Capital Projects Dashboard - Citywide Schedule History and Variance

This is the history all agency reported forecasts/actual project completion dates. Each row is the snapshot of data taken on each reporting period. The 'completion date type' column shows if the 'completion date' is either a forecast or actual date. Over time, a project would have one or more forecasted completion dates before it is actually completed. The 'variance' is the day difference between 'completion date' of each row and its prior reporting period. This dataset is part of the Capital Projects Dashboard.

City Government Mayor's Office of Operations (OPS) Dataset 95tx-snak 10 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3870
Reporting Period
202409
Managing Agency
DDC
Pid
3870
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2025-11-25T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3870
Reporting Period
202501
Managing Agency
DDC
Pid
3870
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2025-11-25T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3870
Reporting Period
202505
Managing Agency
DDC
Pid
3870
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2025-11-25T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3870
Reporting Period
202509
Managing Agency
DDC
Pid
3870
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Close-out
Completion Date
2025-03-12T00:00:00.000
Completion Date Type
Actual
Variance Day
-258
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3871
Reporting Period
202305
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Design
Completion Date
2025-12-27T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3871
Reporting Period
202309
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Completion Date
2025-12-27T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3871
Reporting Period
202401
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Completion Date
2025-12-27T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3871
Reporting Period
202405
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Completion Date
2026-04-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
123
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3871
Reporting Period
202409
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Completion Date
2026-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
61
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO SCHEDULING OF UTILITY WORK
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3871
Reporting Period
202501
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Completion Date
2026-12-01T00:00:00.000
Completion Date Type
Forecast
Variance Day
155
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3871
Reporting Period
202505
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2026-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
30
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3871
Reporting Period
202509
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2026-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3871
Reporting Period
202601
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2026-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3871
Reporting Period
202605
Managing Agency
DDC
Pid
3871
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Completion Date
2026-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-06-23T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3872
Reporting Period
202305
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Design
Completion Date
2025-12-29T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3872
Reporting Period
202309
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction Procurement
Completion Date
2025-12-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3872
Reporting Period
202401
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction Procurement
Completion Date
2025-12-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3872
Reporting Period
202405
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction Procurement
Completion Date
2025-12-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3872
Reporting Period
202409
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction
Completion Date
2025-09-08T00:00:00.000
Completion Date Type
Forecast
Variance Day
-112
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3872
Reporting Period
202501
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction
Completion Date
2025-10-20T00:00:00.000
Completion Date Type
Forecast
Variance Day
42
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3872
Reporting Period
202505
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction
Completion Date
2025-10-20T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3872
Reporting Period
202509
Managing Agency
DDC
Pid
3872
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Close-out
Completion Date
2025-04-30T00:00:00.000
Completion Date Type
Actual
Variance Day
-173
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3873
Reporting Period
202305
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3873
Reporting Period
202309
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3873
Reporting Period
202401
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3873
Reporting Period
202405
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3873
Reporting Period
202409
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3873
Reporting Period
202501
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-04-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3873
Reporting Period
202505
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-12-25T00:00:00.000
Completion Date Type
Forecast
Variance Day
255
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3873
Reporting Period
202509
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-12-25T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3873
Reporting Period
202601
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-12-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
1
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3873
Reporting Period
202605
Managing Agency
DDC
Pid
3873
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Completion Date
2025-12-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-03-16T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3874
Reporting Period
202305
Managing Agency
DDC
Pid
3874
Agency Project Name
INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI
Current Phase
Close-out
Completion Date
2021-11-09T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3874
Reporting Period
202309
Managing Agency
DDC
Pid
3874
Agency Project Name
INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI
Current Phase
Close-out
Completion Date
2021-11-09T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2023-09-01T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3874
Reporting Period
202401
Managing Agency
DDC
Pid
3874
Agency Project Name
INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI
Current Phase
Close-out
Completion Date
2021-11-09T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2023-09-01T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3874
Reporting Period
202405
Managing Agency
DDC
Pid
3874
Agency Project Name
INSTALL NEW CATCH BASINS & RECON, BROOKLYN & SI
Current Phase
Close-out
Completion Date
2021-11-09T00:00:00.000
Completion Date Type
Actual
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3875
Reporting Period
202305
Managing Agency
DDC
Pid
3875
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Current Phase
Close-out
Completion Date
2022-06-21T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3875
Reporting Period
202309
Managing Agency
DDC
Pid
3875
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Current Phase
Close-out
Completion Date
2022-06-21T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2023-09-01T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3875
Reporting Period
202401
Managing Agency
DDC
Pid
3875
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Current Phase
Close-out
Completion Date
2022-06-21T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2023-09-01T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3875
Reporting Period
202405
Managing Agency
DDC
Pid
3875
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND
Current Phase
Close-out
Completion Date
2022-06-21T00:00:00.000
Completion Date Type
Actual
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3876
Reporting Period
202305
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3876
Reporting Period
202309
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3876
Reporting Period
202401
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3876
Reporting Period
202405
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3876
Reporting Period
202409
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3876
Reporting Period
202501
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3876
Reporting Period
202505
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3876
Reporting Period
202509
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3876
Reporting Period
202601
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3876
Reporting Period
202605
Managing Agency
DDC
Pid
3876
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Completion Date
2029-06-29T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-06-23T00:00:00.000