Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3864
Fms Id
HWQ1198
Total Budget
40235680.00
Spend To Date
829434.05
Spend To Date 1
0.0206
Fms Project Name
Reconst. of Beach Channel Drive-Phase B Non Sandy(QED-1030B)
Agency Project Name
Reconstruction of Beach Channel Drive -- Phase B
Current Phase
Design
Current Phase Start
2021-04-15T00:00:00.000
Forecast Current Phase End
2026-11-15T00:00:00.000
Forecast Completion
2030-09-13T00:00:00.000
Actual Design Start
2021-04-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3864
Fms Id
QED-1030
Total Budget
10583217.49
Spend To Date
8524721.94
Spend To Date 1
0.8054
Fms Project Name
Water Main & Sewer Work, Beach Channel Drive Area (SANDHW11)
Agency Project Name
Reconstruction of Beach Channel Drive -- Phase B
Current Phase
Design
Current Phase Start
2021-04-15T00:00:00.000
Forecast Current Phase End
2026-11-15T00:00:00.000
Forecast Completion
2030-09-13T00:00:00.000
Actual Design Start
2021-04-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
SE-0002Q
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3865
Fms Id
HWR700
Total Budget
23999550.00
Spend To Date
682145.26
Spend To Date 1
0.0284
Fms Project Name
St George-Richmond Terrace Intersection Improvements
Agency Project Name
Richmond Terrace-Bay Street Safety Improvements
Current Phase
Design
Current Phase Start
2022-04-28T00:00:00.000
Forecast Current Phase End
2025-01-20T00:00:00.000
Forecast Completion
2028-06-29T00:00:00.000
Actual Design Start
2022-04-28T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0001R, HW-D104
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3866
Fms Id
HWS2021R
Total Budget
3299924.20
Spend To Date
242034.40
Spend To Date 1
0.0733
Fms Project Name
PRIOR NOTICE SIDEWALK - STATEN ISLAND
Agency Project Name
FY21 Prior Notice Sidewalk contract -Staten Island
Current Phase
Construction
Current Phase Start
2023-06-26T00:00:00.000
Forecast Current Phase End
2024-12-21T00:00:00.000
Forecast Completion
2024-12-21T00:00:00.000
Actual Design Start
2021-12-09T00:00:00.000
Actual Design End
2022-07-21T00:00:00.000
Actual Construction
2022-07-21T00:00:00.000
Actual Construction 1
2023-06-26T00:00:00.000
Actual Construction Start
2023-06-26T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0200, HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3867
Fms Id
HWS2023R
Total Budget
4308000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prior Notice Sidewalks - Staten Island
Agency Project Name
FY23 Prior Notice Sidewalk - Staten Island
Current Phase
Construction Procurement
Current Phase Start
2023-11-06T00:00:00.000
Forecast Current Phase End
2024-08-23T00:00:00.000
Forecast Completion
2026-02-03T00:00:00.000
Actual Design Start
2023-05-16T00:00:00.000
Actual Design End
2023-11-06T00:00:00.000
Actual Construction
2023-11-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3868
Fms Id
MIBBNC04B
Total Budget
43548000.00
Spend To Date
124430.28
Spend To Date 1
0.0028
Fms Project Name
Storm and sanitary sewer installation
Agency Project Name
Storm sewer installation and water main replacement in Hunter Avenue between Haven Avenue and Nugent Avenue, as well as other locations.
Current Phase
Design
Current Phase Start
2024-01-15T00:00:00.000
Forecast Current Phase End
2026-01-29T00:00:00.000
Forecast Completion
2030-06-29T00:00:00.000
Actual Design Start
2024-01-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
SE-0002R, SE-0200R, WM-0001
Ten Year Plan Category
BLUEBELT PROGRAM
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3869
Fms Id
QED-1054
Total Budget
23928995.05
Spend To Date
4427851.31
Spend To Date 1
0.185
Fms Project Name
Dist WM work in Ellwell Crescent from Alderton to Carlton St
Agency Project Name
Distribution Water Main work in Ellwell Crescent from Alderton Street to Carlton Street, as well as other locations listed in Page 3 of attached CPI. Borough of Queens.
Current Phase
Construction
Current Phase Start
2022-09-12T00:00:00.000
Forecast Current Phase End
2024-09-10T00:00:00.000
Forecast Completion
2024-09-10T00:00:00.000
Actual Design Start
2021-02-25T00:00:00.000
Actual Design End
2022-02-10T00:00:00.000
Actual Construction
2022-02-10T00:00:00.000
Actual Construction 1
2022-09-12T00:00:00.000
Actual Construction Start
2022-09-12T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
WM-0001, WM-0944
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3870
Fms Id
RED394
Total Budget
22617046.94
Spend To Date
595447.75
Spend To Date 1
0.0263
Fms Project Name
Area contract - Install Dist WM throughout BKLYN & SI
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction
Current Phase Start
2023-09-11T00:00:00.000
Forecast Current Phase End
2025-11-25T00:00:00.000
Forecast Completion
2025-11-25T00:00:00.000
Actual Design Start
2022-06-09T00:00:00.000
Actual Design End
2023-02-02T00:00:00.000
Actual Construction
2023-02-02T00:00:00.000
Actual Construction 1
2023-09-11T00:00:00.000
Actual Construction Start
2023-09-11T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0001
Ten Year Plan Category
AUGMENTATION OF WATER SUPPLY SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3870
Fms Id
RED395AC
Total Budget
18905000.00
Spend To Date
100000.00
Spend To Date 1
0.0052
Fms Project Name
Area Contract Replacmt & Install Dist WM throughout BK & SI
Agency Project Name
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Current Phase
Construction Procurement
Current Phase Start
2024-01-31T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2025-12-27T00:00:00.000
Actual Design Start
2022-11-02T00:00:00.000
Actual Design End
2024-01-31T00:00:00.000
Actual Construction
2024-01-31T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0001
Ten Year Plan Category
AUGMENTATION OF WATER SUPPLY SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
3872
Fms Id
SANDHWSIB
Total Budget
3655000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Swaim & Huguenot Ave Improvements
Agency Project Name
Reconstruction of segments of Huguenot and Swaim Avenues
Current Phase
Construction Procurement
Current Phase Start
2023-11-15T00:00:00.000
Forecast Current Phase End
2024-06-28T00:00:00.000
Forecast Completion
2025-12-29T00:00:00.000
Actual Design Start
2021-06-15T00:00:00.000
Actual Design End
2023-11-15T00:00:00.000
Actual Construction
2023-11-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
EP-0007, HW-0001R, SE-0002R, SE-0200R, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3873
Fms Id
SE885AVWE
Total Budget
135300380.49
Spend To Date
135298575.34
Spend To Date 1
0.9999
Fms Project Name
SEQ - 150th St Spine Phase II DOT Van Wyck Exp -Trunk Combi
Agency Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Current Phase
Construction
Current Phase Start
2022-05-27T00:00:00.000
Forecast Current Phase End
2025-04-14T00:00:00.000
Forecast Completion
2025-04-14T00:00:00.000
Actual Design Start
2020-03-02T00:00:00.000
Actual Design End
2022-07-10T00:00:00.000
Actual Construction
2022-07-10T00:00:00.000
Actual Construction 1
2022-05-27T00:00:00.000
Actual Construction Start
2022-05-27T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
3876
Fms Id
SER200309
Total Budget
7911980.39
Spend To Date
649035.91
Spend To Date 1
0.082
Fms Project Name
Strm swr R+Ext & WM Work, Maguire Avenue
Agency Project Name
REPL. AND EXT. OF STORM SEWERS IN MAGUIRE AVE
Current Phase
Design
Current Phase Start
2019-06-24T00:00:00.000
Forecast Current Phase End
2027-10-29T00:00:00.000
Forecast Completion
2029-06-29T00:00:00.000
Actual Design Start
2019-06-24T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
SE-0002R, SE-0200R, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
3877
Fms Id
70MULBREC
Total Budget
170134769.62
Spend To Date
2690353.61
Spend To Date 1
0.0158
Fms Project Name
70 MULBERRY STREET - RECONSTRUCTION
Agency Project Name
70 MULBERRY STREET - RECONSTRUCTION
Current Phase
Design
Current Phase Start
2022-06-15T00:00:00.000
Forecast Current Phase End
2024-03-20T00:00:00.000
Forecast Completion
2028-03-29T00:00:00.000
Actual Design Start
2022-06-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3879
Fms Id
BBJ-K
Total Budget
3342321249.85
Spend To Date
29486165.94
Spend To Date 1
0.0088
Fms Project Name
Boro Based Jails New Brooklyn Detention Facility DesignBuild
Agency Project Name
Dismantal of Brooklyn Detention Facility
Current Phase
Construction
Current Phase Start
2022-03-14T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2024-02-29T00:00:00.000
Actual Design Start
2021-12-20T00:00:00.000
Actual Design End
2022-03-07T00:00:00.000
Actual Construction
2022-03-07T00:00:00.000
Actual Construction 1
2022-03-14T00:00:00.000
Actual Construction Start
2022-03-14T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
C-0114
Ten Year Plan Category
New Jail Facilities
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3880
Fms Id
BBJ-K
Total Budget
3342321249.85
Spend To Date
29486165.94
Spend To Date 1
0.0088
Fms Project Name
Boro Based Jails New Brooklyn Detention Facility DesignBuild
Agency Project Name
BBJ Construction of New Brooklyn Detention Facility
Current Phase
Design
Current Phase Start
2023-07-06T00:00:00.000
Forecast Current Phase End
2024-04-24T00:00:00.000
Forecast Completion
2029-03-05T00:00:00.000
Actual Design Start
2023-07-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
C-0114
Ten Year Plan Category
New Jail Facilities
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3881
Fms Id
BBJ-M
Total Budget
2058963199.20
Spend To Date
46628720.30
Spend To Date 1
0.0226
Fms Project Name
Boro Based Jail New Manhattan Detention Facility DesignBuild
Agency Project Name
Dismantal of Manhattan Detention Facility
Current Phase
Construction
Current Phase Start
2022-04-25T00:00:00.000
Forecast Current Phase End
2025-01-22T00:00:00.000
Forecast Completion
2025-01-22T00:00:00.000
Actual Design Start
2021-12-27T00:00:00.000
Actual Design End
2022-04-18T00:00:00.000
Actual Construction
2022-04-18T00:00:00.000
Actual Construction 1
2022-04-25T00:00:00.000
Actual Construction Start
2022-04-25T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
C-0114
Ten Year Plan Category
New Jail Facilities
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3882
Fms Id
BBJ-Q
Total Budget
1985674744.84
Spend To Date
26688885.94
Spend To Date 1
0.0134
Fms Project Name
Boro Based Jails New Queens Detention Facility DesignBuild
Agency Project Name
Dismantal of Queens Detention Facility
Current Phase
Construction
Current Phase Start
2023-04-25T00:00:00.000
Forecast Current Phase End
2024-02-18T00:00:00.000
Forecast Completion
2024-02-18T00:00:00.000
Actual Design Start
2021-12-27T00:00:00.000
Actual Design End
2023-04-25T00:00:00.000
Actual Construction
2023-04-25T00:00:00.000
Actual Construction 1
2023-04-25T00:00:00.000
Actual Construction Start
2023-04-25T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
C-0114
Ten Year Plan Category
New Jail Facilities
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3883
Fms Id
BBJ-X
Total Budget
1933007569.28
Spend To Date
47678402.37
Spend To Date 1
0.0246
Fms Project Name
Boro Based Jails New Bronx Detention Facility DesignBuild
Agency Project Name
Dismantal of Bronx Detention Facility
Current Phase
Construction
Current Phase Start
2022-07-13T00:00:00.000
Forecast Current Phase End
2024-04-07T00:00:00.000
Forecast Completion
2024-04-07T00:00:00.000
Actual Design Start
2022-06-17T00:00:00.000
Actual Design End
2022-07-13T00:00:00.000
Actual Construction
2022-07-13T00:00:00.000
Actual Construction 1
2022-07-13T00:00:00.000
Actual Construction Start
2022-07-13T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0114
Ten Year Plan Category
New Jail Facilities
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3884
Fms Id
C75EWGRVC
Total Budget
15018758.20
Spend To Date
11356481.66
Spend To Date 1
0.7561
Fms Project Name
Emergency Work for GRVC
Agency Project Name
Renovation of George R Vierno Center (GRVC) at Rikers Island
Current Phase
(Completed)
Actual Design Start
2021-10-16T00:00:00.000
Actual Design End
2021-10-30T00:00:00.000
Actual Construction
2021-10-30T00:00:00.000
Actual Construction 1
2021-11-01T00:00:00.000
Actual Construction Start
2021-11-01T00:00:00.000
Actual Construction End
2023-06-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3885
Fms Id
C75EWRMSC
Total Budget
96086556.72
Spend To Date
84109612.90
Spend To Date 1
0.8753
Fms Project Name
Emergency Work for RMSC
Agency Project Name
Renovation of Rose M. Singer Center (RMSC) at Rikers Island
Current Phase
Close-out
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Actual Construction End
2023-06-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3886
Fms Id
C75EWRNDC
Total Budget
37943257.48
Spend To Date
34161729.74
Spend To Date 1
0.9003
Fms Project Name
Emergency Work for RNDC
Agency Project Name
Renovation of Robert N. Davoren Complex (RNDC) at Rikers Island
Current Phase
Close-out
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Actual Construction End
2023-06-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3887
Fms Id
C75EWNIC
Total Budget
23602514.40
Spend To Date
21133156.92
Spend To Date 1
0.8953
Fms Project Name
Emergency Work for NIC
Agency Project Name
Renovation of North Infirmary Command (NIC) at Rikers Island
Current Phase
(Completed)
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Actual Construction End
2023-02-28T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3888
Fms Id
C75EWAMKC
Total Budget
28145280.00
Spend To Date
22257895.14
Spend To Date 1
0.7908
Fms Project Name
Emergency Work for AMKC
Agency Project Name
Renovation of Various Complexes at Rikers Island
Current Phase
Construction
Current Phase Start
2021-10-01T00:00:00.000
Forecast Current Phase End
2024-07-17T00:00:00.000
Forecast Completion
2024-07-17T00:00:00.000
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3888
Fms Id
C75EWRMSC
Total Budget
96086556.72
Spend To Date
84109612.90
Spend To Date 1
0.8753
Fms Project Name
Emergency Work for RMSC
Agency Project Name
Renovation of Various Complexes at Rikers Island
Current Phase
Construction
Current Phase Start
2021-10-01T00:00:00.000
Forecast Current Phase End
2024-07-17T00:00:00.000
Forecast Completion
2024-07-17T00:00:00.000
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOC
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOC
Pid
3888
Fms Id
C75EWRNDC
Total Budget
37943257.48
Spend To Date
34161729.74
Spend To Date 1
0.9003
Fms Project Name
Emergency Work for RNDC
Agency Project Name
Renovation of Various Complexes at Rikers Island
Current Phase
Construction
Current Phase Start
2021-10-01T00:00:00.000
Forecast Current Phase End
2024-07-17T00:00:00.000
Forecast Completion
2024-07-17T00:00:00.000
Actual Design Start
2021-09-30T00:00:00.000
Actual Design End
2021-09-30T00:00:00.000
Actual Construction
2021-09-30T00:00:00.000
Actual Construction 1
2021-10-01T00:00:00.000
Actual Construction Start
2021-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
C-0075
Ten Year Plan Category
BUILDING SYSTEMS AND INFRASTRUCTURE
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: FDNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
FDNY
Pid
3889
Fms Id
F175EC268
Total Budget
33207223.54
Spend To Date
2954923.64
Spend To Date 1
0.0889
Fms Project Name
NEW FIREHOUSE - EC268
Agency Project Name
NEW FIREHOUSE - EC268
Current Phase
Design
Current Phase Start
2019-10-17T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2026-12-31T00:00:00.000
Actual Design Start
2019-10-17T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: FDNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
FDNY
Pid
3890
Fms Id
F175EMS17
Total Budget
45177996.88
Spend To Date
3963912.09
Spend To Date 1
0.0877
Fms Project Name
EMS Station 17 - New Facility
Agency Project Name
EMS Station 17 - New Facility
Current Phase
Construction Procurement
Current Phase Start
2023-05-12T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-04-30T00:00:00.000
Actual Design Start
2019-01-18T00:00:00.000
Actual Design End
2023-05-12T00:00:00.000
Actual Construction
2023-05-12T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
F-0175
Ten Year Plan Category
NEW FACILITIES AND RENOVATIONS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYCHA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYCHA
Pid
3891
Fms Id
HAM20BVBG
Total Budget
10803650.21
Spend To Date
1381190.35
Spend To Date 1
0.1278
Fms Project Name
VAN DYKE BOXING GYM
Agency Project Name
Van Dyke Boxing Gym Community Center Interior Renovation
Current Phase
Construction Procurement
Current Phase Start
2023-12-20T00:00:00.000
Forecast Current Phase End
2024-07-01T00:00:00.000
Forecast Completion
2026-01-31T00:00:00.000
Actual Design Start
2021-06-14T00:00:00.000
Actual Design End
2023-12-20T00:00:00.000
Actual Construction
2023-12-20T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 16
Budget Line
HA-0001
Ten Year Plan Category
LOW TO MODERATE INCOME PUBLIC HOUSING UPGRADE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYCHA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYCHA
Pid
3892
Fms Id
HAM20BVCC
Total Budget
10809621.51
Spend To Date
1303990.40
Spend To Date 1
0.1206
Fms Project Name
BROWNSVILLE COMMUNITY CENTER
Agency Project Name
Brownsville Houses Community Center Interior Renovation
Current Phase
Construction Procurement
Current Phase Start
2023-12-20T00:00:00.000
Forecast Current Phase End
2024-07-01T00:00:00.000
Forecast Completion
2026-01-31T00:00:00.000
Actual Design Start
2021-06-14T00:00:00.000
Actual Design End
2023-12-20T00:00:00.000
Actual Construction
2023-12-20T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 16
Budget Line
HA-0001
Ten Year Plan Category
LOW TO MODERATE INCOME PUBLIC HOUSING UPGRADE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
3893
Fms Id
HH112BLEN
Total Budget
10254167.15
Spend To Date
223778.38
Spend To Date 1
0.0218
Fms Project Name
Bellevue Auditorium Structural Reconstruction
Agency Project Name
Investigatory Probes of Cellar columns, beams & slabs
Current Phase
Construction
Current Phase Start
2023-04-28T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2024-01-31T00:00:00.000
Actual Design Start
2021-09-03T00:00:00.000
Actual Design End
2022-07-20T00:00:00.000
Actual Construction
2022-07-20T00:00:00.000
Actual Construction 1
2023-04-28T00:00:00.000
Actual Construction Start
2023-04-28T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
3894
Fms Id
HH112BLFX
Total Budget
5010000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BELLEVUE - FACADE RESTORATION & WINDOW REPLACEMENT
Agency Project Name
Bellevue Men’s Shelter Partial East Façade Restoration and Window Replacement
Current Phase
Construction Procurement
Current Phase Start
2022-07-06T00:00:00.000
Forecast Current Phase End
2024-07-30T00:00:00.000
Forecast Completion
2025-01-31T00:00:00.000
Actual Design Start
2021-12-16T00:00:00.000
Actual Design End
2022-07-06T00:00:00.000
Actual Construction
2022-07-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 06
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
3895
Fms Id
HH112PJFC
Total Budget
8115000.00
Spend To Date
621522.87
Spend To Date 1
0.0765
Fms Project Name
PAMOJA HOUSE - FACADE REHABILITATION/RESTORATION
Agency Project Name
Façade Stabilization
Current Phase
Construction
Current Phase Start
2023-04-25T00:00:00.000
Forecast Current Phase End
2024-08-30T00:00:00.000
Forecast Completion
2024-08-30T00:00:00.000
Actual Design Start
2022-03-16T00:00:00.000
Actual Design End
2022-05-24T00:00:00.000
Actual Construction
2022-05-24T00:00:00.000
Actual Construction 1
2023-04-25T00:00:00.000
Actual Construction Start
2023-04-25T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOHMH
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOHMH
Pid
3896
Fms Id
HL82WASHT
Total Budget
17570000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WASHINGTON HEIGHTS HEALTH CENTER FACADE RENOVATION
Agency Project Name
Exterior envelope renovation
Current Phase
Pre-Design
Borough
Manhattan
Community Board
Manhattan
Budget Line
HL-0082
Ten Year Plan Category
ADMINISTRATION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: Human Services
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
Human Services
Pid
3897
Fms Id
HR25BRCS
Total Budget
130171624.56
Spend To Date
3675058.26
Spend To Date 1
0.0282
Fms Project Name
Brownsville Community Center DESIGN BUILD
Agency Project Name
444 Thomas Boyland Community Center
Current Phase
Construction
Current Phase Start
2023-05-01T00:00:00.000
Forecast Current Phase End
2026-05-18T00:00:00.000
Forecast Completion
2026-05-18T00:00:00.000
Actual Design Start
2023-02-15T00:00:00.000
Actual Design End
2023-04-28T00:00:00.000
Actual Construction
2023-04-28T00:00:00.000
Actual Construction 1
2023-05-01T00:00:00.000
Actual Construction Start
2023-05-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HR-0025
Ten Year Plan Category
SOCIAL SERVICES BUILDINGS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
3898
Fms Id
LBC17CDOP
Total Budget
1323215.58
Spend To Date
583594.83
Spend To Date 1
0.441
Fms Project Name
CLARENDON OUTDOOR PLAZA
Agency Project Name
CLARENDON OUTDOOR PLAZA
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2023-10-31T00:00:00.000
Actual Design Start
2019-11-27T00:00:00.000
Actual Design End
2022-05-19T00:00:00.000
Actual Construction
2022-05-19T00:00:00.000
Actual Construction 1
2022-09-19T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 17
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
3899
Fms Id
LBK16STRF
Total Budget
2052685.00
Spend To Date
849189.83
Spend To Date 1
0.4136
Fms Project Name
Saratoga Envelope Rehab
Agency Project Name
SARATOGA LIBRARY BUILDING ENVELOPE REHABILITATION
Current Phase
Construction
Current Phase Start
2022-10-12T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2023-09-29T00:00:00.000
Actual Design Start
2019-03-05T00:00:00.000
Actual Design End
2022-02-25T00:00:00.000
Actual Construction
2022-02-25T00:00:00.000
Actual Construction 1
2022-10-12T00:00:00.000
Actual Construction Start
2022-10-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 16
Budget Line
LB-0104, LB-D104, LB-K001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
3900
Fms Id
LBM18EPOH
Total Budget
34278351.97
Spend To Date
3236470.24
Spend To Date 1
0.0944
Fms Project Name
Eastern Parkway Overhaul
Agency Project Name
EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS
Current Phase
Design
Current Phase Start
2018-06-28T00:00:00.000
Forecast Current Phase End
2024-04-12T00:00:00.000
Forecast Completion
2027-04-28T00:00:00.000
Actual Design Start
2018-06-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 09
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
3901
Fms Id
LBP21WIBR
Total Budget
13425224.17
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WASHINGTON IRVING RENOVATION
Agency Project Name
WASHINGTON IRVING BRANCH RENOVATION
Current Phase
Design
Current Phase Start
2023-07-24T00:00:00.000
Forecast Current Phase End
2025-08-04T00:00:00.000
Forecast Completion
2028-04-15T00:00:00.000
Actual Design Start
2023-07-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
LB-0101, LB-0104, LB-0108, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
3902
Fms Id
LN18ALELE
Total Budget
2136693.77
Spend To Date
37000.00
Spend To Date 1
0.0173
Fms Project Name
ALLERTON - Elevator Replacement - 3 stop
Agency Project Name
"ALLERTON - Elevator Replacement - 3 stop
Current Phase
Design
Current Phase Start
2022-04-07T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-10-31T00:00:00.000
Actual Design Start
2022-04-07T00:00:00.000
Borough
Bronx
Community Board
Bronx 11
Budget Line
LN-0008, LN-D008, LN-X001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
3903
Fms Id
LN18CDSGN
Total Budget
6345642.00
Spend To Date
4795616.61
Spend To Date 1
0.7557
Agency Project Name
5 Carnegie Renovations - DSGN
Current Phase
Close-out
Actual Design Start
2018-09-12T00:00:00.000
Actual Design End
2018-12-07T00:00:00.000
Actual Construction
2018-12-07T00:00:00.000
Actual Construction 1
2019-06-03T00:00:00.000
Actual Construction Start
2019-06-03T00:00:00.000
Actual Construction End
2023-01-15T00:00:00.000
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
3904
Fms Id
LN18MRBOI
Total Budget
2779023.21
Spend To Date
75621.65
Spend To Date 1
0.0272
Fms Project Name
Morrisania - Boiler Replacement
Agency Project Name
Morrisania - Boiler Replacement
Current Phase
Design
Current Phase Start
2022-04-14T00:00:00.000
Forecast Current Phase End
2023-12-15T00:00:00.000
Forecast Completion
2025-09-01T00:00:00.000
Actual Design Start
2022-04-14T00:00:00.000
Borough
Bronx
Community Board
Bronx 03
Budget Line
LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
3905
Fms Id
LNRA17NDP
Total Budget
6874843.31
Spend To Date
176010.07
Spend To Date 1
0.0256
Fms Project Name
NEW DORP - HVAC System Replacement
Agency Project Name
New Dorp Library HVAC system Removal and Replacement
Current Phase
Construction Procurement
Current Phase Start
2023-11-15T00:00:00.000
Forecast Current Phase End
2024-09-04T00:00:00.000
Forecast Completion
2026-08-17T00:00:00.000
Actual Design Start
2022-03-08T00:00:00.000
Actual Design End
2023-11-15T00:00:00.000
Actual Construction
2023-11-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
LN-0008, LN-D008, LN-R001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
3906
Fms Id
LNXA20WKF
Total Budget
3651029.00
Spend To Date
61000.00
Spend To Date 1
0.0167
Fms Project Name
Wakefield - Infrastructure and ADA Upgrades
Agency Project Name
ADA Upgrade
Current Phase
Design
Current Phase Start
2023-03-03T00:00:00.000
Forecast Current Phase End
2024-08-26T00:00:00.000
Forecast Completion
2026-10-05T00:00:00.000
Actual Design Start
2023-03-03T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
LN-0008, LN-D008, LN-I001, LN-X001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3907
Fms Id
LQAUB-RG
Total Budget
941000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Auburndale - Reading Garden
Agency Project Name
Auburndale - Exterior Reading Garden
Current Phase
Pre-Design
Borough
Queens
Community Board
Queens
Budget Line
LQ-D122, LQ-Q122
Ten Year Plan Category
SUPPORT SERVICES IMPROVEMENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3908
Fms Id
LQBPEXPN
Total Budget
15658960.00
Spend To Date
1490772.33
Spend To Date 1
0.0952
Fms Project Name
BAISLEY PARK - Branch Renovation
Agency Project Name
Baisley Park Library - Renovation
Current Phase
Design
Current Phase Start
2020-11-09T00:00:00.000
Forecast Current Phase End
2024-11-14T00:00:00.000
Forecast Completion
2027-07-31T00:00:00.000
Actual Design Start
2020-11-09T00:00:00.000
Borough
Queens
Community Board
Queens 12
Budget Line
LQ-0122, LQ-0122, LQ-D122, LQ-D122, LQ-Q005, LQ-Q122, LQ-Q122
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3909
Fms Id
LQBW-EXP
Total Budget
13904801.65
Spend To Date
673587.86
Spend To Date 1
0.0484
Fms Project Name
Briarwood: Branch Renovation
Agency Project Name
Briarwood Community Branch Library
Current Phase
Design
Current Phase Start
2022-10-24T00:00:00.000
Forecast Current Phase End
2024-10-02T00:00:00.000
Forecast Completion
2028-04-01T00:00:00.000
Actual Design Start
2022-10-24T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122, LQ-Q122
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3910
Fms Id
LQC122-JH
Total Budget
33966881.54
Spend To Date
1363790.12
Spend To Date 1
0.0401
Fms Project Name
JACKSON HEIGHTS - Branch Expansion & Renovation
Agency Project Name
Jackson Heights - Comprehensive Renovation and Expansion
Current Phase
Design
Current Phase Start
2021-10-06T00:00:00.000
Forecast Current Phase End
2024-03-13T00:00:00.000
Forecast Completion
2028-03-31T00:00:00.000
Actual Design Start
2021-10-06T00:00:00.000
Borough
Queens
Community Board
Queens 03
Budget Line
LQ-0122, LQ-0122, LQ-D122, LQ-D122
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3911
Fms Id
LQD122-CL
Total Budget
6301663.00
Spend To Date
1813792.46
Spend To Date 1
0.2878
Fms Project Name
Queens Central Library Renovation - Pass-Through
Agency Project Name
Queens Central Library Renovation
Current Phase
Close-out
Actual Design Start
2019-04-23T00:00:00.000
Actual Design End
2019-04-30T00:00:00.000
Actual Construction
2019-04-30T00:00:00.000
Actual Construction 1
2019-07-19T00:00:00.000
Actual Construction Start
2019-07-19T00:00:00.000
Actual Construction End
2023-04-28T00:00:00.000
Borough
Queens
Community Board
Queens 12
Budget Line
LQ-0122
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3912
Fms Id
LQD122LAE
Total Budget
15374189.29
Spend To Date
132692.40
Spend To Date 1
0.0086
Fms Project Name
LAURELTON: Branch Renovation
Agency Project Name
Laurelton - Exterior & Interior Renovation
Current Phase
Design
Current Phase Start
2023-04-14T00:00:00.000
Forecast Current Phase End
2024-08-02T00:00:00.000
Forecast Completion
2027-06-14T00:00:00.000
Actual Design Start
2023-04-14T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122, LQ-Q122
Ten Year Plan Category
RECONSTRUCTION NECESSARY TO MAINTAIN FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
3913
Fms Id
LQEM19FFA
Total Budget
7140575.44
Spend To Date
324812.27
Spend To Date 1
0.0454
Fms Project Name
FLUSHING: FIRE ALARM
Agency Project Name
Flushing - Replacement of the Fire Alarm System(s)
Current Phase
Construction Procurement
Current Phase Start
2023-08-15T00:00:00.000
Forecast Current Phase End
2024-02-26T00:00:00.000
Forecast Completion
2025-01-19T00:00:00.000
Actual Design Start
2021-10-29T00:00:00.000
Actual Design End
2023-08-15T00:00:00.000
Actual Construction
2023-08-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000