Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3400
Fms Id
SANDHM266
Total Budget
950058.52
Spend To Date
100058.52
Spend To Date 1
0.1053
Fms Project Name
HURRICANE SANDY HAZMAT MITIGATION - EC266
Agency Project Name
HURRICANE SANDY HAZMAT MITIGATION - EC266
Current Phase
(On-hold)
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2019-10-01T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3402
Fms Id
SANDHMES4
Total Budget
1213919.38
Spend To Date
180810.37
Spend To Date 1
0.1489
Fms Project Name
HURRICANE SANDY HAZMAT MITIGATION - EMS 4 STATION
Agency Project Name
HURRICANE SANDY HAZMAT MITIGATION - EMS 4 STATION
Current Phase
(On-hold)
Actual Design Start
2017-09-15T00:00:00.000
Actual Design End
2019-07-03T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3404
Fms Id
ACEFDN201
Total Budget
1127281.94
Spend To Date
149960.00
Spend To Date 1
0.133
Fms Project Name
FDNY - Lighting Upgrades at 11 FDNY Facilities
Agency Project Name
FDNY - Lighting Upgrades at 11 FDNY Facilities
Current Phase
Design
Current Phase Start
2023-04-01T00:00:00.000
Forecast Current Phase End
2023-10-01T00:00:00.000
Forecast Completion
2024-05-05T00:00:00.000
Actual Design Start
2023-04-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
F-0175, PU-0025
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3405
Fms Id
ACEFDN202
Total Budget
549879.03
Spend To Date
69541.26
Spend To Date 1
0.1264
Fms Project Name
FDNY - PV Installation at 4 Facilities
Agency Project Name
FDNY - PV Installation at 4 Facilities
Current Phase
Design
Current Phase Start
2022-02-01T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2024-05-31T00:00:00.000
Actual Design Start
2022-02-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 01
Budget Line
F-0175, PU-0025
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3406
Fms Id
F175CHILL
Total Budget
22000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Chiller replacement at Bronx and Queens CO s
Agency Project Name
Chiller replacement at Bronx and Queens CO s
Current Phase
Design
Current Phase Start
2022-11-28T00:00:00.000
Forecast Current Phase End
2025-05-31T00:00:00.000
Forecast Completion
2025-05-31T00:00:00.000
Actual Design Start
2022-11-28T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3407
Fms Id
F175EC287
Total Budget
40000048.44
Spend To Date
2477741.44
Spend To Date 1
0.0619
Fms Project Name
Engine Company 287
Agency Project Name
Engine Company 287
Current Phase
(On-hold)
Actual Design Start
2021-12-15T00:00:00.000
Actual Design End
2022-12-30T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3408
Fms Id
F175EMS4M
Total Budget
3737351.71
Spend To Date
385314.96
Spend To Date 1
0.103
Fms Project Name
MULTI COMPONENT RENOVATIONS - EMS 4
Agency Project Name
MULTI COMPONENT RENOVATIONS - EMS 4
Current Phase
(On-hold)
Actual Design Start
2017-12-13T00:00:00.000
Actual Design End
2019-01-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3409
Fms Id
F175EMS58
Total Budget
18316000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
EMS 58 Construction
Agency Project Name
EMS 58 Construction
Current Phase
Design
Current Phase Start
2023-01-05T00:00:00.000
Forecast Current Phase End
2024-01-05T00:00:00.000
Forecast Completion
2025-01-06T00:00:00.000
Actual Design Start
2023-01-05T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3410
Fms Id
F175FASBK
Total Budget
2170019.77
Spend To Date
1573.84
Spend To Date 1
0.0007
Fms Project Name
Fire Alarm System at Brooklyn CO
Agency Project Name
Fire Alarm System at Brooklyn CO
Current Phase
Design
Current Phase Start
2021-12-02T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2024-12-31T00:00:00.000
Actual Design Start
2021-12-02T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 09
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3411
Fms Id
F175FE163
Total Budget
4345000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
APPARATUS FLOOR - EC163
Agency Project Name
APPARATUS FLOOR - EC163
Current Phase
Design
Current Phase Start
2022-10-24T00:00:00.000
Forecast Current Phase End
2023-06-24T00:00:00.000
Forecast Completion
2024-06-24T00:00:00.000
Actual Design Start
2022-10-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3412
Fms Id
F175FE221
Total Budget
4487000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
APPARATUS FLOOR - EC221
Agency Project Name
APPARATUS FLOOR - EC221
Current Phase
Design
Current Phase Start
2022-11-09T00:00:00.000
Forecast Current Phase End
2023-07-09T00:00:00.000
Forecast Completion
2024-07-09T00:00:00.000
Actual Design Start
2022-11-09T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3413
Fms Id
F175FE260
Total Budget
4400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
APPARATUS FLOOR - EC260
Agency Project Name
APPARATUS FLOOR - EC260
Current Phase
Design
Current Phase Start
2022-11-18T00:00:00.000
Forecast Current Phase End
2023-07-18T00:00:00.000
Forecast Completion
2024-07-18T00:00:00.000
Actual Design Start
2022-11-18T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3414
Fms Id
F175FE294
Total Budget
4837000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
APPARATUS FLOOR - EC294
Agency Project Name
APPARATUS FLOOR - EC294
Current Phase
Design
Current Phase Start
2022-11-21T00:00:00.000
Forecast Current Phase End
2023-07-21T00:00:00.000
Forecast Completion
2024-07-21T00:00:00.000
Actual Design Start
2022-11-21T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3415
Fms Id
F175FEC52
Total Budget
731423.36
Spend To Date
101868.63
Spend To Date 1
0.1392
Fms Project Name
Flood Mitigation Site Drainage - EC52
Agency Project Name
Flood Mitigation Site Drainage - EC52
Current Phase
Construction
Current Phase Start
2023-01-20T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-11-11T00:00:00.000
Actual Design Start
2022-01-11T00:00:00.000
Actual Design End
2022-04-22T00:00:00.000
Actual Construction
2022-08-22T00:00:00.000
Actual Construction 1
2023-01-11T00:00:00.000
Actual Construction Start
2023-01-20T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3416
Fms Id
F175FMHVC
Total Budget
10873733.06
Spend To Date
316234.63
Spend To Date 1
0.029
Fms Project Name
FLEET MAINTENANCE HVAC SYSTEM UPGRADE
Agency Project Name
FLEET MAINTENANCE HVAC SYSTEM UPGRADE
Current Phase
Design
Current Phase Start
2017-05-01T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2024-12-01T00:00:00.000
Actual Design Start
2017-05-01T00:00:00.000
Borough
Queens
Community Board
Queens 02
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3417
Fms Id
F175KIT42
Total Budget
1672335.96
Spend To Date
131007.54
Spend To Date 1
0.0783
Fms Project Name
KITCHEN REPLACEMENT - EC42
Agency Project Name
KITCHEN REPLACEMENT - EC42
Current Phase
Construction
Current Phase Start
2023-02-05T00:00:00.000
Forecast Current Phase End
2023-09-23T00:00:00.000
Forecast Completion
2023-09-23T00:00:00.000
Actual Design Start
2017-11-20T00:00:00.000
Actual Design End
2018-08-14T00:00:00.000
Actual Construction
2022-09-01T00:00:00.000
Actual Construction 1
2022-12-05T00:00:00.000
Actual Construction Start
2023-02-05T00:00:00.000
Borough
Bronx
Community Board
Bronx 05
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3418
Fms Id
F175KTE22
Total Budget
1733805.94
Spend To Date
215451.65
Spend To Date 1
0.1242
Fms Project Name
KITCHENT RENOVATION - EC22
Agency Project Name
KITCHENT RENOVATION - EC22
Current Phase
Construction
Current Phase Start
2023-02-05T00:00:00.000
Forecast Current Phase End
2023-11-23T00:00:00.000
Forecast Completion
2023-11-23T00:00:00.000
Actual Design Start
2019-06-01T00:00:00.000
Actual Design End
2020-03-06T00:00:00.000
Actual Construction
2022-09-01T00:00:00.000
Actual Construction 1
2022-12-05T00:00:00.000
Actual Construction Start
2023-02-05T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 08
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3419
Fms Id
F175MC152
Total Budget
9115146.79
Spend To Date
689989.29
Spend To Date 1
0.0756
Fms Project Name
Multi-Component Renovations - EC152
Agency Project Name
Multi-Component Renovations - EC152
Current Phase
Design
Current Phase Start
2019-03-06T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2025-12-31T00:00:00.000
Actual Design Start
2019-03-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3420
Fms Id
F175MC153
Total Budget
7823650.42
Spend To Date
1262060.84
Spend To Date 1
0.1613
Fms Project Name
MULTI COMPONENT RENOVATIONS - EC153
Agency Project Name
Multi-Component Renovations - EC153
Current Phase
Construction
Current Phase Start
2022-11-02T00:00:00.000
Forecast Current Phase End
2024-11-02T00:00:00.000
Forecast Completion
2024-11-02T00:00:00.000
Actual Design Start
2017-11-14T00:00:00.000
Actual Design End
2018-08-22T00:00:00.000
Actual Construction
2022-01-10T00:00:00.000
Actual Construction 1
2022-07-18T00:00:00.000
Actual Construction Start
2022-11-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3421
Fms Id
F175MC159
Total Budget
11118330.82
Spend To Date
935860.66
Spend To Date 1
0.0841
Fms Project Name
Multi-Component Renovations - EC159
Agency Project Name
Multi-Component Renovations - EC159
Current Phase
(On-hold)
Actual Design Start
2018-12-01T00:00:00.000
Actual Design End
2019-10-01T00:00:00.000
Actual Construction
2022-05-25T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3422
Fms Id
F175MC218
Total Budget
7801193.23
Spend To Date
2691817.81
Spend To Date 1
0.345
Fms Project Name
Multi-Component Renovations - EC218
Agency Project Name
Multi-Component Renovations - EC218
Current Phase
Construction
Current Phase Start
2022-08-01T00:00:00.000
Forecast Current Phase End
2024-02-21T00:00:00.000
Forecast Completion
2024-02-21T00:00:00.000
Actual Design Start
2018-06-01T00:00:00.000
Actual Design End
2021-09-01T00:00:00.000
Actual Construction
2021-09-27T00:00:00.000
Actual Construction 1
2022-05-31T00:00:00.000
Actual Construction Start
2022-08-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3423
Fms Id
F175MC266
Total Budget
8124908.24
Spend To Date
571908.15
Spend To Date 1
0.0703
Fms Project Name
Multi-Component Renovations - EC266
Agency Project Name
Multi-Component Renovations - EC266
Current Phase
(On-hold)
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2019-10-01T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3424
Fms Id
F175MC304
Total Budget
4621650.15
Spend To Date
404253.25
Spend To Date 1
0.0874
Fms Project Name
Multi-Component Renovations - EC304
Agency Project Name
Multi-Component Renovations - EC304
Current Phase
Construction Procurement
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2026-08-31T00:00:00.000
Actual Design Start
2018-11-14T00:00:00.000
Actual Design End
2023-03-31T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3425
Fms Id
F175MC307
Total Budget
7622725.30
Spend To Date
694836.28
Spend To Date 1
0.0911
Fms Project Name
Multi-Component Renovations - EC307
Agency Project Name
Multi-Component Renovations - EC307
Current Phase
Construction
Current Phase Start
2023-02-05T00:00:00.000
Forecast Current Phase End
2025-11-01T00:00:00.000
Forecast Completion
2025-11-01T00:00:00.000
Actual Design Start
2018-11-14T00:00:00.000
Actual Design End
2020-01-30T00:00:00.000
Actual Construction
2022-09-01T00:00:00.000
Actual Construction 1
2022-12-05T00:00:00.000
Actual Construction Start
2023-02-05T00:00:00.000
Borough
Queens
Community Board
Queens 03
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3426
Fms Id
F175MCE33
Total Budget
7872333.44
Spend To Date
554533.62
Spend To Date 1
0.0704
Fms Project Name
Multi-Component Renovations - EC33
Agency Project Name
Multi-Component Renovations - EC33
Current Phase
Construction
Current Phase Start
2023-02-05T00:00:00.000
Forecast Current Phase End
2025-03-01T00:00:00.000
Forecast Completion
2025-03-01T00:00:00.000
Actual Design Start
2018-11-13T00:00:00.000
Actual Design End
2021-10-04T00:00:00.000
Actual Construction
2022-09-01T00:00:00.000
Actual Construction 1
2022-12-05T00:00:00.000
Actual Construction Start
2023-02-05T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 02
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3427
Fms Id
F175MCE74
Total Budget
5663944.12
Spend To Date
2336053.75
Spend To Date 1
0.4124
Fms Project Name
Multi-Component Renovations - EC74
Agency Project Name
Multi-Component Renovations - EC74
Current Phase
Construction
Current Phase Start
2022-08-30T00:00:00.000
Forecast Current Phase End
2024-02-05T00:00:00.000
Forecast Completion
2024-02-05T00:00:00.000
Actual Design Start
2018-08-01T00:00:00.000
Actual Design End
2019-06-21T00:00:00.000
Actual Construction
2021-12-21T00:00:00.000
Actual Construction 1
2022-07-18T00:00:00.000
Actual Construction Start
2022-08-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 07
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3428
Fms Id
F175MCE91
Total Budget
14245929.19
Spend To Date
873820.70
Spend To Date 1
0.0613
Fms Project Name
Multi-Component Renovations - EC91
Agency Project Name
Multi-Component Renovations - EC91
Current Phase
(On-hold)
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3429
Fms Id
F175RFE54
Total Budget
3637122.31
Spend To Date
420634.68
Spend To Date 1
0.1156
Fms Project Name
ROOF AND WATERPROOFING - EC54
Agency Project Name
ROOF AND WATERPROOFING - EC54
Current Phase
Construction
Current Phase Start
2022-10-21T00:00:00.000
Forecast Current Phase End
2023-11-01T00:00:00.000
Forecast Completion
2023-11-01T00:00:00.000
Actual Design Start
2018-11-09T00:00:00.000
Actual Design End
2022-02-28T00:00:00.000
Actual Construction
2022-06-07T00:00:00.000
Actual Construction 1
2022-10-21T00:00:00.000
Actual Construction Start
2022-10-21T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 05
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3430
Fms Id
F175SEWER
Total Budget
137160.53
Spend To Date
126935.96
Spend To Date 1
0.9254
Fms Project Name
New Sewer Main and Pumping Station - Outside Plant Garage
Agency Project Name
New Sewer Main and Pumping Station - Outside Plant Garage
Current Phase
Construction Procurement
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-02-01T00:00:00.000
Forecast Completion
2024-02-01T00:00:00.000
Actual Design Start
2018-11-30T00:00:00.000
Actual Design End
2022-12-01T00:00:00.000
Actual Construction
2023-03-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3431
Fms Id
F175WN266
Total Budget
400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WINDOW REPLACEMENT - EC266
Agency Project Name
WINDOW REPLACEMENT - EC266
Current Phase
(On-hold)
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2019-10-01T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3432
Fms Id
F175WN329
Total Budget
400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WINDOW REPLACEMENT - EC329
Agency Project Name
WINDOW REPLACEMENT - EC329
Current Phase
Construction
Current Phase Start
2023-01-05T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2022-01-05T00:00:00.000
Actual Design End
2022-06-05T00:00:00.000
Actual Construction
2022-08-29T00:00:00.000
Actual Construction 1
2023-01-05T00:00:00.000
Actual Construction Start
2023-01-05T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3433
Fms Id
F175WP301
Total Budget
5272316.15
Spend To Date
532642.80
Spend To Date 1
0.101
Fms Project Name
Waterproofing - EC301
Agency Project Name
Waterproofing - EC301
Current Phase
Construction
Current Phase Start
2023-02-05T00:00:00.000
Forecast Current Phase End
2024-03-01T00:00:00.000
Forecast Completion
2024-03-01T00:00:00.000
Actual Design Start
2018-11-09T00:00:00.000
Actual Design End
2022-03-29T00:00:00.000
Actual Construction
2022-08-24T00:00:00.000
Actual Construction 1
2022-12-05T00:00:00.000
Actual Construction Start
2023-02-05T00:00:00.000
Borough
Queens
Community Board
Queens 12
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3434
Fms Id
F175WP303
Total Budget
3096375.79
Spend To Date
329717.74
Spend To Date 1
0.1064
Fms Project Name
Waterproofing - EC303
Agency Project Name
Waterproofing - EC303
Current Phase
Construction
Current Phase Start
2022-11-22T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-11-11T00:00:00.000
Actual Design Start
2018-08-01T00:00:00.000
Actual Design End
2022-05-01T00:00:00.000
Actual Construction
2022-07-01T00:00:00.000
Actual Construction 1
2022-11-22T00:00:00.000
Actual Construction Start
2022-11-22T00:00:00.000
Borough
Queens
Community Board
Queens 12
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3435
Fms Id
F175WP325
Total Budget
2670977.24
Spend To Date
63625.64
Spend To Date 1
0.0238
Fms Project Name
Roofing and Waterproofing - EC325
Agency Project Name
Roofing and Waterproofing - EC325
Current Phase
Construction
Current Phase Start
2021-09-30T00:00:00.000
Forecast Current Phase End
2023-11-21T00:00:00.000
Forecast Completion
2023-11-21T00:00:00.000
Actual Design Start
2018-06-05T00:00:00.000
Actual Design End
2018-12-03T00:00:00.000
Actual Construction
2019-03-30T00:00:00.000
Actual Construction 1
2021-09-30T00:00:00.000
Actual Construction Start
2021-09-30T00:00:00.000
Borough
Queens
Community Board
Queens 02
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3436
Fms Id
F175WPE46
Total Budget
2235720.36
Spend To Date
168763.35
Spend To Date 1
0.0754
Fms Project Name
Roof and Waterproofing Project - EC46
Agency Project Name
Roof and Waterproofing Project - EC46
Current Phase
Construction
Current Phase Start
2022-11-14T00:00:00.000
Forecast Current Phase End
2023-08-01T00:00:00.000
Forecast Completion
2023-08-01T00:00:00.000
Actual Design Start
2017-12-18T00:00:00.000
Actual Design End
2018-10-22T00:00:00.000
Actual Construction
2022-07-11T00:00:00.000
Actual Construction 1
2022-10-28T00:00:00.000
Actual Construction Start
2022-11-14T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3437
Fms Id
F175WU299
Total Budget
3003969.67
Spend To Date
218568.74
Spend To Date 1
0.0727
Fms Project Name
Cellar Reconstruction - EC299
Agency Project Name
Cellar Reconstruction - EC299
Current Phase
Construction Procurement
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2024-02-28T00:00:00.000
Actual Design Start
2022-02-28T00:00:00.000
Actual Design End
2022-10-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3438
Fms Id
F175XIN82
Total Budget
11462873.73
Spend To Date
6194114.79
Spend To Date 1
0.5403
Fms Project Name
Exterior and Interior Renovations - EC 82
Agency Project Name
Exterior and Interior Renovations - EC 82
Current Phase
Construction
Current Phase Start
2021-06-01T00:00:00.000
Forecast Current Phase End
2024-09-01T00:00:00.000
Forecast Completion
2024-09-01T00:00:00.000
Actual Design Start
2018-01-01T00:00:00.000
Actual Design End
2018-09-01T00:00:00.000
Actual Construction
2020-08-21T00:00:00.000
Actual Construction 1
2021-03-18T00:00:00.000
Actual Construction Start
2021-06-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 03
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3439
Fms Id
F204FTBLD
Total Budget
4363000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fort Totten Buildings 322 and 323
Agency Project Name
Fort Totten Buildings 322 and 323
Current Phase
Construction
Current Phase Start
2023-06-05T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2022-02-17T00:00:00.000
Actual Design End
2022-08-29T00:00:00.000
Actual Construction
2022-12-09T00:00:00.000
Actual Construction 1
2023-02-05T00:00:00.000
Actual Construction Start
2023-06-05T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3440
Fms Id
F204HZTAC
Total Budget
200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HazTac Trailer Replacement
Agency Project Name
HazTac Trailer Replacement
Current Phase
Construction
Current Phase Start
2022-10-18T00:00:00.000
Forecast Current Phase End
2023-12-01T00:00:00.000
Forecast Completion
2023-12-01T00:00:00.000
Actual Design Start
2021-09-01T00:00:00.000
Actual Design End
2021-12-30T00:00:00.000
Actual Construction
2022-01-31T00:00:00.000
Actual Construction 1
2022-10-17T00:00:00.000
Actual Construction Start
2022-10-18T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3441
Fms Id
F204RDWSH
Total Budget
1403515.23
Spend To Date
517316.00
Spend To Date 1
0.3685
Fms Project Name
Randall's Bunker Gear Laundry
Agency Project Name
Randall's Bunker Gear Laundry
Current Phase
Construction
Current Phase Start
2022-10-28T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2020-02-01T00:00:00.000
Actual Design End
2020-12-01T00:00:00.000
Actual Construction
2022-03-07T00:00:00.000
Actual Construction 1
2022-10-27T00:00:00.000
Actual Construction Start
2022-10-28T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3442
Fms Id
F204TRAN1
Total Budget
22227000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Randall's Island Utility Upgrade
Agency Project Name
Randall's Island Utility Upgrade
Current Phase
Design
Current Phase Start
2023-01-19T00:00:00.000
Forecast Current Phase End
2025-04-01T00:00:00.000
Forecast Completion
2028-04-01T00:00:00.000
Actual Design Start
2023-01-19T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3443
Fms Id
F204TRAN2
Total Budget
3711000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fort Totten EVOC Course Renovation
Agency Project Name
Fort Totten EVOC Course Renovation
Current Phase
Design
Current Phase Start
2023-02-02T00:00:00.000
Forecast Current Phase End
2024-02-03T00:00:00.000
Forecast Completion
2026-02-03T00:00:00.000
Actual Design Start
2023-02-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3444
Fms Id
F204TRAN3
Total Budget
21706000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fort Totten Building 318/332 Renovations
Agency Project Name
Fort Totten Building 318/332 Renovations
Current Phase
Design
Current Phase Start
2023-02-02T00:00:00.000
Forecast Current Phase End
2024-02-03T00:00:00.000
Forecast Completion
2026-02-03T00:00:00.000
Actual Design Start
2023-02-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3445
Fms Id
F204WATER
Total Budget
7290589.21
Spend To Date
7294864.82
Spend To Date 1
1.0005
Fms Project Name
Randall's Island Water Tank Replacement
Agency Project Name
Randall's Island Water Tank Replacement
Current Phase
Construction
Current Phase Start
2021-04-01T00:00:00.000
Forecast Current Phase End
2023-08-01T00:00:00.000
Forecast Completion
2023-08-01T00:00:00.000
Actual Design Start
2018-03-06T00:00:00.000
Actual Design End
2018-07-10T00:00:00.000
Actual Construction
2020-08-24T00:00:00.000
Actual Construction 1
2021-03-31T00:00:00.000
Actual Construction Start
2021-04-01T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0204
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3446
Fms Id
FD175D155
Total Budget
159815.00
Spend To Date
79815.00
Spend To Date 1
0.4994
Fms Project Name
Door Replacement - EC155
Agency Project Name
Door Replacement - EC155
Current Phase
Construction
Current Phase Start
2022-03-11T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2021-05-01T00:00:00.000
Actual Design End
2021-10-01T00:00:00.000
Actual Construction
2021-11-24T00:00:00.000
Actual Construction 1
2022-03-11T00:00:00.000
Actual Construction Start
2022-03-11T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3447
Fms Id
FD175D255
Total Budget
249478.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Door Replacement - EC255
Agency Project Name
Door Replacement - EC255
Current Phase
Construction
Current Phase Start
2022-03-11T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2021-05-01T00:00:00.000
Actual Design End
2021-10-01T00:00:00.000
Actual Construction
2021-11-24T00:00:00.000
Actual Construction 1
2022-03-11T00:00:00.000
Actual Construction Start
2022-03-11T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3448
Fms Id
FD175DE95
Total Budget
75000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Door Replacement - EC95
Agency Project Name
Door Replacement - EC95
Current Phase
(On-hold)
Borough
Manhattan
Community Board
Manhattan 12
Budget Line
F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3449
Fms Id
FD175DES8
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Door Replacement - EMS 8
Agency Project Name
Door Replacement - EMS 8
Current Phase
Construction
Current Phase Start
2022-10-28T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2023-09-01T00:00:00.000
Actual Design Start
2022-02-05T00:00:00.000
Actual Design End
2022-05-05T00:00:00.000
Actual Construction
2022-06-23T00:00:00.000
Actual Construction 1
2022-10-28T00:00:00.000
Actual Construction Start
2022-10-28T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3450
Fms Id
FD175G153
Total Budget
1200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GENERATOR - EC153
Agency Project Name
Generator - EC153
Current Phase
Design
Current Phase Start
2023-01-05T00:00:00.000
Forecast Current Phase End
2023-08-01T00:00:00.000
Forecast Completion
2024-08-01T00:00:00.000
Actual Design Start
2023-01-05T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: FDNY • Sponsor Agency: FDNY
Reporting Period
202305
Managing Agency
FDNY
Sponsor Agency
FDNY
Pid
3451
Fms Id
FD175G161
Total Budget
872637.48
Spend To Date
179398.13
Spend To Date 1
0.2055
Fms Project Name
Generator - EC161
Agency Project Name
Generator - EC161
Current Phase
Construction
Current Phase Start
2022-09-30T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2023-10-31T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2019-10-09T00:00:00.000
Actual Construction
2022-01-11T00:00:00.000
Actual Construction 1
2022-07-19T00:00:00.000
Actual Construction Start
2022-09-30T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
F-0175, F-D175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2023-06-22T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000