Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
5998
Trackerid: 5998 • Fmsid: 846 P-6SWK13B • Title: Brooklyn and Staten Island Sidewalk Reconstruction FY13
Trackerid
5998
Fmsid
846 P-6SWK13B
Title
Brooklyn and Staten Island Sidewalk Reconstruction FY13
Summary
This project will reconstruct damaged sidewalks in Brooklyn and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-06-01T00:00:00.000
Designactualcompletion
2012-12-01T00:00:00.000
Procurementstart
2012-12-01T00:00:00.000
Procurementprojectedcompletion
2013-09-01T00:00:00.000
Procurementadjustedcompletion
2014-12-01T00:00:00.000
Procurementactualcompletion
2014-12-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionactualcompletion
2016-01-01T00:00:00.000
Totalfunding
$998,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Various locations, Brooklyn and Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
1012
Trackerid: 1012 • Fmsid: 846 P-6SWK12C • Title: Brooklyn, Queens, and Staten Island Sidewalk Reconstruction FY12
Trackerid
1012
Fmsid
846 P-6SWK12C
Title
Brooklyn, Queens, and Staten Island Sidewalk Reconstruction FY12
Summary
This multisite contract will reconstruct damaged sidewalks in Brooklyn, Queens and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-11-01T00:00:00.000
Designprojectedcompletion
2012-02-01T00:00:00.000
Designactualcompletion
2012-01-01T00:00:00.000
Procurementstart
2012-01-01T00:00:00.000
Procurementprojectedcompletion
2012-10-01T00:00:00.000
Procurementactualcompletion
2013-03-01T00:00:00.000
Constructionstart
2013-04-01T00:00:00.000
Constructionprojectedcom
2014-04-01T00:00:00.000
Constructionactualcompletion
2013-10-01T00:00:00.000
Totalfunding
$1,374,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Various locations, Brooklyn, Queens, Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
2091
Trackerid: 2091 • Fmsid: 846 P-2TREE03 • Title: Brooklyn Street Tree Planting FY10 (BG-810MA)
Trackerid
2091
Fmsid
846 P-2TREE03
Title
Brooklyn Street Tree Planting FY10 (BG-810MA)
Summary
This project will plant new street trees, expand sidewalk tree pits, and install tree pit guards in Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-06-01T00:00:00.000
Designactualcompletion
2011-08-01T00:00:00.000
Procurementstart
2011-08-01T00:00:00.000
Procurementprojectedcompletion
2012-05-01T00:00:00.000
Procurementactualcompletion
2012-04-01T00:00:00.000
Constructionstart
2012-04-01T00:00:00.000
Constructionprojectedcom
2013-10-01T00:00:00.000
Constructionadjustedcompletion
2014-02-01T00:00:00.000
Constructionactualcompletion
2014-02-01T00:00:00.000
Totalfunding
$2,864,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, Private
Name
Various locations, Brooklyn.
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
5957
Trackerid: 5957 • Fmsid: 846 P-6GRST05 • Title: Citywide Green Infrastructure Construction FY13
Trackerid
5957
Fmsid
846 P-6GRST05
Title
Citywide Green Infrastructure Construction FY13
Summary
This multisite contract will construct green infrastructure elements at citywide locations.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2013-04-01T00:00:00.000
Designactualcompletion
2013-05-01T00:00:00.000
Procurementstart
2013-05-01T00:00:00.000
Procurementprojectedcompletion
2014-02-01T00:00:00.000
Procurementactualcompletion
2014-01-01T00:00:00.000
Constructionstart
2014-05-01T00:00:00.000
Constructionprojectedcom
2015-04-01T00:00:00.000
Constructionadjustedcompletion
2015-12-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$1,043,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Various locations, citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
6187
Trackerid: 6187 • Fmsid: 846 P-6PNYD02 • Title: Yankee Stadium-Related Street Tree Planting (CNYG-414M)
Trackerid
6187
Fmsid
846 P-6PNYD02
Title
Yankee Stadium-Related Street Tree Planting (CNYG-414M)
Summary
This project will plant new street trees as restitution for the Yankee Stadium construction.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-04-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionadjustedcompletion
2016-07-01T00:00:00.000
Constructionactualcompletion
2016-07-01T00:00:00.000
Totalfunding
$2,165,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations, citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
10591
Trackerid: 10591 • Fmsid: 846 P-6TRGRD1 • Title: Citywide Tree Guard Installation Contract FY24 (CNYG-1420MR)
Trackerid
10591
Fmsid
846 P-6TRGRD1
Title
Citywide Tree Guard Installation Contract FY24 (CNYG-1420MR)
Summary
This project will install tree guard citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-08-01T00:00:00.000
Procurementstart
2023-08-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementadjustedcompletion
2024-04-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2023-09-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionadjustedcompletion
2025-09-01T00:00:00.000
Constructionactualcompletion
2025-05-01T00:00:00.000
Totalfunding
$828,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various Locations, Citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
10259
Trackerid: 10259 • Title: Citywide Tree Rescue FY22 • Currentphase: construction
Trackerid
10259
Title
Citywide Tree Rescue FY22
Summary
This project will perform tree rescue work, such as pruning, soil decompaction, expending tree pits, removing debris, removing metal tree guards and grates.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
92.64
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-12-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2023-01-01T00:00:00.000
Procurementadjustedcompletion
2025-01-01T00:00:00.000
Procurementactualcompletion
2024-12-01T00:00:00.000
Constructionstart
2025-01-01T00:00:00.000
Constructionprojectedcom
2027-01-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
10302
Trackerid: 10302 • Title: Citywide Invasive Species Removal • Summary: This project will remove invasive species Citywide.
Trackerid
10302
Title
Citywide Invasive Species Removal
Summary
This project will remove invasive species Citywide.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
52.53
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-12-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2023-03-01T00:00:00.000
Procurementprojectedcompletion
2024-04-01T00:00:00.000
Procurementadjustedcompletion
2024-05-01T00:00:00.000
Procurementactualcompletion
2024-05-01T00:00:00.000
Constructionstart
2024-05-01T00:00:00.000
Constructionprojectedcom
2029-05-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, Citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
11314
Trackerid: 11314 • Title: Citywide Tree Rescue FY27 (Renewal of CNYG-2122M) • Currentphase: procurement
Trackerid
11314
Title
Citywide Tree Rescue FY27 (Renewal of CNYG-2122M)
Summary
This project will perform tree rescue work, such as pruning, soil decompaction, expending tree pits, removing debris, removing metal tree guards and grates. (Renewal for CNYG-2122M)
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
60.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2026-12-01T00:00:00.000
Designactualcompletion
2026-06-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2027-06-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, citywide
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
9149
Trackerid: 9149 • Fmsid: 846 P-2TRS19A • Currentphase: completed
Trackerid
9149
Fmsid
846 P-2TRS19A
Title
Brooklyn Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 7,10-13,15,18
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Brooklyn Community Boards 7, 10-13, 15, and 18.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-03-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-08-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-08-01T00:00:00.000
Constructionadjustedcompletion
2021-08-01T00:00:00.000
Constructionactualcompletion
2021-04-01T00:00:00.000
Totalfunding
$1,568,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, in Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Brooklyn
VIEW LOCATION
6188
Trackerid: 6188 • Fmsid: 846 P-3TREMTA • Title: Second Avenue Subway Street Tree Planting Restitution for Removed Trees
Trackerid
6188
Fmsid
846 P-3TREMTA
Title
Second Avenue Subway Street Tree Planting Restitution for Removed Trees
Summary
This project will plant street trees in Community Boards 5, 6, 8, 10 and 11 in Manhattan as restitution for trees removed for the Second Avenue Subway construction.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,322,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Private
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
6224
Trackerid: 6224 • Fmsid: 846 P-3SREMOV • Title: Manhattan Sandy-Related Tree Removal
Trackerid
6224
Fmsid
846 P-3SREMOV
Title
Manhattan Sandy-Related Tree Removal
Summary
This project will remove trees damaged from Hurricane Sandy in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2015-08-01T00:00:00.000
Constructionadjustedcompletion
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,168,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
6230
Trackerid: 6230 • Fmsid: 846 P-3SRISKM • Title: Manhattan Sandy-Related Tree Replacement
Trackerid
6230
Fmsid
846 P-3SRISKM
Title
Manhattan Sandy-Related Tree Replacement
Summary
This project will replace trees removed due to Hurricane Sandy damage in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementactualcompletion
2014-09-01T00:00:00.000
Constructionstart
2014-12-01T00:00:00.000
Constructionprojectedcom
2015-11-01T00:00:00.000
Constructionactualcompletion
2015-12-01T00:00:00.000
Totalfunding
$637,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
5944
Trackerid: 5944 • Fmsid: 846 P-3TREE03 • Title: Manhattan Street Tree Planting FY13
Trackerid
5944
Fmsid
846 P-3TREE03
Title
Manhattan Street Tree Planting FY13
Summary
This project will plant trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-07-01T00:00:00.000
Designprojectedcompletion
2012-12-01T00:00:00.000
Designactualcompletion
2013-01-01T00:00:00.000
Procurementstart
2013-01-01T00:00:00.000
Procurementprojectedcompletion
2013-10-01T00:00:00.000
Procurementactualcompletion
2013-01-01T00:00:00.000
Constructionstart
2013-03-01T00:00:00.000
Constructionprojectedcom
2014-03-01T00:00:00.000
Constructionactualcompletion
2014-01-01T00:00:00.000
Totalfunding
$1,598,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
6141
Trackerid: 6141 • Fmsid: 846 P-3TRE14A • Title: Manhattan Street Tree Planting FY14
Trackerid
6141
Fmsid
846 P-3TRE14A
Title
Manhattan Street Tree Planting FY14
Summary
This project will plant new street trees in Community Boards 1 through 12 in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-04-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementactualcompletion
2014-02-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionactualcompletion
2015-02-01T00:00:00.000
Totalfunding
$1,507,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
6590
Trackerid: 6590 • Fmsid: 846 P-3TRE15A • Title: Manhattan Street Tree Planting FY15
Trackerid
6590
Fmsid
846 P-3TRE15A
Title
Manhattan Street Tree Planting FY15
Summary
This project will plant street trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionactualcompletion
2016-03-01T00:00:00.000
Totalfunding
$1,435,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
7181
Trackerid: 7181 • Fmsid: 846 P-3TRE16A • Title: Manhattan Street Tree Planting FY16
Trackerid
7181
Fmsid
846 P-3TRE16A
Title
Manhattan Street Tree Planting FY16
Summary
This project will plant new trees in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-02-01T00:00:00.000
Constructionstart
2016-02-01T00:00:00.000
Constructionprojectedcom
2017-08-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$1,566,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
11146
Trackerid: 11146 • Fmsid: 846 P-3TRE27A • Title: Manhattan Street Tree Planting FY27
Trackerid
11146
Fmsid
846 P-3TRE27A
Title
Manhattan Street Tree Planting FY27
Summary
This project will plant street trees in Manhattan
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Designactualcompletion
2026-02-01T00:00:00.000
Procurementstart
1776-07-01T00:00:00.000
Procurementprojectedcompletion
1777-07-01T00:00:00.000
Totalfunding
Greater than $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Various Locations, Manhattan
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Manhattan
VIEW LOCATION
10908
Trackerid: 10908 • Fmsid: 846 P-6EABTRF • Title: Manhattan and Bronx Emerald Ash Borer (EAB) Related Tree Removal FY25
Trackerid
10908
Fmsid
846 P-6EABTRF
Title
Manhattan and Bronx Emerald Ash Borer (EAB) Related Tree Removal FY25
Summary
This project will remove trees hosted by Emerald Ash Borer (EAB) in Manhattan and Bronx.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
15.64
Designstart
2024-09-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementactualcompletion
2025-12-01T00:00:00.000
Constructionstart
2026-01-01T00:00:00.000
Constructionprojectedcom
2029-01-01T00:00:00.000
Totalfunding
$1,397,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various Locations, Manhattan and Bronx
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Citywide
VIEW LOCATION
10909
Trackerid: 10909 • Fmsid: 846 P-4EABTRA • Title: Queens Emerald Ash Borer (EAB) Related Tree Removal FY25
Trackerid
10909
Fmsid
846 P-4EABTRA
Title
Queens Emerald Ash Borer (EAB) Related Tree Removal FY25
Summary
This project will remove trees hosted by Emerald Ash Borer (EAB) in Queens.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
1.4
Designstart
2024-09-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2024-11-01T00:00:00.000
Procurementstart
2025-04-01T00:00:00.000
Procurementprojectedcompletion
2026-04-01T00:00:00.000
Procurementactualcompletion
2026-03-01T00:00:00.000
Constructionstart
2026-03-01T00:00:00.000
Constructionprojectedcom
2029-03-01T00:00:00.000
Totalfunding
$3,040,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
11029
Trackerid: 11029 • Fmsid: 846 P-4QTDSRC • Title: Queens Tree-Damaged Sidewalk Reconstruction FY26 Community Boards 3 & 4
Trackerid
11029
Fmsid
846 P-4QTDSRC
Title
Queens Tree-Damaged Sidewalk Reconstruction FY26 Community Boards 3 & 4
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 3 and 4 in Queens (renewal for QG-1623M).
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-05-01T00:00:00.000
Designprojectedcompletion
2026-02-01T00:00:00.000
Designactualcompletion
2025-06-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementprojectedcompletion
2026-06-01T00:00:00.000
Procurementactualcompletion
2026-01-01T00:00:00.000
Constructionstart
2025-08-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-08-01T00:00:00.000
Totalfunding
$500,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
11057
Trackerid: 11057 • Fmsid: 846 P-4SWRC23 • Currentphase: construction
Trackerid
11057
Fmsid
846 P-4SWRC23
Title
Queens Tree-Damaged Sidewalk Reconstruction FY23 (renewal QG-623M) - Community Boards 1, 2, 5 ,6, 7, 8
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 1, 2, 5 ,6, 7 and 8 in Queens.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-07-01T00:00:00.000
Designprojectedcompletion
2026-01-01T00:00:00.000
Designactualcompletion
2025-11-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementactualcompletion
2026-06-01T00:00:00.000
Constructionstart
2026-07-01T00:00:00.000
Constructionprojectedcom
2028-06-01T00:00:00.000
Totalfunding
$6,022,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
11058
Trackerid: 11058 • Fmsid: 846 P-4SWRO23 • Currentphase: construction
Trackerid
11058
Fmsid
846 P-4SWRO23
Title
Queens Tree-Damaged Sidewalk Reconstruction FY23 (Renewal QG-1523M)- Community Boards 9-14
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 9, 10, 11, 12, 13, 14 in Queens.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-07-01T00:00:00.000
Designprojectedcompletion
2026-01-01T00:00:00.000
Designactualcompletion
2025-11-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementactualcompletion
2026-09-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2028-08-01T00:00:00.000
Totalfunding
$6,160,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
11144
Trackerid: 11144 • Fmsid: 846 P-4TRE27B • Title: Queens Street Tree Planting FY27 - Community Boards 3-4, 6, 8
Trackerid
11144
Fmsid
846 P-4TRE27B
Title
Queens Street Tree Planting FY27 - Community Boards 3-4, 6, 8
Summary
This project will plant street tree in Queens, Community Boards 3-4, 6, 8
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Designactualcompletion
2026-02-01T00:00:00.000
Procurementstart
1776-07-01T00:00:00.000
Procurementprojectedcompletion
1777-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
11145
Trackerid: 11145 • Fmsid: 846 P-4TRE27A • Title: Queens Street Tree Planting FY27 - Community Boards 1-2, 5
Trackerid
11145
Fmsid
846 P-4TRE27A
Title
Queens Street Tree Planting FY27 - Community Boards 1-2, 5
Summary
This project will plant street trees in Queens - Community Boards 1-2, 5
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-01-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Designactualcompletion
2026-02-01T00:00:00.000
Procurementstart
1776-07-01T00:00:00.000
Procurementprojectedcompletion
1777-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6133
Trackerid: 6133 • Fmsid: 846 P-4PNYT24 • Title: Queens Street Tree Planting FY14 - Community Boards 10,12-14
Trackerid
6133
Fmsid
846 P-4PNYT24
Title
Queens Street Tree Planting FY14 - Community Boards 10,12-14
Summary
This project will plant trees in Community Boards 10, 12, 13 and 14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-04-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementactualcompletion
2014-02-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-02-01T00:00:00.000
Constructionactualcompletion
2015-02-01T00:00:00.000
Totalfunding
$925,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6135
Trackerid: 6135 • Fmsid: 846 P-4TRE14B • Title: Queens Street Tree Planting FY14 - Community Boards 7-9,11
Trackerid
6135
Fmsid
846 P-4TRE14B
Title
Queens Street Tree Planting FY14 - Community Boards 7-9,11
Summary
This project will plant new street trees in Community Boards 7, 8, 9 and 11 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-04-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementactualcompletion
2014-02-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-05-01T00:00:00.000
Constructionactualcompletion
2015-05-01T00:00:00.000
Totalfunding
$1,307,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6136
Trackerid: 6136 • Fmsid: 846 P-4TRE14A • Title: Queens Street Tree Planting FY14 - Community Boards 1-6
Trackerid
6136
Fmsid
846 P-4TRE14A
Title
Queens Street Tree Planting FY14 - Community Boards 1-6
Summary
This project will plant new street trees in Community Boards 1 through 6 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-04-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementactualcompletion
2014-02-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionactualcompletion
2015-03-01T00:00:00.000
Totalfunding
$1,265,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralPrivate
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
5949
Trackerid: 5949 • Fmsid: 846 P-4TREE08 • Title: Queens Street Tree Planting FY13 - Community Boards 1-8
Trackerid
5949
Fmsid
846 P-4TREE08
Title
Queens Street Tree Planting FY13 - Community Boards 1-8
Summary
This project will plant trees in Community Boards 1-8 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-07-01T00:00:00.000
Designprojectedcompletion
2012-12-01T00:00:00.000
Designactualcompletion
2013-01-01T00:00:00.000
Procurementstart
2013-01-01T00:00:00.000
Procurementprojectedcompletion
2013-10-01T00:00:00.000
Procurementactualcompletion
2013-02-01T00:00:00.000
Constructionstart
2013-04-01T00:00:00.000
Constructionprojectedcom
2014-05-01T00:00:00.000
Constructionadjustedcompletion
2014-03-01T00:00:00.000
Constructionactualcompletion
2014-03-01T00:00:00.000
Totalfunding
$1,505,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
5951
Trackerid: 5951 • Fmsid: 846 P-4TREE10 • Title: Queens Street Tree Planting FY13 - Community Boards 10,12-14
Trackerid
5951
Fmsid
846 P-4TREE10
Title
Queens Street Tree Planting FY13 - Community Boards 10,12-14
Summary
This project will plant trees in Community Boards 10 & 12-14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-07-01T00:00:00.000
Designprojectedcompletion
2012-12-01T00:00:00.000
Designactualcompletion
2012-07-01T00:00:00.000
Procurementstart
2012-07-01T00:00:00.000
Procurementprojectedcompletion
2013-04-01T00:00:00.000
Procurementactualcompletion
2013-03-01T00:00:00.000
Constructionstart
2013-09-01T00:00:00.000
Constructionprojectedcom
2014-08-01T00:00:00.000
Constructionadjustedcompletion
2014-08-01T00:00:00.000
Constructionactualcompletion
2014-08-01T00:00:00.000
Totalfunding
$1,252,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6193
Trackerid: 6193 • Fmsid: 846 P-4USTATR • Currentphase: completed
Trackerid
6193
Fmsid
846 P-4USTATR
Title
Flushing Meadows Corona Park Street Tree Planting Restitution for USTA Construction
Summary
This project will plant new street trees in Community Boards 3, 4, 6, 7 and 8 in Queens as restitution for the USTA construction.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionactualcompletion
2015-07-01T00:00:00.000
Totalfunding
$904,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6225
Trackerid: 6225 • Fmsid: 846 P-4SREMV1 • Title: Queens Sandy-Related Tree Removal - Community Boards 1-5
Trackerid
6225
Fmsid
846 P-4SREMV1
Title
Queens Sandy-Related Tree Removal - Community Boards 1-5
Summary
This project will remove trees damaged from Hurricane Sandy in Community Boards 1 through 5 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-07-01T00:00:00.000
Constructionprojectedcom
2015-07-01T00:00:00.000
Constructionadjustedcompletion
2015-08-01T00:00:00.000
Constructionactualcompletion
2015-08-01T00:00:00.000
Totalfunding
$992,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6226
Trackerid: 6226 • Fmsid: 846 P-4SREMOV • Title: Queens Sandy-Related Tree Removal - Community Boards 6-14
Trackerid
6226
Fmsid
846 P-4SREMOV
Title
Queens Sandy-Related Tree Removal - Community Boards 6-14
Summary
This project will remove trees damaged from Hurricane Sandy in Community Boards 6 through 14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2015-08-01T00:00:00.000
Constructionactualcompletion
2015-07-01T00:00:00.000
Totalfunding
$514,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6231
Trackerid: 6231 • Fmsid: 846 P-4SRISKM • Title: Queens Sandy-Related Tree Replacement
Trackerid
6231
Fmsid
846 P-4SRISKM
Title
Queens Sandy-Related Tree Replacement
Summary
This project will replace trees removed due to Hurricane Sandy damage in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2013-12-01T00:00:00.000
Designactualcompletion
2014-01-01T00:00:00.000
Procurementstart
2014-01-01T00:00:00.000
Procurementprojectedcompletion
2014-10-01T00:00:00.000
Procurementactualcompletion
2014-10-01T00:00:00.000
Constructionstart
2014-12-01T00:00:00.000
Constructionprojectedcom
2015-11-01T00:00:00.000
Constructionadjustedcompletion
2016-04-01T00:00:00.000
Constructionactualcompletion
2016-03-01T00:00:00.000
Totalfunding
$2,450,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10555
Trackerid: 10555 • Fmsid: 846 P-4TRS23A • Title: Queens Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 9-14
Trackerid
10555
Fmsid
846 P-4TRS23A
Title
Queens Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 9-14
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 9, 10, 11, 12, 13, 14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-03-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-07-01T00:00:00.000
Constructionstart
2024-08-01T00:00:00.000
Constructionprojectedcom
2026-08-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$5,645,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10556
Trackerid: 10556 • Fmsid: 846 P-4TRS23B • Title: Queens Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 3 & 4
Trackerid
10556
Fmsid
846 P-4TRS23B
Title
Queens Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 3 & 4
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 3 and 4 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-03-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-08-01T00:00:00.000
Constructionprojectedcom
2025-08-01T00:00:00.000
Constructionactualcompletion
2025-03-01T00:00:00.000
Totalfunding
$1,000,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10508
Trackerid: 10508 • Fmsid: 846 P-4TRSD23 • Currentphase: completed
Trackerid
10508
Fmsid
846 P-4TRSD23
Title
Queens Tree-Damaged Sidewalk Reconstruction FY23 - Community Boards 1, 2, 5 ,6, 7, 8
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 1, 2, 5 ,6, 7 and 8 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-03-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-02-01T00:00:00.000
Totalfunding
$5,245,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Various Locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6591
Trackerid: 6591 • Fmsid: 846 P-4TRE15A • Title: Queens Street Tree Planting FY15 - Community Boards 1-6
Trackerid
6591
Fmsid
846 P-4TRE15A
Title
Queens Street Tree Planting FY15 - Community Boards 1-6
Summary
This project will plant trees in Community Boards 1 through 6 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-04-01T00:00:00.000
Constructionprojectedcom
2016-04-01T00:00:00.000
Constructionactualcompletion
2016-04-01T00:00:00.000
Totalfunding
$1,488,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6592
Trackerid: 6592 • Fmsid: 846 P-4TRE15B • Title: Queens Street Tree Planting FY15 - Community Boards 7,8,11,12
Trackerid
6592
Fmsid
846 P-4TRE15B
Title
Queens Street Tree Planting FY15 - Community Boards 7,8,11,12
Summary
This project will plant trees in Community Boards 7, 8, 11 and 12 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-05-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-05-01T00:00:00.000
Constructionactualcompletion
2016-04-01T00:00:00.000
Totalfunding
$1,400,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
6605
Trackerid: 6605 • Fmsid: 846 P-4PNYT25 • Title: Queens Street Tree Planting FY15 - Community Boards 9,10,13,14
Trackerid
6605
Fmsid
846 P-4PNYT25
Title
Queens Street Tree Planting FY15 - Community Boards 9,10,13,14
Summary
This project will plant trees in Community Boards 9, 10, 13 and 14 in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2015-01-01T00:00:00.000
Procurementstart
2015-01-01T00:00:00.000
Procurementprojectedcompletion
2015-10-01T00:00:00.000
Procurementadjustedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2015-12-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$1,110,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
5972
Trackerid: 5972 • Fmsid: 846 P-6PNYR22 • Title: Brooklyn and Queens Reforestation FY13
Trackerid
5972
Fmsid
846 P-6PNYR22
Title
Brooklyn and Queens Reforestation FY13
Summary
This project will remove invasive species and plant new trees in Queens and Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2013-01-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2013-12-01T00:00:00.000
Procurementactualcompletion
2013-12-01T00:00:00.000
Constructionstart
2013-12-01T00:00:00.000
Constructionprojectedcom
2017-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$1,545,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoralPrivate
Name
Various locations, Queens and Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
6144
Trackerid: 6144 • Fmsid: 846 P-6PNYR24 • Title: Brooklyn and Queens Reforestation FY14
Trackerid
6144
Fmsid
846 P-6PNYR24
Title
Brooklyn and Queens Reforestation FY14
Summary
This project will remove invasive species and plant new trees in Queens and Brooklyn.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-05-01T00:00:00.000
Designprojectedcompletion
2013-06-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-04-01T00:00:00.000
Procurementactualcompletion
2014-03-01T00:00:00.000
Constructionstart
2014-04-01T00:00:00.000
Constructionprojectedcom
2016-09-01T00:00:00.000
Constructionactualcompletion
2016-09-01T00:00:00.000
Totalfunding
$659,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens and Brooklyn
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
5934
Trackerid: 5934 • Fmsid: 846 P-6PNYR19 • Title: Queens and Staten Island Reforestation FY12
Trackerid
5934
Fmsid
846 P-6PNYR19
Title
Queens and Staten Island Reforestation FY12
Summary
This multisite contract will remove invasive species and plant new trees in Queens and Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-05-01T00:00:00.000
Designprojectedcompletion
2012-06-01T00:00:00.000
Designactualcompletion
2012-06-01T00:00:00.000
Procurementstart
2012-06-01T00:00:00.000
Procurementprojectedcompletion
2013-03-01T00:00:00.000
Procurementactualcompletion
2013-03-01T00:00:00.000
Constructionstart
2013-05-01T00:00:00.000
Constructionprojectedcom
2015-11-01T00:00:00.000
Constructionactualcompletion
2015-11-01T00:00:00.000
Totalfunding
$1,331,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Queens and Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
VIEW LOCATION
10535
Trackerid: 10535 • Title: Queens Tree-Damaged Sidewalk Reconstruction Community Boards 7,8,11 (QG-1423MR) • Currentphase: completed
Trackerid
10535
Title
Queens Tree-Damaged Sidewalk Reconstruction Community Boards 7,8,11 (QG-1423MR)
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 7,8, 11.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2022-01-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionadjustedcompletion
2024-01-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, Queens NE
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10536
Trackerid: 10536 • Title: Queens Tree-Damaged Sidewalk Reconstruction Community Boards 12-14 (QG-1323MR) • Currentphase: construction
Trackerid
10536
Title
Queens Tree-Damaged Sidewalk Reconstruction Community Boards 12-14 (QG-1323MR)
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 12-14.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
87.63
Procurementactualcompletion
2022-10-01T00:00:00.000
Constructionstart
2022-01-01T00:00:00.000
Constructionprojectedcom
2024-01-01T00:00:00.000
Constructionadjustedcompletion
2024-01-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, Queens SE
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10534
Trackerid: 10534 • Currentphase: completed • Designpercentcomplete: 100.0
Trackerid
10534
Title
Queens Tree-Damaged Sidewalk Reconstruction Community Boards 1-6,9,10 (QG-1223MR)
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 1-6,9, 10.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2024-04-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Name
Various locations, Queens West
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Queens
VIEW LOCATION
10557
Trackerid: 10557 • Fmsid: 846 P-5TRSD23 • Title: Staten Island Tree-Damaged Sidewalk Reconstruction FY23
Trackerid
10557
Fmsid
846 P-5TRSD23
Title
Staten Island Tree-Damaged Sidewalk Reconstruction FY23
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-03-01T00:00:00.000
Designprojectedcompletion
2023-12-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2024-06-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-06-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-05-01T00:00:00.000
Totalfunding
$4,869,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Staten Island
VIEW LOCATION
7182
Trackerid: 7182 • Fmsid: 846 P-5TRE16A • Title: Staten Island Street Tree Planting FY16
Trackerid
7182
Fmsid
846 P-5TRE16A
Title
Staten Island Street Tree Planting FY16
Summary
This project will plant new street trees throughout Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2015-05-01T00:00:00.000
Designactualcompletion
2015-05-01T00:00:00.000
Procurementstart
2015-05-01T00:00:00.000
Procurementprojectedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-01-01T00:00:00.000
Constructionstart
2016-02-01T00:00:00.000
Constructionprojectedcom
2017-08-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$965,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Staten Island
VIEW LOCATION
11059
Trackerid: 11059 • Fmsid: 846 P-5SWRC23 • Title: Staten Island Tree-Damaged Sidewalk Reconstruction FY23 (Renewal RG-423M)
Trackerid
11059
Fmsid
846 P-5SWRC23
Title
Staten Island Tree-Damaged Sidewalk Reconstruction FY23 (Renewal RG-423M)
Summary
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Staten Island.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2025-07-01T00:00:00.000
Designprojectedcompletion
2026-01-01T00:00:00.000
Designactualcompletion
2025-11-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementactualcompletion
2026-08-01T00:00:00.000
Constructionstart
2026-07-01T00:00:00.000
Constructionprojectedcom
2028-07-01T00:00:00.000
Totalfunding
$5,601,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Various locations, Staten Island
Parkid
NA
Latitude
40.61248112
Longitude
-74.16938923
Borough
Staten Island
VIEW LOCATION
6140
Trackerid: 6140 • Fmsid: 846 P-5TRE14A • Title: Staten Island Street Tree Planting FY14
Trackerid
6140
Fmsid
846 P-5TRE14A
Title
Staten Island Street Tree Planting FY14
Summary
This project will plant new street trees in Community Boards 1, 2 and 3 in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-04-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-06-01T00:00:00.000
Procurementstart
2013-06-01T00:00:00.000
Procurementprojectedcompletion
2014-03-01T00:00:00.000
Procurementactualcompletion
2014-02-01T00:00:00.000
Constructionstart
2014-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionactualcompletion
2015-03-01T00:00:00.000
Totalfunding
$1,039,000
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, Private
Name
Various locations, Staten Island
Parkid
NA
Latitude
0.0
Longitude
0.0
Borough
Staten Island
VIEW LOCATION