Street and Highway Capital Reconstruction Projects - Intersection

This data is a spatial representation of street construction projects. Street and Highway capital projects are major street reconstruction projects, ranging from general street resurfacing projects to full reconstruction of the roadbed, sidewalks, sewer and water pipes and other utilities. Capital projects are essential to keep the City's infrastructure in a state of good repair.

Transportation Department of Transportation (DOT) Dataset 97nd-ff3i 30 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
1185
Projectid: 1185 • Projtitle: Reconstruction of Warren Street - West St to Broadway • Fmsid: HWMWTCA7F
The Geom
{"type":"MultiPoint","coordinates":[[-74.01320779418644,40.7165222648471],[-74.01307935595362,40.7164671502789],[-74.01292127784278,40.716398216066544]]}
Projectid
1185
Projtitle
Reconstruction of Warren Street - West St to Broadway
Fmsid
HWMWTCA7F
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2004/12/06 00:00:00
Construc 2
2024/01/31 00:00:00
Currentfun
25044323.0
Projectcos
25044323.0
Overallsco
Sidewalk (Standalone)
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
JOE DIMAGGIO HIGHWAY
Fromstreet
WARREN STREET
Boroughnam
MANHATTAN
Oftcode
111115132940000000
Designfy
0
Latitude
40.7164625437308
Longitude
-74.0130694759943
X
980626.979784414
Y
200303.409919759
VIEW LOCATION
1185
Projectid: 1185 • Projtitle: Reconstruction of Warren Street - West St to Broadway • Fmsid: HWMWTCA7F
The Geom
{"type":"MultiPoint","coordinates":[[-74.00838690934116,40.71436229378301]]}
Projectid
1185
Projtitle
Reconstruction of Warren Street - West St to Broadway
Fmsid
HWMWTCA7F
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2004/12/06 00:00:00
Construc 2
2024/01/31 00:00:00
Currentfun
25044323.0
Projectcos
25044323.0
Overallsco
Sidewalk (Standalone)
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
CHURCH STREET
Fromstreet
WARREN STREET
Boroughnam
MANHATTAN
Oftcode
115350132940000000
Designfy
0
Latitude
40.714362293783
Longitude
-74.0083869093411
X
981924.971829727
Y
199538.065868646
VIEW LOCATION
1185
Projectid: 1185 • Projtitle: Reconstruction of Warren Street - West St to Broadway • Fmsid: HWMWTCA7F
The Geom
{"type":"MultiPoint","coordinates":[[-74.00678194883716,40.7136061526486]]}
Projectid
1185
Projtitle
Reconstruction of Warren Street - West St to Broadway
Fmsid
HWMWTCA7F
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2004/12/06 00:00:00
Construc 2
2024/01/31 00:00:00
Currentfun
25044323.0
Projectcos
25044323.0
Overallsco
Sidewalk (Standalone)
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
BROADWAY
Fromstreet
WARREN STREET
Boroughnam
MANHATTAN
Oftcode
113610132940000000
Designfy
0
Latitude
40.7136061526486
Longitude
-74.0067819488371
X
982369.87940447
Y
199262.542141482
VIEW LOCATION
1186
Projectid: 1186 • Projtitle: RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY • Fmsid: HWMWTCA7G
The Geom
{"type":"MultiPoint","coordinates":[[-74.0095427729431,40.71032749284887]]}
Projectid
1186
Projtitle
RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY
Fmsid
HWMWTCA7G
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2005/03/09 00:00:00
Construc 2
2022/05/12 00:00:00
Currentfun
820000
Projectcos
820000
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
BROADWAY
Fromstreet
JOHN STREET
Boroughnam
MANHATTAN
Oftcode
113610124050000000
Designfy
0
Latitude
40.7103274928488
Longitude
-74.0095427729431
X
981604.381919727
Y
198068.098336145
VIEW LOCATION
1186
Projectid: 1186 • Projtitle: RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY • Fmsid: HWMWTCA7G
The Geom
{"type":"MultiPoint","coordinates":[[-74.00841836996773,40.70953038525735]]}
Projectid
1186
Projtitle
RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY
Fmsid
HWMWTCA7G
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2005/03/09 00:00:00
Construc 2
2022/05/12 00:00:00
Currentfun
820000
Projectcos
820000
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
JOHN STREET
Fromstreet
NASSAU STREET
Boroughnam
MANHATTAN
Oftcode
124050127100000000
Designfy
0
Latitude
40.7095303852573
Longitude
-74.0084183699677
X
981916.081099465
Y
197777.656003639
VIEW LOCATION
1186
Projectid: 1186 • Projtitle: RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY • Fmsid: HWMWTCA7G
The Geom
{"type":"MultiPoint","coordinates":[[-74.00728273387199,40.708709509129214]]}
Projectid
1186
Projtitle
RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY
Fmsid
HWMWTCA7G
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2005/03/09 00:00:00
Construc 2
2022/05/12 00:00:00
Currentfun
820000
Projectcos
820000
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
JOHN STREET
Fromstreet
WILLIAM STREET
Boroughnam
MANHATTAN
Oftcode
124050145440000000
Designfy
0
Latitude
40.7087095091292
Longitude
-74.007282733872
X
982230.90133597
Y
197478.557848558
VIEW LOCATION
1186
Projectid: 1186 • Projtitle: RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY • Fmsid: HWMWTCA7G
The Geom
{"type":"MultiPoint","coordinates":[[-74.00780823673296,40.70908976320118]]}
Projectid
1186
Projtitle
RECONSTRUCTION JOHN STREET - NASSAU STREET AND BROADWAY
Fmsid
HWMWTCA7G
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2016
Designstar
2005/03/09 00:00:00
Construc 2
2022/05/12 00:00:00
Currentfun
820000
Projectcos
820000
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
DUTCH STREET
Fromstreet
JOHN STREET
Boroughnam
MANHATTAN
Oftcode
116880124050000000
Designfy
0
Latitude
40.7090897632011
Longitude
-74.007808236733
X
982085.22085306
Y
197617.10842447
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00514773155685,40.70942552436778]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
ANN STREET
Fromstreet
GOLD STREET
Boroughnam
MANHATTAN
Oftcode
111750121350000000
Designfy
0
Latitude
40.7094255243677
Longitude
-74.0051477315568
X
982822.834535301
Y
197739.381801978
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00316110421471,40.706232014234345]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
MARGINAL STREET
Boroughnam
MANHATTAN
Oftcode
121230125675000000
Designfy
0
Latitude
40.7062320142343
Longitude
-74.0031611042147
X
983373.56834197
Y
196575.863787815
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00405660256769,40.70743678021462],[-74.00392127504155,40.707239744041594]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
WATER STREET
Boroughnam
MANHATTAN
Oftcode
121230133490000000
Designfy
0
Latitude
40.7073382621281
Longitude
-74.0039889388046
X
983144.065520138
Y
196978.912522398
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00372234818066,40.70693234311706],[-74.00360537984601,40.706780592677866]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FRONT STREET
Fromstreet
FULTON STREET
Boroughnam
MANHATTAN
Oftcode
121090121230000000
Designfy
0
Latitude
40.7068564678974
Longitude
-74.0036638640133
X
983234.185254596
Y
196803.376456141
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00705335855747,40.70987195074272]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
DUTCH STREET
Fromstreet
FULTON STREET
Boroughnam
MANHATTAN
Oftcode
116880121230000000
Designfy
0
Latitude
40.7098719507427
Longitude
-74.0070533585575
X
982294.52850531
Y
197902.065203637
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00432857306713,40.70782349484248],[-74.00405660256769,40.70743678021462]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
PEARL STREET
Boroughnam
MANHATTAN
Oftcode
121230128490000000
Designfy
0
Latitude
40.7076301375285
Longitude
-74.0041925878174
X
983087.608940139
Y
197085.254173227
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00643549103405,40.709557321400595]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
WILLIAM STREET
Boroughnam
MANHATTAN
Oftcode
121230145440000000
Designfy
0
Latitude
40.7095573214006
Longitude
-74.0064354910341
X
982465.817532808
Y
197787.423044473
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00526217228413,40.708920710727895]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
RYDERS ALLEY
Boroughnam
MANHATTAN
Oftcode
121230130110000000
Designfy
0
Latitude
40.7089207107279
Longitude
-74.0052621722841
X
982791.09575364
Y
197555.464846984
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00647921526438,40.71123006291927]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
BEEKMAN STREET
Fromstreet
NASSAU STREET
Boroughnam
MANHATTAN
Oftcode
113015127100000000
Designfy
0
Latitude
40.7112300629192
Longitude
-74.0064792152644
X
982453.740457222
Y
198396.854240313
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00481660031511,40.70839029138829]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
CLIFF STREET
Fromstreet
FULTON STREET
Boroughnam
MANHATTAN
Oftcode
115500121230000000
Designfy
0
Latitude
40.7083902913883
Longitude
-74.0048166003151
X
982914.617160141
Y
197362.209984139
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.0090626476865,40.71088670386093]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
BROADWAY
Fromstreet
FULTON STREET
Boroughnam
MANHATTAN
Oftcode
113610121230000000
Designfy
0
Latitude
40.7108867038609
Longitude
-74.0090626476865
X
981737.511902809
Y
198271.821681976
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00737534425913,40.710578867635164]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
ANN STREET
Fromstreet
NASSAU STREET
Boroughnam
MANHATTAN
Oftcode
111750127100000000
Designfy
0
Latitude
40.7105788676351
Longitude
-74.0073753442591
X
982205.282948881
Y
198159.623743638
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00774466570923,40.7102207732423]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
NASSAU STREET
Boroughnam
MANHATTAN
Oftcode
121230127100000000
Designfy
0
Latitude
40.7102207732423
Longitude
-74.0077446657092
X
982102.881906971
Y
198029.167967811
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.00551252957798,40.70909340802258]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
FULTON STREET
Fromstreet
GOLD STREET
Boroughnam
MANHATTAN
Oftcode
121230121350000000
Designfy
0
Latitude
40.7090934080226
Longitude
-74.005512529578
X
982721.689724475
Y
197618.387949482
VIEW LOCATION
1188
Projectid: 1188 • Projtitle: Reconstruction of Fulton St & Ancillary Streetscape • Fmsid: HWMWTCA8B
The Geom
{"type":"MultiPoint","coordinates":[[-74.01046534001382,40.71153454741821]]}
Projectid
1188
Projtitle
Reconstruction of Fulton St & Ancillary Streetscape
Fmsid
HWMWTCA8B
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projectdes
This project includes reconstruction, funded by USDOT- FHWA Relief Program for Lower Manhattan to restore streets damaged by the 9/11/01 WTC Terrorist Attacks.
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2007/01/22 00:00:00
Construc 2
2014/07/18 00:00:00
Currentfun
41872759.0
Projectcos
41872759.0
Overallsco
General Roadway,Sidewalk (Standalone)
Otherscope
Federal Funds
Projectjus
This project includes street reconstruction, funded by the USDOT – FHWA Federal Relief Program as part of an overall street reconstruction program for Lower Manhattan referred to as the 9/11/01 World Trade Center Terrorist Attack Transportation Infrast
Onstreetna
CHURCH STREET
Fromstreet
FULTON STREET
Boroughnam
MANHATTAN
Oftcode
115350121230000000
Designfy
0
Latitude
40.7115345474182
Longitude
-74.0104653400138
X
981348.663927227
Y
198507.894044474
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.96250593665887,40.77309770401567],[-73.9624024464753,40.773054058933496],[-73.96229082068314,40.77300711525477]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 75 STREET
Fromstreet
PARK AVENUE
Boroughnam
MANHATTAN
Oftcode
118490127790000000
Designfy
2014
Latitude
40.7730529594013
Longitude
-73.9623997346058
X
994664.40796497
Y
220923.071654975
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.94762224677477,40.82273707984047]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
CONVENT AVENUE
Fromstreet
WEST 142 STREET
Boroughnam
MANHATTAN
Oftcode
115910136610000000
Designfy
2014
Latitude
40.8227370798404
Longitude
-73.9476222467748
X
998746.607805803
Y
239026.827442139
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.96533896206641,40.76921226219115],[-73.96523746601727,40.76916845813786],[-73.96512772714381,40.76912316566948]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 69 STREET
Fromstreet
PARK AVENUE
Boroughnam
MANHATTAN
Oftcode
118370127790000000
Designfy
2014
Latitude
40.7691679619995
Longitude
-73.9652347184091
X
993879.744508053
Y
219507.313331649
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.9360123176699,40.826025074421466],[-73.9359051719282,40.825980043267705],[-73.9357947272201,40.82592762611324]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
7 AVENUE
Fromstreet
WEST 152 STREET
Boroughnam
MANHATTAN
Oftcode
110610136810000000
Designfy
2014
Latitude
40.8259775809673
Longitude
-73.935904072273
X
1001988.98638228
Y
240209.6159777
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.94165131756432,40.80445015471627]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 123 STREET
Fromstreet
MADISON AVENUE
Boroughnam
MANHATTAN
Oftcode
119410125390000000
Designfy
2014
Latitude
40.8044501547162
Longitude
-73.9416513175643
X
1000403.62155214
Y
232365.292536899
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.96276715589917,40.778313040735455]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 81 STREET
Boroughnam
MANHATTAN
Oftcode
110410118610000000
Designfy
2014
Latitude
40.7783130407354
Longitude
-73.9627671558992
X
994561.826149136
Y
222839.452336639
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.93757542259534,40.82676276883675]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
MACOMBS PLACE
Fromstreet
WEST 152 STREET
Boroughnam
MANHATTAN
Oftcode
125290136810000000
Designfy
2014
Latitude
40.8267627688367
Longitude
-73.9375754225953
X
1001526.22494997
Y
240495.354360729
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.93639500725997,40.8254669779418],[-73.93630602806877,40.82543049477415],[-73.93621670296294,40.82539386726695]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
7 AVENUE
Fromstreet
WEST 151 STREET
Boroughnam
MANHATTAN
Oftcode
110610136790000000
Designfy
2014
Latitude
40.8254304466609
Longitude
-73.9363059127639
X
1001877.91923783
Y
240010.193804368
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.95810353455977,40.784713004600874]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 91 STREET
Boroughnam
MANHATTAN
Oftcode
110410118810000000
Designfy
2014
Latitude
40.7847130046008
Longitude
-73.9581035345598
X
995852.324552387
Y
225171.759351805
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.9596483045434,40.80875389337011]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
AMSTERDAM AVENUE
Fromstreet
WEST 119 STREET
Boroughnam
MANHATTAN
Oftcode
111710136150000000
Designfy
2014
Latitude
40.8087538933701
Longitude
-73.9596483045434
X
995420.498972476
Y
233930.489537731
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.94481902375404,40.82657100992558]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
CONVENT AVENUE
Fromstreet
WEST 148 STREET
Boroughnam
MANHATTAN
Oftcode
115910136730000000
Designfy
2014
Latitude
40.8265710099255
Longitude
-73.944819023754
X
999521.576728299
Y
240424.14387323
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.93923710972246,40.83416331203164]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
JUMEL TERRACE
Fromstreet
WEST 160 STREET
Boroughnam
MANHATTAN
Oftcode
124125136970000000
Designfy
2014
Latitude
40.8341633120316
Longitude
-73.9392371097225
X
1001064.47685772
Y
243191.320425481
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.96322991781467,40.77767704657165]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 80 STREET
Boroughnam
MANHATTAN
Oftcode
110410118590000000
Designfy
2014
Latitude
40.7776770474721
Longitude
-73.9632299178142
X
994433.759148061
Y
222607.684099391
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.95648701141026,40.78404455137182]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 91 STREET
Fromstreet
MADISON AVENUE
Boroughnam
MANHATTAN
Oftcode
118810125390000000
Designfy
2014
Latitude
40.7840445513718
Longitude
-73.9564870114103
X
996300.106793299
Y
224928.4373319
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.95856810052655,40.78408344377716]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 90 STREET
Boroughnam
MANHATTAN
Oftcode
110410118790000000
Designfy
2014
Latitude
40.7840834437771
Longitude
-73.9585681005265
X
995723.781502381
Y
224942.327724054
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.98614708730976,40.74338893142437]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 27 STREET
Fromstreet
MADISON AVENUE
Boroughnam
MANHATTAN
Oftcode
117530125390000000
Designfy
2014
Latitude
40.7433889314243
Longitude
-73.9861470873098
X
988088.647166386
Y
210113.566043064
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.94210240924183,40.80382972058173]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 122 STREET
Fromstreet
MADISON AVENUE
Boroughnam
MANHATTAN
Oftcode
119390125390000000
Designfy
2014
Latitude
40.8038297214822
Longitude
-73.942102409241
X
1000278.88787772
Y
232139.163724065
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.94430194558547,40.80639082279675]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
MT MORRIS PARK WEST
Fromstreet
WEST 124 STREET
Boroughnam
MANHATTAN
Oftcode
126890136250000000
Designfy
2014
Latitude
40.8063908227967
Longitude
-73.9443019455855
X
999669.355304137
Y
233071.868551567
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.93848808499013,40.835196745425876]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
JUMEL TERRACE
Fromstreet
WEST 162 STREET
Boroughnam
MANHATTAN
Oftcode
124125137010000000
Designfy
2014
Latitude
40.8351967454258
Longitude
-73.9384880849901
X
1001271.4846458
Y
243567.983057976
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.960414306121,40.78152426813725]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 86 STREET
Boroughnam
MANHATTAN
Oftcode
110410118710000000
Designfy
2014
Latitude
40.7815242681372
Longitude
-73.960414306121
X
995212.931146145
Y
224009.69671531
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.93548534238026,40.82672573374395],[-73.93539079504966,40.82668313329927],[-73.93525789432526,40.82662838517821]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
7 AVENUE
Fromstreet
WEST 153 STREET
Boroughnam
MANHATTAN
Oftcode
110610136830000000
Designfy
2014
Latitude
40.8266790840738
Longitude
-73.9353780105851
X
1002134.38897862
Y
240465.305973758
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.95174483561925,40.81957261697586]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
AMSTERDAM AVENUE
Fromstreet
WEST 136 STREET
Boroughnam
MANHATTAN
Oftcode
111710136490000000
Designfy
2014
Latitude
40.8195726169758
Longitude
-73.9517448356193
X
997606.232789963
Y
237873.243791312
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.96183836961272,40.779584191968624]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
5 AVENUE
Fromstreet
EAST 83 STREET
Boroughnam
MANHATTAN
Oftcode
110410118650000000
Designfy
2014
Latitude
40.7795841919686
Longitude
-73.9618383696127
X
994818.856474966
Y
223302.686318308
VIEW LOCATION
1191
Projectid: 1191 • Projtitle: Complex Ped Ramps - FY14 MN Landmark Design contract • Fmsid: HWP14MLM
The Geom
{"type":"MultiPoint","coordinates":[[-73.9447750476836,40.779145072915945]]}
Projectid
1191
Projtitle
Complex Ped Ramps - FY14 MN Landmark Design contract
Fmsid
HWP14MLM
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Construc 2
2019/10/07 00:00:00
Currentfun
6313886.0
Projectcos
6313886.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 91 STREET
Fromstreet
YORK AVENUE
Boroughnam
MANHATTAN
Oftcode
118810145590000000
Designfy
2014
Latitude
40.7791450729159
Longitude
-73.9447750476836
X
999544.640658557
Y
223145.219441637
VIEW LOCATION
1192
Projectid: 1192 • Projtitle: Complex Ped Ramps - FY14 MN TA Design contract • Fmsid: HWP14MTA
The Geom
{"type":"MultiPoint","coordinates":[[-73.94335719090702,40.82595479717195]]}
Projectid
1192
Projtitle
Complex Ped Ramps - FY14 MN TA Design contract
Fmsid
HWP14MTA
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Currentfun
5153572.0
Projectcos
5153572.0
Overallsco
Sidewalk (Standalone)
Onstreetna
ST NICHOLAS AVENUE
Fromstreet
WEST 148 STREET
Boroughnam
MANHATTAN
Oftcode
131190136730000000
Designfy
2014
Latitude
40.8259547971719
Longitude
-73.943357190907
X
999926.290485799
Y
240199.893337473
VIEW LOCATION
1192
Projectid: 1192 • Projtitle: Complex Ped Ramps - FY14 MN TA Design contract • Fmsid: HWP14MTA
The Geom
{"type":"MultiPoint","coordinates":[[-73.98162787423048,40.7803289346975],[-73.98151911329141,40.780281757119155],[-73.98140948748319,40.78023541856615]]}
Projectid
1192
Projtitle
Complex Ped Ramps - FY14 MN TA Design contract
Fmsid
HWP14MTA
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Currentfun
5153572.0
Projectcos
5153572.0
Overallsco
Sidewalk (Standalone)
Onstreetna
BROADWAY
Fromstreet
WEST 74 STREET
Boroughnam
MANHATTAN
Oftcode
113610135250000000
Designfy
2014
Latitude
40.7802820367942
Longitude
-73.9815188250017
X
989368.304493333
Y
223555.17258062
VIEW LOCATION
1192
Projectid: 1192 • Projtitle: Complex Ped Ramps - FY14 MN TA Design contract • Fmsid: HWP14MTA
The Geom
{"type":"MultiPoint","coordinates":[[-73.9897648749965,40.739177088783094]]}
Projectid
1192
Projtitle
Complex Ped Ramps - FY14 MN TA Design contract
Fmsid
HWP14MTA
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Currentfun
5153572.0
Projectcos
5153572.0
Overallsco
Sidewalk (Standalone)
Onstreetna
BROADWAY
Fromstreet
EAST 20 STREET
Boroughnam
MANHATTAN
Oftcode
113610117390000000
Designfy
2014
Latitude
40.7391770887831
Longitude
-73.9897648749965
X
987086.336178884
Y
208578.920162231
VIEW LOCATION
1192
Projectid: 1192 • Projtitle: Complex Ped Ramps - FY14 MN TA Design contract • Fmsid: HWP14MTA
The Geom
{"type":"MultiPoint","coordinates":[[-73.94440664154955,40.79480843844459]]}
Projectid
1192
Projtitle
Complex Ped Ramps - FY14 MN TA Design contract
Fmsid
HWP14MTA
Fmsagencyi
841
Leadagency
DOT
Managingag
3
Projecttyp
PED
Projectt 1
PED RAMPS - CONTRACT
Projectsta
Completed Project
Constructi
2016
Designstar
2013/07/31 00:00:00
Currentfun
5153572.0
Projectcos
5153572.0
Overallsco
Sidewalk (Standalone)
Onstreetna
EAST 110 STREET
Fromstreet
LEXINGTON AVENUE
Boroughnam
MANHATTAN
Oftcode
119170124890000000
Designfy
2014
Latitude
40.7948084375441
Longitude
-73.9444066415503
X
999643.049582466
Y
228851.982962474
VIEW LOCATION