Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77SC22R
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77SC22R
Total Budget
999134.00
Spend To Date
40627.29
Spend To Date 1
0.0406
Fms Project Name
22 READE ST - DCAS POLICE CCTV SYSTEM
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77SC280
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77SC280
Total Budget
999134.00
Spend To Date
11633.41
Spend To Date 1
0.0116
Fms Project Name
280 BROADWAY - DCAS POLICE CCTV SYSTEM
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77SC2C
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77SC2C
Total Budget
1096124.00
Spend To Date
39657.85
Spend To Date 1
0.0361
Fms Project Name
2 LAFAYETTE ST - DCAS POLICE CCTV SYSTEM
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77SECAM
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77SECAM
Total Budget
497967.51
Spend To Date
108967.51
Spend To Date 1
0.2188
Fms Project Name
SECURITY CAMERAS - DCAS PUBLIC BUILDINGS
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
PW-0077
Ten Year Plan Category
EQUIPMENT AND INTERAGENCY SERVICES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77TAX
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77TAX
Total Budget
1216066.85
Spend To Date
1055742.06
Spend To Date 1
0.8681
Fms Project Name
1 CENTRE ST.- 11TH FL. TAX COMMISSION REHAB
Current Phase
(Cancelled)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77X215
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77X215
Total Budget
2494000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
215 E161 ST.- OFFICE RENOVATIONS
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW77ZK07
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW77ZK07
Total Budget
473000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BROOKLYN COMMUNITY BOARD 7- 4201 4TH AVENUE
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
PW-0077, PW-0077
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW80CT1
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW80CT1
Total Budget
558000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
2 LAFAYETTE ST.- COOLING TOWER
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0080
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW80ELEC
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW80ELEC
Total Budget
13000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
2 LAFAYETTE STREET ELECTRICAL UPGRADE
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0080
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW80ELEV
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW80ELEV
Total Budget
19806000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
2 LAFAYETTE ST - ELEVATOR MODERNIZATION
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0080
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWBXDHVAC
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWBXDHVAC
Total Budget
7490000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BRONX DA DATACENTER HVAC
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWCN001
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWCN001
Total Budget
68000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Sixth Street compost project
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan, Manhattan 03
Budget Line
PW-D077
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWCOMPDA2
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWCOMPDA2
Total Budget
1166000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Comptroller's Office Data Center Replacement at 1 Centre St.
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD007HPD
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD007HPD
Total Budget
550000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HPD - CONSTRUCTION AND RENOVATION OF NORTHSIDE TOWN HALL
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PW-D007
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD05CYBR
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD05CYBR
Total Budget
3721757.90
Spend To Date
3629757.90
Spend To Date 1
0.9752
Fms Project Name
80 CENTRE ST. - NY COUNTY DA CYBERCRIME AND IDENTITY THEFT
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD05DAHV
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD05DAHV
Total Budget
479000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
80 CENTRE ST. - NY COUNTY DA HVAC UPGRADE SERVER ROOM
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD30BENC
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD30BENC
Total Budget
100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BENJAMIN BANNEKER ACADEMY FOR COMMUNITY DEVELOPMENT
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
PW-D308
Ten Year Plan Category
EQUIPMENT AND INTERAGENCY SERVICES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD5BA1
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD5BA1
Total Budget
2500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
2556 Bainbridge Ave. Community Ctr.
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 02
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD5BA2
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD5BA2
Total Budget
2000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
2556 Bainbridge Ave - Fordham Library renovation
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 02
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD5BAG
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD5BAG
Total Budget
413984.00
Spend To Date
177091.43
Spend To Date 1
0.4277
Fms Project Name
1 CENTRE ST.- BIG APPLE GREETER
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD5HSCHR
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD5HSCHR
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HECKSCHER Building -- Roof Renovation at 1 East 104th Street
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-D005
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD78415A
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD78415A
Total Budget
110000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
88-11 SUTPHIN BLVD.- FACADE RESTORATION
Current Phase
(Pending)
Borough
Queens
Community Board
Queens, Queens 12
Budget Line
PW-D078
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD78BLL
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD78BLL
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
360 ADAMS STREET- BROOKLYN SUPREME COURT LAW LIBRARY
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PW-D078
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWD78SSCT
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWD78SSCT
Total Budget
200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
360 ADAMS ST.- HVAC STATE SUPREME COURT
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PW-D078
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWDNIBO1
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWDNIBO1
Total Budget
250000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Independent Budget Office - New Location Outfitting
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan
Budget Line
PW-D077
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWDNTEW
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWDNTEW
Total Budget
800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
NONTRADITIONAL EMPLOYMENT FOR WOMEN 243 W 20th St
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan
Budget Line
PW-D005
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWDPLONG2
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWDPLONG2
Total Budget
1200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
POLICE ATHLETIC LEAGUE
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
PW-D005
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWK2LEED
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWK2LEED
Total Budget
200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn Borough Hall - LEED- Funding for LEED
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
PW-K002
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWK2MEDIA
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWK2MEDIA
Total Budget
1847973.69
Spend To Date
1379973.69
Spend To Date 1
0.7467
Fms Project Name
209 JORALEMON ST.- BKLYN BORO HALL MEDIA ROOM
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
PW-K002
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWM77FJC
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWM77FJC
Total Budget
8665946.72
Spend To Date
8318569.79
Spend To Date 1
0.9599
Fms Project Name
80 CENTRE ST. - MANHATTAN FAMILY JUSTICE CENTER
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-D077, PW-M077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWMOCSIT1
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWMOCSIT1
Total Budget
622000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
MOCS IT NETWORK INFRASTRUCTURE 100 GOLD STREET 2ND FL
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PW-Q077
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PW-Q077
Total Budget
352792.30
Spend To Date
293734.78
Spend To Date 1
0.8325
Fms Project Name
120-55 QUEENS BLVD- DISCOVER QUEENS VISITORS CENTER
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 09
Budget Line
PW-Q077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWQ77QBH2
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWQ77QBH2
Total Budget
186000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
120-55 QUEENS BLVD.- RENOVATIONS
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PW-Q077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWQ77R213
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWQ77R213
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
120-55 QUEENS BLVD- QUEENS BORO HALL RENOVATIONS
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PW-0077, PW-Q077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWQ77TOPO
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWQ77TOPO
Total Budget
919405.74
Spend To Date
822092.48
Spend To Date 1
0.8941
Fms Project Name
120-55 QUEENS BLVD- QUEENS BORO HALL RENOVATIONS-TOPOGRAPHY
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PW-Q077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWR077MUR
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWR077MUR
Total Budget
50000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
18 RICHMOND TERRACE- STATEN ISLAND COURTHOUSE MURALS
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PW-R077
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWR77GRGE
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWR77GRGE
Total Budget
780000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ST. GEORGE COURTHOUSE & HYATT STREET PLAZA
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island, Staten Island 01
Budget Line
PW-0077, PW-R077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWR77SICC
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWR77SICC
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
NYC OFFICE OF EMERGENCY MANAGEMENT BOROUGH COMMAND CENTER ON
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island
Budget Line
PW-R077
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWXBP78
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWXBP78
Total Budget
75000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx BP Initial Outfit., Demo, Cons - 851 Grand Concourse
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
PW-X078
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: PWXGLASS
Reporting Period
202309
Managing Agency
DCAS
Fms Id
PWXGLASS
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
851 GRAND CONCOURSE- Entry Glass Doors
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 04
Budget Line
PW-X078
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: RE25-162
Reporting Period
202309
Managing Agency
DCAS
Fms Id
RE25-162
Total Budget
1500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
99-01 162nd AVE BULKHEAD REHABILITATION
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PU-0200
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: RE2544DR2
Reporting Period
202309
Managing Agency
DCAS
Fms Id
RE2544DR2
Total Budget
10174.00
Spend To Date
10174.00
Spend To Date 1
1.00
Current Phase
(Pending)
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: RE25LL
Reporting Period
202309
Managing Agency
DCAS
Fms Id
RE25LL
Total Budget
1406000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
LOTTS LANE REPAIRING
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
RE-0025
Ten Year Plan Category
REHABILITATION OF NON-WATERFRONT PROPERTIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: RE25QR
Reporting Period
202309
Managing Agency
DCAS
Fms Id
RE25QR
Total Budget
3823000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
QUENTIN ROAD BROOKLYN STREET RECONSTRUCTION
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
RE-0025
Ten Year Plan Category
REHABILITATION OF NON-WATERFRONT PROPERTIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: RE25VERN
Reporting Period
202309
Managing Agency
DCAS
Fms Id
RE25VERN
Total Budget
492000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
PLATFORM / BULKHEAD REPLACEMENT
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
RE-0025
Ten Year Plan Category
REHABILITATION OF WATERFRONT PROPERTIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: S136-365
Reporting Period
202309
Managing Agency
DCAS
Fms Id
S136-365
Total Budget
1302000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY - 125 E 149TH ST, BX - MN WEST 9 GARAGE LEASE RENEWAL
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: S136-434
Reporting Period
202309
Managing Agency
DCAS
Fms Id
S136-434
Total Budget
8460000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY - 720-780 E132 St - Bronx 1 3 4 Garage Rehab
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: SCA24K191
Reporting Period
202309
Managing Agency
DCAS
Fms Id
SCA24K191
Total Budget
15984000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SCA FY24 Electrification - K191
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: SCA24M030
Reporting Period
202309
Managing Agency
DCAS
Fms Id
SCA24M030
Total Budget
17608000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SCA FY24 Electrification - M030
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DCAS • Fms Id: SCA24M155
Reporting Period
202309
Managing Agency
DCAS
Fms Id
SCA24M155
Total Budget
17132000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SCA FY24 Electrification - M155
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-10-23T00:00:00.000