Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
6119
Trackerid: 6119 • Fmsid: 846 SANDY1-04 • Title: Tiffany Street Pier Reconstruction (Hurricane Sandy)
Trackerid
6119
Fmsid
846 SANDY1-04
Title
Tiffany Street Pier Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the fishing pier that was damaged by Hurricane Sandy.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-08-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-10-01T00:00:00.000
Designactualcompletion
2015-10-01T00:00:00.000
Procurementstart
2015-10-01T00:00:00.000
Procurementprojectedcompletion
2016-07-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionactualcompletion
2018-04-01T00:00:00.000
Totalfunding
$2,088,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Tiffany Street pier located at East river and intersection Tiffany Street and Viele Avenue, Bronx N.Y.
Parkid
X304
Latitude
40.805198
Longitude
-73.889873
Borough
Bronx
VIEW LOCATION
11414
Trackerid: 11414 • Title: Tiger Playground Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
11414
Title
Tiger Playground Public Restroom Building Reconstruction
Summary
This project will demolish and reconstruct the Public Restroom Building at Tiger Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Evergreen Avenue between Eldert Street and Covert Street
Parkid
B307
Latitude
40.6882393571
Longitude
-73.910982283
Borough
Brooklyn
VIEW LOCATION
1477111
Trackerid: 1477111 • Fmsid: 846 P-3PAVTMK • Title: Tompkins Square Park Multipurpose Play Area Reconstruction
Trackerid
1477111
Fmsid
846 P-3PAVTMK
Title
Tompkins Square Park Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at Tompkins Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-05-01T00:00:00.000
Designprojectedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2022-10-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-06-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$1,400,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
M088
Latitude
40.72671
Longitude
-73.98205
Borough
Manhattan
VIEW LOCATION
10826
Trackerid: 10826 • Fmsid: 846 P-303TSPK • Currentphase: design
Trackerid
10826
Fmsid
846 P-303TSPK
Title
Tompkins Square Park Mini Pool, Basketball Courts, and Adult Fitness Reconstruction
Summary
This project will demolish the existing above ground mini pool and construct a new, expanded in-ground mini pool and reconstruct the basketball courts and adult fitness area at Tompkins Square Park.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2027-03-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
Avenue B and East 10th Street
Parkid
M088
Latitude
40.72685272
Longitude
-73.98068434
Borough
Manhattan
VIEW LOCATION
11158
Trackerid: 11158 • Fmsid: 846 P-303TDRR • Title: Tompkins Square Park Dog Run Synthetic Turf Installation
Trackerid
11158
Fmsid
846 P-303TDRR
Title
Tompkins Square Park Dog Run Synthetic Turf Installation
Summary
This project will install synthetic turf at the dog run in Tompkins Square Park.
Currentphase
design
Designpercentcomplete
90.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-10-01T00:00:00.000
Designprojectedcompletion
2026-04-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
State
Name
Avenue B at East 9th Street
Parkid
M088
Latitude
40.7265377
Longitude
-73.9811324
Borough
Manhattan
VIEW LOCATION
7095
Trackerid: 7095 • Fmsid: 846 P-303TSPL • Title: Tompkins Square Playground Reconstruction
Trackerid
7095
Fmsid
846 P-303TSPL
Title
Tompkins Square Playground Reconstruction
Summary
This project will reconstruct two playgrounds in Tompkins Square Park with new play equipment, safety surfacing, spray showers, seating, and fencing.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-11-01T00:00:00.000
Designprojectedcompletion
2016-12-01T00:00:00.000
Designadjustedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-07-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-09-01T00:00:00.000
Totalfunding
$2,295,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
East 7th Street and Avenue B
Parkid
M088
Latitude
40.72645194
Longitude
-73.98171306
Borough
Manhattan
VIEW LOCATION
9252
Trackerid: 9252 • Fmsid: 846 P-303TPSQ • Title: Tompkins Square Park Field House Reconstruction
Trackerid
9252
Fmsid
846 P-303TPSQ
Title
Tompkins Square Park Field House Reconstruction
Summary
This project will reconstruct the field house in Tompkins Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-03-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designadjustedcompletion
2020-10-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-06-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2023-01-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionactualcompletion
2025-03-01T00:00:00.000
Totalfunding
$5,600,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East 9th Street between Avenue A and Avenue B
Parkid
M088
Latitude
40.726828
Longitude
-73.981436
Borough
Manhattan
VIEW LOCATION
10698
Trackerid: 10698 • Fmsid: 846 P-402TLLP • Title: Lou Lodati Playground and Dog Run Reconstruction
Trackerid
10698
Fmsid
846 P-402TLLP
Title
Lou Lodati Playground and Dog Run Reconstruction
Summary
This project will reconstruct the playground and the dog run at Lou Lodati Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-08-01T00:00:00.000
Designprojectedcompletion
2025-11-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
41-15 Skillman Avenue, QUEENS, NY 11104
Parkid
Q340
Latitude
40.74733452
Longitude
-73.92165544
Borough
Queens
VIEW LOCATION
11130
Trackerid: 11130 • Title: Tramway Plaza Reconstruction • Summary: This project will reconstruct Tramway Plaza.
Trackerid
11130
Title
Tramway Plaza Reconstruction
Summary
This project will reconstruct Tramway Plaza.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Second Avenue between East 59th Street and East 60th Street
Parkid
M280
Latitude
40.76095949
Longitude
-73.96442634
Borough
Manhattan
VIEW LOCATION
8662
Trackerid: 8662 • Fmsid: 846 P-403TTOT • Title: Travers Park Tot Lot Reconstruction
Trackerid
8662
Fmsid
846 P-403TTOT
Title
Travers Park Tot Lot Reconstruction
Summary
The project will reconstruct the tot lot in Travers Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2018-06-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$1,536,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
78th Street between Northern Boulevard and 34th Avenue
Parkid
Q303
Latitude
40.754442
Longitude
-73.889192
Borough
Queens
VIEW LOCATION
10605
Trackerid: 10605 • Fmsid: 846 P-403TRVR • Title: Travers Park Basketball Courts Reconstruction
Trackerid
10605
Fmsid
846 P-403TRVR
Title
Travers Park Basketball Courts Reconstruction
Summary
This Project will reconstruct the basketball courts at Travers Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-02-01T00:00:00.000
Designprojectedcompletion
2025-02-01T00:00:00.000
Designadjustedcompletion
2025-07-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
This project is located between Northern Boulevard, 34th Avenue, 77th and 79th Streets
Parkid
Q303
Latitude
40.75405803
Longitude
-73.88931469
Borough
Queens
VIEW LOCATION
7245
Trackerid: 7245 • Fmsid: 846 P-401TBDR • Title: Triborough Bridge Playground C Reconstruction
Trackerid
7245
Fmsid
846 P-401TBDR
Title
Triborough Bridge Playground C Reconstruction
Summary
This project will construct a dog run and reconstruct a basketball court at Triborough Bridge Playground C.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-01-01T00:00:00.000
Procurementstart
2017-01-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementadjustedcompletion
2017-12-01T00:00:00.000
Procurementactualcompletion
2017-11-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-03-01T00:00:00.000
Totalfunding
$760,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Hoyt Avenue North, Hoyt Avenue South, 23rd Street, 24th Street
Parkid
Q066C
Latitude
40.773978
Longitude
-73.922239
Borough
Queens
VIEW LOCATION
6618
Trackerid: 6618 • Fmsid: 846 SANDY4-18 • Title: Tribute Park Reconstruction (Hurricane Sandy)
Trackerid
6618
Fmsid
846 SANDY4-18
Title
Tribute Park Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct Tribute Park due to damage from Hurricane Sandy.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2019-12-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$2,288,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilFederalMayoral
Name
Beach Channel Drive Between Beach 116th and Beach 117th Streets.
Parkid
Q028A
Latitude
40.582049
Longitude
-73.838851
Borough
Queens
VIEW LOCATION
1467111
Trackerid: 1467111 • Fmsid: 846 P-2GRNTHB • Title: Halsey Garden Water Service Installation
Trackerid
1467111
Fmsid
846 P-2GRNTHB
Title
Halsey Garden Water Service Installation
Summary
This project will install water service at Halsey Garden.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-08-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2024-02-01T00:00:00.000
Procurementprojectedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-12-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2025-01-01T00:00:00.000
Totalfunding
$326,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Parkid
B575
Latitude
40.683234
Longitude
-73.935648
Borough
Brooklyn
VIEW LOCATION
2324
Trackerid: 2324 • Fmsid: 846 P-306TRYG • Title: Trygve Lie Plaza Sitting Area Reconstruction
Trackerid
2324
Fmsid
846 P-306TRYG
Title
Trygve Lie Plaza Sitting Area Reconstruction
Summary
This project will reconstruct the sitting area at Trygve Lie Plaza.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-03-01T00:00:00.000
Designprojectedcompletion
2013-09-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-11-01T00:00:00.000
Procurementadjustedcompletion
2015-02-01T00:00:00.000
Procurementactualcompletion
2015-01-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,118,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
First Avenue between East 41st Street and East 42nd Street
Parkid
M203A
Latitude
40.74858417
Longitude
-73.97037694
Borough
Manhattan
VIEW LOCATION
1941111
Trackerid: 1941111 • Fmsid: 846 P-410TUDO • Title: Tudor Park Fence Construction
Trackerid
1941111
Fmsid
846 P-410TUDO
Title
Tudor Park Fence Construction
Summary
This project includes the reconstruction of fencing at Tudor Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2026-06-01T00:00:00.000
Designactualcompletion
2026-06-01T00:00:00.000
Procurementstart
2026-01-01T00:00:00.000
Procurementprojectedcompletion
2026-06-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-09-01T00:00:00.000
Constructionprojectedcom
2026-11-01T00:00:00.000
Totalfunding
$250,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q094
Latitude
40.6728764
Longitude
-73.8535563
Borough
Queens
VIEW LOCATION
10711
Trackerid: 10711 • Fmsid: 846 P-410TPAF • Title: Tudor Park Adult Fitness Equipment Construction
Trackerid
10711
Fmsid
846 P-410TPAF
Title
Tudor Park Adult Fitness Equipment Construction
Summary
This project will construct the adult fitness equipment at Tudor Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-12-01T00:00:00.000
Procurementstart
2025-09-01T00:00:00.000
Procurementprojectedcompletion
2026-09-01T00:00:00.000
Procurementactualcompletion
2026-03-01T00:00:00.000
Constructionstart
2026-10-01T00:00:00.000
Constructionprojectedcom
2027-10-01T00:00:00.000
Totalfunding
$780,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
LOCATED BETWEEN NORTH CONDUIT AND 133RD AVENUES AND 83RD STREET
Parkid
Q094
Latitude
40.672107
Longitude
-73.851351
Borough
Queens
VIEW LOCATION
11186
Trackerid: 11186 • Title: Tudor Park Flagpole Reconstruction • Summary: This project will reconstruct the flagpole at Addabbo Playground in Tudor Park.
Trackerid
11186
Title
Tudor Park Flagpole Reconstruction
Summary
This project will reconstruct the flagpole at Addabbo Playground in Tudor Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
State
Name
North Conduit Avenue, 81st Street, 133rd Avenue, 82nd Street
Parkid
Q094
Latitude
40.6730128
Longitude
-73.8536489
Borough
Queens
VIEW LOCATION
11370
Trackerid: 11370 • Title: Turtle Playground Reconstruction • Summary: This project will reconstruct Turtle Playground.
Trackerid
11370
Title
Turtle Playground Reconstruction
Summary
This project will reconstruct Turtle Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Horace Harding Expressway, 138th Street, 61st Road
Parkid
Q357G
Latitude
40.7421163
Longitude
-73.8274756
Borough
Queens
VIEW LOCATION
6599
Trackerid: 6599 • Fmsid: 846 P-308SPCS • Title: Twenty-Four Sycamores Public Restroom Building Reconstruction
Trackerid
6599
Fmsid
846 P-308SPCS
Title
Twenty-Four Sycamores Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Twenty-Four Sycamores Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-10-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2016-07-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-11-01T00:00:00.000
Constructionprojectedcom
2021-05-01T00:00:00.000
Constructionadjustedcompletion
2021-08-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$1,543,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
FDR Drive, East 60th Street, East 61st Street, York Avenue
Parkid
M108Q
Latitude
40.75945639
Longitude
-73.95866694
Borough
Manhattan
VIEW LOCATION
10602
Trackerid: 10602 • Fmsid: 846 P-3SYCAMO • Title: 24 Sycamores Playground Handball, Basketball and Play Equipment Reconstruction
Trackerid
10602
Fmsid
846 P-3SYCAMO
Title
24 Sycamores Playground Handball, Basketball and Play Equipment Reconstruction
Summary
This project will reconstruct the Handball, Basketball and Play Equipment at 24 Sycamores Playground.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-03-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designadjustedcompletion
2026-10-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council, Private
Name
York Avenue between East 60th Street and East 61st Street
Parkid
M108Q
Latitude
40.75929963
Longitude
-73.95861469
Borough
Manhattan
VIEW LOCATION
9861
Trackerid: 9861 • Fmsid: 846 P-4UDALNP • Title: Udall's Park Preserve Forest Restoration
Trackerid
9861
Fmsid
846 P-4UDALNP
Title
Udall's Park Preserve Forest Restoration
Summary
This project will restore native species habitat within forested natural areas in Udall's Park Preserve.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
40th Avenue between Douglas Road and Little Neck Parkway
Parkid
Q452
Latitude
40.77343484
Longitude
-73.74446986
Borough
Queens
VIEW LOCATION
9226
Trackerid: 9226 • Fmsid: 846 P-214UMMA • Title: Umma Park Reconstruction
Trackerid
9226
Fmsid
846 P-214UMMA
Title
Umma Park Reconstruction
Summary
This project will reconstruct Umma Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
20.0
Designstart
2022-12-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designadjustedcompletion
2024-05-01T00:00:00.000
Designactualcompletion
2024-05-01T00:00:00.000
Procurementstart
2024-05-01T00:00:00.000
Procurementprojectedcompletion
2026-04-01T00:00:00.000
Procurementactualcompletion
2026-03-01T00:00:00.000
Constructionstart
2026-05-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
$3,050,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Ocean Avenue at Woodruff Avenue
Parkid
B389
Latitude
40.65378063
Longitude
-73.96190036
Borough
Brooklyn
VIEW LOCATION
1814111
Trackerid: 1814111 • Fmsid: 846 P-305USPF • Title: Union Square Park Evelyn's Playground Fence Reconstruction
Trackerid
1814111
Fmsid
846 P-305USPF
Title
Union Square Park Evelyn's Playground Fence Reconstruction
Summary
This project will reconstruct fencing at Evelyn's Playground in Union Square Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-10-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-06-01T00:00:00.000
Procurementstart
2025-10-01T00:00:00.000
Procurementprojectedcompletion
2026-03-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$300,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Parkid
M089
Latitude
40.7359236
Longitude
-73.990413
Borough
Manhattan
VIEW LOCATION
10853
Trackerid: 10853 • Title: Union Square Park Water and Drainage Systems and Pathways Reconstruction • Currentphase: proposed
Trackerid
10853
Title
Union Square Park Water and Drainage Systems and Pathways Reconstruction
Summary
This project will reconstruct the water and drainage systems and pathways in Union Square Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
East 14th Street, Union Square West, East 17th Street, Union Square East
Parkid
M089
Latitude
40.73608331
Longitude
-73.9902248
Borough
Manhattan
VIEW LOCATION
10731
Trackerid: 10731 • Title: University Woods Forest Restoration • Summary: This project will remove invasive and plant trees in University Woods.
Trackerid
10731
Title
University Woods Forest Restoration
Summary
This project will remove invasive and plant trees in University Woods.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Between Sedgewick Ave and Cedar Ave
Parkid
X051
Latitude
40.8593150182
Longitude
-73.9148590095
Borough
Bronx
VIEW LOCATION
4806
Trackerid: 4806 • Fmsid: 846 P-1UNIVER • Title: University Park Stairway Reconstruction
Trackerid
4806
Fmsid
846 P-1UNIVER
Title
University Park Stairway Reconstruction
Summary
This project will reconstruct stairways and landings in University Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-11-01T00:00:00.000
Designprojectedcompletion
2009-01-01T00:00:00.000
Designadjustedcompletion
2010-12-01T00:00:00.000
Designactualcompletion
2010-12-01T00:00:00.000
Procurementstart
2010-12-01T00:00:00.000
Procurementprojectedcompletion
2011-09-01T00:00:00.000
Procurementactualcompletion
2012-07-01T00:00:00.000
Constructionstart
2012-08-01T00:00:00.000
Constructionprojectedcom
2013-02-01T00:00:00.000
Constructionadjustedcompletion
2014-06-01T00:00:00.000
Constructionactualcompletion
2014-06-01T00:00:00.000
Totalfunding
$410,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Sedgwick to Cedar Avenues, North of West 180 Street
Parkid
X051
Latitude
40.859189
Longitude
-73.914983
Borough
Bronx
VIEW LOCATION
7044
Trackerid: 7044 • Fmsid: 846 P-4CPIVAL • Title: Van Alst Playground Reconstruction
Trackerid
7044
Fmsid
846 P-4CPIVAL
Title
Van Alst Playground Reconstruction
Summary
This project will reconstruct Van Alst Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-12-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-08-01T00:00:00.000
Constructionprojectedcom
2017-10-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$2,976,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
29th Avenue and 30th Avenue between 14th Street and 21st Street
Parkid
Q321
Latitude
40.77058083
Longitude
-73.92827389
Borough
Queens
VIEW LOCATION
1990111
Trackerid: 1990111 • Title: Van Cortlandt Park Synthetic Turf and Track Reconstruction • Summary: This project will reconstruct the track and synthetic turf field.
Trackerid
1990111
Title
Van Cortlandt Park Synthetic Turf and Track Reconstruction
Summary
This project will reconstruct the track and synthetic turf field.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X092
Latitude
40.8957801
Longitude
-73.8948611
Borough
Bronx
VIEW LOCATION
1331111
Trackerid: 1331111 • Fmsid: 846 P-1VCSHND • Title: Van Cortlandt Park Shandler Recreation Area Paths Reconstruction
Trackerid
1331111
Fmsid
846 P-1VCSHND
Title
Van Cortlandt Park Shandler Recreation Area Paths Reconstruction
Summary
This project will reconstruct paths at Shandler Recreation Area in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-03-01T00:00:00.000
Designprojectedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2023-02-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionactualcompletion
2023-08-01T00:00:00.000
Totalfunding
$1,000,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X092
Latitude
40.891999
Longitude
-73.882874
Borough
Bronx
VIEW LOCATION
1337111
Trackerid: 1337111 • Fmsid: 846 P-1VCSTDM • Title: Van Cortlandt Park Basketball Court Reconstruction
Trackerid
1337111
Fmsid
846 P-1VCSTDM
Title
Van Cortlandt Park Basketball Court Reconstruction
Summary
This project will reconstruct pavements at the basketball court next to the stadium in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-04-01T00:00:00.000
Designprojectedcompletion
2021-11-01T00:00:00.000
Designactualcompletion
2021-08-01T00:00:00.000
Procurementstart
2021-06-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementactualcompletion
2021-07-01T00:00:00.000
Constructionstart
2021-08-01T00:00:00.000
Constructionprojectedcom
2021-12-01T00:00:00.000
Constructionactualcompletion
2021-10-01T00:00:00.000
Totalfunding
$250,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X092
Latitude
40.887995026432
Longitude
-73.898681682381
Borough
Bronx
VIEW LOCATION
1385111
Trackerid: 1385111 • Fmsid: 846 P-1DCTVCP • Currentphase: completed
Trackerid
1385111
Fmsid
846 P-1DCTVCP
Title
Van Cortlandt House Museum and Van Cortlandt Park Nature Center Telecommunication Lines Reconstruction
Summary
This project will reconstruct the telecommunication lines at the Van Cortlandt House Museum and Van Cortlandt Park Nature Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-10-01T00:00:00.000
Designprojectedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2022-08-01T00:00:00.000
Constructionactualcompletion
2022-08-01T00:00:00.000
Totalfunding
$460,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X092
Latitude
40.8963
Longitude
-73.886921
Borough
Bronx
VIEW LOCATION
9850
Trackerid: 9850 • Title: Van Cortlandt House Museum Reconstruction • Currentphase: proposed
Trackerid
9850
Title
Van Cortlandt House Museum Reconstruction
Summary
This project will reconstruction the exterior of Van Cortlandt House Museum and provide accessibility to the first floor and surrounding site in Van Cortlandt Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2022-06-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
6036 Broadway
Parkid
X092
Latitude
40.89114016
Longitude
-73.89482959
Borough
Bronx
VIEW LOCATION
10130
Trackerid: 10130 • Fmsid: 846 P-108MUSE • Title: Van Cortlandt House Museum Fence Reconstruction
Trackerid
10130
Fmsid
846 P-108MUSE
Title
Van Cortlandt House Museum Fence Reconstruction
Summary
This project will reconstruct the wrought iron fence at Van Cortland House Museum.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-09-01T00:00:00.000
Constructionactualcompletion
2025-05-01T00:00:00.000
Totalfunding
$1,700,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
6036 Broadway, between West 242nd Street and West 246th Street
Parkid
X092
Latitude
40.896124
Longitude
-73.887271
Borough
Bronx
VIEW LOCATION
5165
Trackerid: 5165 • Fmsid: 846 P-1CROT13 • Title: Van Cortlandt Park Greenhouse Reconstruction
Trackerid
5165
Fmsid
846 P-1CROT13
Title
Van Cortlandt Park Greenhouse Reconstruction
Summary
This project will reconstruct the greenhouse and head house at the Van Cortlandt Park Nursery.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
76.1
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-01-01T00:00:00.000
Constructionprojectedcom
2025-01-01T00:00:00.000
Constructionadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
$45,218,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Between Van Cortlandt Park East and Major Deegan Expressway at East 242nd Street.
Parkid
X092
Latitude
40.903255
Longitude
-73.87300319
Borough
Bronx
VIEW LOCATION
7098
Trackerid: 7098 • Fmsid: 846 P-108VCBD • Title: Van Cortlandt Park Playground Construction
Trackerid
7098
Fmsid
846 P-108VCBD
Title
Van Cortlandt Park Playground Construction
Summary
This project will construct a playground in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-04-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-10-01T00:00:00.000
Procurementactualcompletion
2018-10-01T00:00:00.000
Constructionstart
2019-05-01T00:00:00.000
Constructionprojectedcom
2020-05-01T00:00:00.000
Constructionadjustedcompletion
2020-07-01T00:00:00.000
Constructionactualcompletion
2020-07-01T00:00:00.000
Totalfunding
$2,774,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralState
Name
Broadway and Mosholu Avenue
Parkid
X092
Latitude
40.903994
Longitude
-73.896062
Borough
Bronx
VIEW LOCATION
9487
Trackerid: 9487 • Fmsid: 846 P-108SKTE • Title: Van Cortlandt Park Skate Park Construction
Trackerid
9487
Fmsid
846 P-108SKTE
Title
Van Cortlandt Park Skate Park Construction
Summary
This project will construct a skate park in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-08-01T00:00:00.000
Procurementstart
2015-08-01T00:00:00.000
Procurementprojectedcompletion
2016-05-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-06-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$1,001,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Broadway and Van Cortlandt Park South
Parkid
X092
Latitude
40.887742
Longitude
-73.898786
Borough
Bronx
VIEW LOCATION
9973
Trackerid: 9973 • Title: Van Cortlandt Park Stadium Baseball Field 1 Reconstruction • Summary: This project will reconstruct baseball field 1 at Van Cortlandt Park Stadium.
Trackerid
9973
Title
Van Cortlandt Park Stadium Baseball Field 1 Reconstruction
Summary
This project will reconstruct baseball field 1 at Van Cortlandt Park Stadium.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Broadway and West 242nd Street
Parkid
X092
Latitude
40.8967181
Longitude
-73.89553151
Borough
Bronx
VIEW LOCATION
8573
Trackerid: 8573 • Fmsid: 846 P-111VCPE • Title: Van Cortlandt Park Broadway Entrance Reconstruction
Trackerid
8573
Fmsid
846 P-111VCPE
Title
Van Cortlandt Park Broadway Entrance Reconstruction
Summary
This project will reconstruct the entrance to Van Cortlandt Park at Broadway and West 242nd Street.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementadjustedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2019-03-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionactualcompletion
2020-06-01T00:00:00.000
Totalfunding
$5,446,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Broadway at West 242nd Street
Parkid
X092
Latitude
40.8895535
Longitude
-73.8980342
Borough
Bronx
VIEW LOCATION
10333
Trackerid: 10333 • Title: Van Cortlandt Pool Reconstruction • Summary: This project will reconstruct a portion of the Van Cortlandt Pool.
Trackerid
10333
Title
Van Cortlandt Pool Reconstruction
Summary
This project will reconstruct a portion of the Van Cortlandt Pool.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
Broadway, Jerome Ave., City Line, Van Cortlandt Park South
Parkid
X092
Latitude
40.88989011
Longitude
-73.89604086
Borough
Bronx
VIEW LOCATION
10031
Trackerid: 10031 • Fmsid: 846 GXBXGI-03 • Title: Van Cortlandt Park Green Infrastructure Construction
Trackerid
10031
Fmsid
846 GXBXGI-03
Title
Van Cortlandt Park Green Infrastructure Construction
Summary
This project will install multiple green infrastructure elements throughout Van Cortlandt Park.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
40.0
Constructionpercentcomplete
0.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2023-05-01T00:00:00.000
Designadjustedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-12-01T00:00:00.000
Procurementstart
2026-07-01T00:00:00.000
Procurementprojectedcompletion
2027-07-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Broadway, Jerome Avenue, City Line, Van Cortlandt Park South, Van Cortlandt Park East
Parkid
X092
Latitude
40.8896002
Longitude
-73.89683969
Borough
Bronx
VIEW LOCATION
4781
Trackerid: 4781 • Fmsid: 846 P-1PUTNAM • Title: Van Cortlandt Park Putnam Greenway Construction
Trackerid
4781
Fmsid
846 P-1PUTNAM
Title
Van Cortlandt Park Putnam Greenway Construction
Summary
This project will construct a portion of the Putnam Greenway in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-05-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designadjustedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-01-01T00:00:00.000
Procurementstart
2018-01-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2020-08-01T00:00:00.000
Constructionadjustedcompletion
2020-10-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$3,783,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilFederalMayoral
Name
City line to Van Cortlandt Park South
Parkid
X092
Latitude
40.8989097
Longitude
-73.8870831
Borough
Bronx
VIEW LOCATION
7099
Trackerid: 7099 • Fmsid: 846 P-108VCIW • Title: Van Cortlandt Park Indian Fields Ballfields Reconstruction
Trackerid
7099
Fmsid
846 P-108VCIW
Title
Van Cortlandt Park Indian Fields Ballfields Reconstruction
Summary
This project will reconstruct the existing natural grass ballfields (Indian Fields) in Van Cortlandt Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-10-01T00:00:00.000
Designadjustedcompletion
2017-03-01T00:00:00.000
Designactualcompletion
2017-04-01T00:00:00.000
Procurementstart
2017-04-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementadjustedcompletion
2018-12-01T00:00:00.000
Procurementactualcompletion
2018-11-01T00:00:00.000
Constructionstart
2019-03-01T00:00:00.000
Constructionprojectedcom
2020-03-01T00:00:00.000
Constructionadjustedcompletion
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$2,882,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
StateCity CouncilMayoral
Name
East 233rd Street between Jerome Avenue and Van Cortlandt Park East
Parkid
X092
Latitude
40.896659
Longitude
-73.878142
Borough
Bronx
VIEW LOCATION
11053
Trackerid: 11053 • Title: Van Cortlandt Park East Side Perimeter Reconstruction • Currentphase: proposed
Trackerid
11053
Title
Van Cortlandt Park East Side Perimeter Reconstruction
Summary
This project will reconstruct pathways, retaining walls, sidewalks, fencing, security lighting, drainage, and timber barrier rails along the east side of Van Cortlandt Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East Gun Hill Road, Jerome Avenue, East 233rd Street, Van Cortlandt Park East
Parkid
X092
Latitude
40.89729664
Longitude
-73.8919116
Borough
Bronx
VIEW LOCATION
10825
Trackerid: 10825 • Title: Van Cortlandt Park Woodland Crossings Reconstruction • Currentphase: proposed
Trackerid
10825
Title
Van Cortlandt Park Woodland Crossings Reconstruction
Summary
This project will reconstruct and enhance two pedestrian crossings in Van Cortlandt Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
Jerome Avenue and E 233rd Street and John Muir Trail underpass at Major Deegan Expressway
Parkid
X092
Latitude
40.8973852
Longitude
-73.89112719
Borough
Bronx
VIEW LOCATION
11052
Trackerid: 11052 • Title: Van Cortlandt Park Allen Shandler Recreation Area Sewer Line Construction • Currentphase: proposed
Trackerid
11052
Title
Van Cortlandt Park Allen Shandler Recreation Area Sewer Line Construction
Summary
This project will construct a new sewer line connection to Allen Shandler Recreation Area in Van Cortlandt Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Jerome Avenue between Bainbridge Avenue and East 233rd Street
Parkid
X092
Latitude
40.90016253
Longitude
-73.87296024
Borough
Bronx
VIEW LOCATION
7357
Trackerid: 7357 • Title: Van Cortlandt Park Birding Bridge Reconstruction • Currentphase: proposed
Trackerid
7357
Title
Van Cortlandt Park Birding Bridge Reconstruction
Summary
This project will reconstruct the birding bridge over Tibbetts Brook on the John Kieran Nature Trail in Van Cortlandt Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
John Kieran Nature Trail over Tibbetts Brook in Van Cortlandt Golf Course
Parkid
X092
Latitude
40.75113703
Longitude
-73.83735377
Borough
Bronx
VIEW LOCATION
10305
Trackerid: 10305 • Fmsid: 846 P-1VNCFTR • Title: Van Cortlandt Park Forest Tree Replacement
Trackerid
10305
Fmsid
846 P-1VNCFTR
Title
Van Cortlandt Park Forest Tree Replacement
Summary
This project will plant replacement trees and restore native species habitat within forested natural areas in Van Cortlandt Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
1.77
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-03-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2025-02-01T00:00:00.000
Constructionstart
2025-09-01T00:00:00.000
Constructionprojectedcom
2028-08-01T00:00:00.000
Totalfunding
$4,660,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
South of Forest Ave between Broadway and Major Deegan Expressway
Parkid
X092
Latitude
40.89666782
Longitude
-73.88637029
Borough
Bronx
VIEW LOCATION
10027
Trackerid: 10027 • Title: Van Cortlandt Park Greenhouse Stabilization • Currentphase: completed
Trackerid
10027
Title
Van Cortlandt Park Greenhouse Stabilization
Summary
This project will temporarily stabilize the head house at the Van Cortlandt Park Greenhouse to support mechanical systems and continued operations.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2021-12-01T00:00:00.000
Designactualcompletion
2021-12-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2022-08-01T00:00:00.000
Constructionactualcompletion
2022-06-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Name
Van Cortlandt Park East and East 242nd Street
Parkid
X092
Latitude
40.903539721726
Longitude
-73.872737527999
Borough
Bronx
VIEW LOCATION
9566
Trackerid: 9566 • Fmsid: 846 P-108WDLN • Title: Woodlawn Playground Reconstruction
Trackerid
9566
Fmsid
846 P-108WDLN
Title
Woodlawn Playground Reconstruction
Summary
This project will reconstruct Woodlawn Playground in Van Cortlandt Park, including new steel play equipment, swings, safety surfacing, fencing, landscaping, benches, and park security lighting.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
45.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2023-03-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-09-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementadjustedcompletion
2026-07-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2027-05-01T00:00:00.000
Totalfunding
$5,082,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Van Cortlandt Park East between Oneida and Kepler Avenues
Parkid
X092
Latitude
40.89982132
Longitude
-73.87251952
Borough
Bronx
VIEW LOCATION