smith Street
Parkid
B118B
Latitude
40.675786
Longitude
-73.99754
Borough
Brooklyn
VIEW LOCATION
7209
Trackerid: 7209 • Fmsid: 846 P-206SMRY • Title: St. Mary's Playground Multi-Purpose Area Reconstruction
Trackerid
7209
Fmsid
846 P-206SMRY
Title
St. Mary's Playground Multi-Purpose Area Reconstruction
Summary
This project will reconstruct the existing multipurpose play area at St. Mary's Playground to include a skate park, basketball courts, multi-use synthetic turf field, adult fitness equipment and color seal coat walking track.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-02-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-07-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$860,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Smith Street between Nelson Street and Luquer Street
Parkid
B118A
Latitude
40.676431
Longitude
-73.99722
Borough
Brooklyn
VIEW LOCATION
8830
Trackerid: 8830 • Fmsid: 846 P-101MAR2 • Title: St. Mary's Park Playground West Public Restroom Building Reconstruction
Trackerid
8830
Fmsid
846 P-101MAR2
Title
St. Mary's Park Playground West Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at St. Mary's Park Playground West.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designadjustedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-07-01T00:00:00.000
Procurementstart
2018-07-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2022-03-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$2,925,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
St. Ann's Avenue and East 147th Street
Parkid
X045
Latitude
40.812857
Longitude
-73.913429
Borough
Bronx
VIEW LOCATION
10458
Trackerid: 10458 • Fmsid: 846 P-209WGTF • Title: Wingate Park Track and Field Reconstruction
Trackerid
10458
Fmsid
846 P-209WGTF
Title
Wingate Park Track and Field Reconstruction
Summary
This project will reconstruct the track and field at Wingate Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2027-07-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Brooklyn Avenue and Rutland Road
Parkid
B254
Latitude
40.65833568
Longitude
-73.94447664
Borough
Brooklyn
VIEW LOCATION
8891
Trackerid: 8891 • Fmsid: 846 P-1ANCH02 • Title: St. Mary's Park Plaza, Pathways, and Gil Scott-Heron Amphitheater Reconstruction
Trackerid
8891
Fmsid
846 P-1ANCH02
Title
St. Mary's Park Plaza, Pathways, and Gil Scott-Heron Amphitheater Reconstruction
Summary
This project will reconstruct the plaza, pathways, lighting, and Gil Scott-Heron Amphitheater at St. Mary’s Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-07-01T00:00:00.000
Designprojectedcompletion
2018-07-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-04-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2022-12-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$15,997,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
St. Anns Avenue between East 143rd Street and East 149th Street
Parkid
X045
Latitude
40.811505
Longitude
-73.911909
Borough
Bronx
VIEW LOCATION
6077
Trackerid: 6077 • Fmsid: 846 P-1GIGP01 • Title: St. Mary's Park and Recreation Center Green Infrastructure Construction
Trackerid
6077
Fmsid
846 P-1GIGP01
Title
St. Mary's Park and Recreation Center Green Infrastructure Construction
Summary
This project will construct rain gardens and other green infrastructure to capture storm water at St. Mary's Park in the Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designadjustedcompletion
2017-10-01T00:00:00.000
Designactualcompletion
2017-09-01T00:00:00.000
Procurementstart
2017-09-01T00:00:00.000
Procurementprojectedcompletion
2018-06-01T00:00:00.000
Procurementadjustedcompletion
2018-12-01T00:00:00.000
Procurementactualcompletion
2018-11-01T00:00:00.000
Constructionstart
2019-01-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$1,207,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
St. Anns Avenue between East 145th and East 146th Streets
Parkid
X045
Latitude
40.8989097
Longitude
-73.8870831
Borough
Bronx
VIEW LOCATION
6324
Trackerid: 6324 • Fmsid: 846 P-1PDSMRC • Title: St. Mary's Park Recreation Center Reconstruction
Trackerid
6324
Fmsid
846 P-1PDSMRC
Title
St. Mary's Park Recreation Center Reconstruction
Summary
This project will reconstruct St. Mary's Park Recreation Center.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
90.5
Designstart
2015-11-01T00:00:00.000
Designprojectedcompletion
2017-09-01T00:00:00.000
Designadjustedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-04-01T00:00:00.000
Procurementstart
2020-04-01T00:00:00.000
Procurementprojectedcompletion
2021-01-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionadjustedcompletion
2026-07-01T00:00:00.000
Totalfunding
$20,573,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoralState
Name
St. Anns Avenue between East 145th and East 147th Streets.
Parkid
X045
Latitude
40.81145887
Longitude
-73.91406864
Borough
Bronx
VIEW LOCATION
7052
Trackerid: 7052 • Fmsid: 846 P-101STMR • Title: St. Mary's Park Playground West Reconstruction (X045-215MA)
Trackerid
7052
Fmsid
846 P-101STMR
Title
St. Mary's Park Playground West Reconstruction (X045-215MA)
Summary
This project will reconstruct the basketball and tennis courts, and install play equipment, seating areas, planting beds and trees at St. Mary's Park Playground West.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-04-01T00:00:00.000
Procurementstart
2017-04-01T00:00:00.000
Procurementprojectedcompletion
2017-12-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-07-01T00:00:00.000
Constructionprojectedcom
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-08-01T00:00:00.000
Totalfunding
$3,700,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
St. Anns Avenue between East 146th Street and East 148th Street
Parkid
X045
Latitude
40.810923
Longitude
-73.912087
Borough
Bronx
VIEW LOCATION
8989
Trackerid: 8989 • Fmsid: 846 P-1ANCH01 • Title: St. Mary's Park Ballfields and Dog Run Reconstruction
Trackerid
8989
Fmsid
846 P-1ANCH01
Title
St. Mary's Park Ballfields and Dog Run Reconstruction
Summary
This project will reconstruct the ballfields and dog run, including natural turf, irrigation, sports lighting, fencing and landscaping at St. Mary's Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementadjustedcompletion
2018-12-01T00:00:00.000
Procurementactualcompletion
2018-11-01T00:00:00.000
Constructionstart
2018-12-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionactualcompletion
2020-06-01T00:00:00.000
Totalfunding
$8,962,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
St. Mary's Street and Jackson Avenue
Parkid
X045
Latitude
40.811633
Longitude
-73.912462
Borough
Bronx
VIEW LOCATION
11372
Trackerid: 11372 • Title: St. Mary's Park Playground South Reconstruction • Summary: This project will reconstruct St. Mary's Park Playground South.
Trackerid
11372
Title
St. Mary's Park Playground South Reconstruction
Summary
This project will reconstruct St. Mary's Park Playground South.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
St. Marys Street between Crimmins Avenue and Beekman Avenue
Parkid
X045
Latitude
40.812813
Longitude
-73.9129478
Borough
Bronx
VIEW LOCATION
1377111
Trackerid: 1377111 • Fmsid: 846 P-6SUSTN1 • Title: St. Michael's Playground Ballfield Lighting Reconstruction
Trackerid
1377111
Fmsid
846 P-6SUSTN1
Title
St. Michael's Playground Ballfield Lighting Reconstruction
Summary
This project will reconstruct the ballfield lighting at St. Michael's Playground with energy-efficient LED fixtures.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-10-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designactualcompletion
2022-11-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2023-11-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2023-12-01T00:00:00.000
Totalfunding
$221,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q174A
Latitude
40.759192
Longitude
-73.900085
Borough
Queens
VIEW LOCATION
9242
Trackerid: 9242 • Fmsid: 846 P-401SMST • Title: St. Michael's Playground Synthetic Turf Field Reconstruction
Trackerid
9242
Fmsid
846 P-401SMST
Title
St. Michael's Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at St. Michael's Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designadjustedcompletion
2021-06-01T00:00:00.000
Designactualcompletion
2021-06-01T00:00:00.000
Procurementstart
2021-06-01T00:00:00.000
Procurementprojectedcompletion
2022-03-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-07-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$3,702,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
30th Avenue, 31st Avenue, Brooklyn Queens Expressway, Boody Street
Parkid
Q174A
Latitude
40.759276
Longitude
-73.899915
Borough
Queens
VIEW LOCATION
10360
Trackerid: 10360 • Fmsid: 846 P-4STMCPG • Title: St. Michael's Playground Reconstruction
Trackerid
10360
Fmsid
846 P-4STMCPG
Title
St. Michael's Playground Reconstruction
Summary
This project will reconstruct the children's play area, handball courts and basketball courts at St. Michael's Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2025-10-01T00:00:00.000
Designadjustedcompletion
2026-01-01T00:00:00.000
Designactualcompletion
2026-01-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council, Private
Name
This project is located between the Brooklyn Queens Expressway, and 30th Avenue and 31st Avenue.
Parkid
Q174A
Latitude
40.758955
Longitude
-73.900138
Borough
Queens
VIEW LOCATION
1305111
Trackerid: 1305111 • Fmsid: 846 P-6RETW18 • Title: St. Nicholas Park Rockface Reconstruction
Trackerid
1305111
Fmsid
846 P-6RETW18
Title
St. Nicholas Park Rockface Reconstruction
Summary
This project will reconstruct the rockface along St. Nicholas Avenue between West 138th Street and West 139th Street in St. Nicholas Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-11-01T00:00:00.000
Designprojectedcompletion
2020-12-01T00:00:00.000
Designadjustedcompletion
2021-10-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementactualcompletion
2021-10-01T00:00:00.000
Constructionstart
2022-01-01T00:00:00.000
Constructionprojectedcom
2022-04-01T00:00:00.000
Constructionactualcompletion
2022-04-01T00:00:00.000
Totalfunding
$966,000
Projectliaison
Contact Us
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M077
Latitude
40.817658
Longitude
-73.949781
Borough
Manhattan
VIEW LOCATION
1324111
Trackerid: 1324111 • Fmsid: 846 P-3STNICK • Title: St. Nicholas Park Paths Reconstruction
Trackerid
1324111
Fmsid
846 P-3STNICK
Title
St. Nicholas Park Paths Reconstruction
Summary
This project will reconstruct paths in St. Nicholas Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-12-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-04-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2023-12-01T00:00:00.000
Totalfunding
$500,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M077
Latitude
40.817919
Longitude
-73.948836
Borough
Manhattan
VIEW LOCATION
10577
Trackerid: 10577 • Fmsid: 846 P-309STN4 • Title: St. Nicholas Park 136th Street Staircase Reconstruction
Trackerid
10577
Fmsid
846 P-309STN4
Title
St. Nicholas Park 136th Street Staircase Reconstruction
Summary
This project will reconstruct a staircase in St. Nicholas Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-02-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designactualcompletion
2026-05-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
St. Nicholas Avenue and 136th Street
Parkid
M077
Latitude
40.81816538
Longitude
-73.94778828
Borough
Manhattan
VIEW LOCATION
11085
Trackerid: 11085 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
11085
Title
St Nicholas Park Park 133rd Street Playground and Public Restroom Building Construction
Summary
This project will reconstruct the 133rd Street playground and construct a Public Restroom Building at St. Nicholas Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
St. Nicholas Avenue and West 133rd Street
Parkid
M077
Latitude
40.8156397
Longitude
-73.94902929
Borough
Manhattan
VIEW LOCATION
10765
Trackerid: 10765 • Fmsid: 846 P-3CPINPR • Title: St. Nicholas Playground South Public Restroom Building Construction
Trackerid
10765
Fmsid
846 P-3CPINPR
Title
St. Nicholas Playground South Public Restroom Building Construction
Summary
This project will construct a public restroom building at St. Nicholas Playground South.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-04-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Adam Clayton Powell Jr. Boulevard and West 128th Street
Parkid
M211A
Latitude
40.81106047
Longitude
-73.94720335
Borough
Manhattan
VIEW LOCATION
10461
Trackerid: 10461 • Fmsid: 846 P-3CPISNS • Title: St. Nicholas Playground South Reconstruction
Trackerid
10461
Fmsid
846 P-3CPISNS
Title
St. Nicholas Playground South Reconstruction
Summary
This project will reconstruct St. Nicholas Playground South.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-12-01T00:00:00.000
Designprojectedcompletion
2025-12-01T00:00:00.000
Designadjustedcompletion
2026-08-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Adam Clayton Powell Jr. Boulevard between West 127th and West 129th Streets
Parkid
M211A
Latitude
40.81127141
Longitude
-73.94702842
Borough
Manhattan
VIEW LOCATION
9248
Trackerid: 9248 • Fmsid: 846 P-306STVA • Title: St. Vartan Park Playground Reconstruction
Trackerid
9248
Fmsid
846 P-306STVA
Title
St. Vartan Park Playground Reconstruction
Summary
This project will reconstruct the playground in St. Vartan Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
55.0
Designstart
2020-02-01T00:00:00.000
Designprojectedcompletion
2021-02-01T00:00:00.000
Designadjustedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-04-01T00:00:00.000
Procurementstart
2023-04-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-02-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2027-03-01T00:00:00.000
Totalfunding
$4,797,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
1st Avenue between East 35th Street and East 36th Street
Parkid
M076
Latitude
40.7452704
Longitude
-73.97407447
Borough
Manhattan
VIEW LOCATION
11161
Trackerid: 11161 • Title: St. Vartan Park Sports Lighting Reconstruction • Currentphase: proposed
Trackerid
11161
Title
St. Vartan Park Sports Lighting Reconstruction
Summary
This project will reconstruct the sports lighting at the athletic field at St. Vartan Park, including electrical service and new conduits, cables, a scoreboard, and service equipment.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
First Avenue between East 35th Street and East 36th Street
Parkid
M076
Latitude
40.74529013
Longitude
-73.97392317
Borough
Manhattan
VIEW LOCATION
1760111
Trackerid: 1760111 • Fmsid: 846 P-203STAR • Title: Star Spangled Playground Synthetic Turf Field Reconstruction
Trackerid
1760111
Fmsid
846 P-203STAR
Title
Star Spangled Playground Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field at Star Spangled Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2024-08-01T00:00:00.000
Procurementprojectedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2024-11-01T00:00:00.000
Constructionstart
2024-12-01T00:00:00.000
Constructionprojectedcom
2025-04-01T00:00:00.000
Constructionactualcompletion
2025-03-01T00:00:00.000
Totalfunding
$364,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B266
Latitude
40.6920879
Longitude
-73.9579809
Borough
Brooklyn
VIEW LOCATION
8896
Trackerid: 8896 • Fmsid: 846 P-405STR2 • Title: Starr Playground Play Area and Spray Shower Reconstruction
Trackerid
8896
Fmsid
846 P-405STR2
Title
Starr Playground Play Area and Spray Shower Reconstruction
Summary
This project will reconstruct the playground and spray shower at Starr Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-09-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-08-01T00:00:00.000
Procurementactualcompletion
2022-08-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-10-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$2,115,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Onderdonk Avenue between Starr Street and Willoughby Avenue
Parkid
Q291
Latitude
40.709803
Longitude
-73.917834
Borough
Queens
VIEW LOCATION
8593
Trackerid: 8593 • Fmsid: 846 P-405STRR • Title: Starr Playground Multi-Purpose Play Area and Handball Courts Reconstruction
Trackerid
8593
Fmsid
846 P-405STRR
Title
Starr Playground Multi-Purpose Play Area and Handball Courts Reconstruction
Summary
This project will reconstruct the multi-purpose play area and handball courts in Starr Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-04-01T00:00:00.000
Procurementstart
2019-04-01T00:00:00.000
Procurementprojectedcompletion
2020-01-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-05-01T00:00:00.000
Constructionstart
2021-07-01T00:00:00.000
Constructionprojectedcom
2022-07-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,375,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Onderdonk Avenue between Starr Street and Willoughby Avenue
Parkid
Q291
Latitude
40.709836
Longitude
-73.917639
Borough
Queens
VIEW LOCATION
11411
Trackerid: 11411 • Title: Stars & Stripes Playground Basketball Courts Repavement • Summary: This project will repave the basketball courts at Stars & Stripes Playground.
Trackerid
11411
Title
Stars & Stripes Playground Basketball Courts Repavement
Summary
This project will repave the basketball courts at Stars & Stripes Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Crawford Avenue at Baychester Avenue
Parkid
X193
Latitude
40.8854948954
Longitude
-73.8396163029
Borough
Bronx
VIEW LOCATION
3899
Trackerid: 3899 • Fmsid: 846 P-6BLDG9B • Title: Citywide Electrical Systems Reconstruction (CNYG-309M)
Trackerid
3899
Fmsid
846 P-6BLDG9B
Title
Citywide Electrical Systems Reconstruction (CNYG-309M)
Summary
This project will reconstruct the electrical systems at public restroom buildings in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-03-01T00:00:00.000
Designactualcompletion
2009-03-01T00:00:00.000
Procurementstart
2009-03-01T00:00:00.000
Procurementprojectedcompletion
2009-12-01T00:00:00.000
Procurementactualcompletion
2011-06-01T00:00:00.000
Constructionstart
2011-07-01T00:00:00.000
Constructionprojectedcom
2014-07-01T00:00:00.000
Constructionadjustedcompletion
2015-03-01T00:00:00.000
Constructionactualcompletion
2014-01-01T00:00:00.000
Totalfunding
$357,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Staten Island Expressway, Merrill Avenue, Teleport, South Avenue
Parkid
R143
Latitude
40.612585
Longitude
-74.174011
Borough
Staten Island, Bronx
VIEW LOCATION
3899
Trackerid: 3899 • Fmsid: 846 P-6BLDG9B • Title: Citywide Electrical Systems Reconstruction (CNYG-309M)
Trackerid
3899
Fmsid
846 P-6BLDG9B
Title
Citywide Electrical Systems Reconstruction (CNYG-309M)
Summary
This project will reconstruct the electrical systems at public restroom buildings in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-03-01T00:00:00.000
Designactualcompletion
2009-03-01T00:00:00.000
Procurementstart
2009-03-01T00:00:00.000
Procurementprojectedcompletion
2009-12-01T00:00:00.000
Procurementactualcompletion
2011-06-01T00:00:00.000
Constructionstart
2011-07-01T00:00:00.000
Constructionprojectedcom
2014-07-01T00:00:00.000
Constructionadjustedcompletion
2015-03-01T00:00:00.000
Constructionactualcompletion
2014-01-01T00:00:00.000
Totalfunding
$357,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Van Cortlandt Avenue East, Bainbridge Avenue, Reservoir Oval
Parkid
X104
Latitude
40.876587
Longitude
-73.878479
Borough
Staten Island, Bronx
VIEW LOCATION
8610
Trackerid: 8610 • Fmsid: 846 P-201STRN • Title: Sternberg Park Synthetic Turf Field Reconstruction
Trackerid
8610
Fmsid
846 P-201STRN
Title
Sternberg Park Synthetic Turf Field Reconstruction
Summary
This project will reconstruct the synthetic turf field and construct new sports lighting at the basketball courts at Sternberg Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-09-01T00:00:00.000
Designprojectedcompletion
2018-09-01T00:00:00.000
Designactualcompletion
2018-08-01T00:00:00.000
Procurementstart
2018-08-01T00:00:00.000
Procurementprojectedcompletion
2019-05-01T00:00:00.000
Procurementadjustedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-02-01T00:00:00.000
Constructionstart
2020-10-01T00:00:00.000
Constructionprojectedcom
2021-10-01T00:00:00.000
Constructionactualcompletion
2021-10-01T00:00:00.000
Totalfunding
$2,114,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Montrose Avenue, Boerum Street, Lorimer Street, Leonard Street
Parkid
B055
Latitude
40.70658
Longitude
-73.947137
Borough
Brooklyn
VIEW LOCATION
7411
Trackerid: 7411 • Fmsid: 846 P-2CPISTK • Title: Stockton Playground Reconstruction
Trackerid
7411
Fmsid
846 P-2CPISTK
Title
Stockton Playground Reconstruction
Summary
This project will reconstruct Stockton Playground with new play equipment, a spray shower, a synthetic turf field and painted track, lighting, fencing, pavement, plantings, and site furnishings.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-02-01T00:00:00.000
Constructionstart
2017-03-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionadjustedcompletion
2018-04-01T00:00:00.000
Constructionactualcompletion
2018-04-01T00:00:00.000
Totalfunding
$3,529,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Park Avenue and Martin Luther King Jr. Place between Marcy Avenue and Tompkins Avenue
Parkid
B298
Latitude
40.69727
Longitude
-73.948756
Borough
Brooklyn
VIEW LOCATION
11386
Trackerid: 11386 • Title: Strawberry Playground Reconstruction • Summary: This project will reconstruct Strawberry Playground.
Trackerid
11386
Title
Strawberry Playground Reconstruction
Summary
This project will reconstruct Strawberry Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
Rodney Street between South 3rd Street and South 4th Street
Parkid
B223PC
Latitude
40.7098584
Longitude
-73.9557884
Borough
Brooklyn
VIEW LOCATION
6637
Trackerid: 6637 • Fmsid: 846 P-208STUD • Title: Stroud Playground Reconstruction
Trackerid
6637
Fmsid
846 P-208STUD
Title
Stroud Playground Reconstruction
Summary
This project will reconstruct Stroud Playground, including the multi-use area, landscaping, play equipment, safety surface, spray shower, seating areas, basketball court and handball court.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-12-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designadjustedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-06-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2019-01-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$4,626,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Classon Avenue between Park Place and Sterling Place
Parkid
B350
Latitude
40.6749875
Longitude
-73.96194861
Borough
Brooklyn
VIEW LOCATION
10724
Trackerid: 10724 • Fmsid: 846 P-306SSHR • Title: Stuyvesant Square East Public Restroom Building Reconstruction
Trackerid
10724
Fmsid
846 P-306SSHR
Title
Stuyvesant Square East Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in the eastern half of Stuyvesant Square.
Currentphase
design
Designpercentcomplete
35.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-05-01T00:00:00.000
Designprojectedcompletion
2026-05-01T00:00:00.000
Designadjustedcompletion
2027-01-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Northeast corner of Second Avenue and East 15th Street
Parkid
M086
Latitude
40.73323114
Longitude
-73.98454214
Borough
Manhattan
VIEW LOCATION
2199
Trackerid: 2199 • Fmsid: 846 P-302SSQP • Title: Stuyvesant Square East Section Fence and Sidewalk Reconstruction
Trackerid
2199
Fmsid
846 P-302SSQP
Title
Stuyvesant Square East Section Fence and Sidewalk Reconstruction
Summary
This project will reconstruct the fence and sidewalks in the eastern half of Stuyvesant Square.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-08-01T00:00:00.000
Designprojectedcompletion
2012-12-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementadjustedcompletion
2014-07-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-10-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionadjustedcompletion
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$5,033,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Rutherford Place, Nathan D. Perlman Place, East 15th Street, East 17th Street
Parkid
M086
Latitude
40.73345611
Longitude
-73.98355278
Borough
Manhattan
VIEW LOCATION
9294
Trackerid: 9294 • Fmsid: 846 P-2SUCSGN • Title: Success Garden Reconstruction
Trackerid
9294
Fmsid
846 P-2SUCSGN
Title
Success Garden Reconstruction
Summary
This project will reconstruct the multi-purpose play and passive recreation areas in Success Garden.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2019-09-01T00:00:00.000
Designactualcompletion
2019-10-01T00:00:00.000
Procurementstart
2019-10-01T00:00:00.000
Procurementprojectedcompletion
2020-06-01T00:00:00.000
Procurementadjustedcompletion
2020-11-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-06-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$1,758,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Alabama Avenue & Livonia Avenue
Parkid
B383
Latitude
40.664533
Longitude
-73.897372
Borough
Brooklyn
VIEW LOCATION
1211111
Trackerid: 1211111 • Fmsid: 846 P-6CSBLDG • Title: Sumner Playground Public Restroom Building Reconstruction
Trackerid
1211111
Fmsid
846 P-6CSBLDG
Title
Sumner Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Sumner Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-02-01T00:00:00.000
Constructionstart
2021-03-01T00:00:00.000
Constructionprojectedcom
2021-12-01T00:00:00.000
Constructionactualcompletion
2021-12-01T00:00:00.000
Totalfunding
$996,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B263
Latitude
40.697349
Longitude
-73.94279
Borough
Brooklyn
VIEW LOCATION
6235
Trackerid: 6235 • Fmsid: 846 P-203SUMN • Title: Sumner Playground Reconstruction
Trackerid
6235
Fmsid
846 P-203SUMN
Title
Sumner Playground Reconstruction
Summary
This project will reconstruct Sumner Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-09-01T00:00:00.000
Designprojectedcompletion
2014-12-01T00:00:00.000
Designadjustedcompletion
2015-09-01T00:00:00.000
Designactualcompletion
2015-09-01T00:00:00.000
Procurementstart
2015-09-01T00:00:00.000
Procurementprojectedcompletion
2016-06-01T00:00:00.000
Procurementadjustedcompletion
2017-02-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionadjustedcompletion
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$5,045,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Throop Avenue between Park Avenue and Myrtle Avenue
Parkid
B263
Latitude
40.69727583
Longitude
-73.94275917
Borough
Brooklyn
VIEW LOCATION
9284
Trackerid: 9284 • Fmsid: 846 P-218SUNN • Title: Sunners Playground Reconstruction
Trackerid
9284
Fmsid
846 P-218SUNN
Title
Sunners Playground Reconstruction
Summary
This project will reconstruct Sunners Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-12-01T00:00:00.000
Designprojectedcompletion
2019-12-01T00:00:00.000
Designadjustedcompletion
2020-08-01T00:00:00.000
Designactualcompletion
2020-08-01T00:00:00.000
Procurementstart
2020-08-01T00:00:00.000
Procurementprojectedcompletion
2021-05-01T00:00:00.000
Procurementadjustedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-05-01T00:00:00.000
Constructionactualcompletion
2023-05-01T00:00:00.000
Totalfunding
$1,400,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Kings Highway, Avenue H, East 49th Street
Parkid
B206
Latitude
40.632525
Longitude
-73.929575
Borough
Brooklyn
VIEW LOCATION
11189
Trackerid: 11189 • Title: Vladeck Park Playground Reconstruction • Summary: This project will reconstruct the playground in Vladeck Park.
Trackerid
11189
Title
Vladeck Park Playground Reconstruction
Summary
This project will reconstruct the playground in Vladeck Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Madison Street to Water Street, between Jackson Street and Gouverneur Street.
Parkid
M182
Latitude
40.7127558
Longitude
-73.9820818
Borough
Manhattan
VIEW LOCATION
10880
Trackerid: 10880 • Title: Sunrise Playground Multipurpose Play Area and Spray Shower Reconstruction • Currentphase: proposed
Trackerid
10880
Title
Sunrise Playground Multipurpose Play Area and Spray Shower Reconstruction
Summary
This project will reconstruct the multipurpose play area, spray showers, seating area, flagpole, stormwater drainage system, security lighting and sidewalks at Sunrise Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
253rd Street. Bet 149th Avenue and 149th Rd, Rosedale. Queens.
Parkid
Q430
Latitude
40.6526658
Longitude
-73.7363769
Borough
Queens
VIEW LOCATION
8591
Trackerid: 8591 • Fmsid: 846 P-413COV2 • Title: Sunset Cove Park Boardwalk and Outdoor Classroom Construction
Trackerid
8591
Fmsid
846 P-413COV2
Title
Sunset Cove Park Boardwalk and Outdoor Classroom Construction
Summary
This project will construct a boardwalk and outdoor classroom at Sunset Cove Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-12-01T00:00:00.000
Designprojectedcompletion
2018-01-01T00:00:00.000
Designadjustedcompletion
2021-07-01T00:00:00.000
Designactualcompletion
2021-05-01T00:00:00.000
Procurementstart
2021-05-01T00:00:00.000
Procurementprojectedcompletion
2022-02-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2023-05-01T00:00:00.000
Constructionadjustedcompletion
2023-08-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$4,242,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentFederalMayoralState
Name
Cross Bay Boulevard between West 19th Road and West 22nd Road
Parkid
Q498
Latitude
40.598644
Longitude
-73.823753
Borough
Queens
VIEW LOCATION
7132
Trackerid: 7132 • Fmsid: 846 P-413COVE • Title: Sunset Cove Park Saltwater Marsh and Coastal Upland Construction
Trackerid
7132
Fmsid
846 P-413COVE
Title
Sunset Cove Park Saltwater Marsh and Coastal Upland Construction
Summary
This project will construct a salt marsh and upland coastal forest area in Sunset Cove Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-03-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designadjustedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-02-01T00:00:00.000
Procurementadjustedcompletion
2018-04-01T00:00:00.000
Procurementactualcompletion
2018-03-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$10,410,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoralPrivate
Name
south of West 19th street between Jamaica Bay and Cross Bay Boulevard
Parkid
Q498
Latitude
40.59853
Longitude
-73.822995
Borough
Queens
VIEW LOCATION
1992111
Trackerid: 1992111 • Title: Sunset Park Synthetic Turf and Track Reconstruction • Summary: This project will reconstruct the track and synthetic turf field.
Trackerid
1992111
Title
Sunset Park Synthetic Turf and Track Reconstruction
Summary
This project will reconstruct the track and synthetic turf field.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B087
Latitude
40.647715
Longitude
-74.0035574
Borough
Brooklyn
VIEW LOCATION
2001111
Trackerid: 2001111 • Title: Sunset Pool Recreation Center Roof Reconstruction • Summary: This project will reconstruct the recreation center roof.
Trackerid
2001111
Title
Sunset Pool Recreation Center Roof Reconstruction
Summary
This project will reconstruct the recreation center roof.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B087
Latitude
40.646948
Longitude
-74.002127
Borough
Brooklyn
VIEW LOCATION
1312111
Trackerid: 1312111 • Fmsid: 846 P-2DCTSNS • Title: Sunset Park Recreation Center Telecommunication Lines Reconstruction
Trackerid
1312111
Fmsid
846 P-2DCTSNS
Title
Sunset Park Recreation Center Telecommunication Lines Reconstruction
Summary
This project will reconstruct the telecommunication lines to Sunset Park Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-11-01T00:00:00.000
Designprojectedcompletion
2021-05-01T00:00:00.000
Designactualcompletion
2021-09-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-11-01T00:00:00.000
Constructionprojectedcom
2022-02-01T00:00:00.000
Constructionactualcompletion
2022-03-01T00:00:00.000
Totalfunding
$128,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B087
Latitude
40.648347
Longitude
-74.004327
Borough
Brooklyn
VIEW LOCATION
1405111
Trackerid: 1405111 • Fmsid: 846 P-2SNSTCN • Title: Sunset Park Pool Structural Reconstruction
Trackerid
1405111
Fmsid
846 P-2SNSTCN
Title
Sunset Park Pool Structural Reconstruction
Summary
This project will reconstruct Sunset Park Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-11-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-11-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
$0
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B087
Latitude
40.648438
Longitude
-74.003966
Borough
Brooklyn
VIEW LOCATION
1479111
Trackerid: 1479111 • Fmsid: 846 P-2SNSTEL • Title: Sunset Park Pool Electrical System Reconstruction
Trackerid
1479111
Fmsid
846 P-2SNSTEL
Title
Sunset Park Pool Electrical System Reconstruction
Summary
This project will reconstruct the electrical system at Sunset Park Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-05-01T00:00:00.000
Designprojectedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-10-01T00:00:00.000
Constructionprojectedcom
2023-02-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$251,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
B087
Latitude
40.64709
Longitude
-74.0021
Borough
Brooklyn
VIEW LOCATION
1075111
Trackerid: 1075111 • Fmsid: 846 P-2PLG17A • Title: Sunset Park Spray Shower Reconstruction
Trackerid
1075111
Fmsid
846 P-2PLG17A
Title
Sunset Park Spray Shower Reconstruction
Summary
This project will reconstruct the subterranean controller vaults for the spray shower at Sunset Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-12-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-03-01T00:00:00.000
Procurementprojectedcompletion
2017-08-01T00:00:00.000
Procurementactualcompletion
2017-04-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$1,079,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
B087
Latitude
40.648116
Longitude
-74.003212
Borough
Brooklyn
VIEW LOCATION