Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
9003
Trackerid: 9003 • Fmsid: 846 P-2TRSD19 • Currentphase: completed
Trackerid
9003
Fmsid
846 P-2TRSD19
Title
Brooklyn Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 1-6,8,9,14,16,17
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Brooklyn Community Boards 1-6, 8, 9, 14, 16, and 17.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-02-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-03-01T00:00:00.000
Totalfunding
$1,690,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
9155
Trackerid: 9155 • Fmsid: 846 P-2TRE19C • Title: Brooklyn Street Tree Planting FY19 - Community Boards 11,13,15
Trackerid
9155
Fmsid
846 P-2TRE19C
Title
Brooklyn Street Tree Planting FY19 - Community Boards 11,13,15
Summary
This project will plant street trees in Community Boards 11, 13, and 15 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2018-08-01T00:00:00.000
Designactualcompletion
2018-05-01T00:00:00.000
Procurementstart
2018-05-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2018-09-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-05-01T00:00:00.000
Totalfunding
$990,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
6222
Trackerid: 6222 • Fmsid: 846 P-2SREMV1 • Title: Brooklyn Sandy-Related Tree Removal - Community Boards 1-6
Trackerid
6222
Fmsid
846 P-2SREMV1
Title
Brooklyn Sandy-Related Tree Removal - Community Boards 1-6
Summary
This project will remove trees damaged from Hurricane Sandy in Community Boards 1-6 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementactualcompletion
2014-05-01T00:00:00.000
Constructionstart
2014-06-01T00:00:00.000
Constructionprojectedcom
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,048,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
6223
Trackerid: 6223 • Fmsid: 846 P-2SREMOV • Title: Brooklyn Sandy-Related Tree Removal - Community Boards 7-18
Trackerid
6223
Fmsid
846 P-2SREMOV
Title
Brooklyn Sandy-Related Tree Removal - Community Boards 7-18
Summary
This project will remove Sandy-damaged trees in Community Boards 7-18 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementactualcompletion
2014-05-01T00:00:00.000
Constructionstart
2014-06-01T00:00:00.000
Constructionprojectedcom
2015-06-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,691,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8753
Trackerid: 8753 • Fmsid: 846 P-2TRE18B • Title: Brooklyn Street Tree Planting FY18 - Community Boards 5,14,18
Trackerid
8753
Fmsid
846 P-2TRE18B
Title
Brooklyn Street Tree Planting FY18 - Community Boards 5,14,18
Summary
This project will plant new trees in Community Boards 5, 14, and 18 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2017-08-01T00:00:00.000
Designadjustedcompletion
2017-09-01T00:00:00.000
Designactualcompletion
2017-09-01T00:00:00.000
Procurementstart
2017-09-01T00:00:00.000
Procurementprojectedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-06-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2020-02-01T00:00:00.000
Constructionadjustedcompletion
2020-02-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$2,871,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8754
Trackerid: 8754 • Fmsid: 846 P-2TRE18C • Title: Brooklyn Street Tree Planting FY18 - Community Boards 6,7,10,12
Trackerid
8754
Fmsid
846 P-2TRE18C
Title
Brooklyn Street Tree Planting FY18 - Community Boards 6,7,10,12
Summary
This project will plant new trees in Brooklyn Community Boards 6, 7, 10, and 12.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-06-01T00:00:00.000
Designprojectedcompletion
2017-08-01T00:00:00.000
Designadjustedcompletion
2017-09-01T00:00:00.000
Designactualcompletion
2017-09-01T00:00:00.000
Procurementstart
2017-09-01T00:00:00.000
Procurementprojectedcompletion
2018-06-01T00:00:00.000
Procurementadjustedcompletion
2018-08-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2020-02-01T00:00:00.000
Constructionadjustedcompletion
2020-02-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$2,998,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
7173
Trackerid: 7173 • Fmsid: 846 P-2PNYT26 • Title: Brooklyn Street Tree Planting FY16 - Community Boards 1-4
Trackerid
7173
Fmsid
846 P-2PNYT26
Title
Brooklyn Street Tree Planting FY16 - Community Boards 1-4
Summary
This project will plant new trees in Community Boards 1-4 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-04-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-01-01T00:00:00.000
Totalfunding
$2,117,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
7174
Trackerid: 7174 • Fmsid: 846 P-2TRE16A • Title: Brooklyn Street Tree Planting FY16 - Community Boards 5,8,9,16,17
Trackerid
7174
Fmsid
846 P-2TRE16A
Title
Brooklyn Street Tree Planting FY16 - Community Boards 5,8,9,16,17
Summary
This project will plant new trees in Community Boards 5, 8, 9, 16 & 17 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementadjustedcompletion
2016-05-01T00:00:00.000
Procurementactualcompletion
2016-03-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-01-01T00:00:00.000
Totalfunding
$2,091,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoralPrivate
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
7175
Trackerid: 7175 • Fmsid: 846 P-2PNYT27 • Title: Brooklyn Street Tree Planting FY16 - Community Boards 6,7,10,12
Trackerid
7175
Fmsid
846 P-2PNYT27
Title
Brooklyn Street Tree Planting FY16 - Community Boards 6,7,10,12
Summary
This project will plant new trees in Community Boards 6, 7, 10 & 12 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-02-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionadjustedcompletion
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$1,969,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
7176
Trackerid: 7176 • Fmsid: 846 P-2TRE16B • Title: Brooklyn Street Tree Planting FY16 - Community Boards 11,13-15,18
Trackerid
7176
Fmsid
846 P-2TRE16B
Title
Brooklyn Street Tree Planting FY16 - Community Boards 11,13-15,18
Summary
This project will plant new trees in Community Boards 11,13-15 & 18 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-02-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$1,744,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoralPrivate
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8531
Trackerid: 8531 • Fmsid: 846 P-2TRE17A • Title: Brooklyn Street Tree Planting FY17 - Community Boards 1-4,16
Trackerid
8531
Fmsid
846 P-2TRE17A
Title
Brooklyn Street Tree Planting FY17 - Community Boards 1-4,16
Summary
This project will plant new trees in Community Boards 1-4 and 16 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-11-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionadjustedcompletion
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-01-01T00:00:00.000
Totalfunding
$2,971,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivateBorough President
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8533
Trackerid: 8533 • Fmsid: 846 P-2TRE17B • Title: Brooklyn Street Tree Planting FY17 - Community Boards 6,7,10,12
Trackerid
8533
Fmsid
846 P-2TRE17B
Title
Brooklyn Street Tree Planting FY17 - Community Boards 6,7,10,12
Summary
This project will plant new trees in Community Boards 6, 7, 10, and 12 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-11-01T00:00:00.000
Procurementactualcompletion
2017-09-01T00:00:00.000
Constructionstart
2017-09-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2018-07-01T00:00:00.000
Totalfunding
$1,381,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8534
Trackerid: 8534 • Fmsid: 846 P-2PNYT29 • Title: Brooklyn Street Tree Planting FY17 - Community Boards 8,9,17
Trackerid
8534
Fmsid
846 P-2PNYT29
Title
Brooklyn Street Tree Planting FY17 - Community Boards 8,9,17
Summary
This project will plant new trees in Community Boards 8, 9, and 17 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-04-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$1,600,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8535
Trackerid: 8535 • Fmsid: 846 P-2TRE17C • Title: Brooklyn Street Tree Planting FY17 - Community Boards 11,13,15
Trackerid
8535
Fmsid
846 P-2TRE17C
Title
Brooklyn Street Tree Planting FY17 - Community Boards 11,13,15
Summary
This project will plant new trees in Community Boards 11, 13, and 15 in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-08-01T00:00:00.000
Totalfunding
$2,373,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
7371
Trackerid: 7371 • Fmsid: 846 P-6PNYR32 • Title: Brooklyn and Queens Reforestation FY17
Trackerid
7371
Fmsid
846 P-6PNYR32
Title
Brooklyn and Queens Reforestation FY17
Summary
This project will remove of various invasive species; prepare of all tree pits; furnish, plant, maintain and replace various types of trees; and install native seed mixes in Brooklyn and Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2015-11-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-04-01T00:00:00.000
Totalfunding
$1,536,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations in Brooklyn and Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
9357
Trackerid: 9357 • Fmsid: 846 P-6REF20A • Title: Queens Community Boards 1-7 and Brooklyn Reforestation FY20
Trackerid
9357
Fmsid
846 P-6REF20A
Title
Queens Community Boards 1-7 and Brooklyn Reforestation FY20
Summary
This project will remove invasive species and plant new and replacement trees in Brooklyn, and Queens Community Boards 1-7.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-02-01T00:00:00.000
Designactualcompletion
2019-03-01T00:00:00.000
Procurementstart
2019-03-01T00:00:00.000
Procurementprojectedcompletion
2019-12-01T00:00:00.000
Procurementadjustedcompletion
2021-01-01T00:00:00.000
Procurementactualcompletion
2020-11-01T00:00:00.000
Constructionstart
2021-01-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2022-12-01T00:00:00.000
Totalfunding
$1,065,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn and Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
9416
Trackerid: 9416 • Fmsid: 846 P-6EABTRB • Title: Brooklyn and Staten Island Emerald Ash Borer (EAB) Related Tree Removal
Trackerid
9416
Fmsid
846 P-6EABTRB
Title
Brooklyn and Staten Island Emerald Ash Borer (EAB) Related Tree Removal
Summary
This project will remove trees with emerald ash borer (EAB) in Brooklyn and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-04-01T00:00:00.000
Procurementstart
2019-04-01T00:00:00.000
Procurementprojectedcompletion
2019-12-01T00:00:00.000
Procurementadjustedcompletion
2020-11-01T00:00:00.000
Procurementactualcompletion
2020-12-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2023-03-01T00:00:00.000
Constructionadjustedcompletion
2023-03-01T00:00:00.000
Constructionactualcompletion
2023-03-01T00:00:00.000
Totalfunding
$937,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn and Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
5038
Trackerid: 5038 • Fmsid: 846 P-6PNYR14 • Title: Brooklyn and Staten Island Street Tree Planting FY10
Trackerid
5038
Fmsid
846 P-6PNYR14
Title
Brooklyn and Staten Island Street Tree Planting FY10
Summary
This project will plant new trees in parks and playgrounds in Brooklyn and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-04-01T00:00:00.000
Designactualcompletion
2011-01-01T00:00:00.000
Procurementstart
2011-01-01T00:00:00.000
Procurementprojectedcompletion
2011-10-01T00:00:00.000
Procurementactualcompletion
2011-08-01T00:00:00.000
Constructionstart
2011-09-01T00:00:00.000
Constructionprojectedcom
2013-12-01T00:00:00.000
Constructionadjustedcompletion
2013-12-01T00:00:00.000
Constructionactualcompletion
2013-12-01T00:00:00.000
Totalfunding
$1,166,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn and Staten Island.
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
1065
Trackerid: 1065 • Fmsid: 846 HWD200-04 • Title: Brooklyn Street Tree Planting FY10 - Community Board 2
Trackerid
1065
Fmsid
846 HWD200-04
Title
Brooklyn Street Tree Planting FY10 - Community Board 2
Summary
This project will plant new street trees in Brooklyn Community Board 2.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-09-01T00:00:00.000
Designactualcompletion
2011-08-01T00:00:00.000
Procurementstart
2011-08-01T00:00:00.000
Procurementprojectedcompletion
2012-05-01T00:00:00.000
Procurementactualcompletion
2012-06-01T00:00:00.000
Constructionstart
2012-07-01T00:00:00.000
Constructionprojectedcom
2013-07-01T00:00:00.000
Constructionadjustedcompletion
2013-11-01T00:00:00.000
Constructionactualcompletion
2013-11-01T00:00:00.000
Totalfunding
$789,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various locations in Brooklyn Community Board 2.
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
8805
Trackerid: 8805 • Fmsid: 846 P-6PNYR36 • Title: Brooklyn, Queens and Staten Island Reforestation FY18
Trackerid
8805
Fmsid
846 P-6PNYR36
Title
Brooklyn, Queens and Staten Island Reforestation FY18
Summary
This project will remove invasive species and plant new and replacement trees in Brooklyn, Queens, and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-08-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2018-01-01T00:00:00.000
Procurementstart
2018-01-01T00:00:00.000
Procurementprojectedcompletion
2018-10-01T00:00:00.000
Procurementadjustedcompletion
2019-01-01T00:00:00.000
Procurementactualcompletion
2018-12-01T00:00:00.000
Constructionstart
2019-01-01T00:00:00.000
Constructionprojectedcom
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-06-01T00:00:00.000
Totalfunding
$1,742,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Brooklyn, Queens, and Staten Island.
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
9993
Trackerid: 9993 • Fmsid: 846 SAND4TREE • Title: Manhattan East Side Coastal Resiliency Stormwater Greenstreets Construction
Trackerid
9993
Fmsid
846 SAND4TREE
Title
Manhattan East Side Coastal Resiliency Stormwater Greenstreets Construction
Summary
This project will construct stormwater greenstreets in Community Board 3 in Manhattan.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-10-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designadjustedcompletion
2027-05-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various Locations in Community Board 3 in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
10030
Trackerid: 10030 • Fmsid: 846 SAND5TREE • Title: Manhattan East Side Coastal Resiliency Sidewalk Bioswales Construction
Trackerid
10030
Fmsid
846 SAND5TREE
Title
Manhattan East Side Coastal Resiliency Sidewalk Bioswales Construction
Summary
This project will construct sidewalk bioswales and green infrastructure to capture storm water in Community Boards 3 and 6 in Manhattan.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
28.9
Designstart
2021-11-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-06-01T00:00:00.000
Procurementstart
2022-06-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-07-01T00:00:00.000
Constructionstart
2024-08-01T00:00:00.000
Constructionprojectedcom
2027-08-01T00:00:00.000
Totalfunding
$5,000,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
10186
Trackerid: 10186 • Fmsid: 846 P-3TRE22A • Title: Manhattan Lower East Side Street Tree Planting and Community Greening FY22
Trackerid
10186
Fmsid
846 P-3TRE22A
Title
Manhattan Lower East Side Street Tree Planting and Community Greening FY22
Summary
This project will plant new and replacement trees on the Lower East Side of Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-06-01T00:00:00.000
Constructionstart
2023-08-01T00:00:00.000
Constructionprojectedcom
2024-08-01T00:00:00.000
Constructionactualcompletion
2024-02-01T00:00:00.000
Totalfunding
$300,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
10199
Trackerid: 10199 • Fmsid: 846 P-3TREP22 • Title: Manhattan Street Tree Planting FY22 - Council District 5
Trackerid
10199
Fmsid
846 P-3TREP22
Title
Manhattan Street Tree Planting FY22 - Council District 5
Summary
This project will plant new and replacement trees in Council District 5 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-03-01T00:00:00.000
Constructionstart
2023-08-01T00:00:00.000
Constructionprojectedcom
2024-08-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council, Private
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9794
Trackerid: 9794 • Fmsid: 846 P-3SPT21B • Title: Manhattan Park Tree Planting FY21
Trackerid
9794
Fmsid
846 P-3SPT21B
Title
Manhattan Park Tree Planting FY21
Summary
This project will plant new and replacement park trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-05-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementactualcompletion
2021-07-01T00:00:00.000
Constructionstart
2021-10-01T00:00:00.000
Constructionprojectedcom
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$492,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Private
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9800
Trackerid: 9800 • Fmsid: 846 P-3SPT21A • Title: Manhattan Street Tree Planting FY21 - Community Boards 2, 4, 7, 9, 10, 12
Trackerid
9800
Fmsid
846 P-3SPT21A
Title
Manhattan Street Tree Planting FY21 - Community Boards 2, 4, 7, 9, 10, 12
Summary
This project will plant new and replacement trees in Community Boards 2, 4, 7, 9, 10, and 12 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-05-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementactualcompletion
2021-06-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Private
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9803
Trackerid: 9803 • Fmsid: 846 P-3SPT21C • Title: Manhattan Street Tree Planting FY21 - Community Boards 3, 5, 6, 8, 11
Trackerid
9803
Fmsid
846 P-3SPT21C
Title
Manhattan Street Tree Planting FY21 - Community Boards 3, 5, 6, 8, 11
Summary
This project will plant new and replacement trees in Community Boards 3, 5, 6, 8, and 11 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-05-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementactualcompletion
2021-07-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-02-01T00:00:00.000
Totalfunding
$489,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Private
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9467
Trackerid: 9467 • Fmsid: 846 P-3NRGF01 • Title: Manhattan Reforestation FY20
Trackerid
9467
Fmsid
846 P-3NRGF01
Title
Manhattan Reforestation FY20
Summary
This project will remove invasive species and plant new and replacement trees in Manhattan.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
59.98
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2019-08-01T00:00:00.000
Designadjustedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Totalfunding
$1,035,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9483
Trackerid: 9483 • Fmsid: 846 P-3TRESM2 • Title: Manhattan Street Tree Planting FY20 - Community Board 2
Trackerid
9483
Fmsid
846 P-3TRESM2
Title
Manhattan Street Tree Planting FY20 - Community Board 2
Summary
This project will plant new trees in Community Board 2 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementactualcompletion
2020-11-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$87,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9484
Trackerid: 9484 • Fmsid: 846 P-3TRESM3 • Title: Manhattan Street Tree Planting FY20 - Community Board 3
Trackerid
9484
Fmsid
846 P-3TRESM3
Title
Manhattan Street Tree Planting FY20 - Community Board 3
Summary
This project will plant new trees in Community Board 3 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementactualcompletion
2021-01-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$90,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9485
Trackerid: 9485 • Fmsid: 846 P-3TRESM4 • Title: Manhattan Street Tree Planting FY20 - Community Board 4
Trackerid
9485
Fmsid
846 P-3TRESM4
Title
Manhattan Street Tree Planting FY20 - Community Board 4
Summary
This project will plant new trees in Community Board 4 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-05-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-11-01T00:00:00.000
Procurementactualcompletion
2020-11-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$90,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9490
Trackerid: 9490 • Fmsid: 846 P-3TREL21 • Title: Manhattan Street Tree Planting FY21 - Community Boards 1, 2, 4, 5, 7-12
Trackerid
9490
Fmsid
846 P-3TREL21
Title
Manhattan Street Tree Planting FY21 - Community Boards 1, 2, 4, 5, 7-12
Summary
This project will plant new trees in Community Boards 1, 2, 4, 5, and 7-12 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2019-11-01T00:00:00.000
Designadjustedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2020-07-01T00:00:00.000
Procurementstart
2020-07-01T00:00:00.000
Procurementprojectedcompletion
2021-04-01T00:00:00.000
Procurementadjustedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionadjustedcompletion
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$13,565,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9507
Trackerid: 9507 • Fmsid: 846 SAND3TREE • Title: Manhattan Street Tree Planting FY21 - Community Boards 3, 6
Trackerid
9507
Fmsid
846 SAND3TREE
Title
Manhattan Street Tree Planting FY21 - Community Boards 3, 6
Summary
This project will plant new trees in Community Boards 3 and 6 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2019-11-01T00:00:00.000
Designadjustedcompletion
2021-04-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-11-01T00:00:00.000
Procurementadjustedcompletion
2022-11-01T00:00:00.000
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2022-11-01T00:00:00.000
Constructionprojectedcom
2024-11-01T00:00:00.000
Constructionactualcompletion
2024-10-01T00:00:00.000
Totalfunding
$8,393,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9310
Trackerid: 9310 • Fmsid: 846 P-3TRE20B • Title: Manhattan Street Tree Planting FY20 - Community Boards 2,4,7,9,10,12
Trackerid
9310
Fmsid
846 P-3TRE20B
Title
Manhattan Street Tree Planting FY20 - Community Boards 2,4,7,9,10,12
Summary
This project will plant new street trees in Community Boards 2, 4, 7, 9, 10, and 12 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designactualcompletion
2018-12-01T00:00:00.000
Procurementstart
2018-12-01T00:00:00.000
Procurementprojectedcompletion
2019-09-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2021-01-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$4,496,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9311
Trackerid: 9311 • Fmsid: 846 P-3TRE20A • Title: Manhattan Street Tree Planting FY20 - Community Boards 1,3,5,6,8,11
Trackerid
9311
Fmsid
846 P-3TRE20A
Title
Manhattan Street Tree Planting FY20 - Community Boards 1,3,5,6,8,11
Summary
This project will plant new street trees in Community Boards 1, 3, 5, 6, 8, and 11 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2018-12-01T00:00:00.000
Designactualcompletion
2018-12-01T00:00:00.000
Procurementstart
2018-12-01T00:00:00.000
Procurementprojectedcompletion
2019-09-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-11-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-09-01T00:00:00.000
Constructionadjustedcompletion
2021-01-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$4,428,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
9161
Trackerid: 9161 • Fmsid: 846 P-3PNYT12 • Title: Manhattan Street Tree Planting FY19
Trackerid
9161
Fmsid
846 P-3PNYT12
Title
Manhattan Street Tree Planting FY19
Summary
This project will plant street trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2018-08-01T00:00:00.000
Designactualcompletion
2018-05-01T00:00:00.000
Procurementstart
2018-05-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementactualcompletion
2019-01-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionadjustedcompletion
2020-02-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$986,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
8536
Trackerid: 8536 • Fmsid: 846 P-3TRE17A • Title: Manhattan Street Tree Planting FY17
Trackerid
8536
Fmsid
846 P-3TRE17A
Title
Manhattan Street Tree Planting FY17
Summary
This project will plant new street trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-06-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-04-01T00:00:00.000
Constructionstart
2017-05-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2018-10-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$2,386,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
10193
Trackerid: 10193 • Fmsid: 846 P-6TREP22 • Title: Manhattan and Bronx Street Tree Planting FY22
Trackerid
10193
Fmsid
846 P-6TREP22
Title
Manhattan and Bronx Street Tree Planting FY22
Summary
This project will plant new and replacement trees and install tree guard around newly planted trees in Manhattan and Bronx.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations in Manhattan and Bronx
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
9996
Trackerid: 9996 • Fmsid: 846 P-4TRS21E • Title: Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 8, 11-14
Trackerid
9996
Fmsid
846 P-4TRS21E
Title
Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 8, 11-14
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 8 and 11-14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-04-01T00:00:00.000
Procurementstart
2021-04-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-09-01T00:00:00.000
Totalfunding
$1,146,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
9997
Trackerid: 9997 • Fmsid: 846 P-4TRS21D • Title: Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 1-7, 9-10
Trackerid
9997
Fmsid
846 P-4TRS21D
Title
Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 1-7, 9-10
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 1-7 and 9-10 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-04-01T00:00:00.000
Procurementstart
2021-04-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2021-11-01T00:00:00.000
Constructionstart
2021-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$2,975,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10016
Trackerid: 10016 • Fmsid: 846 P-4TRE20R • Title: Queens Street Tree Planting FY21 - Community Boards 12-13
Trackerid
10016
Fmsid
846 P-4TRE20R
Title
Queens Street Tree Planting FY21 - Community Boards 12-13
Summary
This project will plant new street trees in Community Boards 12 and 13 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-05-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designactualcompletion
2021-05-01T00:00:00.000
Procurementstart
2021-05-01T00:00:00.000
Procurementprojectedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2021-11-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-06-01T00:00:00.000
Totalfunding
$2,757,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10045
Trackerid: 10045 • Fmsid: 846 P-4UNION • Title: Queens Council District 20 Sidewalk Reconstruction
Trackerid
10045
Fmsid
846 P-4UNION
Title
Queens Council District 20 Sidewalk Reconstruction
Summary
This project will reconstruct tree pits and sidewalks in Council District 20 in Queens.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
27.64
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2023-02-01T00:00:00.000
Designadjustedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-06-01T00:00:00.000
Constructionstart
2025-10-01T00:00:00.000
Constructionprojectedcom
2026-10-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various Locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10183
Trackerid: 10183 • Fmsid: 846 P-4TRE22D • Title: Queens Park Tree Planting FY22
Trackerid
10183
Fmsid
846 P-4TRE22D
Title
Queens Park Tree Planting FY22
Summary
This project will plant new and replacement park trees in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementadjustedcompletion
2023-06-01T00:00:00.000
Procurementactualcompletion
2023-05-01T00:00:00.000
Constructionstart
2023-05-01T00:00:00.000
Constructionprojectedcom
2024-11-01T00:00:00.000
Constructionactualcompletion
2024-06-01T00:00:00.000
Totalfunding
$2,858,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10185
Trackerid: 10185 • Fmsid: 846 P-4TRE22C • Title: Queens Street Tree Planting FY22 - Community Boards 9-10, 14
Trackerid
10185
Fmsid
846 P-4TRE22C
Title
Queens Street Tree Planting FY22 - Community Boards 9-10, 14
Summary
This project will plant new and replacement trees in Community Boards 9, 10, and 14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-12-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-09-01T00:00:00.000
Procurementadjustedcompletion
2023-04-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2024-02-01T00:00:00.000
Totalfunding
$2,531,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoralPrivate
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10187
Trackerid: 10187 • Fmsid: 846 P-4TREP22 • Title: Queens Street Tree Planting FY22 - Community Boards 1-4
Trackerid
10187
Fmsid
846 P-4TREP22
Title
Queens Street Tree Planting FY22 - Community Boards 1-4
Summary
This project will plant new and replacement trees in Community Boards 1-4 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-03-01T00:00:00.000
Procurementactualcompletion
2023-04-01T00:00:00.000
Constructionstart
2023-04-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Private
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10196
Trackerid: 10196 • Fmsid: 846 P-4TRE22B • Title: Queens Street Tree Planting FY22 - Council District 30
Trackerid
10196
Fmsid
846 P-4TRE22B
Title
Queens Street Tree Planting FY22 - Council District 30
Summary
This project will plant new and replacement trees in Council District 30 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$346,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10197
Trackerid: 10197 • Fmsid: 846 P-4TRE22A • Title: Queens Site Preparation FY22 - Council District 30
Trackerid
10197
Fmsid
846 P-4TRE22A
Title
Queens Site Preparation FY22 - Council District 30
Summary
This project will prepare sites for new and replacement trees in Council District 30 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designactualcompletion
2021-11-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-08-01T00:00:00.000
Procurementadjustedcompletion
2023-05-01T00:00:00.000
Procurementactualcompletion
2022-11-01T00:00:00.000
Constructionstart
2022-11-01T00:00:00.000
Constructionprojectedcom
2023-11-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$400,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
9502
Trackerid: 9502 • Fmsid: 846 P-4TRS21A • Title: Queens Street Tree Planting FY21 - Community Board 7 (QG-1019M)
Trackerid
9502
Fmsid
846 P-4TRS21A
Title
Queens Street Tree Planting FY21 - Community Board 7 (QG-1019M)
Summary
This project will plant new trees in Community Board 7 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2019-11-01T00:00:00.000
Designactualcompletion
2019-09-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-06-01T00:00:00.000
Procurementadjustedcompletion
2022-01-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2022-10-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$854,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
9005
Trackerid: 9005 • Fmsid: 846 P-4TRSD19 • Title: Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 1-7,9,10
Trackerid
9005
Fmsid
846 P-4TRSD19
Title
Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 1-7,9,10
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Queens Community Boards 1-7, 9, and 10.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-07-01T00:00:00.000
Constructionprojectedcom
2021-07-01T00:00:00.000
Constructionadjustedcompletion
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-06-01T00:00:00.000
Totalfunding
$2,546,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
9148
Trackerid: 9148 • Fmsid: 846 P-4TRS19A • Title: Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 8,11-14
Trackerid
9148
Fmsid
846 P-4TRS19A
Title
Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 8,11-14
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Queens Community Boards 8 and 11-14.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-08-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionadjustedcompletion
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-01-01T00:00:00.000
Totalfunding
$2,191,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations in Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION