Capital Projects Dashboard - Citywide Schedule History and Variance

This is the history all agency reported forecasts/actual project completion dates. Each row is the snapshot of data taken on each reporting period. The 'completion date type' column shows if the 'completion date' is either a forecast or actual date. Over time, a project would have one or more forecasted completion dates before it is actually completed. The 'variance' is the day difference between 'completion date' of each row and its prior reporting period. This dataset is part of the Capital Projects Dashboard.

City Government Mayor's Office of Operations (OPS) Dataset 95tx-snak 10 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3946
Reporting Period
202405
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2027-09-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3946
Reporting Period
202409
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2027-09-14T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3946
Reporting Period
202501
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2029-08-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
714
Data Date
2024-11-13T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3946
Reporting Period
202505
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2029-08-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3946
Reporting Period
202509
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2029-08-28T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3946
Reporting Period
202601
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2031-08-27T00:00:00.000
Completion Date Type
Forecast
Variance Day
729
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3946
Reporting Period
202605
Managing Agency
DDC
Pid
3946
Agency Project Name
111TH STREET SAFETY IMPROVEMENTS, QNS
Current Phase
Design
Completion Date
2031-08-27T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-06-23T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3947
Reporting Period
202305
Managing Agency
DDC
Pid
3947
Agency Project Name
115th Street Basement Slab and Boiler Replacement
Current Phase
Construction
Completion Date
2023-10-30T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3947
Reporting Period
202309
Managing Agency
DDC
Pid
3947
Agency Project Name
115th Street Basement Slab and Boiler Replacement
Current Phase
Construction
Completion Date
2024-02-15T00:00:00.000
Completion Date Type
Forecast
Variance Day
108
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3947
Reporting Period
202401
Managing Agency
DDC
Pid
3947
Agency Project Name
115th Street Basement Slab and Boiler Replacement
Current Phase
Construction
Completion Date
2024-02-15T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3947
Reporting Period
202405
Managing Agency
DDC
Pid
3947
Agency Project Name
115th Street Basement Slab and Boiler Replacement
Current Phase
Construction
Completion Date
2024-02-16T00:00:00.000
Completion Date Type
Actual
Variance Day
1
Data Date
2024-07-18T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3948
Reporting Period
202305
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Design
Completion Date
2026-12-30T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3948
Reporting Period
202309
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Design
Completion Date
2027-04-10T00:00:00.000
Completion Date Type
Forecast
Variance Day
101
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3948
Reporting Period
202401
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Design
Completion Date
2027-04-10T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3948
Reporting Period
202405
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Design
Completion Date
2027-06-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
77
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3948
Reporting Period
202409
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Design
Completion Date
2027-06-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3948
Reporting Period
202501
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Construction Procurement
Completion Date
2027-09-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
92
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3948
Reporting Period
202505
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Construction Procurement
Completion Date
2027-09-26T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3948
Reporting Period
202509
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Construction Procurement
Completion Date
2027-11-30T00:00:00.000
Completion Date Type
Forecast
Variance Day
65
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3948
Reporting Period
202601
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Construction Procurement
Completion Date
2028-05-23T00:00:00.000
Completion Date Type
Forecast
Variance Day
175
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3948
Reporting Period
202605
Managing Agency
DDC
Pid
3948
Agency Project Name
12th Avenue Accessibility Improvements
Current Phase
Construction Procurement
Completion Date
2028-09-12T00:00:00.000
Completion Date Type
Forecast
Variance Day
112
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Data Date
2026-06-23T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3949
Reporting Period
202305
Managing Agency
DDC
Pid
3949
Agency Project Name
227 Duffield St. - Temporary Seal and Stabilization
Current Phase
Close-out
Completion Date
2023-01-18T00:00:00.000
Completion Date Type
Actual
Data Date
2023-09-01T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3950
Reporting Period
202305
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2029-05-29T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3950
Reporting Period
202309
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
616
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3950
Reporting Period
202401
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3950
Reporting Period
202405
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3950
Reporting Period
202409
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3950
Reporting Period
202501
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3950
Reporting Period
202505
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-02-04T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3950
Reporting Period
202509
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-09-19T00:00:00.000
Completion Date Type
Forecast
Variance Day
227
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3950
Reporting Period
202601
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-09-19T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3950
Reporting Period
202605
Managing Agency
DDC
Pid
3950
Agency Project Name
42nd Street Pedestrian Security Measures
Current Phase
Design
Completion Date
2031-09-19T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-06-23T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3951
Reporting Period
202305
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2027-03-30T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3951
Reporting Period
202309
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2028-04-18T00:00:00.000
Completion Date Type
Forecast
Variance Day
385
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3951
Reporting Period
202401
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2028-04-18T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3951
Reporting Period
202405
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2029-09-12T00:00:00.000
Completion Date Type
Forecast
Variance Day
512
Reason For Forecast Completion Change
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3951
Reporting Period
202409
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2029-09-12T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3951
Reporting Period
202501
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2029-09-12T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3951
Reporting Period
202505
Managing Agency
DDC
Pid
3951
Agency Project Name
43rd STREET SHARED STREET
Current Phase
Design
Completion Date
2030-02-06T00:00:00.000
Completion Date Type
Forecast
Variance Day
147
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3951
Reporting Period
202509
Managing Agency
DDC
Pid
3951
Agency Project Name
‘Reconstruction of 43rd Street
Current Phase
Design
Completion Date
2030-05-23T00:00:00.000
Completion Date Type
Forecast
Variance Day
106
Data Date
2025-10-23T00:00:00.000
202601
Reporting Period: 202601 • Managing Agency: DDC • Pid: 3951
Reporting Period
202601
Managing Agency
DDC
Pid
3951
Agency Project Name
‘Reconstruction of 43rd Street
Current Phase
Design
Completion Date
2030-05-23T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-03-16T00:00:00.000
202605
Reporting Period: 202605 • Managing Agency: DDC • Pid: 3951
Reporting Period
202605
Managing Agency
DDC
Pid
3951
Agency Project Name
‘Reconstruction of 43rd Street
Current Phase
Design
Completion Date
2030-05-23T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2026-06-23T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Pid: 3952
Reporting Period
202305
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2024-06-17T00:00:00.000
Completion Date Type
Forecast
Data Date
2023-09-01T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 3952
Reporting Period
202309
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2024-06-17T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202401
Reporting Period: 202401 • Managing Agency: DDC • Pid: 3952
Reporting Period
202401
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2024-06-17T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-02-16T00:00:00.000
202405
Reporting Period: 202405 • Managing Agency: DDC • Pid: 3952
Reporting Period
202405
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2025-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
562
Reason For Forecast Completion Change
PROJECT DELAYED PENDING APPROVAL OF NECESSARY PERMITS
Data Date
2024-07-18T00:00:00.000
202409
Reporting Period: 202409 • Managing Agency: DDC • Pid: 3952
Reporting Period
202409
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2025-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2024-11-07T00:00:00.000
202501
Reporting Period: 202501 • Managing Agency: DDC • Pid: 3952
Reporting Period
202501
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2025-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-02-26T00:00:00.000
202505
Reporting Period: 202505 • Managing Agency: DDC • Pid: 3952
Reporting Period
202505
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2025-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-05-30T00:00:00.000
202509
Reporting Period: 202509 • Managing Agency: DDC • Pid: 3952
Reporting Period
202509
Managing Agency
DDC
Pid
3952
Agency Project Name
4TH AVE. SAFETY IMPROVEMENTS PHASE II-VISION ZERO
Current Phase
Construction
Completion Date
2025-12-31T00:00:00.000
Completion Date Type
Forecast
Variance Day
0
Data Date
2025-10-23T00:00:00.000