Capital Projects Dashboard - Citywide Schedule History and Variance

This is the history all agency reported forecasts/actual project completion dates. Each row is the snapshot of data taken on each reporting period. The 'completion date type' column shows if the 'completion date' is either a forecast or actual date. Over time, a project would have one or more forecasted completion dates before it is actually completed. The 'variance' is the day difference between 'completion date' of each row and its prior reporting period. This dataset is part of the Capital Projects Dashboard.

City Government Mayor's Office of Operations (OPS) Dataset 95tx-snak 10 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3361
Reporting Period
202401
Managing Agency
DCAS
Pid
3361
Agency Project Name
NYPD - 44TH PRECINCT
Current Phase
Construction
Completion Date
2024-05-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
81
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3361
Reporting Period
202405
Managing Agency
DCAS
Pid
3361
Agency Project Name
NYPD - 44TH PRECINCT
Current Phase
Construction
Completion Date
2024-05-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3361
Reporting Period
202409
Managing Agency
DCAS
Pid
3361
Agency Project Name
NYPD - 44TH PRECINCT
Current Phase
Construction
Completion Date
2026-05-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
713
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3361
Reporting Period
202501
Managing Agency
DCAS
Pid
3361
Agency Project Name
NYPD - 44TH PRECINCT
Current Phase
Construction
Completion Date
2026-05-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3361
Reporting Period
202505
Managing Agency
DCAS
Pid
3361
Agency Project Name
NYPD - 44TH PRECINCT
Current Phase
Close-out
Completion Date
2025-02-13T00:00:00.000
Completion Date Type
Actual
Variance Day
-455
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202305
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction Procurement
Completion Date
2024-04-22T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202309
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction Procurement
Completion Date
2024-04-22T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202401
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction
Completion Date
2024-05-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
37
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202405
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction
Completion Date
2024-05-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202409
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction
Completion Date
2026-03-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
666
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202501
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Construction
Completion Date
2026-03-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3362
Reporting Period
202505
Managing Agency
DCAS
Pid
3362
Agency Project Name
NYPD - 122ND PRECINCT
Current Phase
Close-out
Completion Date
2025-03-27T00:00:00.000
Completion Date Type
Forecast
Variance Day
-364
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202305
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction Procurement
Completion Date
2024-03-22T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202309
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction Procurement
Completion Date
2024-03-22T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202401
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
161
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202405
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202409
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction
Completion Date
2026-09-09T00:00:00.000
Completion Date Type
Forecast
Variance Day
740
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202501
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Construction
Completion Date
2026-09-09T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3363
Reporting Period
202505
Managing Agency
DCAS
Pid
3363
Agency Project Name
DHS - MANHATTAN BOWERY SHELTER
Current Phase
Close-out
Completion Date
2025-04-24T00:00:00.000
Completion Date Type
Actual
Variance Day
-503
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202305
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction Procurement
Completion Date
2024-01-30T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202309
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction Procurement
Completion Date
2024-01-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202401
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction
Completion Date
2024-09-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
244
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202405
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction
Completion Date
2024-09-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202409
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction
Completion Date
2026-11-15T00:00:00.000
Completion Date Type
Forecast
Variance Day
776
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202501
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Construction
Completion Date
2026-11-15T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3364
Reporting Period
202505
Managing Agency
DCAS
Pid
3364
Agency Project Name
HHC/DHS - AUBURN FAMILY RESIDENCE (CUMBERLAND DIAGNOSTIC)
Current Phase
Close-out
Completion Date
2025-04-07T00:00:00.000
Completion Date Type
Actual
Variance Day
-587
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202305
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction Procurement
Completion Date
2024-03-04T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202309
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction Procurement
Completion Date
2024-03-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202401
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
179
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202405
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202409
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction
Completion Date
2026-09-19T00:00:00.000
Completion Date Type
Forecast
Variance Day
750
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202501
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Construction
Completion Date
2026-09-19T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3365
Reporting Period
202505
Managing Agency
DCAS
Pid
3365
Agency Project Name
DHS - FRANKLIN WOMEN'S SHELTER
Current Phase
Close-out
Completion Date
2025-05-15T00:00:00.000
Completion Date Type
Actual
Variance Day
-492
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202305
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction Procurement
Completion Date
2024-05-22T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202309
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction Procurement
Completion Date
2024-05-22T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202401
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
100
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202405
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction
Completion Date
2024-08-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202409
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction
Completion Date
2026-06-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
669
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202501
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction
Completion Date
2026-06-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202505
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Construction
Completion Date
2025-02-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
-487
Data Date
2025-06-18T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DCAS • Pid: 3366
Reporting Period
202509
Managing Agency
DCAS
Pid
3366
Agency Project Name
DHS - FORT WASHINGTON ARMORY - SHELTER (PROJECT RENEWAL)
Current Phase
Close-out
Completion Date
2025-06-25T00:00:00.000
Completion Date Type
Actual
Variance Day
117
Data Date
2025-11-17T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202305
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction Procurement
Completion Date
2024-09-30T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202309
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction Procurement
Completion Date
2024-09-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202401
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction
Completion Date
2024-06-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
-94
Data Date
2024-05-02T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202405
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction
Completion Date
2024-06-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-11T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202409
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction
Completion Date
2024-07-10T00:00:00.000
Completion Date Type
Forecast
Variance Day
12
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO UNAVAILABILITY OF PRODUCT
Data Date
2024-11-01T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202501
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Construction
Completion Date
2026-06-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
720
Data Date
2025-03-04T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DCAS • Pid: 3367
Reporting Period
202505
Managing Agency
DCAS
Pid
3367
Agency Project Name
DHS - FANNIE BARNES (URBAN TRANSITIONAL HOUSING)
Current Phase
Close-out
Completion Date
2024-12-02T00:00:00.000
Completion Date Type
Actual
Variance Day
-575
Data Date
2025-06-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Pid: 3368
Reporting Period
202305
Managing Agency
DCAS
Pid
3368
Agency Project Name
DHS - PARK SLOPE ARMORY SHELTER
Current Phase
Design
Completion Date
2024-04-23T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-06-28T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Pid: 3368
Reporting Period
202309
Managing Agency
DCAS
Pid
3368
Agency Project Name
DHS - PARK SLOPE ARMORY SHELTER
Current Phase
Design
Completion Date
2024-04-23T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-01-04T00:00:00.000