Capital Projects Database (CPDB) - Commitments

Office of Management and Budget (OMB) publishes the Capital Commitment Plan three times a year as a series of pdf files, generally in the months of January, April, and September as part of the publication of the Preliminary, Executive, and Adopted Capital Budgets.

To explore the data, please visit Capital Planning Explorer

For additional information, please visit A Guide to The Capital Budget

All previously released versions of this data are available on the DCP Website: BYTES of the BIG APPLE. Current version: 26exec

City Government Department of City Planning (DCP) Dataset djxg-kcfi 22 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISUNUT • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISUNUT
Magency
801
Projectid
GOVISUNUT
Projectdescription
Governors Island Underground Utilities
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
3720000
Ccexempt
0
Totalcityplannedcommit
3720000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
3720000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISP101 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISP101
Magency
801
Projectid
GOVISP101
Projectdescription
Governors Island - Waterfront Recreation Hub at Pier 101
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-M831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
200000
Ccexempt
0
Totalcityplannedcommit
200000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
200000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISP101 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISP101
Magency
801
Projectid
GOVISP101
Projectdescription
Governors Island - Waterfront Recreation Hub at Pier 101
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-D831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
2500000
Ccexempt
0
Totalcityplannedcommit
2500000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
2500000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISNYCX • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISNYCX
Magency
801
Projectid
GOVISNYCX
Projectdescription
Governors Island NY Climate Exchange Infrastructure
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
44212000
Ccexempt
0
Totalcityplannedcommit
44212000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
44212000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISNYCX • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISNYCX
Magency
801
Projectid
GOVISNYCX
Projectdescription
Governors Island NY Climate Exchange Infrastructure
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2028-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
81788000
Ccexempt
0
Totalcityplannedcommit
81788000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
81788000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISNYCX • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISNYCX
Magency
801
Projectid
GOVISNYCX
Projectdescription
Governors Island NY Climate Exchange Infrastructure
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2029-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2030-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2031-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
1527000
Ccexempt
0
Totalcityplannedcommit
1527000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
1527000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2032-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2033-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLND2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLND2
Magency
801
Projectid
GOVISLND2
Projectdescription
Governors Island Infrastructure Improvements
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLIMA • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLIMA
Magency
801
Projectid
GOVISLIMA
Projectdescription
Governors Island - Lima Pier Reconstruction
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
24000000
Ccexempt
0
Totalcityplannedcommit
24000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
24000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISLIMA • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISLIMA
Magency
801
Projectid
GOVISLIMA
Projectdescription
Governors Island - Lima Pier Reconstruction
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
484000
Ccexempt
0
Totalcityplannedcommit
484000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
484000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISGOV1 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISGOV1
Magency
801
Projectid
GOVISGOV1
Projectdescription
Gov1 Ferry Retrofit
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
EQUIPMENT - VEHICLES
Commitmentcode
EQVH
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
1197000
Ccexempt
0
Totalcityplannedcommit
1197000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
1197000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISGOOD • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISGOOD
Magency
801
Projectid
GOVISGOOD
Projectdescription
Governors Island Ferry - Mark Goode
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
EQUIPMENT - VEHICLES
Commitmentcode
EQVH
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISFRY2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISFRY2
Magency
801
Projectid
GOVISFRY2
Projectdescription
Governors Island - Passenger and Vehicle Ferry 2
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
EQUIPMENT - VEHICLES
Commitmentcode
EQVH
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISFRY2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISFRY2
Magency
801
Projectid
GOVISFRY2
Projectdescription
Governors Island - Passenger and Vehicle Ferry 2
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2025-07-01T00:00:00.000
Commitmentdescription
EQUIPMENT - VEHICLES
Commitmentcode
EQVH
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
76000
Ccexempt
0
Totalcityplannedcommit
76000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
76000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISFCHG • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISFCHG
Magency
801
Projectid
GOVISFCHG
Projectdescription
Governors Island - Electric Ferry Rapid Charger
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
3000000
Ccexempt
0
Totalcityplannedcommit
3000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
3000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISFCHG • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISFCHG
Magency
801
Projectid
GOVISFCHG
Projectdescription
Governors Island - Electric Ferry Rapid Charger
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
630000
Ccexempt
0
Totalcityplannedcommit
630000
Nccstate
0
Nccfederal
7500000
Nccother
0
Totalnoncityplannedcommit
7500000
Totalplannedcommit
8130000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISESUB • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISESUB
Magency
801
Projectid
GOVISESUB
Projectdescription
Governors Island - Electrical Substation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISESUB • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISESUB
Magency
801
Projectid
GOVISESUB
Projectdescription
Governors Island - Electrical Substation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
63989000
Ccexempt
0
Totalcityplannedcommit
63989000
Nccstate
0
Nccfederal
4401000
Nccother
0
Totalnoncityplannedcommit
4401000
Totalplannedcommit
68390000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISELE2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISELE2
Magency
801
Projectid
GOVISELE2
Projectdescription
Governors Island Electric Projects
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
3886000
Ccexempt
0
Totalcityplannedcommit
3886000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
3886000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBTRL • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBTRL
Magency
801
Projectid
GOVISBTRL
Projectdescription
Governors Island Trailer Bathroom
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-D831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
11000
Ccexempt
0
Totalcityplannedcommit
11000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
11000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2028-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
16932000
Ccexempt
0
Totalcityplannedcommit
16932000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
16932000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2029-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2030-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
18000000
Ccexempt
0
Totalcityplannedcommit
18000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
18000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2031-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
18131000
Ccexempt
0
Totalcityplannedcommit
18131000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
18131000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBNP2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBNP2
Magency
801
Projectid
GOVISBNP2
Projectdescription
Governors Island - Nolan Park Cultural Campus
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
5000000
Ccexempt
0
Totalcityplannedcommit
5000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
5000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBL • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBL
Magency
801
Projectid
GOVISBMBL
Projectdescription
Governors Island BMB Lighting
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
700000
Ccexempt
0
Totalcityplannedcommit
700000
Nccstate
0
Nccfederal
1072000
Nccother
0
Totalnoncityplannedcommit
1072000
Totalplannedcommit
1772000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBF • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBF
Magency
801
Projectid
GOVISBMBF
Projectdescription
Governors Island BMB Fender Racks
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2028-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBF • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBF
Magency
801
Projectid
GOVISBMBF
Projectdescription
Governors Island BMB Fender Racks
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2029-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
15000000
Ccexempt
0
Totalcityplannedcommit
15000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
15000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBF • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBF
Magency
801
Projectid
GOVISBMBF
Projectdescription
Governors Island BMB Fender Racks
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2030-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
24000000
Ccexempt
0
Totalcityplannedcommit
24000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
24000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBF • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBF
Magency
801
Projectid
GOVISBMBF
Projectdescription
Governors Island BMB Fender Racks
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2031-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
9086000
Ccexempt
0
Totalcityplannedcommit
9086000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
9086000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMBF • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMBF
Magency
801
Projectid
GOVISBMBF
Projectdescription
Governors Island BMB Fender Racks
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
5000000
Ccexempt
0
Totalcityplannedcommit
5000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
5000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBMB2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBMB2
Magency
801
Projectid
GOVISBMB2
Projectdescription
Governors Island BMB Slip5/6 Pile Cluster&Slip 6/7FenderRack
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0075
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
3012000
Nccother
0
Totalnoncityplannedcommit
3012000
Totalplannedcommit
3012000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 846NDF-BRMPK • Magency: 846
Ccpversion
fisa_2026
Maprojid
846NDF-BRMPK
Magency
846
Projectid
NDF-BRMPK
Projectdescription
NDF- Boerum Park
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0384
Projecttype
Economic Development
Plancommdate
2029-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
NRE
Typcname
NEIGHBORHOOD REVITALIZATION
Ccnonexempt
2105000
Ccexempt
0
Totalcityplannedcommit
2105000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
2105000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBLNP • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBLNP
Magency
801
Projectid
GOVISBLNP
Projectdescription
Governors Island Building Stabilization - Nolan Park
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBLNP • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBLNP
Magency
801
Projectid
GOVISBLNP
Projectdescription
Governors Island Building Stabilization - Nolan Park
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2028-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBLNP • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBLNP
Magency
801
Projectid
GOVISBLNP
Projectdescription
Governors Island Building Stabilization - Nolan Park
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2029-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBLNP • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBLNP
Magency
801
Projectid
GOVISBLNP
Projectdescription
Governors Island Building Stabilization - Nolan Park
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
4474000
Ccexempt
0
Totalcityplannedcommit
4474000
Nccstate
1100000
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
1100000
Totalplannedcommit
5574000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBLD2 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBLD2
Magency
801
Projectid
GOVISBLD2
Projectdescription
Governors Island Building Stabilization
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBL20 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBL20
Magency
801
Projectid
GOVISBL20
Projectdescription
Governors Island - Building 20 Nolan Park Renovation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
0
Ccexempt
0
Totalcityplannedcommit
0
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
0
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBL18 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBL18
Magency
801
Projectid
GOVISBL18
Projectdescription
Governors Island - Building 18 Nolan Park Renovation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-MN013
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
250000
Ccexempt
0
Totalcityplannedcommit
250000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
250000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISBL18 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISBL18
Magency
801
Projectid
GOVISBL18
Projectdescription
Governors Island - Building 18 Nolan Park Renovation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-D831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
CTL
Typcname
CULTURAL DEVELOPMENT
Ccnonexempt
2000000
Ccexempt
0
Totalcityplannedcommit
2000000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
2000000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISB324 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISB324
Magency
801
Projectid
GOVISB324
Projectdescription
Governors Island - Building 324 Stabilization
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2027-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
6500000
Ccexempt
0
Totalcityplannedcommit
6500000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
6500000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISB324 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISB324
Magency
801
Projectid
GOVISB324
Projectdescription
Governors Island - Building 324 Stabilization
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
790000
Ccexempt
0
Totalcityplannedcommit
790000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
790000
fisa_2026
Ccpversion: fisa_2026 • Maprojid: 801GOVISB301 • Magency: 801
Ccpversion
fisa_2026
Maprojid
801GOVISB301
Magency
801
Projectid
GOVISB301
Projectdescription
Governors Island - Building 301 Renovation
Sagencyacro
SBS
Sagencyname
Department of Small Business Services
Budgetline
ED-0831
Projecttype
Economic Development
Plancommdate
2026-06-01T00:00:00.000
Commitmentdescription
CONSTRUCTION
Commitmentcode
CONS
Typc
MSC
Typcname
MISCELLANEOUS
Ccnonexempt
1400000
Ccexempt
0
Totalcityplannedcommit
1400000
Nccstate
0
Nccfederal
0
Nccother
0
Totalnoncityplannedcommit
0
Totalplannedcommit
1400000