Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYCHA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYCHA
Pid
4154
Fms Id
HAM18MHCC
Total Budget
8275896.50
Spend To Date
2121048.35
Spend To Date 1
0.2562
Fms Project Name
Mariner's Harbor Community Center
Agency Project Name
Mariners Harbor Community Center
Agency Project Description
Mariner's Harbor Community Center - Renovate space in NYCHA Housing Complex at Mariner's Harbor into a Community Center.
Current Phase
Construction
Current Phase Start
2022-12-07T00:00:00.000
Forecast Current Phase End
2024-05-07T00:00:00.000
Forecast Completion
2024-05-07T00:00:00.000
Actual Design Start
2021-02-11T00:00:00.000
Actual Design End
2022-01-25T00:00:00.000
Actual Construction
2022-01-25T00:00:00.000
Actual Construction 1
2022-12-07T00:00:00.000
Actual Construction Start
2022-12-07T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HA-0001, HR-0025
Ten Year Plan Category
SOCIAL SERVICES BUILDINGS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4155
Fms Id
CO301LL
Total Budget
8849059.80
Spend To Date
3445431.87
Spend To Date 1
0.3893
Fms Project Name
130 STUYVESANT PL - FACADE REPAIRS LOCAL LAW 11
Agency Project Name
130 STUYVESANT PLACE EXTERIOR REHAB, DESIGN PHASE
Agency Project Description
Mark A. Costantino Judicial Center, 130 Stuyvesant Place, Exterior Rehab - Reconstruct the masonry wall at the south facade and bulkhead. Roof replacement and related work at the roof parapets, copings and railings are also included.
Current Phase
Construction
Current Phase Start
2021-12-13T00:00:00.000
Forecast Current Phase End
2024-06-28T00:00:00.000
Forecast Completion
2024-06-28T00:00:00.000
Actual Design Start
2018-04-09T00:00:00.000
Actual Design End
2020-09-09T00:00:00.000
Actual Construction
2020-09-09T00:00:00.000
Actual Construction 1
2021-12-13T00:00:00.000
Actual Construction Start
2021-12-13T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0301, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4156
Fms Id
CO301PD
Total Budget
6509846.16
Spend To Date
2277295.73
Spend To Date 1
0.3498
Fms Project Name
130 STUYVESANT PL.- PARKING GARAGE DECK
Agency Project Name
130 Stuyvesant Pl. - Parking Garage Deck
Agency Project Description
Mark A. Costantino Judicial Center, 130 Stuyvesant Place, Parking Deck, 130 Stuyvesant Place - Renovate the surface deck of the parking garage including pavement, drains, lighting, vehicle access gates and access point to the building entrance for ADA accessibility.
Current Phase
Construction
Current Phase Start
2021-12-13T00:00:00.000
Forecast Current Phase End
2024-06-28T00:00:00.000
Forecast Completion
2024-06-28T00:00:00.000
Actual Design Start
2017-06-28T00:00:00.000
Actual Design End
2020-09-09T00:00:00.000
Actual Construction
2020-09-09T00:00:00.000
Actual Construction 1
2021-12-13T00:00:00.000
Actual Construction Start
2021-12-13T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0301
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: HPD
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
HPD
Pid
4157
Fms Id
HAM17GHSE
Total Budget
18243978.60
Spend To Date
2971497.27
Spend To Date 1
0.1628
Fms Project Name
MARLBOROUGH HOUSES BSCAH GREENHOUSE DESIGN BUILD
Agency Project Name
MARLBORO GREENHOUSE
Agency Project Description
MARLBORO AGRICULTURE EDUCATION CENTER AT MARLBORO HOUSES - Building a new building to house a greenhouse, community kitchen, and educational spaces for The Campaign Against Hunger (TCAH) in NYCHA owned Marlborough Houses in Brooklyn using Design Build project delivery method.
Current Phase
Design
Current Phase Start
2022-08-15T00:00:00.000
Forecast Current Phase End
2024-01-19T00:00:00.000
Forecast Completion
2025-05-21T00:00:00.000
Actual Design Start
2022-08-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
HA-K001, HD-I001
Ten Year Plan Category
OTHER PUBLIC HOUSING SUPPORT INVESTMENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4158
Fms Id
LBC16MD2F
Total Budget
9226019.04
Spend To Date
1064271.30
Spend To Date 1
0.1153
Fms Project Name
MIDWOOD 2ND FLOOR RENOVATIONS
Agency Project Name
Midwood 2nd Floor Renovation
Agency Project Description
Midwood Library will undergo a 2nd Floor Interior Renovation. The work scope will include the replacement of the HVAC system, Fire Alarm, second floor Security System and the installation of a new BMS. The work scope will also include the replacement of the roofing system and bulkhead restoration.
Current Phase
Construction Procurement
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2024-01-05T00:00:00.000
Forecast Completion
2025-06-28T00:00:00.000
Actual Design Start
2016-07-15T00:00:00.000
Actual Design End
2023-03-15T00:00:00.000
Actual Construction
2023-03-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 14
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4159
Fms Id
LNEA13MHU
Total Budget
4615104.71
Spend To Date
1514439.43
Spend To Date 1
0.3281
Fms Project Name
Mosholu: New Roof and Exterior Work
Agency Project Name
Mosholu Roof, Exterior & HVAC Upgrade
Agency Project Description
Mosholu Library roof replacement and perform exterior renovation work.
Current Phase
Construction
Current Phase Start
2021-12-01T00:00:00.000
Forecast Current Phase End
2024-05-30T00:00:00.000
Forecast Completion
2024-05-30T00:00:00.000
Actual Design Start
2014-11-20T00:00:00.000
Actual Design End
2018-12-14T00:00:00.000
Actual Construction
2018-12-14T00:00:00.000
Actual Construction 1
2021-12-01T00:00:00.000
Actual Construction Start
2021-12-01T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 07
Budget Line
LN-0008, LN-0101M, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4160
Fms Id
LNCA13MOT
Total Budget
4181028.47
Spend To Date
3607454.34
Spend To Date 1
0.8628
Fms Project Name
MOTT HAVEN: HVAC
Agency Project Name
Mott Haven HVAC Upgrade
Agency Project Description
Mott Haven Library HVAC system replacement.
Current Phase
(Completed)
Actual Design Start
2014-01-23T00:00:00.000
Actual Design End
2018-10-02T00:00:00.000
Actual Construction
2018-10-02T00:00:00.000
Actual Construction 1
2019-08-01T00:00:00.000
Actual Construction Start
2019-08-01T00:00:00.000
Actual Construction End
2023-07-20T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 01
Budget Line
LN-0008, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4161
Fms Id
LNCA14MBG
Total Budget
3789521.14
Spend To Date
2478050.20
Spend To Date 1
0.6539
Fms Project Name
HVAC and Related Work
Agency Project Name
Muhlenberg HVAC & Related Work
Agency Project Description
Muhlenberg Library Replacement of HVAC systems.
Current Phase
Construction
Current Phase Start
2022-01-18T00:00:00.000
Forecast Current Phase End
2024-03-06T00:00:00.000
Forecast Completion
2024-03-06T00:00:00.000
Actual Design Start
2015-08-24T00:00:00.000
Actual Design End
2020-12-04T00:00:00.000
Actual Construction
2020-12-04T00:00:00.000
Actual Construction 1
2022-01-18T00:00:00.000
Actual Construction Start
2022-01-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
LN-0008, LN-0101M, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4162
Fms Id
HWPEDSF4
Total Budget
21801244.89
Spend To Date
15445182.55
Spend To Date 1
0.7084
Fms Project Name
Multi-Site Pedestrian Safety
Agency Project Name
MULTI-SITE PEDESTRIAN SAFETY
Agency Project Description
Multi-Site Pedestrian Safety, Citywide
Current Phase
Construction
Current Phase Start
2019-02-05T00:00:00.000
Forecast Current Phase End
2024-12-27T00:00:00.000
Forecast Completion
2024-12-27T00:00:00.000
Actual Design Start
2014-08-07T00:00:00.000
Actual Design End
2017-12-15T00:00:00.000
Actual Construction
2017-12-15T00:00:00.000
Actual Construction 1
2019-02-05T00:00:00.000
Actual Construction Start
2019-02-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 99
Budget Line
HW-0988
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4163
Fms Id
PV241EXTR
Total Budget
4867973.00
Spend To Date
701995.68
Spend To Date 1
0.1442
Fms Project Name
MCNY - Exterior Facade Rehabilitation
Agency Project Name
MCNY Exterior Rehabilitation & Restoration
Agency Project Description
Museum of the City of New York (MCNY) - Exterior Façade Rehabilitation and Restoration.
Current Phase
Construction Procurement
Current Phase Start
2023-11-08T00:00:00.000
Forecast Current Phase End
2024-03-29T00:00:00.000
Forecast Completion
2025-09-20T00:00:00.000
Actual Design Start
2018-08-07T00:00:00.000
Actual Design End
2023-11-08T00:00:00.000
Actual Construction
2023-11-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
PV-0241, PV-0467, PV-D241, PV-I001, PV-M241
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4164
Fms Id
HED-562
Total Budget
33069089.18
Spend To Date
1672264.74
Spend To Date 1
0.0505
Fms Project Name
New 46" Trunk Water Main in E.233rd St. Bronx
Agency Project Name
NEW 48" TRUNK WATER MAIN IN E 233 STREET
Agency Project Description
New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue & Baychester Avenue, etc.
Current Phase
Design
Current Phase Start
2015-10-01T00:00:00.000
Forecast Current Phase End
2024-11-15T00:00:00.000
Forecast Completion
2027-08-17T00:00:00.000
Actual Design Start
2015-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 12
Budget Line
SE-0002X, WM-0001, WM-0006
Ten Year Plan Category
EXTENSIONS TO ACCOMMODATE NEW DEVELOPMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPD
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPD
Pid
4165
Fms Id
SANDBOMB
Total Budget
29815823.41
Spend To Date
2369508.53
Spend To Date 1
0.0794
Fms Project Name
Reconstruct Hurricane Sandy Damaged Bomb Sq bldg
Agency Project Name
BOMB SQUAD BUILDING RECONSTRUCTION
Agency Project Description
New building to replace existing Bomb Squad building damaged during Sandy storm. Two story building to house training, offices, lockers and vehicle storage. Existing building to be demolished and area to be landscaped upon completion of new building.
Current Phase
Construction Procurement
Current Phase Start
2022-11-15T00:00:00.000
Forecast Current Phase End
2024-01-29T00:00:00.000
Forecast Completion
2026-03-01T00:00:00.000
Actual Design Start
2014-04-15T00:00:00.000
Actual Design End
2022-11-15T00:00:00.000
Actual Construction
2022-11-15T00:00:00.000
Borough
Bronx
Community Board
Bronx 10
Budget Line
PO-0079, PU-0025
Ten Year Plan Category
POLICE FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4166
Fms Id
HH112FWFA
Total Budget
8042005.40
Spend To Date
604383.65
Spend To Date 1
0.0751
Fms Project Name
FT. WASHINGTON - FIRE ALARM
Agency Project Name
FORT WASHINGTON ARMORY: FIRE ALARM UPGRADE
Agency Project Description
New building wide fire alarm system
Current Phase
Design
Current Phase Start
2016-01-13T00:00:00.000
Forecast Current Phase End
2024-08-28T00:00:00.000
Forecast Completion
2027-02-09T00:00:00.000
Actual Design Start
2016-01-13T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4167
Fms Id
PV272EDUC
Total Budget
28775353.44
Spend To Date
3071659.59
Spend To Date 1
0.1067
Fms Project Name
QBG - Queens Botanical Garden Educ Bldg Renovation
Agency Project Name
Queens Botanical Garden Educ Bldg Renovation
Agency Project Description
New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.
Current Phase
Construction Procurement
Current Phase Start
2023-03-21T00:00:00.000
Forecast Current Phase End
2024-10-01T00:00:00.000
Forecast Completion
2026-10-01T00:00:00.000
Actual Design Start
2019-06-18T00:00:00.000
Actual Design End
2023-03-21T00:00:00.000
Actual Construction
2023-03-21T00:00:00.000
Borough
Queens
Community Board
Queens 07
Budget Line
PU-0025, PV-0272, PV-D272, PV-Q272
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4168
Fms Id
HH112SWFA
Total Budget
2561279.50
Spend To Date
257320.28
Spend To Date 1
0.1004
Fms Project Name
SCHWARTZ WARDS ISLAND FIRE SAFETY
Agency Project Name
Schwartz Assessment – Fire Alarm Replacement
Agency Project Description
New fire alarm system at the Shwartz Assessment Center, Wards Island.
Current Phase
Construction Procurement
Current Phase Start
2023-12-15T00:00:00.000
Forecast Current Phase End
2024-12-02T00:00:00.000
Forecast Completion
2025-12-02T00:00:00.000
Actual Design Start
2018-01-03T00:00:00.000
Actual Design End
2023-12-15T00:00:00.000
Actual Construction
2023-12-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4169
Fms Id
HH115JCFS
Total Budget
1487191.07
Spend To Date
111742.28
Spend To Date 1
0.0751
Fms Project Name
JACKSON FAMILY FIRE SAFETY
Agency Project Name
Jackson Family Residence:Fire Alarm Upgrade
Agency Project Description
New fire alarm system for the Jackson Family Residence shelter.
Current Phase
Construction Procurement
Current Phase Start
2023-06-28T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2025-04-01T00:00:00.000
Actual Design Start
2016-10-19T00:00:00.000
Actual Design End
2023-06-28T00:00:00.000
Actual Construction
2023-06-28T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HH-0115
Ten Year Plan Category
SHELTERS FOR HOMELESS FAMILIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4170
Fms Id
HH115LFAU
Total Budget
1264800.53
Spend To Date
116064.62
Spend To Date 1
0.0917
Fms Project Name
LINDEN FIRE ALARM UPGRADE
Agency Project Name
Linden Family Residence:501 New Lots.Fire Alarm
Agency Project Description
New fire alarm system installation at the Linden Family Residence Shelter.
Current Phase
Design
Current Phase Start
2017-09-26T00:00:00.000
Forecast Current Phase End
2024-07-26T00:00:00.000
Forecast Completion
2026-04-22T00:00:00.000
Actual Design Start
2017-09-26T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4171
Fms Id
HBFDR14BP
Total Budget
182567765.33
Spend To Date
438137.38
Spend To Date 1
0.0023
Fms Project Name
East 14th St (near ConEd Plant) Bike Path
Agency Project Name
New Flyover Pedestrian Bridge
Agency Project Description
New Flyover Pedestrian Bridge
Current Phase
Design
Current Phase Start
2022-05-03T00:00:00.000
Forecast Current Phase End
2024-06-15T00:00:00.000
Forecast Completion
2028-02-10T00:00:00.000
Actual Design Start
2022-05-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0508
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4172
Fms Id
LQDL-NEW
Total Budget
32937351.22
Spend To Date
2178667.61
Spend To Date 1
0.0661
Fms Project Name
DOUGLASTON: Replacement Facility
Agency Project Name
Douglaston New Facility
Agency Project Description
New library facility for the Douglaston/Little Neck community.
Current Phase
Design
Current Phase Start
2019-11-20T00:00:00.000
Forecast Current Phase End
2024-03-12T00:00:00.000
Forecast Completion
2027-12-04T00:00:00.000
Actual Design Start
2019-11-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122, LQ-Q122, PU-0025
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4173
Fms Id
LQQ122-RG
Total Budget
47418483.68
Spend To Date
4283927.39
Spend To Date 1
0.0903
Fms Project Name
REGO PARK LIBRARY - REPLACEMENT FACILITY
Agency Project Name
Rego Park New Facility
Agency Project Description
New Library for Rego Park
Current Phase
Design
Current Phase Start
2019-04-11T00:00:00.000
Forecast Current Phase End
2024-06-03T00:00:00.000
Forecast Completion
2028-03-03T00:00:00.000
Actual Design Start
2019-04-11T00:00:00.000
Borough
Queens
Community Board
Queens 06
Budget Line
LQ-0122, LQ-0122, LQ-D122, LQ-D122, LQ-Q122, LQ-Q122
Ten Year Plan Category
SUPPORT SERVICES IMPROVEMENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4174
Fms Id
SEQNS005
Total Budget
26600000.00
Spend To Date
1600000.00
Spend To Date 1
0.0601
Fms Project Name
SEQ - Sewer When & Where Contract in SE Queens
Agency Project Name
SEWER WHEN & WHERE SEQ
Agency Project Description
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS
Current Phase
Pre-Design
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4175
Fms Id
SEQNS004
Total Budget
23468372.11
Spend To Date
6039020.88
Spend To Date 1
0.2573
Fms Project Name
SEQ -SEWER WHEN & WHERE CONTRACT IN S.E. QNS
Agency Project Name
SEWER WHEN & WHERE SEQ
Agency Project Description
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH WHEN AND WHERE PROJECTS
Current Phase
Construction
Current Phase Start
2022-10-11T00:00:00.000
Forecast Current Phase End
2024-10-09T00:00:00.000
Forecast Completion
2024-10-09T00:00:00.000
Actual Design Start
2019-06-18T00:00:00.000
Actual Design End
2022-02-08T00:00:00.000
Actual Construction
2022-02-08T00:00:00.000
Actual Construction 1
2022-10-11T00:00:00.000
Actual Construction Start
2022-10-11T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
HW-0200, SE-0002Q, SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4176
Fms Id
SER200247
Total Budget
46265576.15
Spend To Date
299275.81
Spend To Date 1
0.0064
Fms Project Name
New Storm Sewers in King St
Agency Project Name
STORM SEWER IN KING STREET, SI
Agency Project Description
NEW STORM SEWERS IN KING STREET BETWEEN PRESTON AVE AND RIDGECREST AVE, ETC., STATEN ISLAND
Current Phase
Design
Current Phase Start
2017-01-17T00:00:00.000
Forecast Current Phase End
2028-11-27T00:00:00.000
Forecast Completion
2031-06-30T00:00:00.000
Actual Design Start
2017-01-17T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
SE-0002R, SE-0200R, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4177
Fms Id
LBM17NUOH
Total Budget
24898478.30
Spend To Date
715540.52
Spend To Date 1
0.0287
Fms Project Name
New Utrecht Overhaul
Agency Project Name
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Agency Project Description
New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.
Current Phase
Pre-Design
Borough
Brooklyn
Community Board
Brooklyn 11
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4178
Fms Id
PV385RLP3
Total Budget
1580768.00
Spend To Date
1179874.60
Spend To Date 1
0.7463
Fms Project Name
SIG - Signature Theater Center - Phase 3
Agency Project Name
signature theater ph 3
Agency Project Description
New work involving an interactive technological experience system for visitors, digital signage, lobby-café lighting and sound system, and IT/network/wireless installation.
Current Phase
Construction
Current Phase Start
2015-07-17T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-15T00:00:00.000
Actual Design End
2014-04-22T00:00:00.000
Actual Construction
2014-04-22T00:00:00.000
Actual Construction 1
2015-07-17T00:00:00.000
Actual Construction Start
2015-07-17T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
PV-0N385, PV-DN385
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4179
Fms Id
CO304REHB
Total Budget
77282969.00
Spend To Date
1644497.77
Spend To Date 1
0.0212
Fms Project Name
60 CENTRE ST. - RECONSTRUCTION
Agency Project Name
60 CENTRE ST. - RECONSTRUCTION
Agency Project Description
New York County Courthouse, Building Envelope, 60 Centre Street - Restore the building envelope to ensure weather tightness and structural integrity. The work includes facades, roofs, the building’s site perimeter and landscaped areas, and specific electrical and plumbing systems, fire protection equipment and interior finishes affected by the moisture infiltration.
Current Phase
Design
Current Phase Start
2018-06-29T00:00:00.000
Forecast Current Phase End
2025-08-31T00:00:00.000
Forecast Completion
2028-11-01T00:00:00.000
Actual Design Start
2018-06-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0304
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4180
Fms Id
HWMNYPL
Total Budget
10104541.23
Spend To Date
699204.09
Spend To Date 1
0.0691
Fms Project Name
New York Public Library Pedestrian Improvements
Agency Project Name
New York Public Library Pedestrian Improvements
Agency Project Description
New York Public Library Pedestrian Improvements at the following locations in Manhattan:- Southern sidewalk and curb of West 42nd Street between 5th Avenue and 6th Avenue- Northern sidewalk and curb of West 40th Street between 5th Avenue and 6th Avenue- Curb extension at 6th Avenue on West 40th Street
Current Phase
Design
Current Phase Start
2018-10-23T00:00:00.000
Forecast Current Phase End
2026-09-01T00:00:00.000
Forecast Completion
2029-05-02T00:00:00.000
Actual Design Start
2018-10-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0200, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4181
Fms Id
SER20079
Total Budget
16621413.91
Spend To Date
5608662.10
Spend To Date 1
0.3374
Fms Project Name
RECON OF STORM SEWER, WILLOW AV(TOMPKINS-EDGEWATER AVS)
Agency Project Name
NEW STRM/SAN SWRS IN WILLOW AVE., SI
Agency Project Description
NSTALLATION OF NEW STORM SEWERS AND REPLACEMENT OF SANITARY SEWERS AND WATER MAINS IN WILLOW AVENUE BETWEEN TOMPKINS AVENUE AND BAY STREET, SI
Current Phase
Construction
Current Phase Start
2022-02-14T00:00:00.000
Forecast Current Phase End
2023-12-29T00:00:00.000
Forecast Completion
2023-12-29T00:00:00.000
Actual Design Start
2018-11-27T00:00:00.000
Actual Design End
2019-12-27T00:00:00.000
Actual Construction
2019-12-27T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
HW-0200, SE-0200R
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4182
Fms Id
GI-BX-PP
Total Budget
57866072.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GI - POROUS PAVEMENT INSTALLATIONS, BRONX
Agency Project Name
Design-Bid-Build Green Infrastructure Precast Porous Concrete Panels within the Bronx River and Westchester Creek Watersheds
Agency Project Description
NYC DEP has expanded the Standard Designs for Green Infrastructure to include precast porous concrete panels (PPCP). The DDC design consultant will perform, analyze, and review previous geotechnical investigation and utility information, performing walkthroughs and geotechnical investigations as required, survey and advance 50,000LF of PPCP to final design using DEP GI Standard Procedures and Designs for Green Infrastructure.
Current Phase
Design
Current Phase Start
2023-05-15T00:00:00.000
Forecast Current Phase End
2024-12-23T00:00:00.000
Forecast Completion
2027-08-10T00:00:00.000
Actual Design Start
2023-05-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4183
Fms Id
PV274KITR
Total Budget
5983710.43
Spend To Date
431329.93
Spend To Date 1
0.072
Fms Project Name
NYHOS - NY Hall of Science,Great Hall, Kitchen & Restroom
Agency Project Name
NYHOS: GREAT HALL, KITCHEN & RESTROOM RECON
Agency Project Description
NYHOS: GREAT HALL Kitchen and restrooms renovation to provide additional services to the public.
Current Phase
Construction
Current Phase Start
2023-03-14T00:00:00.000
Forecast Current Phase End
2024-08-13T00:00:00.000
Forecast Completion
2024-08-13T00:00:00.000
Actual Design Start
2016-07-07T00:00:00.000
Actual Design End
2022-08-19T00:00:00.000
Actual Construction
2022-08-19T00:00:00.000
Actual Construction 1
2023-03-14T00:00:00.000
Actual Construction Start
2023-03-14T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
PV-0274, PV-D274, PV-D467, PV-Q274, PV-Q467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4184
Fms Id
LNCA13HAM
Total Budget
19054935.05
Spend To Date
1803025.71
Spend To Date 1
0.0946
Fms Project Name
HAMILTON FISH: REHABILITATION
Agency Project Name
Hamilton Fish Park Branch Renovation
Agency Project Description
NYPL - Hamilton Fish Branch Library - Interior & Exterior Renovation, New Fire Alarm, HVAC, and Boiler
Current Phase
Construction
Current Phase Start
2023-09-25T00:00:00.000
Forecast Current Phase End
2025-11-28T00:00:00.000
Forecast Completion
2025-11-28T00:00:00.000
Actual Design Start
2013-11-19T00:00:00.000
Actual Design End
2022-11-02T00:00:00.000
Actual Construction
2022-11-02T00:00:00.000
Actual Construction 1
2023-09-25T00:00:00.000
Actual Construction Start
2023-09-25T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 03
Budget Line
LN-0008, LN-D008, LN-I001, LN-M001, PU-0025
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4185
Fms Id
BED-830
Total Budget
2474000.00
Spend To Date
82286.27
Spend To Date 1
0.0332
Fms Project Name
Rplment WM Park Ave btw Classon Ave & Ryerson (HWD007K03)
Agency Project Name
Park Avenue Pedestrian Safety Improvements at the Crossover
Agency Project Description
Park Avenue Pedestrian Safety Improvements
Current Phase
Design
Current Phase Start
2018-12-14T00:00:00.000
Forecast Current Phase End
2024-10-30T00:00:00.000
Forecast Completion
2028-07-28T00:00:00.000
Actual Design Start
2018-12-14T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4185
Fms Id
HWD007K03
Total Budget
7835162.55
Spend To Date
1260667.25
Spend To Date 1
0.1608
Fms Project Name
Park Avenue Ped Safety Improvement at the Crossover,BED-830
Agency Project Name
Park Avenue Pedestrian Safety Improvements at the Crossover
Agency Project Description
Park Avenue Pedestrian Safety Improvements
Current Phase
Design
Current Phase Start
2018-12-14T00:00:00.000
Forecast Current Phase End
2024-10-30T00:00:00.000
Forecast Completion
2028-07-28T00:00:00.000
Actual Design Start
2018-12-14T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02, Brooklyn 03, Brooklyn 04
Budget Line
HW-0001K, HW-D101, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4186
Fms Id
HWD10105A
Total Budget
38284375.52
Spend To Date
7172399.36
Spend To Date 1
0.1873
Fms Project Name
Ped Safety Upgrades on Atlantic Ave - Phase 2 (BED-785B)
Agency Project Name
ATLANTIC AVE SAFETY IMPROVEMENTS - PH 2, BROOKLYN
Agency Project Description
PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN
Current Phase
Construction
Current Phase Start
2021-07-06T00:00:00.000
Forecast Current Phase End
2024-05-30T00:00:00.000
Forecast Completion
2024-05-30T00:00:00.000
Actual Design Start
2016-08-04T00:00:00.000
Actual Design End
2019-12-23T00:00:00.000
Actual Construction
2019-12-23T00:00:00.000
Actual Construction 1
2021-07-06T00:00:00.000
Actual Construction Start
2021-07-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0001Q
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4187
Fms Id
HWKDTBK
Total Budget
10418700.00
Spend To Date
580769.12
Spend To Date 1
0.0557
Fms Project Name
Park Avenue - Ingersoll Safety Improvements
Agency Project Name
Park Ave - Ingersoll Houses Safety Improvements
Agency Project Description
Pedestrian and cyclist Safety Improvements near Ingersoll Houses in downtown Brooklyn.
Current Phase
Design
Current Phase Start
2022-04-05T00:00:00.000
Forecast Current Phase End
2024-03-24T00:00:00.000
Forecast Completion
2028-06-23T00:00:00.000
Actual Design Start
2022-04-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4188
Fms Id
HWPR20K1
Total Budget
14498934.26
Spend To Date
12766674.16
Spend To Date 1
0.8805
Fms Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Close-out
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-10-28T00:00:00.000
Actual Construction
2019-10-28T00:00:00.000
Actual Construction 1
2021-06-14T00:00:00.000
Actual Construction Start
2021-06-14T00:00:00.000
Actual Construction End
2023-04-17T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4188
Fms Id
HWPR20K3
Total Budget
14685616.41
Spend To Date
2410005.60
Spend To Date 1
0.1641
Fms Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Construction
Current Phase Start
2023-04-17T00:00:00.000
Forecast Current Phase End
2025-04-15T00:00:00.000
Forecast Completion
2025-04-15T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2022-07-27T00:00:00.000
Actual Construction
2022-07-27T00:00:00.000
Actual Construction 1
2023-04-17T00:00:00.000
Actual Construction Start
2023-04-17T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4189
Fms Id
HWPR20K2
Total Budget
14373969.60
Spend To Date
10982901.17
Spend To Date 1
0.764
Fms Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Construction
Current Phase Start
2021-08-09T00:00:00.000
Forecast Current Phase End
2023-11-09T00:00:00.000
Forecast Completion
2023-11-09T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-10-28T00:00:00.000
Actual Construction
2019-10-28T00:00:00.000
Actual Construction 1
2021-08-09T00:00:00.000
Actual Construction Start
2021-08-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4191
Fms Id
HWPR22MC
Total Budget
16329000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY24 Non-Standard Pedestrian Ramp Upgrades
Agency Project Name
Pedestrian Ramp Upgrades at 81 non-standard locations in Manhattan.
Agency Project Description
Pedestrian Ramp Upgrades at 81 non-standard locations in Manhattan
Current Phase
Pre-Design
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, HW-0944, TF-0001
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4192
Fms Id
HWPR22KRC
Total Budget
20353000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY24 Non-Standard Pedestrian Ramp Upgrades
Agency Project Name
Pedestrian Ramp Upgrades at 91 non-standard locations in Brooklyn and Staten Island.
Agency Project Description
Pedestrian Ramp Upgrades at non-standard locations in Brooklyn and Staten Island.
Current Phase
Pre-Design
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, HW-0944, TF-0001
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4193
Fms Id
HWPR21KR
Total Budget
18697769.15
Spend To Date
4266446.89
Spend To Date 1
0.2281
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn&Staten Islan
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Agency Project Description
Pedestrian Ramps rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn and Staten Island.
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-07-27T00:00:00.000
Forecast Completion
2024-07-27T00:00:00.000
Actual Design Start
2020-04-07T00:00:00.000
Actual Design End
2020-08-04T00:00:00.000
Actual Construction
2020-08-04T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4193
Fms Id
HWPR22KR
Total Budget
18379022.60
Spend To Date
123687.72
Spend To Date 1
0.0067
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn & SI
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2025-07-08T00:00:00.000
Forecast Completion
2025-07-08T00:00:00.000
Actual Design Start
2022-01-03T00:00:00.000
Actual Design End
2022-08-18T00:00:00.000
Actual Construction
2022-08-18T00:00:00.000
Actual Construction 1
2023-07-10T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4194
Fms Id
HWPEDSF5
Total Budget
26361139.69
Spend To Date
8419954.58
Spend To Date 1
0.3194
Fms Project Name
Multi-Site Pedestrian Safety Phase 5
Agency Project Name
MULTI-SITE PEDESTRIAN SAFETY PHASE 5
Agency Project Description
PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE
Current Phase
Construction
Current Phase Start
2021-01-04T00:00:00.000
Forecast Current Phase End
2024-06-01T00:00:00.000
Forecast Completion
2024-06-01T00:00:00.000
Actual Design Start
2017-08-01T00:00:00.000
Actual Design End
2018-12-28T00:00:00.000
Actual Construction
2018-12-28T00:00:00.000
Actual Construction 1
2021-01-04T00:00:00.000
Actual Construction Start
2021-01-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-D102, TF-0002
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4195
Fms Id
HWCSCHPQN
Total Budget
19830375.00
Spend To Date
1790968.73
Spend To Date 1
0.0903
Fms Project Name
SAFE ROUTES TO SCHOOLS- QUEENS
Agency Project Name
SAFE ROUTES TO SCHOOLS, QNS
Agency Project Description
Pedestrian safety improvements at the following eight schools in Queens: P.S. 50, P.S. 71 – Forest School, P. S 89, P.S. 220, I.S. 125, St. Elizabeth School and JHS 210 and Epic High School North (previously known as Benedict Joseph Labre School)
Current Phase
Design
Current Phase Start
2018-06-27T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-08-18T00:00:00.000
Actual Design Start
2018-06-27T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0988, HW-D103, HW-D105, TF-0002
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4196
Fms Id
HWK1673
Total Budget
29538000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
South Brooklyn Pedestrian Safety Improvements
Agency Project Name
South Brooklyn Pedestrian Safety Improvements
Agency Project Description
Pedestrian Safety Improvements in South Brooklyn
Current Phase
Design
Current Phase Start
2023-10-19T00:00:00.000
Forecast Current Phase End
2025-10-17T00:00:00.000
Forecast Completion
2028-12-21T00:00:00.000
Actual Design Start
2023-10-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4197
Fms Id
HWX710A
Total Budget
149389514.94
Spend To Date
133859951.03
Spend To Date 1
0.896
Fms Project Name
Pelham Pkwy - West & East and North & South Bounds (Phase A)
Agency Project Name
PELHAM PKWY - Phase 2
Agency Project Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River PkwyPelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.Stillwell Ave from westbound mainline to north service road
Current Phase
Construction
Current Phase Start
2017-08-01T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2023-12-22T00:00:00.000
Actual Design Start
2002-02-15T00:00:00.000
Actual Design End
2016-11-30T00:00:00.000
Actual Construction
2016-11-30T00:00:00.000
Actual Construction 1
2017-08-01T00:00:00.000
Actual Construction Start
2017-08-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 11
Budget Line
HW-0001X, HW-0710, HW-0944, HW-1684, TF-0002, TF-0502, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4197
Fms Id
SEX002247
Total Budget
4344615.06
Spend To Date
4344615.06
Spend To Date 1
1.00
Agency Project Name
PELHAM PKWY - Phase 2
Agency Project Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River PkwyPelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.Stillwell Ave from westbound mainline to north service road
Current Phase
Construction
Current Phase Start
2017-08-01T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2023-12-22T00:00:00.000
Actual Design Start
2002-02-15T00:00:00.000
Actual Design End
2016-11-30T00:00:00.000
Actual Construction
2016-11-30T00:00:00.000
Actual Construction 1
2017-08-01T00:00:00.000
Actual Construction Start
2017-08-01T00:00:00.000
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4198
Fms Id
LNMNA08LS
Total Budget
6345278.95
Spend To Date
5119562.81
Spend To Date 1
0.8068
Fms Project Name
MANHATTAN - Life Safety Projects @ 17 Branch Libraries
Agency Project Name
Muhlenberg Fire Alarm Upgrade
Agency Project Description
Pending Task order registration By comptroller office.
Current Phase
Construction
Current Phase Start
2023-10-20T00:00:00.000
Forecast Current Phase End
2024-08-30T00:00:00.000
Forecast Completion
2024-08-30T00:00:00.000
Actual Design Start
2009-12-27T00:00:00.000
Actual Design End
2013-01-03T00:00:00.000
Actual Construction
2013-01-03T00:00:00.000
Actual Construction 1
2023-10-20T00:00:00.000
Actual Construction Start
2023-10-20T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
LN-0008, LN-0101X, LN-D003, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4199
Fms Id
HWQ1187
Total Budget
46546055.86
Spend To Date
1359262.73
Spend To Date 1
0.0292
Fms Project Name
Westbourne-Dunbar Roadways & Bulkheads (SAND1187, SEQ200595)
Agency Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Agency Project Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Current Phase
Design
Current Phase Start
2016-12-15T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-09-12T00:00:00.000
Actual Design Start
2016-12-15T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 14
Budget Line
HW-0001Q, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4199
Fms Id
SEQ200595
Total Budget
44200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Westbourne Ave-Norton Drive Recon (HWQ1187, SAND1187)
Agency Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Agency Project Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Current Phase
Design
Current Phase Start
2016-12-15T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-09-12T00:00:00.000
Actual Design Start
2016-12-15T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000