City of New York Municipal Solar-Readiness Assessment (Local Law 24 of 2016) data

These data were prepared in compliance with the requirements of Local Law 24 of 2016 (LL24). Under LL24, the Department of Citywide Administrative Services (DCAS) is required to assess the solar photovoltaic (PV) potential of all City-owned buildings over 10,000 gross square feet once every two years. Special focus is given to identifying and quantifying potential capacity at solar-ready buildings, which are defined as buildings that have roofs that are no more than 10 years old and are in fair or good condition. The 2022 Solar-Readiness Assessment is the fourth biennial assessment pursuant to LL24. The full report is available at https://www1.nyc.gov/assets/dcas/downloads/pdf/energy/reportsandpublication/local24_2022.pdf

City Government Department of Citywide Administrative Services (DCAS) Dataset cfz5-6fvh 32 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
SUNY
City Council District: 3 • Agency: SUNY • Site: FIT Campus: Building D Pomerantz Center
City Council District
3
Agency
SUNY
Site
FIT Campus: Building D Pomerantz Center
Address
227 West 27th St
Borough
Manhattan
Disadvantaged Community
�
Installation Date
42307
Installed Or Estimated
42.00 kW
Percentage Of Max Peak Demand
1.59
Estimated Annual Production
46,200 kWh
Percentage Of Annual
0.37
Estimated Annual Emissions
13 MT CO2
Estimated Social Cost Of
1764
Estimated Annual Energy
6930
Upfront Project Cost
420000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10001
Latitude
40.747127
Longitude
-73.994991
Community Board
105
Census Tract
95
Bin
1014251
Bbl
1007770018
Nta
Midtown-Midtown South
VIEW LOCATION
DOE
City Council District: 12 • Agency: DOE • Site: X425_Bronx Lab School
City Council District
12
Agency
DOE
Site
X425_Bronx Lab School
Address
800 East Gun Hill Rd
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
42382
Installed Or Estimated
131.76 kW
Percentage Of Max Peak Demand
0.21
Estimated Annual Production
144,936 kWh
Percentage Of Annual
0.08
Estimated Annual Emissions
42 MT CO2
Estimated Social Cost Of
5948
Estimated Annual Energy
21740
Upfront Project Cost
570186
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10467
Latitude
40.875953
Longitude
-73.86197
Community Board
212
Census Tract
372
Bin
2057045
Bbl
2046330040
Nta
Williamsbridge-Olinville
VIEW LOCATION
DOE
City Council District: 33 • Agency: DOE • Site: K380_PS 380 John Wayne Elementary
City Council District
33
Agency
DOE
Site
K380_PS 380 John Wayne Elementary
Address
370 Marcy Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
42441
Installed Or Estimated
104.31 kW
Percentage Of Max Peak Demand
0.26
Estimated Annual Production
114,741 kWh
Percentage Of Annual
0.2
Estimated Annual Emissions
33 MT CO2
Estimated Social Cost Of
4709
Estimated Annual Energy
26390
Upfront Project Cost
434640
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11206
Latitude
40.702427
Longitude
-73.952985
Community Board
301
Census Tract
531
Bin
3061235
Bbl
3022360009
Nta
Bedford
VIEW LOCATION
DOE
City Council District: 13 • Agency: DOE • Site: X192_I.S. 192 Piagentini and Jones
City Council District
13
Agency
DOE
Site
X192_I.S. 192 Piagentini and Jones
Address
650 Hollywood Ave
Borough
Bronx
Disadvantaged Community
�
Installation Date
42444
Installed Or Estimated
137.25 kW
Percentage Of Max Peak Demand
0.43
Estimated Annual Production
150,975 kWh
Percentage Of Annual
0.15
Estimated Annual Emissions
44 MT CO2
Estimated Social Cost Of
6196
Estimated Annual Energy
24156
Upfront Project Cost
571895
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10465
Latitude
40.826526
Longitude
-73.818417
Community Board
210
Census Tract
158
Bin
2077130
Bbl
2054380001
Nta
Schuylerville-Throgs Neck-Edgewater Park
VIEW LOCATION
DOE
City Council District: 18 • Agency: DOE • Site: X131_J.H.S. 131 Albert Einstein
City Council District
18
Agency
DOE
Site
X131_J.H.S. 131 Albert Einstein
Address
885 Bolton Ave
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
42444
Installed Or Estimated
200.08 kW
Percentage Of Max Peak Demand
0.5
Estimated Annual Production
220,088 kWh
Percentage Of Annual
0.25
Estimated Annual Emissions
64 MT CO2
Estimated Social Cost Of
9032
Estimated Annual Energy
46385
Upfront Project Cost
833696
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10473
Latitude
40.823526
Longitude
-73.859662
Community Board
209
Census Tract
42
Bin
2103869
Bbl
2036440001
Nta
Soundview-Castle Hill-Clason Point-Harding Park
VIEW LOCATION
DOE
City Council District: 24 • Agency: DOE • Site: Q505_Hillcrest High School
City Council District
24
Agency
DOE
Site
Q505_Hillcrest High School
Address
160-05 Highland Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
42466
Installed Or Estimated
367.83 kW
Percentage Of Max Peak Demand
0.47
Estimated Annual Production
404,613 kWh
Percentage Of Annual
0.19
Estimated Annual Emissions
117 MT CO2
Estimated Social Cost Of
16605
Estimated Annual Energy
72830
Upfront Project Cost
1589608
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11432
Latitude
40.709446
Longitude
-73.80166
Community Board
408
Census Tract
448
Bin
4448767
Bbl
4097740001
Nta
Briarwood-Jamaica Hills
VIEW LOCATION
DOE
City Council District: 26 • Agency: DOE • Site: Q204_I.S. 204 Oliver W. Holmes
City Council District
26
Agency
DOE
Site
Q204_I.S. 204 Oliver W. Holmes
Address
36-41 28 St
Borough
Queens
Disadvantaged Community
�
Installation Date
42466
Installed Or Estimated
159.21 kW
Percentage Of Max Peak Demand
0.74
Estimated Annual Production
175,131 kWh
Percentage Of Annual
0.31
Estimated Annual Emissions
51 MT CO2
Estimated Social Cost Of
7187
Estimated Annual Energy
35026
Upfront Project Cost
663398
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11106
Latitude
40.757065
Longitude
-73.932664
Community Board
401
Census Tract
51
Bin
4004156
Bbl
4003430001
Nta
Queensbridge-Ravenswood-Long Island City
VIEW LOCATION
DOE
City Council District: 26 • Agency: DOE • Site: Q445_William Cullen Bryant High School
City Council District
26
Agency
DOE
Site
Q445_William Cullen Bryant High School
Address
48-10 31 Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
42466
Installed Or Estimated
199.88 kW
Percentage Of Max Peak Demand
0.48
Estimated Annual Production
219,868 kWh
Percentage Of Annual
0.19
Estimated Annual Emissions
64 MT CO2
Estimated Social Cost Of
9023
Estimated Annual Energy
39576
Upfront Project Cost
792584
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11103
Latitude
40.75823
Longitude
-73.910514
Community Board
401
Census Tract
163
Bin
4013655
Bbl
4007380002
Nta
Astoria
VIEW LOCATION
DOE
City Council District: 13 • Agency: DOE • Site: X144_J.H.S. 144 Michelangelo
City Council District
13
Agency
DOE
Site
X144_J.H.S. 144 Michelangelo
Address
2545 Gunther Ave
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
42468
Installed Or Estimated
192.15 kW
Percentage Of Max Peak Demand
0.56
Estimated Annual Production
211,365 kWh
Percentage Of Annual
0.25
Estimated Annual Emissions
61 MT CO2
Estimated Social Cost Of
8674
Estimated Annual Energy
42273
Upfront Project Cost
800653
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10469
Latitude
40.863735
Longitude
-73.83607
Community Board
211
Census Tract
310
Bin
2053518
Bbl
2044930001
Nta
Allerton-Pelham Gardens
VIEW LOCATION
DOE
City Council District: 17 • Agency: DOE • Site: X184_I.S. 184 South Bronx Academy for Applied Media
City Council District
17
Agency
DOE
Site
X184_I.S. 184 South Bronx Academy for Applied Media
Address
778 Forest Ave
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
42468
Installed Or Estimated
248.85 kW
Percentage Of Max Peak Demand
0.56
Estimated Annual Production
273,735 kWh
Percentage Of Annual
0.26
Estimated Annual Emissions
79 MT CO2
Estimated Social Cost Of
11234
Estimated Annual Energy
57484
Upfront Project Cost
943255
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10456
Latitude
40.818874
Longitude
-73.905927
Community Board
201
Census Tract
77
Bin
2004690
Bbl
2026550030
Nta
Melrose South-Mott Haven North
VIEW LOCATION
DOE
City Council District: 46 • Agency: DOE • Site: K278_J.H.S. 278 Marine Park
City Council District
46
Agency
DOE
Site
K278_J.H.S. 278 Marine Park
Address
1925 Stuart St
Borough
Brooklyn
Disadvantaged Community
�
Installation Date
42472
Installed Or Estimated
120.78 kW
Percentage Of Max Peak Demand
0.29
Estimated Annual Production
132,858 kWh
Percentage Of Annual
0.23
Estimated Annual Emissions
38 MT CO2
Estimated Social Cost Of
5453
Estimated Annual Energy
27900
Upfront Project Cost
503268
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11229
Latitude
40.60665
Longitude
-73.939176
Community Board
315
Census Tract
666
Bin
3239889
Bbl
3084960100
Nta
park-cemetery-etc-Brooklyn
VIEW LOCATION
DOE
City Council District: 46 • Agency: DOE • Site: K515_South Shore Educational Campus
City Council District
46
Agency
DOE
Site
K515_South Shore Educational Campus
Address
6565 Flatlands Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
42472
Installed Or Estimated
590.20 kW
Percentage Of Max Peak Demand
0.7
Estimated Annual Production
649,220 kWh
Percentage Of Annual
0.36
Estimated Annual Emissions
188 MT CO2
Estimated Social Cost Of
26644
Estimated Annual Energy
116860
Upfront Project Cost
2617082
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11236
Latitude
40.633285
Longitude
-73.916735
Community Board
318
Census Tract
950
Bin
3224139
Bbl
3079980005
Nta
Canarsie
VIEW LOCATION
DOE
City Council District: 20 • Agency: DOE • Site: Q237_I.S. 237 Rachel Carson
City Council District
20
Agency
DOE
Site
Q237_I.S. 237 Rachel Carson
Address
46-21 Colden St
Borough
Queens
Disadvantaged Community
EJA
Installation Date
42473
Installed Or Estimated
247.00 kW
Percentage Of Max Peak Demand
0.55
Estimated Annual Production
271,700 kWh
Percentage Of Annual
0.31
Estimated Annual Emissions
79 MT CO2
Estimated Social Cost Of
11151
Estimated Annual Energy
62491
Upfront Project Cost
907435
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11355
Latitude
40.749545
Longitude
-73.822073
Community Board
407
Census Tract
845
Bin
4116436
Bbl
4051470001
Nta
Flushing
VIEW LOCATION
DOE
City Council District: 28 • Agency: DOE • Site: Q072_Catherine & Count Basie Middle School 72
City Council District
28
Agency
DOE
Site
Q072_Catherine & Count Basie Middle School 72
Address
133-25 Guy R Brewer Blvd
Borough
Queens
Disadvantaged Community
EJA
Installation Date
42473
Installed Or Estimated
248.85 kW
Percentage Of Max Peak Demand
0.82
Estimated Annual Production
273,735 kWh
Percentage Of Annual
0.3
Estimated Annual Emissions
79 MT CO2
Estimated Social Cost Of
11234
Estimated Annual Energy
49272
Upfront Project Cost
943255
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11434
Latitude
40.673769
Longitude
-73.775951
Community Board
412
Census Tract
33402
Bin
4270059
Bbl
4124950270
Nta
Springfield Gardens North
VIEW LOCATION
DOE
City Council District: 28 • Agency: DOE • Site: Q226_J.H.S. 226 Virgil I. Grissom
City Council District
28
Agency
DOE
Site
Q226_J.H.S. 226 Virgil I. Grissom
Address
121-10 Rockaway Blvd
Borough
Queens
Disadvantaged Community
EJA
Installation Date
42473
Installed Or Estimated
135.85 kW
Percentage Of Max Peak Demand
0.28
Estimated Annual Production
149,435 kWh
Percentage Of Annual
0.1
Estimated Annual Emissions
43 MT CO2
Estimated Social Cost Of
6133
Estimated Annual Energy
23910
Upfront Project Cost
499089
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11420
Latitude
40.675771
Longitude
-73.816938
Community Board
410
Census Tract
840
Bin
4253607
Bbl
4117140100
Nta
South Ozone Park
VIEW LOCATION
DOE
City Council District: 49 • Agency: DOE • Site: R445_Port Richmond High School
City Council District
49
Agency
DOE
Site
R445_Port Richmond High School
Address
85 St. Josephs Ave
Borough
Staten Island
Disadvantaged Community
�
Installation Date
42475
Installed Or Estimated
120.78 kW
Percentage Of Max Peak Demand
0.14
Estimated Annual Production
132,858 kWh
Percentage Of Annual
0.07
Estimated Annual Emissions
38 MT CO2
Estimated Social Cost Of
5453
Estimated Annual Energy
23914
Upfront Project Cost
545104
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10302
Latitude
40.634573
Longitude
-74.141818
Community Board
501
Census Tract
213
Bin
5026076
Bbl
5011210001
Nta
Port Richmond
VIEW LOCATION
DOE
City Council District: 51 • Agency: DOE • Site: R075_I.S. 075 Frank D. Paulo
City Council District
51
Agency
DOE
Site
R075_I.S. 075 Frank D. Paulo
Address
455 Huguenot Ave
Borough
Staten Island
Disadvantaged Community
�
Installation Date
42475
Installed Or Estimated
129.68 kW
Percentage Of Max Peak Demand
0.19
Estimated Annual Production
142,648 kWh
Percentage Of Annual
0.14
Estimated Annual Emissions
41 MT CO2
Estimated Social Cost Of
5854
Estimated Annual Energy
34236
Upfront Project Cost
568796
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10312
Latitude
40.54438
Longitude
-74.197897
Community Board
503
Census Tract
17010
Bin
5079651
Bbl
5060500002
Nta
Arden Heights
VIEW LOCATION
DOE
City Council District: 51 • Agency: DOE • Site: R455_Tottenville High School
City Council District
51
Agency
DOE
Site
R455_Tottenville High School
Address
100 Luten Ave
Borough
Staten Island
Disadvantaged Community
�
Installation Date
42475
Installed Or Estimated
532.53 kW
Percentage Of Max Peak Demand
0.55
Estimated Annual Production
585,783 kWh
Percentage Of Annual
0.21
Estimated Annual Emissions
169 MT CO2
Estimated Social Cost Of
24041
Estimated Annual Energy
99583
Upfront Project Cost
2218953
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10312
Latitude
40.528092
Longitude
-74.192032
Community Board
503
Census Tract
198
Bin
5082634
Bbl
5066130001
Nta
Annadale-Huguenot-Prince's Bay-Eltingville
VIEW LOCATION
DOE
City Council District: 3 • Agency: DOE • Site: M070_I.S. 70 Manhattan
City Council District
3
Agency
DOE
Site
M070_I.S. 70 Manhattan
Address
333 West 17 St
Borough
Manhattan
Disadvantaged Community
�
Installation Date
42481
Installed Or Estimated
159.21 kW
Percentage Of Max Peak Demand
0.18
Estimated Annual Production
175,131 kWh
Percentage Of Annual
0.28
Estimated Annual Emissions
51 MT CO2
Estimated Social Cost Of
7187
Estimated Annual Energy
52539
Upfront Project Cost
650690
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10011
Latitude
40.742129
Longitude
-74.002198
Community Board
104
Census Tract
83
Bin
1079152
Bbl
1007410010
Nta
Hudson Yards-Chelsea-Flatiron-Union Square
VIEW LOCATION
EDC
City Council District: 33 • Agency: EDC • Site: Brooklyn Navy Yard - Building 293
City Council District
33
Agency
EDC
Site
Brooklyn Navy Yard - Building 293
Address
63 Flushing Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
42491
Installed Or Estimated
992.88 kW
Percentage Of Max Peak Demand
4.28
Estimated Annual Production
1,092,168 kWh
Percentage Of Annual
0.69
Estimated Annual Emissions
316 MT CO2
Estimated Social Cost Of
44823
Estimated Annual Energy
163825
Upfront Project Cost
0
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11205
Latitude
40.69802
Longitude
-73.974986
Community Board
302
Census Tract
543
Bin
3335129
Bbl
3020230001
Nta
park-cemetery-etc-Brooklyn
VIEW LOCATION
DPR
City Council District: 17 • Agency: DPR • Site: Bronx River Greenway River House
City Council District
17
Agency
DPR
Site
Bronx River Greenway River House
Address
1490 Sheridan Expy
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
42887
Installed Or Estimated
68.67 kW
Percentage Of Max Peak Demand
0.93
Estimated Annual Production
75,537 kWh
Percentage Of Annual
0.33
Estimated Annual Emissions
22 MT CO2
Estimated Social Cost Of
3100
Estimated Annual Energy
43056
Upfront Project Cost
N/A
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10459
Latitude
40.832528
Longitude
-73.883782
Community Board
209
Census Tract
157
Bin
2000000
Bbl
2030190100
Nta
Crotona Park East
VIEW LOCATION
DSNY
City Council District: 39 • Agency: DSNY • Site: BK 6 Salt Lot Community Compost
City Council District
39
Agency
DSNY
Site
BK 6 Salt Lot Community Compost
Address
12 2nd Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
42996
Installed Or Estimated
24.40 kW
Percentage Of Max Peak Demand
1
Estimated Annual Production
26,840 kWh
Percentage Of Annual
1
Estimated Annual Emissions
7 MT CO2
Estimated Social Cost Of
1025
Estimated Annual Energy
4026
Upfront Project Cost
244000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11215
Latitude
40.675249
Longitude
-73.991189
Community Board
306
Census Tract
119
Bin
3000000
Bbl
3009770003
Nta
Park Slope-Gowanus
VIEW LOCATION
CUNY
City Council District: 1 • Agency: CUNY • Site: BMCC (Borough of Manhattan Community College)
City Council District
1
Agency
CUNY
Site
BMCC (Borough of Manhattan Community College)
Address
199 Chambers St
Borough
Manhattan
Disadvantaged Community
�
Installation Date
43068
Installed Or Estimated
309.67 kW
Percentage Of Max Peak Demand
0.09
Estimated Annual Production
340,637 kWh
Percentage Of Annual
0.12
Estimated Annual Emissions
98 MT CO2
Estimated Social Cost Of
13980
Estimated Annual Energy
47689
Upfront Project Cost
4200000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10007
Latitude
40.716838
Longitude
-74.012117
Community Board
101
Census Tract
39
Bin
1066406
Bbl
1001420050
Nta
SoHo-TriBeCa-Civic Center-Little Italy
VIEW LOCATION
DCLA
City Council District: 15 • Agency: DCLA • Site: NYBG Howell Family Garden Center
City Council District
15
Agency
DCLA
Site
NYBG Howell Family Garden Center
Address
1575 Bronx Park Rd
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
43101
Installed Or Estimated
11.00 kW
Percentage Of Max Peak Demand
0.01
Estimated Annual Production
12,100 kWh
Percentage Of Annual
0
Estimated Annual Emissions
3 MT CO2
Estimated Social Cost Of
497
Estimated Annual Energy
1452
Upfront Project Cost
N/A
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10467
Latitude
40.856665
Longitude
-73.875798
Community Board
227
Census Tract
334
Bin
2000000
Bbl
2043360001
Nta
park-cemetery-etc-Bronx
VIEW LOCATION
DOE
City Council District: 31 • Agency: DOE • Site: Q215_Lucretia Mott
City Council District
31
Agency
DOE
Site
Q215_Lucretia Mott
Address
535 Briar Pl
Borough
Queens
Disadvantaged Community
EJA
Installation Date
43262
Installed Or Estimated
172.66 kW
Percentage Of Max Peak Demand
0.95
Estimated Annual Production
189,926 kWh
Percentage Of Annual
0.61
Estimated Annual Emissions
55 MT CO2
Estimated Social Cost Of
7795
Estimated Annual Energy
58877
Upfront Project Cost
2798825
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11691
Latitude
40.5993
Longitude
-73.758206
Community Board
414
Census Tract
99801
Bin
4301194
Bbl
4157720031
Nta
Far Rockaway-Bayswater
VIEW LOCATION
SUNY
City Council District: 3 • Agency: SUNY • Site: FIT Campus: Building E
City Council District
3
Agency
SUNY
Site
FIT Campus: Building E
Address
200 West 27th St
Borough
Manhattan
Disadvantaged Community
�
Installation Date
43889
Installed Or Estimated
33.60 kW
Percentage Of Max Peak Demand
1.27
Estimated Annual Production
36,960 kWh
Percentage Of Annual
0.3
Estimated Annual Emissions
10 MT CO2
Estimated Social Cost Of
1411
Estimated Annual Energy
5544
Upfront Project Cost
336000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10001
Latitude
40.746649
Longitude
-73.993908
Community Board
105
Census Tract
95
Bin
1014236
Bbl
1007760040
Nta
Midtown-Midtown South
VIEW LOCATION
DOE
City Council District: 22 • Agency: DOE • Site: Q171
City Council District
22
Agency
DOE
Site
Q171
Address
14-14 29th Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44036
Installed Or Estimated
178.02 kW
Percentage Of Max Peak Demand
0.68
Estimated Annual Production
195,822 kWh
Percentage Of Annual
0.31
Estimated Annual Emissions
57 MT CO2
Estimated Social Cost Of
8037
Estimated Annual Energy
29370
Upfront Project Cost
0
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11102
Latitude
40.771336
Longitude
-73.929086
Community Board
401
Census Tract
83
Bin
4006046
Bbl
4005370014
Nta
Old Astoria
VIEW LOCATION
NYBG
City Council District: 15 • Agency: NYBG • Site: Pvilion location
City Council District
15
Agency
NYBG
Site
Pvilion location
Address
2900 Southern Boulevard / 1 BOTANICAL GARDENS CT BX PK MUSEUM BLDG B S
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
44053
Installed Or Estimated
6.40 kW
Percentage Of Max Peak Demand
1.01
Estimated Annual Production
7,040 kWh
Percentage Of Annual
0.26
Estimated Annual Emissions
2 MT CO2
Estimated Social Cost Of
269
Estimated Annual Energy
1056
Upfront Project Cost
64000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
DOE
City Council District: 19 • Agency: DOE • Site: Q025
City Council District
19
Agency
DOE
Site
Q025
Address
34-65 192nd St
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44286
Installed Or Estimated
213.21 kW
Percentage Of Max Peak Demand
0.37
Estimated Annual Production
234,531 kWh
Percentage Of Annual
0.29
Estimated Annual Emissions
68 MT CO2
Estimated Social Cost Of
9625
Estimated Annual Energy
35180
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11358
Latitude
40.765133
Longitude
-73.790083
Community Board
411
Census Tract
1139
Bin
4119139
Bbl
4052610001
Nta
Auburndale
VIEW LOCATION
DOE
City Council District: 27 • Agency: DOE • Site: Q192
City Council District
27
Agency
DOE
Site
Q192
Address
109-89 204th St
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44286
Installed Or Estimated
301.92 kW
Percentage Of Max Peak Demand
1.01
Estimated Annual Production
336,996 kWh
Percentage Of Annual
0.42
Estimated Annual Emissions
97 MT CO2
Estimated Social Cost Of
13830
Estimated Annual Energy
49817
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11412
Latitude
40.70646
Longitude
-73.753579
Community Board
412
Census Tract
508
Bin
4234318
Bbl
4109440301
Nta
Hollis
VIEW LOCATION
DOE
City Council District: 32 • Agency: DOE • Site: Q210
City Council District
32
Agency
DOE
Site
Q210
Address
93-11 101 Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44286
Installed Or Estimated
246.33 kW
Percentage Of Max Peak Demand
0.69
Estimated Annual Production
270,963 kWh
Percentage Of Annual
0.3
Estimated Annual Emissions
78 MT CO2
Estimated Social Cost Of
11120
Estimated Annual Energy
40644
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11416
Latitude
40.683858
Longitude
-73.84747
Community Board
409
Census Tract
38
Bin
4188567
Bbl
4090670001
Nta
Woodhaven
VIEW LOCATION
DOE
City Council District: 36 • Agency: DOE • Site: K026
City Council District
36
Agency
DOE
Site
K026
Address
1014 Lafayette Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44320
Installed Or Estimated
291.74 kW
Percentage Of Max Peak Demand
1.08
Estimated Annual Production
290,521 kWh
Percentage Of Annual
0.52
Estimated Annual Emissions
84 MT CO2
Estimated Social Cost Of
11923
Estimated Annual Energy
48137
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11221
Latitude
40.692126
Longitude
-73.931731
Community Board
303
Census Tract
291
Bin
3393805
Bbl
3016160001
Nta
Stuyvesant Heights
VIEW LOCATION
DOE
City Council District: 45 • Agency: DOE • Site: K152
City Council District
45
Agency
DOE
Site
K152
Address
2310 Glenwood Rd
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44320
Installed Or Estimated
79.66 kW
Percentage Of Max Peak Demand
0.13
Estimated Annual Production
77,924 kWh
Percentage Of Annual
0.05
Estimated Annual Emissions
23 MT CO2
Estimated Social Cost Of
3198
Estimated Annual Energy
13144
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11210
Latitude
40.633232
Longitude
-73.954655
Community Board
314
Census Tract
772
Bin
3205780
Bbl
3075510026
Nta
Flatbush
VIEW LOCATION
DOE
City Council District: 29 • Agency: DOE • Site: Q139
City Council District
29
Agency
DOE
Site
Q139
Address
93-06 63rd Dr
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44333
Installed Or Estimated
117.30 kW
Percentage Of Max Peak Demand
0.57
Estimated Annual Production
130,922 kWh
Percentage Of Annual
0.32
Estimated Annual Emissions
38 MT CO2
Estimated Social Cost Of
5373
Estimated Annual Energy
19355
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11374
Latitude
40.72814
Longitude
-73.863582
Community Board
406
Census Tract
693
Bin
4072457
Bbl
4030950050
Nta
Rego Park
VIEW LOCATION
DOE
City Council District: 30 • Agency: DOE • Site: Q229
City Council District
30
Agency
DOE
Site
Q229
Address
67-25 51St Rd
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44349
Installed Or Estimated
114.24 kW
Percentage Of Max Peak Demand
0.48
Estimated Annual Production
127,512 kWh
Percentage Of Annual
0.23
Estimated Annual Emissions
37 MT CO2
Estimated Social Cost Of
5233
Estimated Annual Energy
18850
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11377
Latitude
40.734294
Longitude
-73.897557
Community Board
405
Census Tract
513
Bin
4440274
Bbl
4024230001
Nta
Maspeth
VIEW LOCATION
DOE
City Council District: 36 • Agency: DOE • Site: K335
City Council District
36
Agency
DOE
Site
K335
Address
130 Rochester Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44350
Installed Or Estimated
185.02 kW
Percentage Of Max Peak Demand
1.31
Estimated Annual Production
178,904 kWh
Percentage Of Annual
0.4
Estimated Annual Emissions
52 MT CO2
Estimated Social Cost Of
7342
Estimated Annual Energy
30528
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11213
Latitude
40.674656
Longitude
-73.927794
Community Board
308
Census Tract
307
Bin
3035887
Bbl
3013550023
Nta
Crown Heights North
VIEW LOCATION
DOE
City Council District: 14 • Agency: DOE • Site: X026
City Council District
14
Agency
DOE
Site
X026
Address
1930 Andrews Ave
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
44356
Installed Or Estimated
205.34 kW
Percentage Of Max Peak Demand
0.46
Estimated Annual Production
226,512 kWh
Percentage Of Annual
0.23
Estimated Annual Emissions
65 MT CO2
Estimated Social Cost Of
9296
Estimated Annual Energy
33881
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10453
Latitude
40.854701
Longitude
-73.913197
Community Board
205
Census Tract
24502
Bin
2014692
Bbl
2032160002
Nta
University Heights-Morris Heights
VIEW LOCATION
DOE
City Council District: 14 • Agency: DOE • Site: X117
City Council District
14
Agency
DOE
Site
X117
Address
1865 Morris Ave
Borough
Bronx
Disadvantaged Community
EJA
Installation Date
44363
Installed Or Estimated
147.66 kW
Percentage Of Max Peak Demand
0.48
Estimated Annual Production
160,930 kWh
Percentage Of Annual
0.23
Estimated Annual Emissions
47 MT CO2
Estimated Social Cost Of
6605
Estimated Annual Energy
24364
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10453
Latitude
40.848547
Longitude
-73.908416
Community Board
205
Census Tract
23301
Bin
2007902
Bbl
2028270001
Nta
Mount Hope
VIEW LOCATION
DOE
City Council District: 46 • Agency: DOE • Site: K251
City Council District
46
Agency
DOE
Site
K251
Address
1037 East 54th St
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44470
Installed Or Estimated
187.88 kW
Percentage Of Max Peak Demand
1
Estimated Annual Production
206,668 kWh
Percentage Of Annual
0.6
Estimated Annual Emissions
76 MT CO2
Estimated Social Cost Of
10806
Estimated Annual Energy
39494
Upfront Project Cost
368371
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11234
Latitude
40.632524
Longitude
-73.924417
Community Board
318
Census Tract
722
Bin
3214729
Bbl
3077580001
Nta
Flatlands
VIEW LOCATION
DOE
City Council District: 42 • Agency: DOE • Site: K273
City Council District
42
Agency
DOE
Site
K273
Address
923 Jerome St
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44475
Installed Or Estimated
228.00 kW
Percentage Of Max Peak Demand
0.85
Estimated Annual Production
185,592 kWh
Percentage Of Annual
0.62
Estimated Annual Emissions
54 MT CO2
Estimated Social Cost Of
7617
Estimated Annual Energy
37620
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11207
Latitude
40.657922
Longitude
-73.879354
Community Board
305
Census Tract
1078
Bin
3097973
Bbl
3044010001
Nta
East New York
VIEW LOCATION
DOE
City Council District: 39 • Agency: DOE • Site: K058
City Council District
39
Agency
DOE
Site
K058
Address
330 Smith St
Borough
Brooklyn
Disadvantaged Community
�
Installation Date
44481
Installed Or Estimated
205.20 kW
Percentage Of Max Peak Demand
0.74
Estimated Annual Production
225,720 kWh
Percentage Of Annual
0.49
Estimated Annual Emissions
65 MT CO2
Estimated Social Cost Of
9264
Estimated Annual Energy
33858
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11231
Latitude
40.680149
Longitude
-73.994938
Community Board
306
Census Tract
77
Bin
3007547
Bbl
3004490015
Nta
Carroll Gardens-Columbia Street-Red Hook
VIEW LOCATION
DOE
City Council District: 42 • Agency: DOE • Site: K166
City Council District
42
Agency
DOE
Site
K166
Address
800 Van Sicklen Ave
Borough
Brooklyn
Disadvantaged Community
EJA
Installation Date
44483
Installed Or Estimated
295.68 kW
Percentage Of Max Peak Demand
0.84
Estimated Annual Production
325,248 kWh
Percentage Of Annual
0.92
Estimated Annual Emissions
94 MT CO2
Estimated Social Cost Of
13348
Estimated Annual Energy
48787
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
DOE
City Council District: 19 • Agency: DOE • Site: Q021
City Council District
19
Agency
DOE
Site
Q021
Address
147-36 26th Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44518
Installed Or Estimated
124.20 kW
Percentage Of Max Peak Demand
0.33
Estimated Annual Production
136,620 kWh
Percentage Of Annual
0.19
Estimated Annual Emissions
39 MT CO2
Estimated Social Cost Of
5607
Estimated Annual Energy
20493
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11354
Latitude
40.774512
Longitude
-73.819284
Community Board
407
Census Tract
1047
Bin
4108665
Bbl
4048030001
Nta
Murray Hill
VIEW LOCATION
DOE
City Council District: 27 • Agency: DOE • Site: Q490
City Council District
27
Agency
DOE
Site
Q490
Address
207-01 116th Ave
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44536
Installed Or Estimated
386.40 kW
Percentage Of Max Peak Demand
1.1
Estimated Annual Production
425,040 kWh
Percentage Of Annual
0.35
Estimated Annual Emissions
123 MT CO2
Estimated Social Cost Of
17444
Estimated Annual Energy
63756
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11411
Latitude
40.697819
Longitude
-73.745728
Community Board
413
Census Tract
53401
Bin
4238003
Bbl
4110490001
Nta
Cambria Heights
VIEW LOCATION
DOE
City Council District: 23 • Agency: DOE • Site: Q115
City Council District
23
Agency
DOE
Site
Q115
Address
80-51 261 St
Borough
Queens
Disadvantaged Community
�
Installation Date
44540
Installed Or Estimated
184.03 kW
Percentage Of Max Peak Demand
0.87
Estimated Annual Production
202,433 kWh
Percentage Of Annual
0.45
Estimated Annual Emissions
59 MT CO2
Estimated Social Cost Of
8308
Estimated Annual Energy
30365
Upfront Project Cost
N/A
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11004
Latitude
40.744099
Longitude
-73.709845
Community Board
413
Census Tract
157902
Bin
4178127
Bbl
4087170001
Nta
Glen Oaks-Floral Park-New Hyde Park
VIEW LOCATION
NYPL
City Council District: 51 • Agency: NYPL • Site: Charleston Branch Library
City Council District
51
Agency
NYPL
Site
Charleston Branch Library
Address
225 Bricktown Way
Borough
Staten Island
Disadvantaged Community
�
Installation Date
44540
Installed Or Estimated
60.48 kW
Percentage Of Max Peak Demand
1
Estimated Annual Production
66,528 kWh
Percentage Of Annual
1
Estimated Annual Emissions
18 MT CO2
Estimated Social Cost Of
2540
Estimated Annual Energy
9979
Upfront Project Cost
N/A
Financing Mechanism
Capital
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
10309
Latitude
40.52959
Longitude
-74.232261
Community Board
503
Census Tract
226
Bin
5000000
Bbl
5074520050
Nta
Charleston-Richmond Valley-Tottenville
VIEW LOCATION
DOE
City Council District: 23 • Agency: DOE • Site: Q018
City Council District
23
Agency
DOE
Site
Q018
Address
86-35 235th Ct
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44152
Installed Or Estimated
161.46 kW
Percentage Of Max Peak Demand
0.97
Estimated Annual Production
177,606 kWh
Percentage Of Annual
0.42
Estimated Annual Emissions
51 MT CO2
Estimated Social Cost Of
7289
Estimated Annual Energy
26641
Upfront Project Cost
0
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11427
Latitude
40.732112
Longitude
-73.73246
Community Board
413
Census Tract
1621
Bin
4166561
Bbl
4079550002
Nta
Bellerose
VIEW LOCATION
DOE
City Council District: 23 • Agency: DOE • Site: Q074
City Council District
23
Agency
DOE
Site
Q074
Address
61-15 Oceania St
Borough
Queens
Disadvantaged Community
EJA
Installation Date
44154
Installed Or Estimated
143.52 kW
Percentage Of Max Peak Demand
0.34
Estimated Annual Production
157,872 kWh
Percentage Of Annual
0.2
Estimated Annual Emissions
46 MT CO2
Estimated Social Cost Of
6479
Estimated Annual Energy
23681
Upfront Project Cost
0
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11364
Latitude
40.745201
Longitude
-73.767446
Community Board
411
Census Tract
1367
Bin
4163953
Bbl
4077230001
Nta
Oakland Gardens
VIEW LOCATION
DOE
City Council District: 29 • Agency: DOE • Site: Q157
City Council District
29
Agency
DOE
Site
Q157
Address
63-55 102nd St
Borough
Queens
Disadvantaged Community
�
Installation Date
44159
Installed Or Estimated
207.00 kW
Percentage Of Max Peak Demand
0.49
Estimated Annual Production
227,700 kWh
Percentage Of Annual
0.21
Estimated Annual Emissions
66 MT CO2
Estimated Social Cost Of
9345
Estimated Annual Energy
34155
Upfront Project Cost
0
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11374
Latitude
40.732289
Longitude
-73.853825
Community Board
406
Census Tract
721
Bin
4442846
Bbl
4021260014
Nta
Forest Hills
VIEW LOCATION
DOE
City Council District: 19 • Agency: DOE • Site: Q405
City Council District
19
Agency
DOE
Site
Q405
Address
32-24 Corp Kennedy St
Borough
Queens
Disadvantaged Community
�
Installation Date
44160
Installed Or Estimated
456.78 kW
Percentage Of Max Peak Demand
0.91
Estimated Annual Production
502,458 kWh
Percentage Of Annual
0.29
Estimated Annual Emissions
145 MT CO2
Estimated Social Cost Of
20621
Estimated Annual Energy
75369
Upfront Project Cost
0
Financing Mechanism
PPA
Status
Completed
Year Of Report
2020
Data Current As Of
2021-06-14T00:00:00.000
Postcode
11361
Latitude
40.771755
Longitude
-73.780296
Community Board
411
Census Tract
1097
Bin
4134578
Bbl
4060440001
Nta
Bayside-Bayside Hills
VIEW LOCATION